# Mine No 3

- **MSHA mine ID:** 4406985
- **Status:** Abandoned and Sealed
- **Type / commodity:** Underground / Coal (Bituminous)
- **Location:** Dickenson, VA
- **Operator:** Double A Mining Inc
- **Controller:** O A  Stump Jr
- **Public source rows linked:** 1,811
- **Source coverage:** 15 / 20
- **Generated:** 2026-10-13T11:26:59.401Z

## Current entity hierarchy

**O A  Stump Jr (C14881) → Double A Mining Inc (0053714) → Mine No 3 (4406985)**

Current identity source: `msha-mines`. This is a current snapshot, not a historical claim.

## Controller and operator valid-time history

- **Pittston Company → Paramont Coal Corporation:** 2000-03-01 through 2002-12-12; derived from co-tenure at mine 4406985; source `msha-controller-operator-history`.
- **Alpha Natural Resources, Inc. → Paramont Coal Company Virginia, LLC:** 2002-12-13 through 2003-04-22; derived from co-tenure at mine 4406985; source `msha-controller-operator-history`.
- **Tom  Roberts et al → Kelly Branch Resources Incorporated:** 2003-04-23 through 2005-03-06; derived from co-tenure at mine 4406985; source `msha-controller-operator-history`.
- **O A  Stump Jr et al → Double A Mining Inc:** 2005-03-07 through current/open; derived from co-tenure at mine 4406985; source `msha-controller-operator-history`.

- History rows: 4
- Typed edges: 12
- Interval anomalies: 0
- Valid-time bounds: inclusive; date granularity; null end means open-ended in the upstream history row; not independent proof of present control.
- Transaction-time observation: 2026-10-13T11:19:05.459773+00:00.

## Assessment signals

1. **SAFETY — 0 since 2021:** Accidents and injuries 21 historical accident/injury rows; 0 coded fatalities and 1,024 lost days across the published record.
2. **COMPLIANCE — 0 since 2021:** Violations and penalties 415 violation rows across the full record; 170 carry an S&S flag and $65,067 appears in current assessed amounts.
3. **HEALTH — 632 samples:** Occupational health samples 543 coal dust; 52 coal quartz; 37 noise. 0 personal-sample rows have a published C/E ratio above 1; 8 noise rows have an action-level or PEL dose above 100%. These are separate measures, not a silica exceedance count. Silica results and sample status are shown separately.
4. **PRODUCTION — 0 tons:** Quarterly production and employment 0 employee hours and 0 summed average employees across reported subunits in the latest published quarter.
5. **LEGAL — 11 linked rows:** Contests, conferences and decisions 0 contested-violation rows, 0 civil-penalty docket/decision rows, and 11 conference records linked by issuance number.
6. **CONTRACTORS — 1 linked entities:** Contractors Contractors are linked through this mine’s violation or accident records. Their production and hours cover all their operations, so they are not included in this mine’s totals.
7. **INSPECTIONS — 0 since 2021:** Inspections 138 inspection events and 4K published inspection hours across the historical record.

## EIA annual operating context

No matched record in the 2024 EIA coal-public workbook. This may be inapplicable for a non-coal operation.

## Recent Title 30 crosswalk

Snapshot current through 2026-08-19.

- **30 CFR 75.1711 — Sealing of mines.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-R/section-75.1711
- **30 CFR 75.503 — Permissible electric face equipment; maintenance.** (2 retained recent rows) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-F/section-75.503
- **30 CFR 75.202 — Protection from falls of roof, face and ribs.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-C/section-75.202
- **30 CFR 75.211 — Roof testing and scaling.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-C/section-75.211
- **30 CFR 75.333 — Ventilation controls.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.333
- **30 CFR 75.400 — Accumulation of combustible materials.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-E/section-75.400
- **30 CFR 75.220 — Roof control plan.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-C/section-75.220
- **30 CFR 77.1103 — Flammable liquids; storage.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-L/section-77.1103
- **30 CFR 75.807 — Installation of high-voltage transmission cables.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-I/section-75.807
- **30 CFR 75.1101-8 — Water sprinkler systems; arrangement of sprinklers.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-L/section-75.1101-8
- **30 CFR 75.1100-2 — Quantity and location of firefighting equipment.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-L/section-75.1100-2

## Source coverage

- **Accident, Injuries, and Illnesses:** 21 rows; 2000-07-24 through 2004-07-14; source ID `msha-accidents`
- **Addresses of Record:** 1 rows; 2006-06-26 through 2006-06-26; source ID `msha-addresses`
- **Assessed Violations:** 392 rows; 2000-03-23 through 2006-05-31; source ID `msha-assessed-violations`
- **Coal Dust Samples:** 543 rows; 2000-04-11 through 2005-08-22; source ID `msha-coal-dust-samples`
- **Conferences:** 11 rows; 2004-04-27 through 2005-05-05; source ID `msha-conferences`
- **Contractor Employment and Production — Quarterly:** 106 rows; unknown through unknown; source ID `msha-contractor-production-quarterly`
- **Contractor Employment and Production — Yearly:** 19 rows; unknown through unknown; source ID `msha-contractor-production-yearly`
- **Controller and Operator History:** 4 rows; 2000-03-01 through 2005-03-07; source ID `msha-controller-operator-history`
- **Inspections:** 138 rows; 2000-03-10 through 2006-06-26; source ID `msha-inspections`
- **Mine Employment and Production — Quarterly:** 58 rows; unknown through unknown; source ID `msha-mine-production-quarterly`
- **Mine Employment and Production — Yearly:** 13 rows; unknown through unknown; source ID `msha-mine-production-yearly`
- **Mines:** 1 rows; unknown through unknown; source ID `msha-mines`
- **Noise Samples:** 37 rows; 2001-03-21 through 2005-05-16; source ID `msha-noise-samples`
- **Quartz Samples — Coal:** 52 rows; 2000-05-01 through 2005-06-13; source ID `msha-quartz-samples`
- **Violations:** 415 rows; 2000-03-23 through 2006-05-31; source ID `msha-violations`

## Caveats

- This is public-record decision support, not legal advice or an official MSHA record.
- Missing data can indicate no event, publication delay, an unresolved identity, or inapplicability.
- Contractor production data is entity-level and is not attributed to this mine.

## Alternate representations

- HTML: `/mines/mine-no-3-4406985`
- JSON: `/api/v1/mines/mine-no-3-4406985`
- Silica records, units, sample status and quarterly means: `/api/v1/mines/4406985/silica` (snapshot year by default; `?year=all` for history; `&format=csv` for all matching rows)
- Relationship JSON: `/api/v1/mines/4406985/relationships`
- MCP resource: `mine://4406985/assessment`
- Complete Title 30 corpus: `/data/title30-sections.json`
