Amrize Ltd safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Safety defects; examination, correction and records.
Amrize Millville Quarry · 460002730 CFR 56.14100(b) · $151.00 proposed penalty
Safety defects; examination, correction and records.
Amrize Millville Quarry · 460002730 CFR 56.14100(b) · $151.00 proposed penalty
Inspection.
Amrize Millville Quarry · 460002730 CFR 56.4201(a)(2) · $504.00 proposed penalty
Moving machine parts.
Amrize Millville Quarry · 460002730 CFR 56.14107 · Significant and substantial (S&S) · $2,503.00 proposed penalty
Electrical Technical Investigation
Amrize Joppa Plant · 11007866.0 on-site hours reported
Regular Safety and Health Inspection
Amrize Dundee Quarry · 200238310.5 on-site hours reported
Insulation and fittings for power wires and cables.
Amrize Joppa Plant · 110078630 CFR 56.12008 · $193.00 proposed penalty
Extinguisher recharging or replacement.
Amrize Fredonia Quarry · 150002230 CFR 56.4203 · $151.00 proposed penalty
Horns and backup alarms.
Amrize Fredonia Quarry · 150002230 CFR 56.14132(b)(2) · $151.00 proposed penalty
Dust control.
Amrize Fredonia Quarry · 150002230 CFR 56.9315 · Significant and substantial (S&S) · $1,219.00 proposed penalty
Moving machine parts.
Amrize Rockville Quarry · 180002930 CFR 56.14107(a) · $151.00 proposed penalty
Fuel lines.
Amrize Dundee Quarry · 200238330 CFR 56.4501 · $151.00 proposed penalty
Inspection and cover plates.
AMRIZE RAVENA PLANT · 300000630 CFR 56.12032 · $193.00 proposed penalty
Inspection and cover plates.
AMRIZE RAVENA PLANT · 300000630 CFR 56.12032 · $193.00 proposed penalty
Air receiver tanks.
AMRIZE RAVENA PLANT · 300000630 CFR 56.13011 · $151.00 proposed penalty
Operators stations.
AMRIZE RAVENA PLANT · 300000630 CFR 56.14103(b) · $177.00 proposed penalty
Training plans.
AMRIZE RAVENA PLANT · 300000630 CFR 46.3(b)(4) · $151.00 proposed penalty
Identification of power switches.
AMRIZE RAVENA PLANT · 300000630 CFR 56.12018 · $177.00 proposed penalty
Electrical conductors.
AMRIZE RAVENA PLANT · 300000630 CFR 56.12004 · $151.00 proposed penalty
Operating speeds and control of equipment.
Amrize Millville Quarry · 460002730 CFR 56.9101 · $288.00 proposed penalty
Regular Safety and Health Inspection
Amrize Rockville Quarry · 180002922.5 on-site hours reported
Regular Safety and Health Inspection
Amrize Lockport Quarry · 300004512.5 on-site hours reported
Regular Safety and Health Inspection
Amrize Millville Quarry · 460002729.3 on-site hours reported
Electrical conductors.
AMRIZE RAVENA PLANT · 300000630 CFR 56.12004 · $398.00 proposed penalty
Protection for openings around travelways.
AMRIZE RAVENA PLANT · 300000630 CFR 56.11012 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.