ACNR Holdings, Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Accumulation of combustible materials.
MARSHALL COUNTY MINE · 460143730 CFR 75.400 · $366.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
MARSHALL COUNTY MINE · 460143730 CFR 75.1731(b) · $165.00 proposed penalty
Machinery
Harrison County Mine · 4601318Days away from work only
Accident narrative
Employee was installing center bolts using the Fletcher Roof Bolter. Had drilled EE's starter hole and just changed drill steels and when EE started drilling again, a piece of rock fell from the top and bounced off the drill head and struck EE's left forearm. Suffered a contusion with swelling. Missed 3 days of work. Has training and experience and was wearing required PPE.
Spot Inspections
Harrison County Mine · 4601318103(i) · 5.5 on-site hours reported
Spot Inspections
OHIO COUNTY MINE · 4601436103(i) · 4.5 on-site hours reported
Spot Inspections
MARSHALL COUNTY MINE · 4601437103(i) · 8.8 on-site hours reported
Accumulation of combustible materials.
Marion County Mine · 460143330 CFR 75.400 · $226.00 proposed penalty
Protection from falls of roof, face and ribs.
Marion County Mine · 460143330 CFR 75.202(a) · $245.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
OHIO COUNTY MINE · 460143630 CFR 75.1731(a) · $245.00 proposed penalty
Accumulation of combustible materials.
OHIO COUNTY MINE · 460143630 CFR 75.400 · $504.00 proposed penalty
Accumulation of combustible materials.
OHIO COUNTY MINE · 460143630 CFR 75.400 · $504.00 proposed penalty
Roof control plan.
OHIO COUNTY MINE · 460143630 CFR 75.220(a)(1) · $267.00 proposed penalty
Criteria—Self-propelled personnel carriers.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-6(b)(3) · Significant and substantial (S&S) · $1,037.00 proposed penalty
Criteria—Track haulage roads.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-8(d) · $151.00 proposed penalty
Criteria—Belt conveyors.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-5(g) · $165.00 proposed penalty
Ventilation controls.
MARSHALL COUNTY MINE · 460143730 CFR 75.333(d)(3) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
MARSHALL COUNTY MINE · 460143730 CFR 75.1731(b) · $165.00 proposed penalty
Electrical Technical Investigation
Marion County Mine · 46014334.8 on-site hours reported
Verbal Hazard Complaint Inspections
Marion County Mine · 460143312.0 on-site hours reported
Electrical Technical Investigation
Marion County Mine · 460143313.8 on-site hours reported
Health Technical Investigation
OHIO COUNTY MINE · 460143611.0 on-site hours reported
Verbal Hazard Complaint Inspections
MARSHALL COUNTY MINE · 46014374.0 on-site hours reported
Accumulation of combustible materials.
Harrison County Mine · 460131830 CFR 75.400 · $226.00 proposed penalty
Other safeguards.
Marion County Mine · 460143330 CFR 75.1403 · Significant and substantial (S&S) · $2,133.00 proposed penalty
Accumulation of combustible materials.
Marion County Mine · 460143330 CFR 75.400 · $504.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.