# No 2

- **MSHA mine ID:** 4405032
- **Status:** Abandoned and Sealed
- **Type / commodity:** Underground / Coal (Bituminous)
- **Location:** Dickenson, VA
- **Operator:** Basic Mining Corp
- **Controller:** Paul  Lowe
- **Public source rows linked:** 414
- **Source coverage:** 14 / 20
- **Generated:** 2026-10-13T11:26:59.401Z

## Current entity hierarchy

**Paul  Lowe (C11156) → Basic Mining Corp (P23572) → No 2 (4405032)**

Current identity source: `msha-mines`. This is a current snapshot, not a historical claim.

## Controller and operator valid-time history

- **J Marc  Abadou → Pennington Coal Mining Company Inc:** 1978-05-01 through 1978-11-15; derived from co-tenure at mine 4405032; source `msha-controller-operator-history`.
- **Lewis  Campbell → Emini Coal Company:** 1978-11-16 through 1981-12-10; derived from co-tenure at mine 4405032; source `msha-controller-operator-history`.
- **L T  Hawkins → Richter & Hawkins Mining Company Of Va:** 1981-12-11 through 1990-06-14; derived from co-tenure at mine 4405032; source `msha-controller-operator-history`.
- **Sam  Blankenship → Hokie Mining Company:** 1990-06-15 through 1990-08-29; derived from co-tenure at mine 4405032; source `msha-controller-operator-history`.
- **Roy  Horne → Savage Mining Inc:** 1990-08-30 through 1997-10-19; derived from co-tenure at mine 4405032; source `msha-controller-operator-history`.
- **Arlie J  Lambert et al → Lambert Coal Company Inc:** 1997-10-20 through 1999-07-13; derived from co-tenure at mine 4405032; source `msha-controller-operator-history`.
- **Dennis B  Sutherland et al → Lambert Coal Company Inc:** 1997-10-20 through 1999-07-13; derived from co-tenure at mine 4405032; source `msha-controller-operator-history`.
- **Paul  Lowe → Basic Mining Corp:** 1999-07-14 through current/open; derived from co-tenure at mine 4405032; source `msha-controller-operator-history`.

- History rows: 8
- Typed edges: 22
- Interval anomalies: 0
- Valid-time bounds: inclusive; date granularity; null end means open-ended in the upstream history row; not independent proof of present control.
- Transaction-time observation: 2026-10-13T11:19:05.459773+00:00.

## Assessment signals

1. **SAFETY — 0 since 2021:** Accidents and injuries 6 historical accident/injury rows; 1 coded fatalities and 42 lost days across the published record.
2. **COMPLIANCE — 0 since 2021:** Violations and penalties 81 violation rows across the full record; 42 carry an S&S flag and $39,909 appears in current assessed amounts.
3. **HEALTH — 124 samples:** Occupational health samples 113 coal dust; 7 coal quartz; 4 noise. 0 personal-sample rows have a published C/E ratio above 1; 0 noise rows have an action-level or PEL dose above 100%. These are separate measures, not a silica exceedance count. Silica results and sample status are shown separately.
4. **PRODUCTION — 0 tons:** Quarterly production and employment 10 employee hours and 1 summed average employees across reported subunits in the latest published quarter.
5. **LEGAL — 36 linked rows:** Contests, conferences and decisions 0 contested-violation rows, 11 civil-penalty docket/decision rows, and 25 conference records linked by issuance number.
6. **CONTRACTORS — 0 linked entities:** Contractors Contractors are linked through this mine’s violation or accident records. Their production and hours cover all their operations, so they are not included in this mine’s totals.
7. **INSPECTIONS — 0 since 2021:** Inspections 47 inspection events and 1K published inspection hours across the historical record.

## EIA annual operating context

No matched record in the 2024 EIA coal-public workbook. This may be inapplicable for a non-coal operation.

## Recent Title 30 crosswalk

Snapshot current through 2026-08-19.

- **30 CFR 49.2 — Availability of mine rescue teams.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-H/part-49/subpart-A/section-49.2
- **30 CFR 75.220 — Roof control plan.** (2 retained recent rows) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-C/section-75.220
- **30 CFR 75.601-1 — Short circuit protection; ratings and settings of circuit breakers.** (6 retained recent rows) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-G/section-75.601-1
- **30 CFR 75.503 — Permissible electric face equipment; maintenance.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-F/section-75.503
- **30 CFR 75.342 — Methane monitors.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.342
- **30 CFR 75.523 — Electric face equipment; deenergization.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-F/section-75.523

## Source coverage

- **Accident, Injuries, and Illnesses:** 6 rows; 2000-03-08 through 2003-07-23; source ID `msha-accidents`
- **Addresses of Record:** 1 rows; 2004-02-03 through 2004-02-03; source ID `msha-addresses`
- **Assessed Violations:** 79 rows; 2000-01-05 through 2001-06-13; source ID `msha-assessed-violations`
- **Civil Penalty Dockets and Decisions:** 11 rows; 2001-04-30 through 2001-04-30; source ID `msha-civil-penalty-dockets-decisions`
- **Coal Dust Samples:** 113 rows; 2000-01-10 through 2001-03-13; source ID `msha-coal-dust-samples`
- **Conferences:** 25 rows; 2001-04-18 through 2001-04-18; source ID `msha-conferences`
- **Controller and Operator History:** 8 rows; 1978-05-01 through 1999-07-14; source ID `msha-controller-operator-history`
- **Inspections:** 47 rows; 2000-01-05 through 2004-01-23; source ID `msha-inspections`
- **Mine Employment and Production — Quarterly:** 26 rows; unknown through unknown; source ID `msha-mine-production-quarterly`
- **Mine Employment and Production — Yearly:** 5 rows; unknown through unknown; source ID `msha-mine-production-yearly`
- **Mines:** 1 rows; unknown through unknown; source ID `msha-mines`
- **Noise Samples:** 4 rows; 2000-02-08 through 2000-02-08; source ID `msha-noise-samples`
- **Quartz Samples — Coal:** 7 rows; 2000-01-10 through 2000-12-18; source ID `msha-quartz-samples`
- **Violations:** 81 rows; 2000-01-05 through 2001-06-13; source ID `msha-violations`

## Caveats

- This is public-record decision support, not legal advice or an official MSHA record.
- Missing data can indicate no event, publication delay, an unresolved identity, or inapplicability.
- Contractor production data is entity-level and is not attributed to this mine.

## Alternate representations

- HTML: `/mines/no-2-4405032`
- JSON: `/api/v1/mines/no-2-4405032`
- Silica records, units, sample status and quarterly means: `/api/v1/mines/4405032/silica` (snapshot year by default; `?year=all` for history; `&format=csv` for all matching rows)
- Relationship JSON: `/api/v1/mines/4405032/relationships`
- MCP resource: `mine://4405032/assessment`
- Complete Title 30 corpus: `/data/title30-sections.json`
