← Brandon Davis

Brandon Davis safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Verbal Hazard Complaint Inspections

    inspectionRecord F042297
    Eureka Mine · 3503848

    8.3 on-site hours reported

  2. Berms or guardrails.

    violationRecord 5059174
    Eureka Mine · 3503848

    30 CFR 56.9300(a) · Significant and substantial (S&S) · $1,320.00 proposed penalty

  3. Safe access.

    violationRecord 5059173
    Eureka Mine · 3503848

    30 CFR 56.11001 · Significant and substantial (S&S) · $366.00 proposed penalty

  4. Berms or guardrails.

    violationRecord 5059172
    Eureka Mine · 3503848

    30 CFR 56.9300(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty

  5. Barricades and warning signs.

    violationRecord 5059171
    Eureka Mine · 3503848

    30 CFR 56.20011 · Significant and substantial (S&S) · $1,219.00 proposed penalty

  6. Experienced miner training.

    violationRecord 5059166
    Eureka Mine · 3503848

    30 CFR 48.26(b) · $168.00 proposed penalty

  7. Training of new miners; minimum courses of instruction; hours of instruction.

    violationRecord 5059165
    Eureka Mine · 3503848

    30 CFR 48.25(a) · Significant and substantial (S&S) · $1,467.00 proposed penalty

  8. Verbal Hazard Complaint Inspections

    inspectionRecord F042293
    Eureka Mine · 3503848

    25.8 on-site hours reported

  9. Verbal Hazard Complaint Inspections

    inspectionRecord F04504F
    Eureka Mine · 3503848

    4.3 on-site hours reported

  10. Spot Inspection

    inspectionRecord F045052
    Eureka Mine · 3503848

    0.0 on-site hours reported

  11. Records of training.

    violationRecord 5101284
    Eureka Mine · 3503848

    30 CFR 48.29(a) · $151.00 proposed penalty

  12. Verbal Hazard Complaint Inspections

    inspectionRecord F045046
    Eureka Mine · 3503848

    3.8 on-site hours reported

  13. Regular Safety and Health Inspection

    inspectionRecord F03B2E7
    Eureka Mine · 3503848

    6.0 on-site hours reported

  14. Training of miners assigned to a task in which they have had no previous experience; minimum courses of instruction.

    violationRecord 5101270
    Eureka Mine · 3503848

    30 CFR 48.27 · $151.00 proposed penalty

  15. Examination of working places.

    violationRecord 5101269
    Eureka Mine · 3503848

    30 CFR 56.18002(a) · Significant and substantial (S&S) · $4,749.00 proposed penalty

  16. Safety defects; examination, correction and records.

    violationRecord 5101268
    Eureka Mine · 3503848

    30 CFR 56.14100(a) · $151.00 proposed penalty

  17. Securing movable parts.

    violationRecord 5101267
    Eureka Mine · 3503848

    30 CFR 56.14206(b) · $151.00 proposed penalty

  18. Mine Idle Activity

    inspectionRecord F02E6AC
    Eureka Mine · 3503848

    0.3 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.