← Alpha Metallurgical Resources Inc

Alpha Metallurgical Resources Inc safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Condition and examination of firefighting equipment.

    violationRecord 9837143
    Lynn Branch No. 2 Mine · 4609575

    30 CFR 75.1100-3 · $336.00 proposed penalty

  2. Handling of materials

    accidentRecord 220251250003
    Glen Alum Tunnel Mine · 4609375

    No dys awy frm wrk,no rstr act

    Accident narrative

    EE was assisting in placing a piece of takeup in line for a new setup Another employee raised one side of the takeup portion with a bar in order to place a 6" beam under the takeup foot As the injured EE was placing the beam under the takeup foot the bar slipped and caught EE's right thumb between the takeup foot and the beam causing a laceration and a fracture to the thumb.

  3. Installation of high-voltage transmission cables.

    violationRecord 5026026
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.807 · $642.00 proposed penalty

  4. Protection from falls of roof, face and ribs.

    violationRecord 5090272
    ROAD FORK #52 MINE · 4609522

    30 CFR 75.202(a) · Significant and substantial (S&S) · $4,749.00 proposed penalty

  5. Mine ventilation plan; submission and approval.

    violationRecord 5090271
    ROAD FORK #52 MINE · 4609522

    30 CFR 75.370(a)(1) · $592.00 proposed penalty

  6. Accumulation of combustible materials.

    violationRecord 9848407
    BLACK EAGLE · 4609550

    30 CFR 75.400 · $697.00 proposed penalty

  7. Drill dust control at underground areas of underground mines.

    violationRecord 9848406
    BLACK EAGLE · 4609550

    30 CFR 72.630(b) · $245.00 proposed penalty

  8. Protection from falls of roof, face and ribs.

    violationRecord 5023894
    BLACK EAGLE · 4609550

    30 CFR 75.202(a) · Significant and substantial (S&S) · $29,904.00 proposed penalty

  9. Protection from falls of roof, face and ribs.

    violationRecord 5023893
    BLACK EAGLE · 4609550

    30 CFR 75.202(a) · Significant and substantial (S&S) · $9,004.00 proposed penalty

  10. Protection from falls of roof, face and ribs.

    violationRecord 5023892
    BLACK EAGLE · 4609550

    30 CFR 75.202(a) · Significant and substantial (S&S) · $9,004.00 proposed penalty

  11. Power wires and cables; insulation and protection.

    violationRecord 5090620
    Lynn Branch No. 2 Mine · 4609575

    30 CFR 75.517 · Significant and substantial (S&S) · $3,184.00 proposed penalty

  12. Regular Safety and Health Inspection

    inspectionRecord F00BF2C
    Power Mountain Processing · 4606880

    148.8 on-site hours reported

  13. Health Technical Investigation

    inspectionRecord F009580
    Marfork Processing · 4608374

    8.5 on-site hours reported

  14. Regular Safety and Health Inspection

    inspectionRecord F00A072
    Republic Energy · 4609054

    102.5 on-site hours reported

  15. Spot Inspections

    inspectionRecord F0107D5
    ROAD FORK #52 MINE · 4609522

    103(i) · 7.5 on-site hours reported

  16. Spot Inspections

    inspectionRecord F013A00
    Lynn Branch No. 2 Mine · 4609575

    103(i) · 9.5 on-site hours reported

  17. Machinery and equipment; operation and maintenance.

    violationRecord 8282099
    DEEP MINE 41 · 4407223

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $1,219.00 proposed penalty

  18. Respirable dust standards.

    violationRecord 8282098
    DEEP MINE 41 · 4407223

    30 CFR 70.100(b)(2) · $313.00 proposed penalty

  19. Mechanical equipment guards.

    violationRecord 9166288
    Power Mountain Processing · 4606880

    30 CFR 77.400(a) · $151.00 proposed penalty

  20. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9166287
    Power Mountain Processing · 4606880

    30 CFR 77.1606(c) · $151.00 proposed penalty

  21. Accumulations of combustible materials.

    violationRecord 9166286
    Power Mountain Processing · 4606880

    30 CFR 77.1104 · $151.00 proposed penalty

  22. Cable fittings; suitability.

    violationRecord 9166285
    Power Mountain Processing · 4606880

    30 CFR 77.505 · $151.00 proposed penalty

  23. Illumination.

    violationRecord 9166284
    Power Mountain Processing · 4606880

    30 CFR 77.207 · $151.00 proposed penalty

  24. Loading and haulage equipment; inspection and maintenance.

    violationRecord 9166283
    Power Mountain Processing · 4606880

    30 CFR 77.1606(c) · $151.00 proposed penalty

  25. Roof control plan.

    violationRecord 9849999
    Jerry Fork Eagle · 4608787

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $1,550.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.