# Hatfield

- **MSHA mine ID:** 4407104
- **Status:** Abandoned
- **Type / commodity:** Underground / Coal (Bituminous)
- **Location:** Russell, VA
- **Operator:** Harold Keene Coal Co., Inc.
- **Controller:** Jeffery A  Hoops
- **Public source rows linked:** 2,999
- **Source coverage:** 17 / 20
- **Generated:** 2026-10-13T11:26:59.401Z

## Current entity hierarchy

**Jeffery A  Hoops (C15863) → Harold Keene Coal Co., Inc. (P05011) → Hatfield (4407104)**

Current identity source: `msha-mines`. This is a current snapshot, not a historical claim.

## Controller and operator valid-time history

- **Larry  Stinson et al → Omega Mining, Inc.:** 2004-07-23 through 2004-10-20; derived from co-tenure at mine 4407104; source `msha-controller-operator-history`.
- **(Harold) Lynn  Keene et al → Omega Mining, Inc.:** 2004-07-23 through 2004-10-20; derived from co-tenure at mine 4407104; source `msha-controller-operator-history`.
- **Dick J  Plaster → Harvest-Time Coal Inc.:** 2004-10-21 through 2006-05-21; derived from co-tenure at mine 4407104; source `msha-controller-operator-history`.
- **(Harold) Lynn  Keene et al → Omega Mining, Inc.:** 2006-05-22 through 2011-01-13; derived from co-tenure at mine 4407104; source `msha-controller-operator-history`.
- **Larry  Stinson et al → Omega Mining, Inc.:** 2006-05-22 through 2011-01-13; derived from co-tenure at mine 4407104; source `msha-controller-operator-history`.
- **Omega Holdings LLC → Omega Mining Hatfield, LLC:** 2011-01-14 through 2013-09-05; derived from co-tenure at mine 4407104; source `msha-controller-operator-history`.
- **Cullen  Ratliff → Abby Contractors, Inc:** 2013-09-06 through 2014-10-16; derived from co-tenure at mine 4407104; source `msha-controller-operator-history`.
- **SunCoke Energy Incorporated → Harold Keene Coal Co., Inc.:** 2014-10-17 through 2018-08-20; derived from co-tenure at mine 4407104; source `msha-controller-operator-history`.
- **(Harold) Lynn  Keene et al → Harold Keene Coal Co., Inc.:** 2014-10-17 through 2012-01-16; derived from co-tenure at mine 4407104; source `msha-controller-operator-history`.
- **Larry  Stinson et al → Harold Keene Coal Co., Inc.:** 2014-10-17 through 2012-01-16; derived from co-tenure at mine 4407104; source `msha-controller-operator-history`.
- **Jeffery A  Hoops → Harold Keene Coal Co., Inc.:** 2018-08-21 through current/open; derived from co-tenure at mine 4407104; source `msha-controller-operator-history`.

- History rows: 11
- Typed edges: 24
- Interval anomalies: 2
- Valid-time bounds: inclusive; date granularity; null end means open-ended in the upstream history row; not independent proof of present control.
- Transaction-time observation: 2026-10-13T11:19:05.459773+00:00.

## Assessment signals

1. **SAFETY — 0 since 2021:** Accidents and injuries 9 historical accident/injury rows; 0 coded fatalities and 106 lost days across the published record.
2. **COMPLIANCE — 0 since 2021:** Violations and penalties 654 violation rows across the full record; 206 carry an S&S flag and $188,200 appears in current assessed amounts.
3. **HEALTH — 709 samples:** Occupational health samples 609 coal dust; 49 coal quartz; 51 noise. 0 personal-sample rows have a published C/E ratio above 1; 3 noise rows have an action-level or PEL dose above 100%. These are separate measures, not a silica exceedance count. Silica results and sample status are shown separately.
4. **PRODUCTION — 0 tons:** Quarterly production and employment 0 employee hours and 0 summed average employees across reported subunits in the latest published quarter.
5. **LEGAL — 332 linked rows:** Contests, conferences and decisions 155 contested-violation rows, 155 civil-penalty docket/decision rows, and 22 conference records linked by issuance number.
6. **CONTRACTORS — 4 linked entities:** Contractors Contractors are linked through this mine’s violation or accident records. Their production and hours cover all their operations, so they are not included in this mine’s totals.
7. **INSPECTIONS — 0 since 2021:** Inspections 106 inspection events and 5K published inspection hours across the historical record.

## EIA annual operating context

No matched record in the 2024 EIA coal-public workbook. This may be inapplicable for a non-coal operation.

## Recent Title 30 crosswalk

Snapshot current through 2026-08-19.

- **30 CFR 71.403 — Waiver of surface facilities requirements; posting of waiver.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-71/subpart-E/section-71.403
- **30 CFR 77.1707 — First aid equipment; location; minimum requirements.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-R/section-77.1707
- **30 CFR 50.30 — Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-I/part-50/subpart-D/section-50.30
- **30 CFR 75.1713-1 — Arrangements for emergency medical assistance and transportation for injured persons; agreements; reporting requirements; posting requirements.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-R/section-75.1713-1
- **30 CFR 75.333 — Ventilation controls.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.333
- **30 CFR 75.312 — Main mine fan examinations and records.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.312
- **30 CFR 75.1202-1 — Temporary notations, revisions, and supplements.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-M/section-75.1202-1
- **30 CFR 77.1110 — Examination and maintenance of firefighting equipment.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-L/section-77.1110
- **30 CFR 77.513 — Insulating mats at power switches.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-F/section-77.513
- **30 CFR 75.1403 — Other safeguards.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-O/section-75.1403
- **30 CFR 75.503 — Permissible electric face equipment; maintenance.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-F/section-75.503
- **30 CFR 75.220 — Roof control plan.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-C/section-75.220

## Source coverage

- **Accident, Injuries, and Illnesses:** 9 rows; 2005-01-28 through 2012-04-18; source ID `msha-accidents`
- **Addresses of Record:** 1 rows; 2018-09-26 through 2018-09-26; source ID `msha-addresses`
- **Assessed Violations:** 642 rows; 2004-11-16 through 2014-05-14; source ID `msha-assessed-violations`
- **Civil Penalty Dockets and Decisions:** 155 rows; 2007-01-29 through 2015-01-23; source ID `msha-civil-penalty-dockets-decisions`
- **Coal Dust Samples:** 609 rows; 2004-11-16 through 2013-08-20; source ID `msha-coal-dust-samples`
- **Conferences:** 22 rows; 2005-11-08 through 2013-03-05; source ID `msha-conferences`
- **Contested Violations:** 155 rows; 2005-02-02 through 2013-02-21; source ID `msha-contested-violations`
- **Contractor Employment and Production — Quarterly:** 336 rows; unknown through unknown; source ID `msha-contractor-production-quarterly`
- **Contractor Employment and Production — Yearly:** 87 rows; unknown through unknown; source ID `msha-contractor-production-yearly`
- **Controller and Operator History:** 11 rows; 2004-07-23 through 2014-10-17; source ID `msha-controller-operator-history`
- **Inspections:** 106 rows; 2004-08-06 through 2018-08-15; source ID `msha-inspections`
- **Mine Employment and Production — Quarterly:** 93 rows; unknown through unknown; source ID `msha-mine-production-quarterly`
- **Mine Employment and Production — Yearly:** 18 rows; unknown through unknown; source ID `msha-mine-production-yearly`
- **Mines:** 1 rows; unknown through unknown; source ID `msha-mines`
- **Noise Samples:** 51 rows; 2007-11-28 through 2013-07-29; source ID `msha-noise-samples`
- **Quartz Samples — Coal:** 49 rows; 2004-11-16 through 2013-06-11; source ID `msha-quartz-samples`
- **Violations:** 654 rows; 2004-11-16 through 2014-05-14; source ID `msha-violations`

## Caveats

- This is public-record decision support, not legal advice or an official MSHA record.
- Missing data can indicate no event, publication delay, an unresolved identity, or inapplicability.
- Contractor production data is entity-level and is not attributed to this mine.

## Alternate representations

- HTML: `/mines/hatfield-4407104`
- JSON: `/api/v1/mines/hatfield-4407104`
- Silica records, units, sample status and quarterly means: `/api/v1/mines/4407104/silica` (snapshot year by default; `?year=all` for history; `&format=csv` for all matching rows)
- Relationship JSON: `/api/v1/mines/4407104/relationships`
- MCP resource: `mine://4407104/assessment`
- Complete Title 30 corpus: `/data/title30-sections.json`
