Alpha Metallurgical Resources Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Spot Inspections
ROAD FORK #52 MINE · 4609522103(i) · 7.8 on-site hours reported
Spot Inspection
Cedar Grove Mine No 3 · 46096116.0 on-site hours reported
Verbal Hazard Complaint Inspections
Cedar Grove Mine No 3 · 460961110.5 on-site hours reported
Shaft, Slope or Major Construction Spot Inspection
KINGSTON SEWELL · 46096314.0 on-site hours reported
Electric equipment and circuits; overload and short-circuit protection.
TOMS CREEK COMPLEX · 440527030 CFR 77.506 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
ROAD FORK #52 MINE · 460952230 CFR 75.370(a)(1) · $1,126.00 proposed penalty
Roof control plan.
ROAD FORK #52 MINE · 460952230 CFR 75.220(a)(1) · $697.00 proposed penalty
Violation — cited standard not reported
Cedar Grove Mine No 3 · 4609611$151.00 proposed penalty
Weekly examination.
Cedar Grove Mine No 3 · 460961130 CFR 75.364(h) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
Cedar Grove Mine No 3 · 460961130 CFR 75.202(a) · Significant and substantial (S&S) · $642.00 proposed penalty
Protection from falls of roof, face and ribs.
Cedar Grove Mine No 3 · 460961130 CFR 75.202(a) · Significant and substantial (S&S) · $642.00 proposed penalty
Protection from falls of roof, face and ribs.
Cedar Grove Mine No 3 · 460961130 CFR 75.202(a) · Significant and substantial (S&S) · $432.00 proposed penalty
Accumulation of combustible materials.
Cedar Grove Mine No 3 · 460961130 CFR 75.400 · $267.00 proposed penalty
Spot Inspections
DEEP MINE 41 · 4407223103(i) · 7.0 on-site hours reported
Regular Safety and Health Inspection
Kingston Processing · 460434351.5 on-site hours reported
Spot Inspections
Jerry Fork Eagle · 4608787103(i) · 8.0 on-site hours reported
Electric equipment; examination, testing, and maintenance.
Kingston Processing · 460434330 CFR 77.502 · $151.00 proposed penalty
Examination and maintenance of firefighting equipment.
Kingston Processing · 460434330 CFR 77.1110 · $151.00 proposed penalty
Mechanical equipment guards.
Kingston Processing · 460434330 CFR 77.400(a) · $151.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
Kingston Processing · 460434330 CFR 77.502 · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Marfork Processing · 460837430 CFR 77.1606(c) · $151.00 proposed penalty
Loading and haulage equipment; installations.
Marfork Processing · 460837430 CFR 77.1605(d) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Marfork Processing · 460837430 CFR 77.1606(c) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
PANTHER EAGLE MINE · 460921230 CFR 75.370(a)(1) · $151.00 proposed penalty
Impoundment Spot Inspection
Rum Creek Preparation Plant · 46050863.8 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.