Amrize Ltd safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Horns and backup alarms.
Amrize Three Rivers Quarry · 150010030 CFR 56.14132(b)(1)(i) · $151.00 proposed penalty
Moving machine parts.
Amrize Three Rivers Quarry · 150010030 CFR 56.14107(a) · $336.00 proposed penalty
Moving machine parts.
Amrize Three Rivers Quarry · 150010030 CFR 56.14107(a) · $336.00 proposed penalty
Safety defects; examination, correction and records.
Amrize Three Rivers Quarry · 150010030 CFR 56.14100(b) · $465.00 proposed penalty
Guarding electrical connections and resistor grids.
Amrize Midlothian Plant · 410330730 CFR 56.12023 · $151.00 proposed penalty
Inspection.
Amrize Midlothian Plant · 410330730 CFR 56.4201(a)(2) · $151.00 proposed penalty
Handrails and toeboards.
Amrize Midlothian Plant · 410330730 CFR 56.11002 · $151.00 proposed penalty
Inspection.
Amrize Midlothian Plant · 410330730 CFR 56.4201(a)(1) · $209.00 proposed penalty
Electrical conductors.
Amrize Midlothian Plant · 410330730 CFR 56.12004 · $209.00 proposed penalty
Testing grounding systems.
Amrize Midlothian Plant · 410330730 CFR 56.12028 · $209.00 proposed penalty
Spillage and leakage.
Amrize Midlothian Plant · 410330730 CFR 56.4102 · $209.00 proposed penalty
Testing grounding systems.
Amrize Midlothian Plant · 410330730 CFR 56.12028 · $209.00 proposed penalty
Moving machine parts.
Amrize Rockville Quarry · 180002930 CFR 56.14107(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Inspection.
Amrize Rockville Quarry · 180002930 CFR 56.4201(a) · $151.00 proposed penalty
General requirements.
Amrize Rockville Quarry · 180002930 CFR 56.4200(b)(1) · $151.00 proposed penalty
Housekeeping.
Amrize Three Rivers Quarry · 150010030 CFR 56.20003(a) · $1,679.00 proposed penalty
Housekeeping.
Amrize Three Rivers Quarry · 150010030 CFR 56.20003(a) · $1,679.00 proposed penalty
Safety defects; examination, correction and records.
Amrize Three Rivers Quarry · 150010030 CFR 56.14100(b) · $642.00 proposed penalty
Safe access.
Amrize Three Rivers Quarry · 150010030 CFR 56.11001 · $432.00 proposed penalty
Roll-over protective structures (ROPS) and seat belts.
Amrize Three Rivers Quarry · 150010030 CFR 56.14130(c) · $151.00 proposed penalty
New task training.
Amrize Alpena Plant · 200004430 CFR 46.7(a) · Significant and substantial (S&S) · $6,540.00 proposed penalty
Spot Inspection
Amrize Joliet S & G Underground Mine # 1 · 11030842.3 on-site hours reported
Spot Inspection
Amrize The R S & D Mine · 11031446.5 on-site hours reported
Spot Inspection
Amrize Alpena Plant · 20000440.8 on-site hours reported
Non-Fatal Accident Investigation
Amrize Alpena Plant · 200004410.5 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.