# Mount View No. 1 Mine

- **MSHA mine ID:** 4609159
- **Status:** Abandoned
- **Type / commodity:** Underground / Coal (Bituminous)
- **Location:** Mcdowell, WV
- **Operator:** San-West Coal Co., Inc.
- **Controller:** Edward A  Asbury
- **Public source rows linked:** 471
- **Source coverage:** 17 / 20
- **Generated:** 2026-10-13T11:26:59.401Z

## Current entity hierarchy

**Edward A  Asbury (C03440) → San-West Coal Co., Inc. (P16358) → Mount View No. 1 Mine (4609159)**

Current identity source: `msha-mines`. This is a current snapshot, not a historical claim.

## Controller and operator valid-time history

- **Edward A  Asbury → San-West Coal Co., Inc.:** 2006-04-03 through current/open; derived from co-tenure at mine 4609159; source `msha-controller-operator-history`.

- History rows: 1
- Typed edges: 3
- Interval anomalies: 0
- Valid-time bounds: inclusive; date granularity; null end means open-ended in the upstream history row; not independent proof of present control.
- Transaction-time observation: 2026-10-13T11:19:05.459773+00:00.

## Assessment signals

1. **SAFETY — 0 since 2021:** Accidents and injuries 5 historical accident/injury rows; 0 coded fatalities and 58 lost days across the published record.
2. **COMPLIANCE — 0 since 2021:** Violations and penalties 69 violation rows across the full record; 24 carry an S&S flag and $25,449 appears in current assessed amounts.
3. **HEALTH — 151 samples:** Occupational health samples 142 coal dust; 3 coal quartz; 6 noise. 0 personal-sample rows have a published C/E ratio above 1; 0 noise rows have an action-level or PEL dose above 100%. These are separate measures, not a silica exceedance count. Silica results and sample status are shown separately.
4. **PRODUCTION — 684 tons:** Quarterly production and employment 3K employee hours and 14 summed average employees across reported subunits in the latest published quarter.
5. **LEGAL — 48 linked rows:** Contests, conferences and decisions 23 contested-violation rows, 23 civil-penalty docket/decision rows, and 2 conference records linked by issuance number.
6. **CONTRACTORS — 2 linked entities:** Contractors Contractors are linked through this mine’s violation or accident records. Their production and hours cover all their operations, so they are not included in this mine’s totals.
7. **INSPECTIONS — 0 since 2021:** Inspections 20 inspection events and 590 published inspection hours across the historical record.

## EIA annual operating context

No matched record in the 2024 EIA coal-public workbook. This may be inapplicable for a non-coal operation.

## Recent Title 30 crosswalk

Snapshot current through 2026-08-19.

- **30 CFR 75.370 — Mine ventilation plan; submission and approval.** (2 retained recent rows) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.370
- **30 CFR 75.312 — Main mine fan examinations and records.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.312
- **30 CFR 75.706 — Deenergized underground power circuits; idle days—idle shifts.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-H/section-75.706
- **30 CFR 75.403 — Maintenance of incombustible content of rock dust.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-E/section-75.403
- **30 CFR 75.360 — Preshift examination at fixed intervals.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.360
- **30 CFR 75.1103-1 — Automatic fire sensors.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-L/section-75.1103-1
- **30 CFR 75.400 — Accumulation of combustible materials.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-E/section-75.400
- **30 CFR 75.1725 — Machinery and equipment; operation and maintenance.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-R/section-75.1725
- **30 CFR 75.701 — Grounding metallic frames, casings, and other enclosures of electric equipment.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-H/section-75.701
- **30 CFR 75.604 — Permanent splicing of trailing cables.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-G/section-75.604
- **30 CFR 75.333 — Ventilation controls.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.333

## Source coverage

- **Accident, Injuries, and Illnesses:** 5 rows; 2007-01-10 through 2009-03-20; source ID `msha-accidents`
- **Addresses of Record:** 1 rows; 2009-04-14 through 2009-04-14; source ID `msha-addresses`
- **Assessed Violations:** 68 rows; 2006-11-07 through 2009-02-18; source ID `msha-assessed-violations`
- **Civil Penalty Dockets and Decisions:** 23 rows; 2008-06-27 through 2011-12-14; source ID `msha-civil-penalty-dockets-decisions`
- **Coal Dust Samples:** 142 rows; 2006-10-23 through 2009-03-23; source ID `msha-coal-dust-samples`
- **Conferences:** 2 rows; 2007-05-08 through 2007-12-12; source ID `msha-conferences`
- **Contested Violations:** 23 rows; 2007-07-11 through 2009-03-12; source ID `msha-contested-violations`
- **Contractor Employment and Production — Quarterly:** 66 rows; unknown through unknown; source ID `msha-contractor-production-quarterly`
- **Contractor Employment and Production — Yearly:** 12 rows; unknown through unknown; source ID `msha-contractor-production-yearly`
- **Controller and Operator History:** 1 rows; 2006-04-03 through 2006-04-03; source ID `msha-controller-operator-history`
- **Inspections:** 20 rows; 2006-10-31 through 2009-04-09; source ID `msha-inspections`
- **Mine Employment and Production — Quarterly:** 22 rows; unknown through unknown; source ID `msha-mine-production-quarterly`
- **Mine Employment and Production — Yearly:** 7 rows; unknown through unknown; source ID `msha-mine-production-yearly`
- **Mines:** 1 rows; unknown through unknown; source ID `msha-mines`
- **Noise Samples:** 6 rows; 2008-03-03 through 2008-03-04; source ID `msha-noise-samples`
- **Quartz Samples — Coal:** 3 rows; 2006-11-01 through 2008-12-09; source ID `msha-quartz-samples`
- **Violations:** 69 rows; 2006-11-07 through 2009-02-18; source ID `msha-violations`

## Caveats

- This is public-record decision support, not legal advice or an official MSHA record.
- Missing data can indicate no event, publication delay, an unresolved identity, or inapplicability.
- Contractor production data is entity-level and is not attributed to this mine.

## Alternate representations

- HTML: `/mines/mount-view-no-1-mine-4609159`
- JSON: `/api/v1/mines/mount-view-no-1-mine-4609159`
- Silica records, units, sample status and quarterly means: `/api/v1/mines/4609159/silica` (snapshot year by default; `?year=all` for history; `&format=csv` for all matching rows)
- Relationship JSON: `/api/v1/mines/4609159/relationships`
- MCP resource: `mine://4609159/assessment`
- Complete Title 30 corpus: `/data/title30-sections.json`
