Electrical conductors.
Cargill Deicing Solutions-Cleveland Mn · 330199430 CFR 57.12004 · $151.00 proposed penalty
Identification of power switches.
Cargill Deicing Solutions-Cleveland Mn · 330199430 CFR 57.12018 · $151.00 proposed penalty
Inspection and cover plates.
Cargill Deicing Solutions-Cleveland Mn · 330199430 CFR 57.12032 · $151.00 proposed penalty
Abandoned electric circuits.
Cargill Deicing Solutions-Cleveland Mn · 330199430 CFR 57.4011 · $151.00 proposed penalty
Correction of hazardous conditions.
Cargill Deicing Solutions-Cleveland Mn · 330199430 CFR 57.3200 · $151.00 proposed penalty
Correction of dangerous conditions.
Cargill Deicing Solutions-Cleveland Mn · 330199430 CFR 57.12030 · $151.00 proposed penalty
Requirement for container labels.
Cargill Deicing Solutions-Cleveland Mn · 330199430 CFR 47.41(a)(1) · $151.00 proposed penalty
Unguarded conveyors with adjacent travelways.
Cargill Deicing Solutions-Cleveland Mn · 330199430 CFR 57.14109 · $151.00 proposed penalty
Housekeeping.
Cargill Deicing Solutions-Cleveland Mn · 330199430 CFR 57.20003(a) · $151.00 proposed penalty
Housekeeping.
Cargill Deicing Solutions-Cleveland Mn · 330199430 CFR 57.20003(a) · $151.00 proposed penalty
Two-way communication equipment for underground operations.
Cargill Deicing Solutions-Cleveland Mn · 330199430 CFR 57.20032 · $151.00 proposed penalty
Inspection and cover plates.
Cargill Deicing Solutions-Cleveland Mn · 330199430 CFR 57.12032 · $151.00 proposed penalty
Construction and maintenance of guards.
Cargill Deicing Solutions-Cleveland Mn · 330199430 CFR 57.14112(a)(1) · $151.00 proposed penalty
Moving machine parts.
Cargill Deicing Solutions-Cleveland Mn · 330199430 CFR 57.14107(a) · $151.00 proposed penalty
Two-way communication equipment for underground operations.
Cargill Deicing Solutions-Cleveland Mn · 330199430 CFR 57.20032 · $151.00 proposed penalty
Escape and evacuation plans.
Cargill Deicing Solutions-Cleveland Mn · 330199430 CFR 57.11053 · $151.00 proposed penalty
Inspection and cover plates.
Cargill Deicing Solutions-Cleveland Mn · 330199430 CFR 57.12032 · $151.00 proposed penalty
Combustible waste.
Cargill Deicing Solutions-Cleveland Mn · 330199430 CFR 57.4104(a) · $151.00 proposed penalty
Regular Safety and Health Inspection
Cargill Deicing Solutions-Cleveland Mn · 3301994101.8 on-site hours reported
Check-in, check-out system.
Cargill Deicing Solutions-Cleveland Mn · 330199430 CFR 57.11058 · $151.00 proposed penalty
Combustible waste.
Cargill Deicing Solutions-Cleveland Mn · 330199430 CFR 57.4104(a) · $151.00 proposed penalty
Correction of hazardous conditions.
CAYUGA MINE · 300066330 CFR 57.3200 · Significant and substantial (S&S) · $1,037.00 proposed penalty
Regular Safety and Health Inspection
CAYUGA MINE · 300066392.5 on-site hours reported
Hoisting
Cargill Deicing Solutions-Cleveland Mn · 3301994Accident only
Accident narrative
Transformer blew on surface, which caused power to drop on the surface and in the mine. Outage was reported to Cleveland Public Power (CPP) and mine was evacuated until power was restored.
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.