Retaining dams.
Amrize Daniels Sand Pit # 1 & 2 · 050190230 CFR 56.20010 · $1,219.00 proposed penalty
Safe access.
Amrize Fredonia Quarry · 150002230 CFR 56.11001 · Significant and substantial (S&S) · $1,679.00 proposed penalty
Correction of dangerous conditions.
Amrize Fredonia Quarry · 150002230 CFR 56.12030 · $151.00 proposed penalty
Protection for openings around travelways.
Amrize Three Rivers Quarry · 150010030 CFR 56.11012 · $336.00 proposed penalty
Safety can use.
Amrize Three Rivers Quarry · 150010030 CFR 56.4402 · $151.00 proposed penalty
Securing gas cylinders.
Amrize Three Rivers Quarry · 150010030 CFR 56.16005 · $336.00 proposed penalty
Safety defects; examination, correction and records.
Amrize Three Rivers Quarry · 150010030 CFR 56.14100(b) · $336.00 proposed penalty
Illumination of surface working areas.
Amrize Portland Plant · 050003730 CFR 56.17001 · Significant and substantial (S&S) · $4,749.00 proposed penalty
Housekeeping.
Amrize Portland Plant · 050003730 CFR 56.20003(a) · Significant and substantial (S&S) · $4,749.00 proposed penalty
Housekeeping.
Amrize Portland Plant · 050003730 CFR 56.20003(a) · Significant and substantial (S&S) · $4,749.00 proposed penalty
Storage of hazardous materials.
Amrize Portland Plant · 050003730 CFR 56.16003 · $432.00 proposed penalty
Housekeeping.
Amrize Portland Plant · 050003730 CFR 56.20003(a) · Significant and substantial (S&S) · $4,749.00 proposed penalty
Housekeeping.
Amrize Portland Plant · 050003730 CFR 56.20003(a) · Significant and substantial (S&S) · $4,749.00 proposed penalty
Housekeeping.
Amrize Portland Plant · 050003730 CFR 56.20003(a) · Significant and substantial (S&S) · $15,768.00 proposed penalty
Identification of power switches.
Amrize Portland Plant · 050003730 CFR 56.12018 · $432.00 proposed penalty
Housekeeping.
Amrize Portland Plant · 050003730 CFR 56.20003(a) · $959.00 proposed penalty
Machinery lubrication.
Amrize Portland Plant · 050003730 CFR 56.14204 · $432.00 proposed penalty
High-pressure hose connections.
Amrize Portland Plant · 050003730 CFR 56.13021 · Significant and substantial (S&S) · $1,431.00 proposed penalty
Fire
Amrize Ada Plant · 3400023Accident only
Accident narrative
A fire developed under a alternative fuel (shredded tires) conveyor due to a piece of rebar accidently being added into hoppers and causing friction at the scavenger conveyor.
Parking procedures for unattended equipment.
Amrize Portland Plant · 050003730 CFR 56.14207 · $151.00 proposed penalty
Housekeeping.
Amrize Portland Plant · 050003730 CFR 56.20003(a) · $959.00 proposed penalty
Testing grounding systems.
Amrize Portland Plant · 050003730 CFR 56.12028 · $2,503.00 proposed penalty
Warning signs.
Amrize Portland Plant · 050003730 CFR 56.4101 · $432.00 proposed penalty
Warning signs.
Amrize Portland Plant · 050003730 CFR 56.4101 · $432.00 proposed penalty
Testing grounding systems.
Amrize Portland Plant · 050003730 CFR 56.12028 · $755.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.