Preshift examination at fixed intervals.
Oak Grove Mine · 010085130 CFR 75.360(g) · $151.00 proposed penalty
Accumulation of combustible materials.
Oak Grove Mine · 010085130 CFR 75.400 · $697.00 proposed penalty
Mine ventilation plan; submission and approval.
Oak Grove Mine · 010085130 CFR 75.370(a)(1) · $432.00 proposed penalty
Roof control plan.
Oak Grove Mine · 010085130 CFR 75.220(a)(1) · Significant and substantial (S&S) · $14,557.00 proposed penalty
Mine ventilation plan; submission and approval.
Oak Grove Mine · 010085130 CFR 75.370(a)(1) · $432.00 proposed penalty
Drill dust control at underground areas of underground mines.
Oak Grove Mine · 010085130 CFR 72.630(b) · $549.00 proposed penalty
Spot Inspections
Oak Grove Mine · 0100851103(i) · 8.0 on-site hours reported
Escapeways; bituminous and lignite mines.
Oak Grove Mine · 010085130 CFR 75.380(d)(1) · $2,312.00 proposed penalty
Handling of materials
Oak Grove Mine · 0100851Days away from work only
Accident narrative
IE was adding DEF fluid to the 336 Excavator when DEF jug slipped. When the employee attempted to catch the jug, the lid fell striking right wrist.
Roof control plan.
Oak Grove Mine · 010085130 CFR 75.220(a)(1) · Significant and substantial (S&S) · $3,184.00 proposed penalty
Roof control plan.
Oak Grove Mine · 010085130 CFR 75.220(a)(1) · $10,569.00 proposed penalty
Handling of materials
Oak Grove Mine · 0100851Days away from work only
Accident narrative
IE was installing a fork on a lotrac when the fork hit their finger causing a fracture.
Accumulation of combustible materials.
Oak Grove Mine · 010085130 CFR 75.400 · $697.00 proposed penalty
Other safeguards.
Oak Grove Mine · 010085130 CFR 75.1403 · $1,037.00 proposed penalty
Other safeguards.
Oak Grove Mine · 010085130 CFR 75.1403 · Significant and substantial (S&S) · $1,550.00 proposed penalty
Multi-gas detectors.
Oak Grove Mine · 010085130 CFR 75.1714-7(a) · $313.00 proposed penalty
Preshift examination at fixed intervals.
Oak Grove Mine · 010085130 CFR 75.360(b)(3) · $7,676.00 proposed penalty
Preshift examination at fixed intervals.
Oak Grove Mine · 010085130 CFR 75.360(f) · $209.00 proposed penalty
Escapeways; bituminous and lignite mines.
Oak Grove Mine · 010085130 CFR 75.380(d)(1) · $7,676.00 proposed penalty
Accumulation of combustible materials.
Oak Grove Mine · 010085130 CFR 75.400 · $697.00 proposed penalty
Spot Inspections
Oak Grove Mine · 0100851103(i) · 8.0 on-site hours reported
Spot Inspections
Oak Grove Mine · 0100851103(i) · 8.0 on-site hours reported
Power wires and cables; insulation and protection.
Oak Grove Mine · 010085130 CFR 75.517 · $366.00 proposed penalty
Condition and examination of firefighting equipment.
Oak Grove Mine · 010085130 CFR 75.1100-3 · $336.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Oak Grove Mine · 010085130 CFR 75.1731(a) · $313.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.