Brakes.
Signal Mountain Cement Co · 400083830 CFR 56.14101(a)(2) · $151.00 proposed penalty
Extinguisher recharging or replacement.
Signal Mountain Cement Co · 400083830 CFR 56.4203 · $151.00 proposed penalty
Housekeeping.
1604 QUARRY & PLANT · 410301930 CFR 56.20003(a) · $151.00 proposed penalty
Inspection.
1604 QUARRY & PLANT · 410301930 CFR 56.4201(a)(1) · $151.00 proposed penalty
Testing grounding systems.
1604 QUARRY & PLANT · 410301930 CFR 56.12028 · $151.00 proposed penalty
Regular Safety and Health Inspection
1604 QUARRY & PLANT · 410301927.0 on-site hours reported
Berms or guardrails.
Signal Mountain Cement Co · 400083830 CFR 56.9300(b) · Significant and substantial (S&S) · $465.00 proposed penalty
Safe access.
Signal Mountain Cement Co · 400083830 CFR 56.11001 · Significant and substantial (S&S) · $465.00 proposed penalty
Handling of materials
1604 QUARRY & PLANT · 4103019Days restricted activity only
Accident narrative
Employee was opening the water truck cab door to open the water tank fill valve when the tip if EE's right fifth finger got wedged in between the cab door frame and the water fill tank valve resulting in a laceration.
Electrical conductors.
Signal Mountain Cement Co · 400083830 CFR 56.12004 · $151.00 proposed penalty
General requirements.
Lone Star Industries · 120006430 CFR 56.4200(b)(2) · Significant and substantial (S&S) · $1,968.00 proposed penalty
Inspection.
MARYNEAL QUARRY AND MILL · 410028330 CFR 56.4201(a)(2) · $226.00 proposed penalty
Housekeeping.
MARYNEAL QUARRY AND MILL · 410028330 CFR 56.20003(a) · Significant and substantial (S&S) · $4,047.00 proposed penalty
High-pressure hose connections.
MARYNEAL QUARRY AND MILL · 410028330 CFR 56.13021 · $226.00 proposed penalty
Inspection and cover plates.
MARYNEAL QUARRY AND MILL · 410028330 CFR 56.12032 · Significant and substantial (S&S) · $2,936.00 proposed penalty
High-pressure hose connections.
MARYNEAL QUARRY AND MILL · 410028330 CFR 56.13021 · $226.00 proposed penalty
First-aid materials.
MARYNEAL QUARRY AND MILL · 410028330 CFR 56.15001 · $226.00 proposed penalty
Inspection.
MARYNEAL QUARRY AND MILL · 410028330 CFR 56.4201(a)(2) · $226.00 proposed penalty
Barricades and warning signs.
MARYNEAL QUARRY AND MILL · 410028330 CFR 56.20011 · $226.00 proposed penalty
Insulation and fittings for power wires and cables.
MARYNEAL QUARRY AND MILL · 410028330 CFR 56.12008 · $226.00 proposed penalty
Housekeeping.
MARYNEAL QUARRY AND MILL · 410028330 CFR 56.20003(a) · Significant and substantial (S&S) · $4,047.00 proposed penalty
Taglines, hitches, and slings.
MARYNEAL QUARRY AND MILL · 410028330 CFR 56.16007(b) · $226.00 proposed penalty
Inspection.
MARYNEAL QUARRY AND MILL · 410028330 CFR 56.4201(a)(2) · $336.00 proposed penalty
Requirement for container labels.
MARYNEAL QUARRY AND MILL · 410028330 CFR 47.41(a) · $226.00 proposed penalty
Warning signs.
MARYNEAL QUARRY AND MILL · 410028330 CFR 56.4101 · Significant and substantial (S&S) · $1,679.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.