ACNR Holdings, Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Permissible electric face equipment; maintenance.
OHIO COUNTY MINE · 460143630 CFR 75.503 · $151.00 proposed penalty
Accumulation of combustible materials.
OHIO COUNTY MINE · 460143630 CFR 75.400 · $226.00 proposed penalty
Accumulation of combustible materials.
OHIO COUNTY MINE · 460143630 CFR 75.400 · $226.00 proposed penalty
Mine ventilation plan; submission and approval.
OHIO COUNTY MINE · 460143630 CFR 75.370(a)(1) · $177.00 proposed penalty
Protection from falls of roof, face and ribs.
OHIO COUNTY MINE · 460143630 CFR 75.202(a) · $1,320.00 proposed penalty
Accumulation of combustible materials.
OHIO COUNTY MINE · 460143630 CFR 75.400 · $755.00 proposed penalty
Criteria—Self-propelled personnel carriers.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-6(b)(3) · Significant and substantial (S&S) · $818.00 proposed penalty
Criteria—Self-propelled personnel carriers.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-6(b)(3) · $165.00 proposed penalty
Escapeways; bituminous and lignite mines.
MARSHALL COUNTY MINE · 460143730 CFR 75.380(d)(1) · Significant and substantial (S&S) · $755.00 proposed penalty
Criteria—Belt conveyors.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-5(g) · $165.00 proposed penalty
Mechanical equipment guards.
MARSHALL COUNTY MINE · 460143730 CFR 75.1722(a) · $209.00 proposed penalty
Accumulation of combustible materials.
MARSHALL COUNTY MINE · 460143730 CFR 75.400 · $366.00 proposed penalty
Installation of water sprinkler systems; requirements.
MARSHALL COUNTY MINE · 460143730 CFR 75.1101-7(c) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
MARSHALL COUNTY MINE · 460143730 CFR 75.1731(b) · $165.00 proposed penalty
Machinery and equipment; operation and maintenance.
MARSHALL COUNTY MINE · 460143730 CFR 75.1725(a) · $151.00 proposed penalty
Accumulation of combustible materials.
MARSHALL COUNTY MINE · 460143730 CFR 75.400 · $366.00 proposed penalty
Handling of materials
OHIO COUNTY MINE · 4601436Days away from work only
Accident narrative
Employee was struck by a rock that had fallen from in between the shields, striking EE's left hand, and resulting in a contusion to EE's left pinky and ring finger. Compliance with rules/regs, PPE, mining equip/systems not a factor. Miner proficiency may be a factor.
Spot Inspections
Harrison County Mine · 4601318103(i) · 6.5 on-site hours reported
Roof control plan.
Harrison County Mine · 460131830 CFR 75.220(a)(1) · $267.00 proposed penalty
Ventilation controls.
MARSHALL COUNTY MINE · 460143730 CFR 75.333(d)(1) · $313.00 proposed penalty
Ventilation controls.
MARSHALL COUNTY MINE · 460143730 CFR 75.333(h) · $209.00 proposed penalty
Ventilation controls.
MARSHALL COUNTY MINE · 460143730 CFR 75.333(d)(1) · $151.00 proposed penalty
Ventilation controls.
MARSHALL COUNTY MINE · 460143730 CFR 75.333(h) · $209.00 proposed penalty
Accumulation of combustible materials.
MARSHALL COUNTY MINE · 460143730 CFR 75.400 · $366.00 proposed penalty
Criteria—Self-propelled personnel carriers.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-6(b)(3) · $165.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.