# Darby Road Mine #1

- **MSHA mine ID:** 4407253
- **Status:** Temporarily Idled
- **Type / commodity:** Surface / Coal (Bituminous)
- **Location:** Wise, VA
- **Operator:** Virginia Fuels Corporation
- **Controller:** Jillean L  Justice; James C  Justice lll
- **Public source rows linked:** 684
- **Source coverage:** 15 / 20
- **Generated:** 2026-10-17T06:17:15.228Z

## Current entity hierarchy

**Jillean L  Justice; James C  Justice lll (0091855) → Virginia Fuels Corporation (0112288) → Darby Road Mine #1 (4407253)**

Current identity source: `msha-mines`. This is a current snapshot, not a historical claim.

## Controller and operator valid-time history

- **James A  Sigmon → Sigmon Coal Company Inc:** 2009-03-03 through 2010-09-21; derived from co-tenure at mine 4407253; source `msha-controller-operator-history`.
- **James C  Justice II et al → Virginia Fuels Corporation:** 2010-09-22 through 2017-02-12; derived from co-tenure at mine 4407253; source `msha-controller-operator-history`.
- **James C  Justice lll et al → Virginia Fuels Corporation:** 2017-02-13 through current/open; derived from co-tenure at mine 4407253; source `msha-controller-operator-history`.
- **Jillean L  Justice et al → Virginia Fuels Corporation:** 2017-02-13 through current/open; derived from co-tenure at mine 4407253; source `msha-controller-operator-history`.

- History rows: 4
- Typed edges: 9
- Interval anomalies: 0
- Valid-time bounds: inclusive; date granularity; null end means open-ended in the upstream history row; not independent proof of present control.
- Transaction-time observation: 2026-10-17T05:35:58.500035+00:00.

## Assessment signals

1. **SAFETY — 0 since 2021:** Accidents and injuries 1 historical accident/injury rows; 0 coded fatalities and 158 lost days across the published record.
2. **COMPLIANCE — 0 since 2021:** Violations and penalties 92 violation rows across the full record; 34 carry an S&S flag and $76,459 appears in current assessed amounts.
3. **HEALTH — 64 samples:** Occupational health samples 41 coal dust; 23 noise. 0 personal-sample rows have a published C/E ratio above 1; 1 noise rows have an action-level or PEL dose above 100%. These are separate measures, not a silica exceedance count. Silica results and sample status are shown separately.
4. **PRODUCTION — No published quarter:** Quarterly production and employment The source remains registered, but no mine-keyed quarterly production row was published.
5. **LEGAL — 124 linked rows:** Contests, conferences and decisions 58 contested-violation rows, 58 civil-penalty docket/decision rows, and 8 conference records linked by issuance number.
6. **CONTRACTORS — 2 linked entities:** Contractors Contractors are linked through this mine’s violation or accident records. Their production and hours cover all their operations, so they are not included in this mine’s totals.
7. **INSPECTIONS — 4 since 2021:** Inspections 35 inspection events and 858 published inspection hours across the historical record.

## EIA annual operating context

No matched record in the 2024 EIA coal-public workbook. This may be inapplicable for a non-coal operation.

## Recent Title 30 crosswalk

Snapshot current through 2026-08-19.

- **30 CFR 77.1104 — Accumulations of combustible materials.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-L/section-77.1104
- **30 CFR 77.404 — Machinery and equipment; operation and maintenance.** (3 retained recent rows) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-E/section-77.404
- **30 CFR 41.12 — Changes; notification by operator.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-G/part-41/subpart-B/section-41.12
- **30 CFR 77.1606 — Loading and haulage equipment; inspection and maintenance.** (2 retained recent rows) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-Q/section-77.1606
- **30 CFR 50.40 — Maintenance of records.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-I/part-50/subpart-E/section-50.40
- **30 CFR 77.403 — Mobile equipment; falling object protective structures (FOPS).** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-E/section-77.403
- **30 CFR 48.23 — Training plans; time of submission; where filed; information required; time for approval; method for disapproval; commencement of training; approval of instructors.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-H/part-48/subpart-B/section-48.23
- **30 CFR 77.502-2 — Electric equipment; frequency of examination and testing.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-F/section-77.502-2
- **30 CFR 77.1712 — Reopening mines; notification; inspection prior to mining.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-R/section-77.1712

## Source coverage

- **Accident, Injuries, and Illnesses:** 1 rows; 2011-11-10 through 2011-11-10; source ID `msha-accidents`
- **Addresses of Record:** 1 rows; 2018-01-31 through 2018-01-31; source ID `msha-addresses`
- **Assessed Violations:** 91 rows; 2009-05-07 through 2017-07-12; source ID `msha-assessed-violations`
- **Civil Penalty Dockets and Decisions:** 58 rows; 2011-10-18 through 2020-06-10; source ID `msha-civil-penalty-dockets-decisions`
- **Coal Dust Samples:** 41 rows; 2009-05-12 through 2017-06-28; source ID `msha-coal-dust-samples`
- **Conferences:** 8 rows; 2011-08-19 through 2014-09-25; source ID `msha-conferences`
- **Contested Violations:** 58 rows; 2010-10-22 through 2017-07-12; source ID `msha-contested-violations`
- **Contractor Employment and Production — Quarterly:** 226 rows; unknown through unknown; source ID `msha-contractor-production-quarterly`
- **Contractor Employment and Production — Yearly:** 36 rows; unknown through unknown; source ID `msha-contractor-production-yearly`
- **Controller and Operator History:** 4 rows; 2009-03-03 through 2010-09-22; source ID `msha-controller-operator-history`
- **Inspections:** 35 rows; 2009-05-07 through 2026-08-05; source ID `msha-inspections`
- **Mine Employment and Production — Yearly:** 9 rows; unknown through unknown; source ID `msha-mine-production-yearly`
- **Mines:** 1 rows; unknown through unknown; source ID `msha-mines`
- **Noise Samples:** 23 rows; 2009-05-12 through 2012-01-10; source ID `msha-noise-samples`
- **Violations:** 92 rows; 2009-05-07 through 2017-07-12; source ID `msha-violations`

## Caveats

- This is public-record decision support, not legal advice or an official MSHA record.
- Missing data can indicate no event, publication delay, an unresolved identity, or inapplicability.
- Contractor production data is entity-level and is not attributed to this mine.

## Alternate representations

- HTML: `/mines/darby-road-mine-1-4407253`
- JSON: `/api/v1/mines/darby-road-mine-1-4407253`
- Silica records, units, sample status and quarterly means: `/api/v1/mines/4407253/silica` (snapshot year by default; `?year=all` for history; `&format=csv` for all matching rows)
- Relationship JSON: `/api/v1/mines/4407253/relationships`
- MCP resource: `mine://4407253/assessment`
- Complete Title 30 corpus: `/data/title30-sections.json`
