MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Protection from falls of roof, face and ribs.
PANTHER EAGLE MINE · 460921230 CFR 75.202(a) · $366.00 proposed penalty
Roof control plan.
ROAD FORK #52 MINE · 460952230 CFR 75.220(a)(1) · $883.00 proposed penalty
Roof control plan.
BLACK EAGLE · 460955030 CFR 75.220(a)(1) · $1,550.00 proposed penalty
Roof testing and scaling.
BLACK EAGLE · 460955030 CFR 75.211(c) · Significant and substantial (S&S) · $1,968.00 proposed penalty
Quantity and location of firefighting equipment.
BLACK EAGLE · 460955030 CFR 75.1100-2(f) · $193.00 proposed penalty
Mining methods.
BLACK EAGLE · 460955030 CFR 75.203(b) · $398.00 proposed penalty
Travelways at surface installations.
BLACK EAGLE · 460955030 CFR 77.205(a) · Significant and substantial (S&S) · $4,383.00 proposed penalty
Water sprinkler systems; fire warning devices at belt drives.
BLACK EAGLE · 460955030 CFR 75.1101-10 · $177.00 proposed penalty
Quantity and location of firefighting equipment.
Kingston No. 2 · 460893230 CFR 75.1100-2(f) · $226.00 proposed penalty
Permissible electric face equipment; maintenance.
Kingston No. 2 · 460893230 CFR 75.503 · $1,219.00 proposed penalty
Permissible electric face equipment; maintenance.
Kingston No. 2 · 460893230 CFR 75.503 · $1,320.00 proposed penalty
Accumulation of combustible materials.
Kingston No. 2 · 460893230 CFR 75.400 · $398.00 proposed penalty
Handtools (nonpowered)
Workman Creek Surface · 4609475Days away from work only
Accident narrative
9/19/25, EE was straightening metal pipe framework on a drill rig using a chain come-a-long. One of the anchor hooks came loose, striking EE's left hand and thumb. EE was wearing gloves and safety glasses. First aid was administered, and EE returned to work that day. On 10/02/25, EE reported worsening pain in EE's thumb, which was later diagnosed as fractured at Urgent Care.
Spot Inspections
DEEP MINE 41 · 4407223103(i) · 5.0 on-site hours reported
Spot Inspections
BLACK EAGLE · 4609550103(i) · 5.0 on-site hours reported
Drill dust control at underground areas of underground mines.
Kingston No. 2 · 460893230 CFR 72.630(b) · Significant and substantial (S&S) · $1,818.00 proposed penalty
Accumulation of combustible materials.
Kingston No. 2 · 460893230 CFR 75.400 · $366.00 proposed penalty
Accumulation of combustible materials.
Kingston No. 2 · 460893230 CFR 75.400 · $366.00 proposed penalty
Accumulation of combustible materials.
Kingston No. 2 · 460893230 CFR 75.400 · $366.00 proposed penalty
Accumulation of combustible materials.
Kingston No. 2 · 460893230 CFR 75.400 · $366.00 proposed penalty
Impoundment Spot Inspection
Rum Creek Preparation Plant · 46050862.5 on-site hours reported
Spot Inspections
Jerry Fork Eagle · 4608787103(i) · 8.0 on-site hours reported
Non-Injury Accident Investigation
ROAD FORK #52 MINE · 460952215.3 on-site hours reported
Shaft, Slope or Major Construction Spot Inspection
ROAD FORK #52 MINE · 46095225.0 on-site hours reported
Protection from falls of roof, face and ribs.
DEEP MINE 41 · 440722330 CFR 75.202(a) · Significant and substantial (S&S) · $1,818.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.