← Alpha Metallurgical Resources Inc

Alpha Metallurgical Resources Inc safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Roof control plan.

    violationRecord 5092694
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,037.00 proposed penalty

  2. Mine ventilation plan; submission and approval.

    violationRecord 5020744
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.370(a)(1) · $432.00 proposed penalty

  3. Accumulation of combustible materials.

    violationRecord 5020743
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.400 · $366.00 proposed penalty

  4. Methane monitors.

    violationRecord 5097277
    ROAD FORK #52 MINE · 4609522

    30 CFR 75.342(a)(4) · $336.00 proposed penalty

  5. Records of certified and qualified persons.

    violationRecord 5096606
    ROAD FORK #52 MINE · 4609522

    30 CFR 75.159 · $151.00 proposed penalty

  6. Permissible electric face equipment; maintenance.

    violationRecord 5132138
    Lynn Branch No. 2 Mine · 4609575

    30 CFR 75.503 · $549.00 proposed penalty

  7. Accumulation of combustible materials.

    violationRecord 5132137
    Lynn Branch No. 2 Mine · 4609575

    30 CFR 75.400 · $549.00 proposed penalty

  8. Roof control plan.

    violationRecord 5132136
    Lynn Branch No. 2 Mine · 4609575

    30 CFR 75.220(a)(1) · $193.00 proposed penalty

  9. Proximity detection systems.

    violationRecord 5132135
    Lynn Branch No. 2 Mine · 4609575

    30 CFR 75.1732(b)(1) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  10. Roof control plan.

    violationRecord 5132134
    Lynn Branch No. 2 Mine · 4609575

    30 CFR 75.220(a)(1) · $432.00 proposed penalty

  11. Power wires and cables; insulation and protection.

    violationRecord 5132481
    Cedar Grove Mine No 3 · 4609611

    30 CFR 75.517 · Significant and substantial (S&S) · $959.00 proposed penalty

  12. Power wires and cables; insulation and protection.

    violationRecord 5132480
    Cedar Grove Mine No 3 · 4609611

    30 CFR 75.517 · $193.00 proposed penalty

  13. Electric equipment; examination, testing, and maintenance.

    violationRecord 5131222
    Cedar Grove Mine No 3 · 4609611

    30 CFR 77.502 · $151.00 proposed penalty

  14. Travelways at surface installations.

    violationRecord 5131220
    Cedar Grove Mine No 3 · 4609611

    30 CFR 77.205(a) · $151.00 proposed penalty

  15. Fall of face/rib/pillar/side/highwall

    accidentRecord 220261200002
    ROAD FORK #52 MINE · 4609522

    Days away from work only

    Accident narrative

    While loading in the number ten entry, a piece of coal rib rolled out striking the employee's left ankle.

  16. Spot Inspections

    inspectionRecord F0062A6
    DEEP MINE 41 · 4407223

    103(i) · 6.0 on-site hours reported

  17. Mine ventilation plan; submission and approval.

    violationRecord 8284697
    DEEP MINE 41 · 4407223

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $818.00 proposed penalty

  18. Protection from falls of roof, face and ribs.

    violationRecord 8284696
    DEEP MINE 41 · 4407223

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty

  19. Condition and examination of firefighting equipment.

    violationRecord 5096605
    ROAD FORK #52 MINE · 4609522

    30 CFR 75.1100-3 · $398.00 proposed penalty

  20. Grounding metallic frames, casings, and other enclosures of electric equipment.

    violationRecord 5096604
    ROAD FORK #52 MINE · 4609522

    30 CFR 75.701 · $336.00 proposed penalty

  21. Other safeguards.

    violationRecord 5096603
    ROAD FORK #52 MINE · 4609522

    30 CFR 75.1403 · $2,503.00 proposed penalty

  22. Spot Inspections

    inspectionRecord F00C0AD
    BLACK EAGLE · 4609550

    103(i) · 6.0 on-site hours reported

  23. Mine ventilation plan; submission and approval.

    violationRecord 8284695
    DEEP MINE 41 · 4407223

    30 CFR 75.370(a)(1) · $226.00 proposed penalty

  24. Mine ventilation plan; submission and approval.

    violationRecord 5020631
    Rolling Thunder Mine · 4609111

    30 CFR 75.370(a)(1) · $366.00 proposed penalty

  25. Mine ventilation plan; submission and approval.

    violationRecord 5020630
    Rolling Thunder Mine · 4609111

    30 CFR 75.370(a)(1) · $697.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.