# 30 CFR 556.205 — What does BOEM do before approving a proposed final Five Year program or a significant revision of a previously-approved Five Year program?

- **Chapter:** CHAPTER V—BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR
- **Subchapter:** SUBCHAPTER B—OFFSHORE
- **Part:** PART 556—LEASING OF SULFUR OR OIL AND GAS AND FINANCIAL ASSURANCE REQUIREMENTS IN THE OUTER CONTINENTAL SHELF
- **Subpart:** B
- **Snapshot current through:** 2026-08-19
- **Official eCFR:** https://www.ecfr.gov/current/title-30/chapter-V/subchapter-B/part-556/subpart-B/section-556.205

## Current public text

This compact checkpoint contains the hierarchy and official link for this section. Retrieve the complete static Title 30 corpus at `/data/title30-sections.json` or follow the official eCFR link above.

## Provenance

- Source: Electronic Code of Federal Regulations, Title 30
- Representation: Realm public-data crosswalk
- Legal status: The eCFR is an editorial compilation; consult the official source before relying on the text.
