← Alpha Metallurgical Resources Inc

Alpha Metallurgical Resources Inc safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. On-shift examination.

    violationRecord 5022017
    Rolling Thunder Mine · 4609111

    30 CFR 75.362(a)(2) · Significant and substantial (S&S) · $3,448.00 proposed penalty

  2. Mine ventilation plan; submission and approval.

    violationRecord 5022016
    Rolling Thunder Mine · 4609111

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $6,540.00 proposed penalty

  3. Mine ventilation plan; submission and approval.

    violationRecord 5022015
    Rolling Thunder Mine · 4609111

    30 CFR 75.370(a)(1) · $398.00 proposed penalty

  4. On-shift examination.

    violationRecord 5022014
    Rolling Thunder Mine · 4609111

    30 CFR 75.362(g)(2)(i) · $151.00 proposed penalty

  5. Loading and haulage equipment; operation.

    violationRecord 5022013
    Rolling Thunder Mine · 4609111

    30 CFR 77.1607(i) · Significant and substantial (S&S) · $697.00 proposed penalty

  6. Protection from falls of roof, face and ribs.

    violationRecord 5026074
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.202(a) · $151.00 proposed penalty

  7. Ventilation controls.

    violationRecord 5026073
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.333(c)(2) · $288.00 proposed penalty

  8. Permissible electric face equipment; maintenance.

    violationRecord 5020185
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.503 · $151.00 proposed penalty

  9. Roof control plan.

    violationRecord 5020184
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  10. Protection from falls of roof, face and ribs.

    violationRecord 5020183
    PANTHER EAGLE MINE · 4609212

    30 CFR 75.202(a) · $151.00 proposed penalty

  11. Methane monitors.

    violationRecord 5096872
    ROAD FORK #52 MINE · 4609522

    30 CFR 75.342(a)(4) · Significant and substantial (S&S) · $3,184.00 proposed penalty

  12. Roof control plan.

    violationRecord 5096871
    ROAD FORK #52 MINE · 4609522

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $6,540.00 proposed penalty

  13. Spot Inspections

    inspectionRecord F014936
    DEEP MINE 41 · 4407223

    103(i) · 5.5 on-site hours reported

  14. Spot Inspections

    inspectionRecord F017F2A
    ROAD FORK #52 MINE · 4609522

    103(i) · 5.0 on-site hours reported

  15. Spot Inspections

    inspectionRecord 6322027
    BLACK EAGLE · 4609550

    103(i) · 10.0 on-site hours reported

  16. Daily examination of hoisting equipment.

    violationRecord 9882198
    McClure River Plant · 4405311

    30 CFR 77.1403 · $592.00 proposed penalty

  17. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5020534
    Jerry Fork Eagle · 4608787

    30 CFR 75.1731(a) · $465.00 proposed penalty

  18. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5020533
    Jerry Fork Eagle · 4608787

    30 CFR 75.1731(a) · $465.00 proposed penalty

  19. Mine ventilation plan; submission and approval.

    violationRecord 5091137
    ROAD FORK #52 MINE · 4609522

    30 CFR 75.370(a)(1) · $755.00 proposed penalty

  20. Roof control plan.

    violationRecord 5091136
    ROAD FORK #52 MINE · 4609522

    30 CFR 75.220(a)(1) · $2,936.00 proposed penalty

  21. Mine ventilation plan; submission and approval.

    violationRecord 5091135
    ROAD FORK #52 MINE · 4609522

    30 CFR 75.370(a)(1) · $697.00 proposed penalty

  22. Preshift examination at fixed intervals.

    violationRecord 5090973
    ROAD FORK #52 MINE · 4609522

    30 CFR 75.360(a)(1) · $177.00 proposed penalty

  23. Roof control plan.

    violationRecord 5020658
    BLACK EAGLE · 4609550

    30 CFR 75.220(a)(1) · $818.00 proposed penalty

  24. Mine ventilation plan; submission and approval.

    violationRecord 5020657
    BLACK EAGLE · 4609550

    30 CFR 75.370(a)(1) · $642.00 proposed penalty

  25. Roof control plan.

    violationRecord 5020656
    BLACK EAGLE · 4609550

    30 CFR 75.220(a)(1) · $818.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.