# Wildcat Loadout

- **MSHA mine ID:** 4201864
- **Status:** Abandoned and Sealed
- **Type / commodity:** Facility / Coal (Bituminous)
- **Location:** Carbon, UT
- **Operator:** Coal Energy Group 2, LLC
- **Controller:** Jim  Wayland; Bob  Nead
- **Public source rows linked:** 2,922
- **Source coverage:** 16 / 20
- **Generated:** 2026-10-13T11:26:59.401Z

## Current entity hierarchy

**Jim  Wayland; Bob  Nead (0144181) → Coal Energy Group 2, LLC (0159993) → Wildcat Loadout (4201864)**

Current identity source: `msha-mines`. This is a current snapshot, not a historical claim.

## Controller and operator valid-time history

- **Andalex Resources B V → Andalex Resources Inc:** 1984-02-01 through 2006-08-08; derived from co-tenure at mine 4201864; source `msha-controller-operator-history`.
- **Robert E  Murray → Andalex Resources Inc:** 2006-08-09 through 2010-12-16; derived from co-tenure at mine 4201864; source `msha-controller-operator-history`.
- **Intermountain Power Agency → Intermountain Power Agency:** 2010-12-17 through 2011-03-14; derived from co-tenure at mine 4201864; source `msha-controller-operator-history`.
- **Andalex Resources B V → Andalex Resources, Inc.:** 2011-03-15 through 2006-08-08; derived from co-tenure at mine 4201864; source `msha-controller-operator-history`.
- **Robert E  Murray → Andalex Resources, Inc.:** 2011-03-15 through 2011-05-09; derived from co-tenure at mine 4201864; source `msha-controller-operator-history`.
- **Intermountain Power Agency → Intermountain Power Agency:** 2011-05-10 through 2011-06-19; derived from co-tenure at mine 4201864; source `msha-controller-operator-history`.
- **America West Resources, Inc. → America West Services, Inc.:** 2011-06-20 through 2013-06-23; derived from co-tenure at mine 4201864; source `msha-controller-operator-history`.
- **Patricia C  Baker et al → Wild West Equipment & Hauling, LLC:** 2013-06-24 through 2018-09-09; derived from co-tenure at mine 4201864; source `msha-controller-operator-history`.
- **Dan  Baker et al → Wild West Equipment & Hauling, LLC:** 2013-06-24 through 2018-09-09; derived from co-tenure at mine 4201864; source `msha-controller-operator-history`.
- **Jim  Wayland et al → Coal Energy Group 2, LLC:** 2018-09-10 through current/open; derived from co-tenure at mine 4201864; source `msha-controller-operator-history`.
- **Bob  Nead et al → Coal Energy Group 2, LLC:** 2018-09-10 through current/open; derived from co-tenure at mine 4201864; source `msha-controller-operator-history`.

- History rows: 11
- Typed edges: 24
- Interval anomalies: 1
- Valid-time bounds: inclusive; date granularity; null end means open-ended in the upstream history row; not independent proof of present control.
- Transaction-time observation: 2026-10-13T11:19:05.459773+00:00.

## Assessment signals

1. **SAFETY — 0 since 2021:** Accidents and injuries 5 historical accident/injury rows; 0 coded fatalities and 69 lost days across the published record.
2. **COMPLIANCE — 0 since 2021:** Violations and penalties 101 violation rows across the full record; 40 carry an S&S flag and $14,145 appears in current assessed amounts.
3. **HEALTH — 276 samples:** Occupational health samples 193 coal dust; 8 coal quartz; 75 noise. 0 personal-sample rows have a published C/E ratio above 1; 1 noise rows have an action-level or PEL dose above 100%. These are separate measures, not a silica exceedance count. Silica results and sample status are shown separately.
4. **PRODUCTION — 0 tons:** Quarterly production and employment 0 employee hours and 0 summed average employees across reported subunits in the latest published quarter.
5. **LEGAL — 6 linked rows:** Contests, conferences and decisions 3 contested-violation rows, 3 civil-penalty docket/decision rows, and 0 conference records linked by issuance number.
6. **CONTRACTORS — 12 linked entities:** Contractors Contractors are linked through this mine’s violation or accident records. Their production and hours cover all their operations, so they are not included in this mine’s totals.
7. **INSPECTIONS — 0 since 2021:** Inspections 58 inspection events and 1K published inspection hours across the historical record.

## EIA annual operating context

No matched record in the 2024 EIA coal-public workbook. This may be inapplicable for a non-coal operation.

## Recent Title 30 crosswalk

Snapshot current through 2026-08-19.

- **30 CFR 41.12 — Changes; notification by operator.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-G/part-41/subpart-B/section-41.12
- **30 CFR 48.29 — Records of training.** (2 retained recent rows) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-H/part-48/subpart-B/section-48.29
- **30 CFR 48.31 — Hazard training.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-H/part-48/subpart-B/section-48.31
- **30 CFR 77.205 — Travelways at surface installations.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-C/section-77.205
- **30 CFR 77.211-1 — Continuous methane monitoring device; installation and operation; automatic deenergization of electric equipment.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-C/section-77.211-1
- **30 CFR 48.25 — Training of new miners; minimum courses of instruction; hours of instruction.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-H/part-48/subpart-B/section-48.25
- **30 CFR 77.404 — Machinery and equipment; operation and maintenance.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-E/section-77.404
- **30 CFR 48.26 — Experienced miner training.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-H/part-48/subpart-B/section-48.26
- **30 CFR 47.54 — Availability of an MSDS.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-H/part-47/subpart-F/section-47.54
- **30 CFR 77.213 — Draw-off tunnel escapeways.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-C/section-77.213
- **30 CFR 77.400 — Mechanical equipment guards.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-E/section-77.400

## Source coverage

- **Accident, Injuries, and Illnesses:** 5 rows; 2000-02-23 through 2010-01-26; source ID `msha-accidents`
- **Addresses of Record:** 1 rows; 2021-11-29 through 2021-11-29; source ID `msha-addresses`
- **Assessed Violations:** 99 rows; 2000-03-22 through 2017-05-22; source ID `msha-assessed-violations`
- **Civil Penalty Dockets and Decisions:** 3 rows; 2010-08-16 through 2012-12-12; source ID `msha-civil-penalty-dockets-decisions`
- **Coal Dust Samples:** 193 rows; 2000-03-22 through 2015-06-10; source ID `msha-coal-dust-samples`
- **Contested Violations:** 3 rows; 2007-07-03 through 2011-09-22; source ID `msha-contested-violations`
- **Contractor Employment and Production — Quarterly:** 1,832 rows; unknown through unknown; source ID `msha-contractor-production-quarterly`
- **Contractor Employment and Production — Yearly:** 360 rows; unknown through unknown; source ID `msha-contractor-production-yearly`
- **Controller and Operator History:** 11 rows; 1984-02-01 through 2018-09-10; source ID `msha-controller-operator-history`
- **Inspections:** 58 rows; 2000-03-21 through 2020-03-05; source ID `msha-inspections`
- **Mine Employment and Production — Quarterly:** 142 rows; unknown through unknown; source ID `msha-mine-production-quarterly`
- **Mine Employment and Production — Yearly:** 30 rows; unknown through unknown; source ID `msha-mine-production-yearly`
- **Mines:** 1 rows; unknown through unknown; source ID `msha-mines`
- **Noise Samples:** 75 rows; 2000-10-18 through 2014-11-06; source ID `msha-noise-samples`
- **Quartz Samples — Coal:** 8 rows; 2003-07-08 through 2014-11-06; source ID `msha-quartz-samples`
- **Violations:** 101 rows; 2000-03-22 through 2017-05-22; source ID `msha-violations`

## Caveats

- This is public-record decision support, not legal advice or an official MSHA record.
- Missing data can indicate no event, publication delay, an unresolved identity, or inapplicability.
- Contractor production data is entity-level and is not attributed to this mine.

## Alternate representations

- HTML: `/mines/wildcat-loadout-4201864`
- JSON: `/api/v1/mines/wildcat-loadout-4201864`
- Silica records, units, sample status and quarterly means: `/api/v1/mines/4201864/silica` (snapshot year by default; `?year=all` for history; `&format=csv` for all matching rows)
- Relationship JSON: `/api/v1/mines/4201864/relationships`
- MCP resource: `mine://4201864/assessment`
- Complete Title 30 corpus: `/data/title30-sections.json`