Brian G Keener safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Training of miners assigned to a task in which they have had no previous experience; minimum courses of instruction.
Independent Salt Company · 140041130 CFR 48.27(a)(3)
Conveyor start-up warnings.
Independent Salt Company · 140041130 CFR 57.14201(b)
Roll-over protective structures (ROPS) and seat belts for surface equipment.
Independent Salt Company · 140041130 CFR 57.14130(g)
Fixed ladder landings.
Independent Salt Company · 140041130 CFR 57.11006
Regular Safety and Health Inspection
Independent Salt Company · 14004110.0 on-site hours reported
Construction and maintenance of ladders.
Independent Salt Company · 140041130 CFR 57.11003 · $151.00 proposed penalty
Electrical conductors.
Independent Salt Company · 140041130 CFR 57.12004 · $151.00 proposed penalty
Machinery, equipment, and tools.
Independent Salt Company · 140041130 CFR 57.14205 · Significant and substantial (S&S) · $3,184.00 proposed penalty
Inspection.
Independent Salt Company · 140041130 CFR 57.4201(a)(1) · $151.00 proposed penalty
Waste receptacles.
Independent Salt Company · 140041130 CFR 57.20013 · $336.00 proposed penalty
Handrails and toeboards.
Independent Salt Company · 140041130 CFR 57.11002 · $151.00 proposed penalty
Barricades and warning signs.
Independent Salt Company · 140041130 CFR 57.20011 · $151.00 proposed penalty
Barricades and warning signs.
Independent Salt Company · 140041130 CFR 57.20011 · $151.00 proposed penalty
Protection for openings around travelways.
Independent Salt Company · 140041130 CFR 57.11012 · $151.00 proposed penalty
Correction of dangerous conditions.
Independent Salt Company · 140041130 CFR 57.12030 · $151.00 proposed penalty
Construction and maintenance of guards.
Independent Salt Company · 140041130 CFR 57.14112(b) · $151.00 proposed penalty
Housekeeping.
Independent Salt Company · 140041130 CFR 57.20003(a) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Independent Salt Company · 140041130 CFR 57.14100(b) · $151.00 proposed penalty
Construction and maintenance of guards.
Independent Salt Company · 140041130 CFR 57.14112(a)(1) · $151.00 proposed penalty
Housekeeping.
Independent Salt Company · 140041130 CFR 57.20003(a) · $151.00 proposed penalty
Construction and maintenance of guards.
Independent Salt Company · 140041130 CFR 57.14112(b) · $151.00 proposed penalty
Housekeeping.
Independent Salt Company · 140041130 CFR 57.20003(a) · Significant and substantial (S&S) · $398.00 proposed penalty
Construction and maintenance of guards.
Independent Salt Company · 140041130 CFR 57.14112(b) · $151.00 proposed penalty
Insulation and fittings for power wires and cables.
Independent Salt Company · 140041130 CFR 57.12008 · $151.00 proposed penalty
Construction and maintenance of guards.
Independent Salt Company · 140041130 CFR 57.14112(b) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.