Safety activity
Loading and haulage equipment; inspection and maintenance.
CE#3 · 440301030 CFR 77.1606(a) · Significant and substantial (S&S) · $2,936.00 proposed penalty
Quantity and location of firefighting equipment.
CE#3 · 440301030 CFR 77.1109(c)(1) · Significant and substantial (S&S) · $267.00 proposed penalty
Loading and haulage equipment; installations.
CE#3 · 440301030 CFR 77.1605(d) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
CE#3 · 440301030 CFR 77.1606(c) · Significant and substantial (S&S) · $398.00 proposed penalty
Regular Safety and Health Inspection
Fola Surface Mine No 2 · 4608377102.8 on-site hours reported
Loading and haulage equipment; inspection and maintenance.
CE#3 · 440301030 CFR 77.1606(c) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
CE#3 · 440301030 CFR 77.1606(c) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
CE#3 · 440301030 CFR 77.1606(c) · $151.00 proposed penalty
Examination and maintenance of firefighting equipment.
CE#3 · 440301030 CFR 77.1110 · $151.00 proposed penalty
Drinking water; general.
CE#3 · 440301030 CFR 71.600 · $398.00 proposed penalty
Inspection and cover plates.
CE#3 · 440301030 CFR 77.512 · $398.00 proposed penalty
Cable fittings; suitability.
CE#3 · 440301030 CFR 77.505 · $398.00 proposed penalty
Mechanical equipment guards.
CE#3 · 440301030 CFR 77.400(a) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Surface installations; general.
CE#3 · 440301030 CFR 77.200 · $1,550.00 proposed penalty
Special Emphasis Programs
Fola Surface Mine No 2 · 46083771.0 on-site hours reported
Travelways at surface installations.
CE#3 · 440301030 CFR 77.205(a) · $465.00 proposed penalty
Surface installations; general.
CE#3 · 440301030 CFR 77.200 · $209.00 proposed penalty
Surface installations; general.
CE#3 · 440301030 CFR 77.200 · $209.00 proposed penalty
Travelways at surface installations.
CE#3 · 440301030 CFR 77.205(a) · $465.00 proposed penalty
Surface installations; general.
CE#3 · 440301030 CFR 77.200 · $209.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
CE#3 · 440301030 CFR 77.502 · $209.00 proposed penalty
Surface installations; general.
CE#3 · 440301030 CFR 77.200 · $465.00 proposed penalty
103 (g) Written Notification Hazard Complaint Inspectio
CE#3 · 44030103.0 on-site hours reported
Spot Inspection
Fola Surface Mine No 2 · 460837712.0 on-site hours reported
Protective clothing; requirements.
Fola Surface Mine No 2 · 460837730 CFR 77.1710(g) · Significant and substantial (S&S) · $267.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.