Alpha Metallurgical Resources Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Protection of trailing cables.
PANTHER EAGLE MINE · 460921230 CFR 75.606 · $288.00 proposed penalty
Accumulation of combustible materials.
PANTHER EAGLE MINE · 460921230 CFR 75.400 · $177.00 proposed penalty
Rock dusting.
PANTHER EAGLE MINE · 460921230 CFR 75.402 · $193.00 proposed penalty
Protection from falls of roof, face and ribs.
PANTHER EAGLE MINE · 460921230 CFR 75.202(a) · $366.00 proposed penalty
Methane monitors.
ROAD FORK #52 MINE · 460952230 CFR 75.342(a)(4) · $336.00 proposed penalty
Criteria—Haulage; general.
ROAD FORK #52 MINE · 460952230 CFR 75.1403-10(e) · $226.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Davy Branch Mine · 460957430 CFR 75.1731(a) · $313.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Davy Branch Mine · 460957430 CFR 75.1731(b) · $209.00 proposed penalty
Protection from falls of roof, face and ribs.
Lynn Branch No. 2 Mine · 460957530 CFR 75.202(a) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Mechanical equipment guards.
Lynn Branch No. 2 Mine · 460957530 CFR 75.1722(c) · $432.00 proposed penalty
Accumulation of combustible materials.
Lynn Branch No. 2 Mine · 460957530 CFR 75.400 · $592.00 proposed penalty
Regular Safety and Health Inspection
DEEP MINE 46 · 4407433157.0 on-site hours reported
Spot Inspections
Jerry Fork Eagle · 4608787103(i) · 12.0 on-site hours reported
Escapeways; bituminous and lignite mines.
DEEP MINE 41 · 440722330 CFR 75.380(d)(1) · $165.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Republic Energy · 460905430 CFR 77.1606(c) · $209.00 proposed penalty
Condition and examination of firefighting equipment.
PANTHER EAGLE MINE · 460921230 CFR 75.1100-3 · $151.00 proposed penalty
Quantity and location of firefighting equipment.
PANTHER EAGLE MINE · 460921230 CFR 75.1100-2(f) · $151.00 proposed penalty
Accumulation of combustible materials.
PANTHER EAGLE MINE · 460921230 CFR 75.400 · $366.00 proposed penalty
Machinery and equipment; operation and maintenance.
Lynn Branch No. 2 Mine · 460957530 CFR 75.1725(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty
Identification of circuit breakers.
Lynn Branch No. 2 Mine · 460957530 CFR 75.904 · $432.00 proposed penalty
Fire-resistant hydraulic fluids and fire suppression devices on underground equipment.
Lynn Branch No. 2 Mine · 460957530 CFR 75.1107-1(b) · $151.00 proposed penalty
Health Technical Investigation
Marfork Processing · 46083748.8 on-site hours reported
Spot Inspections
Jerry Fork Eagle · 4608787103(i) · 13.5 on-site hours reported
Loading and haulage equipment; operation.
Mammoth Coal Processing Pl & Riv Tipple · 460331730 CFR 77.1607(bb) · $151.00 proposed penalty
Loading and haulage equipment; inspection and maintenance.
Kingston Processing · 460434330 CFR 77.1606(c) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.