# Premium

- **MSHA mine ID:** 4407181
- **Status:** Abandoned and Sealed
- **Type / commodity:** Underground / Coal (Bituminous)
- **Location:** Dickenson, VA
- **Operator:** Banner Company
- **Controller:** Metinvest B V
- **Public source rows linked:** 1,138
- **Source coverage:** 17 / 20
- **Generated:** 2026-10-13T11:26:59.401Z

## Current entity hierarchy

**Metinvest B V (0085453) → Banner Company (P19871) → Premium (4407181)**

Current identity source: `msha-mines`. This is a current snapshot, not a historical claim.

## Controller and operator valid-time history

- **United  Company → Banner Company:** 2006-08-01 through 2009-04-29; derived from co-tenure at mine 4407181; source `msha-controller-operator-history`.
- **Kenneth L  Stacy → Banner Company:** 2006-08-01 through 2006-01-02; derived from co-tenure at mine 4407181; source `msha-controller-operator-history`.
- **Metinvest B V → Banner Company:** 2009-04-30 through current/open; derived from co-tenure at mine 4407181; source `msha-controller-operator-history`.

- History rows: 3
- Typed edges: 7
- Interval anomalies: 1
- Valid-time bounds: inclusive; date granularity; null end means open-ended in the upstream history row; not independent proof of present control.
- Transaction-time observation: 2026-10-13T11:19:05.459773+00:00.

## Assessment signals

1. **SAFETY — 0 since 2021:** Accidents and injuries 15 historical accident/injury rows; 0 coded fatalities and 297 lost days across the published record.
2. **COMPLIANCE — 0 since 2021:** Violations and penalties 286 violation rows across the full record; 113 carry an S&S flag and $176,320 appears in current assessed amounts.
3. **HEALTH — 285 samples:** Occupational health samples 253 coal dust; 12 coal quartz; 20 noise. 0 personal-sample rows have a published C/E ratio above 1; 0 noise rows have an action-level or PEL dose above 100%. These are separate measures, not a silica exceedance count. Silica results and sample status are shown separately.
4. **PRODUCTION — 0 tons:** Quarterly production and employment 0 employee hours and 0 summed average employees across reported subunits in the latest published quarter.
5. **LEGAL — 144 linked rows:** Contests, conferences and decisions 58 contested-violation rows, 53 civil-penalty docket/decision rows, and 33 conference records linked by issuance number.
6. **CONTRACTORS — 2 linked entities:** Contractors Contractors are linked through this mine’s violation or accident records. Their production and hours cover all their operations, so they are not included in this mine’s totals.
7. **INSPECTIONS — 0 since 2021:** Inspections 49 inspection events and 2K published inspection hours across the historical record.

## EIA annual operating context

No matched record in the 2024 EIA coal-public workbook. This may be inapplicable for a non-coal operation.

## Recent Title 30 crosswalk

Snapshot current through 2026-08-19.

- **30 CFR 75.220 — Roof control plan.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-C/section-75.220
- **30 CFR 72.630 — Drill dust control at underground areas of underground mines.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-72/subpart-E/section-72.630
- **30 CFR 75.900-4 — Testing, examination, and maintenance of circuit breakers; record.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-J/section-75.900-4
- **30 CFR 75.1725 — Machinery and equipment; operation and maintenance.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-R/section-75.1725
- **30 CFR 75.606 — Protection of trailing cables.** (2 retained recent rows) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-G/section-75.606
- **30 CFR 75.1722 — Mechanical equipment guards.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-R/section-75.1722
- **30 CFR 75.503 — Permissible electric face equipment; maintenance.** (2 retained recent rows) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-F/section-75.503
- **30 CFR 75.400 — Accumulation of combustible materials.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-E/section-75.400
- **30 CFR 75.370 — Mine ventilation plan; submission and approval.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.370
- **30 CFR 75.202 — Protection from falls of roof, face and ribs.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-C/section-75.202

## Source coverage

- **Accident, Injuries, and Illnesses:** 15 rows; 2007-03-09 through 2008-12-02; source ID `msha-accidents`
- **Addresses of Record:** 1 rows; 2010-08-09 through 2010-08-09; source ID `msha-addresses`
- **Assessed Violations:** 282 rows; 2007-02-28 through 2008-12-08; source ID `msha-assessed-violations`
- **Civil Penalty Dockets and Decisions:** 53 rows; 2008-06-25 through 2013-01-08; source ID `msha-civil-penalty-dockets-decisions`
- **Coal Dust Samples:** 253 rows; 2007-03-13 through 2008-12-09; source ID `msha-coal-dust-samples`
- **Conferences:** 33 rows; 2007-06-26 through 2008-04-17; source ID `msha-conferences`
- **Contested Violations:** 58 rows; 2007-05-01 through 2008-07-07; source ID `msha-contested-violations`
- **Contractor Employment and Production — Quarterly:** 34 rows; unknown through unknown; source ID `msha-contractor-production-quarterly`
- **Contractor Employment and Production — Yearly:** 11 rows; unknown through unknown; source ID `msha-contractor-production-yearly`
- **Controller and Operator History:** 3 rows; 2006-08-01 through 2006-08-01; source ID `msha-controller-operator-history`
- **Inspections:** 49 rows; 2006-09-05 through 2010-07-30; source ID `msha-inspections`
- **Mine Employment and Production — Quarterly:** 22 rows; unknown through unknown; source ID `msha-mine-production-quarterly`
- **Mine Employment and Production — Yearly:** 5 rows; unknown through unknown; source ID `msha-mine-production-yearly`
- **Mines:** 1 rows; unknown through unknown; source ID `msha-mines`
- **Noise Samples:** 20 rows; 2007-08-30 through 2008-08-13; source ID `msha-noise-samples`
- **Quartz Samples — Coal:** 12 rows; 2007-12-17 through 2008-07-28; source ID `msha-quartz-samples`
- **Violations:** 286 rows; 2007-02-28 through 2008-12-08; source ID `msha-violations`

## Caveats

- This is public-record decision support, not legal advice or an official MSHA record.
- Missing data can indicate no event, publication delay, an unresolved identity, or inapplicability.
- Contractor production data is entity-level and is not attributed to this mine.

## Alternate representations

- HTML: `/mines/premium-4407181`
- JSON: `/api/v1/mines/premium-4407181`
- Silica records, units, sample status and quarterly means: `/api/v1/mines/4407181/silica` (snapshot year by default; `?year=all` for history; `&format=csv` for all matching rows)
- Relationship JSON: `/api/v1/mines/4407181/relationships`
- MCP resource: `mine://4407181/assessment`
- Complete Title 30 corpus: `/data/title30-sections.json`
