Aissa Garza; Rufino Garza Jr; Lisa Carlos safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Verbal Hazard Complaint Inspections
Sullivan Pit · 41053621.0 on-site hours reported
Examination of working places.
Sullivan Pit · 410536230 CFR 56.18002(b) · $151.00 proposed penalty
Records of training.
Sullivan Pit · 410536230 CFR 46.9(b) · $151.00 proposed penalty
Identification of power switches.
Sullivan Pit · 410536230 CFR 56.12018 · $226.00 proposed penalty
Safety can use.
Sullivan Pit · 410536230 CFR 56.4402 · $226.00 proposed penalty
Inspection.
Sullivan Pit · 410536230 CFR 56.4201(b) · $151.00 proposed penalty
Construction and maintenance of ladders.
Sullivan Pit · 410536230 CFR 56.11003 · $226.00 proposed penalty
Safe access.
Sullivan Pit · 410536230 CFR 56.11001 · $226.00 proposed penalty
Parking procedures for unattended equipment.
Sullivan Pit · 410536230 CFR 56.14207 · $151.00 proposed penalty
Regular Safety and Health Inspection
Sullivan Pit · 410536216.3 on-site hours reported
Regular Safety and Health Inspection
Sullivan Pit · 41053625.8 on-site hours reported
Horns and backup alarms.
Sullivan Pit · 410536230 CFR 56.14132(b)(1) · $226.00 proposed penalty
Construction and maintenance of guards.
Sullivan Pit · 410536230 CFR 56.14112(a)(1) · Significant and substantial (S&S) · $1,679.00 proposed penalty
Electrical conductors.
Sullivan Pit · 410536230 CFR 56.12004 · $755.00 proposed penalty
Moving machine parts.
Sullivan Pit · 410536230 CFR 56.14107(a) · Significant and substantial (S&S) · $1,679.00 proposed penalty
Compliance Follow-up Inspection
Sullivan Pit · 41053621.5 on-site hours reported
Dust control.
Sullivan Pit · 410536230 CFR 56.9315 · $226.00 proposed penalty
Examination of working places.
Sullivan Pit · 410536230 CFR 56.18002(b) · Significant and substantial (S&S) · $12,403.00 proposed penalty
New task training.
Sullivan Pit · 410536230 CFR 46.7(a) · $13,782.00 proposed penalty
Loading, blasting, and security.
Sullivan Pit · 410536230 CFR 56.6306(g) · Significant and substantial (S&S) · $12,403.00 proposed penalty
Loading, blasting, and security.
Sullivan Pit · 410536230 CFR 56.6306(c) · Significant and substantial (S&S) · $366.00 proposed penalty
Identification of power switches.
Sullivan Pit · 410536230 CFR 56.12018 · $226.00 proposed penalty
Training plans.
Sullivan Pit · 410536230 CFR 46.3(b)(4) · $151.00 proposed penalty
Records of training.
Sullivan Pit · 410536230 CFR 46.9(b)(2) · $151.00 proposed penalty
Separation of transported explosive material.
Sullivan Pit · 410536230 CFR 56.6201(b)(2) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.