Safety defects; examination, correction and records.
Amrize Ada Plant · 340002330 CFR 56.14100(b) · Significant and substantial (S&S) · $755.00 proposed penalty
Securing gas cylinders.
Amrize Ada Plant · 340002330 CFR 56.16005 · $151.00 proposed penalty
Oxygen cylinder storage.
Amrize Ada Plant · 340002330 CFR 56.4601 · $151.00 proposed penalty
Stationary grinding machines.
Amrize Ada Plant · 340002330 CFR 56.14115(b) · $226.00 proposed penalty
Safety procedures for towing.
Amrize Ada Plant · 340002330 CFR 56.14209(b) · $151.00 proposed penalty
Construction and maintenance of guards.
Amrize Ada Plant · 340002330 CFR 56.14112(b) · $226.00 proposed penalty
Moving machine parts.
Amrize Ada Plant · 340002330 CFR 56.14107(a) · $226.00 proposed penalty
Construction and maintenance of guards.
Amrize Ada Plant · 340002330 CFR 56.14112(b) · $226.00 proposed penalty
Safety defects; examination, correction and records.
Amrize Ada Plant · 340002330 CFR 56.14100(b) · $151.00 proposed penalty
Inspection and cover plates.
Amrize Ada Plant · 340002330 CFR 56.12032 · $151.00 proposed penalty
Warning signs.
Amrize Ada Plant · 340002330 CFR 56.4101 · $151.00 proposed penalty
Protection for openings around travelways.
Amrize Ada Plant · 340002330 CFR 56.11012 · $504.00 proposed penalty
Spot Inspection
Amrize Ste Genevieve Plant · 23002845.3 on-site hours reported
Compliance Follow-up Inspection
AMRIZE RAVENA PLANT · 30000062.0 on-site hours reported
Regular Safety and Health Inspection
Amrize Ada Plant · 340002350.8 on-site hours reported
Housekeeping.
Amrize Ada Plant · 340002330 CFR 56.20003(a) · $151.00 proposed penalty
Inspection and cover plates.
Amrize Ada Plant · 340002330 CFR 56.12032 · $504.00 proposed penalty
Safe access.
Amrize Ada Plant · 340002330 CFR 56.11001 · $151.00 proposed penalty
Spot Inspection
Amrize Aux Sable Plant · 11030251.0 on-site hours reported
Handling of materials
Amrize Ada Plant · 3400023Days away from work only
Accident narrative
An employee lifted a bucket of dust to top of handrail and as they lowered the bucket of material, the employee felt a pull or strain in their right shoulder. First aid until 3/14/2025 when they received light duty and script meds.
Handling of materials
Amrize Holly Hill Plant · 3800014Injuries involvng nonemployees
Accident narrative
Injury occurred to a customer (Xcel Bulk) truck driver. When trying to pull up on a Customer Service SafeRack safety cage, the injured truck driver felt some pain in their right shoulder.
Examination of working places.
Amrize The R S & D Mine · 110314430 CFR 57.18002(b) · $267.00 proposed penalty
Moving machine parts.
Amrize The R S & D Mine · 110314430 CFR 57.14107(a) · $267.00 proposed penalty
Moving machine parts.
Amrize The R S & D Mine · 110314430 CFR 57.14107(a) · $177.00 proposed penalty
Safety defects; examination, correction and records.
Amrize The R S & D Mine · 110314430 CFR 57.14100(c) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.