ACNR Holdings, Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Ventilation controls.
OHIO COUNTY MINE · 460143630 CFR 75.333(h) · $151.00 proposed penalty
Openings in surface installations; safeguards.
Harrison County Mine · 460131830 CFR 77.204 · Significant and substantial (S&S) · $818.00 proposed penalty
Criteria—Haulage; general.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-10(h) · $245.00 proposed penalty
Mine ventilation plan; submission and approval.
MARSHALL COUNTY MINE · 460143730 CFR 75.370(a)(1) · $336.00 proposed penalty
Ventilation controls.
MARSHALL COUNTY MINE · 460143730 CFR 75.333(d)(3) · $267.00 proposed penalty
Protection from falls of roof, face and ribs.
MARSHALL COUNTY MINE · 460143730 CFR 75.202(a) · $165.00 proposed penalty
Identification of circuit breakers.
MARSHALL COUNTY MINE · 460143730 CFR 75.904 · $151.00 proposed penalty
Accumulation of combustible materials.
MARSHALL COUNTY MINE · 460143730 CFR 75.400 · $267.00 proposed penalty
Other safeguards.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403 · $165.00 proposed penalty
Mine ventilation plan; submission and approval.
MARSHALL COUNTY MINE · 460143730 CFR 75.370(a)(1) · $151.00 proposed penalty
Verbal Hazard Complaint Inspections
Marion County Mine · 46014337.0 on-site hours reported
Spot Inspections
MARSHALL COUNTY MINE · 4601437103(i) · 6.0 on-site hours reported
Accumulation of combustible materials.
OHIO COUNTY MINE · 460143630 CFR 75.400 · $245.00 proposed penalty
Accumulation of combustible materials.
MARSHALL COUNTY MINE · 460143730 CFR 75.400 · $267.00 proposed penalty
Mechanical equipment guards.
MARSHALL COUNTY MINE · 460143730 CFR 75.1722(a) · $366.00 proposed penalty
Underground diesel fuel storage facilities and areas; construction and safety precautions.
MARSHALL COUNTY MINE · 460143730 CFR 75.1903(a)(2) · $245.00 proposed penalty
Criteria—Belt conveyors.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-5(g) · $267.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
MARSHALL COUNTY MINE · 460143730 CFR 75.1731(b) · $267.00 proposed penalty
Accumulation of combustible materials.
MARSHALL COUNTY MINE · 460143730 CFR 75.400 · $592.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
MARSHALL COUNTY MINE · 460143730 CFR 75.1731(a) · $245.00 proposed penalty
Other safeguards.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403 · $366.00 proposed penalty
Other safeguards.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403 · $366.00 proposed penalty
Handling of materials
MARSHALL COUNTY MINE · 4601437Days away from work only
Accident narrative
Employee was working along the belt line when they went to pick up a 3/4" hose line, they felt pop in their abdomen. PPE was not a factor, mining system was not a factor, compliance with rules and regulations was not a factor.
Electrical Technical Investigation
MARSHALL COUNTY MINE · 460143738.0 on-site hours reported
Roof control plan.
Harrison County Mine · 460131830 CFR 75.220(a)(1) · $245.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.