ACNR Holdings, Inc safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Deenergization of self-propelled electric face equipment installation requirements.
MARSHALL COUNTY MINE · 460143730 CFR 75.523-1(a) · Significant and substantial (S&S) · $697.00 proposed penalty
Accumulation of combustible materials.
MARSHALL COUNTY MINE · 460143730 CFR 75.400 · $398.00 proposed penalty
Identification of circuit breakers.
MARSHALL COUNTY MINE · 460143730 CFR 75.904 · $151.00 proposed penalty
Slip or fall of person
MARSHALL COUNTY MINE · 4601437Days away from work only
Accident narrative
Employee was pass through man door when they slipped on a rock and fell, landing on right knee. PPE was not a factor, mining systems was not a factor, compliance with rules and regulations was not a factor.
Spot Inspections
Harrison County Mine · 4601318103(i) · 6.8 on-site hours reported
Verbal Hazard Complaint Inspections
Marion County Mine · 46014333.5 on-site hours reported
Spot Inspections
Marion County Mine · 4601433103(i) · 7.3 on-site hours reported
Spot Inspections
OHIO COUNTY MINE · 4601436103(i) · 5.0 on-site hours reported
Ventilation controls.
Harrison County Mine · 460131830 CFR 75.333(h) · $151.00 proposed penalty
Air quality.
OHIO COUNTY MINE · 460143630 CFR 75.321(a)(1) · $465.00 proposed penalty
Identification of circuit breakers.
MARSHALL COUNTY MINE · 460143730 CFR 75.904 · $151.00 proposed penalty
Short circuit protection of trailing cables.
MARSHALL COUNTY MINE · 460143730 CFR 75.601 · $151.00 proposed penalty
Accumulation of combustible materials.
MARSHALL COUNTY MINE · 460143730 CFR 75.400 · $398.00 proposed penalty
Criteria—Track haulage roads.
MARSHALL COUNTY MINE · 460143730 CFR 75.1403-8(b) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
MARSHALL COUNTY MINE · 460143730 CFR 75.202(a) · $226.00 proposed penalty
103 (g) Written Notification Hazard Complaint Inspectio
Marion County Mine · 46014333.5 on-site hours reported
Accumulation of combustible materials.
Marion County Mine · 460143330 CFR 75.400 · $398.00 proposed penalty
Fire-resistant hydraulic fluids and fire suppression devices on underground equipment.
Marion County Mine · 460143330 CFR 75.1107-1(a)(3)(ii) · $165.00 proposed penalty
Accumulation of combustible materials.
Marion County Mine · 460143330 CFR 75.400 · Significant and substantial (S&S) · $1,679.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Marion County Mine · 460143330 CFR 75.1731(a) · $209.00 proposed penalty
Loading and haulage equipment; installations.
Marion County Mine · 460143330 CFR 77.1605(m) · $151.00 proposed penalty
Other safeguards.
Marion County Mine · 460143330 CFR 75.1403 · $288.00 proposed penalty
Maintenance of incombustible content of rock dust.
Marion County Mine · 460143330 CFR 75.403 · $165.00 proposed penalty
Spot Inspections
Harrison County Mine · 4601318103(i) · 6.8 on-site hours reported
Accumulation of combustible materials.
Harrison County Mine · 460131830 CFR 75.400 · $592.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.