# Jeddo No 8 Preparation Plant

- **MSHA mine ID:** 3608649
- **Status:** NonProducing
- **Type / commodity:** Facility / Coal (Anthracite)
- **Location:** Luzerne, PA
- **Operator:** Wildcat Carbon Processing, LLC
- **Controller:** PT BUMA Internasional Grup Tbk
- **Public source rows linked:** 1,835
- **Source coverage:** 17 / 20
- **Generated:** 2026-10-13T11:26:59.401Z

## Current entity hierarchy

**PT BUMA Internasional Grup Tbk (0186221) → Wildcat Carbon Processing, LLC (0191113) → Jeddo No 8 Preparation Plant (3608649)**

Current identity source: `msha-mines`. This is a current snapshot, not a historical claim.

## Controller and operator valid-time history

- **Pagnotti Enterprises Inc → Jeddo Coal Company:** 1997-06-01 through 2023-08-21; derived from co-tenure at mine 3608649; source `msha-controller-operator-history`.
- **ACG Holdco LLC → Wildcat Carbon Processing, LLC:** 2023-08-22 through 2024-06-25; derived from co-tenure at mine 3608649; source `msha-controller-operator-history`.
- **PT BUMA Internasional Grup Tbk → Wildcat Carbon Processing, LLC:** 2024-06-26 through current/open; derived from co-tenure at mine 3608649; source `msha-controller-operator-history`.

- History rows: 3
- Typed edges: 8
- Interval anomalies: 0
- Valid-time bounds: inclusive; date granularity; null end means open-ended in the upstream history row; not independent proof of present control.
- Transaction-time observation: 2026-10-13T11:19:05.459773+00:00.

## Assessment signals

1. **SAFETY — 6 since 2021:** Accidents and injuries 72 historical accident/injury rows; 1 coded fatalities and 5,592 lost days across the published record.
2. **COMPLIANCE — 64 since 2021:** Violations and penalties 309 violation rows across the full record; 107 carry an S&S flag and $60,754 appears in current assessed amounts.
3. **HEALTH — 668 samples:** Occupational health samples 459 coal dust; 46 coal quartz; 163 noise. 0 personal-sample rows have a published C/E ratio above 1; 28 noise rows have an action-level or PEL dose above 100%. These are separate measures, not a silica exceedance count. Silica results and sample status are shown separately.
4. **PRODUCTION — 0 tons:** Quarterly production and employment 1K employee hours and 2 summed average employees across reported subunits in the latest published quarter.
5. **LEGAL — 31 linked rows:** Contests, conferences and decisions 3 contested-violation rows, 3 civil-penalty docket/decision rows, and 25 conference records linked by issuance number.
6. **CONTRACTORS — 5 linked entities:** Contractors Contractors are linked through this mine’s violation or accident records. Their production and hours cover all their operations, so they are not included in this mine’s totals.
7. **INSPECTIONS — 37 since 2021:** Inspections 159 inspection events and 6K published inspection hours across the historical record.

## EIA annual operating context

- **Reporting year:** 2024
- **Production:** 0 short tons
- **Labor hours:** 30,872
- **Average employees:** 18
- **Coal supply region:** Appalachia Northern
- **Union code:** United Mine Workers Of America
- **Published rows under this MSHA ID:** 1

## Recent Title 30 crosswalk

Snapshot current through 2026-08-19.

- **30 CFR 77.400 — Mechanical equipment guards.** (2 retained recent rows) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-E/section-77.400
- **30 CFR 77.410 — Mobile equipment; automatic warning devices.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-E/section-77.410
- **30 CFR 77.205 — Travelways at surface installations.** (3 retained recent rows) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-C/section-77.205
- **30 CFR 77.208 — Storage of materials.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-C/section-77.208
- **30 CFR 77.1110 — Examination and maintenance of firefighting equipment.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-L/section-77.1110
- **30 CFR 77.1713 — Daily inspection of surface coal mine; certified person; reports of inspection.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-R/section-77.1713
- **30 CFR 77.1606 — Loading and haulage equipment; inspection and maintenance.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-Q/section-77.1606
- **30 CFR 77.200 — Surface installations; general.** (2 retained recent rows) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-C/section-77.200

## Source coverage

- **Accident, Injuries, and Illnesses:** 72 rows; 2001-05-15 through 2025-05-19; source ID `msha-accidents`
- **Addresses of Record:** 1 rows; 2025-12-22 through 2025-12-22; source ID `msha-addresses`
- **Assessed Violations:** 305 rows; 2000-08-22 through 2025-10-15; source ID `msha-assessed-violations`
- **Civil Penalty Dockets and Decisions:** 3 rows; 2005-04-15 through 2006-02-28; source ID `msha-civil-penalty-dockets-decisions`
- **Coal Dust Samples:** 459 rows; 2000-01-11 through 2026-08-03; source ID `msha-coal-dust-samples`
- **Conferences:** 25 rows; 2005-06-02 through 2020-07-22; source ID `msha-conferences`
- **Contested Violations:** 3 rows; 2003-10-01 through 2005-03-23; source ID `msha-contested-violations`
- **Contractor Employment and Production — Quarterly:** 104 rows; unknown through unknown; source ID `msha-contractor-production-quarterly`
- **Contractor Employment and Production — Yearly:** 19 rows; unknown through unknown; source ID `msha-contractor-production-yearly`
- **Controller and Operator History:** 3 rows; 1997-06-01 through 2023-08-22; source ID `msha-controller-operator-history`
- **Inspections:** 159 rows; 2000-02-29 through 2026-08-11; source ID `msha-inspections`
- **Mine Employment and Production — Quarterly:** 132 rows; unknown through unknown; source ID `msha-mine-production-quarterly`
- **Mine Employment and Production — Yearly:** 31 rows; unknown through unknown; source ID `msha-mine-production-yearly`
- **Mines:** 1 rows; unknown through unknown; source ID `msha-mines`
- **Noise Samples:** 163 rows; 2001-08-20 through 2026-08-03; source ID `msha-noise-samples`
- **Quartz Samples — Coal:** 46 rows; 2000-03-30 through 2024-08-27; source ID `msha-quartz-samples`
- **Violations:** 309 rows; 2000-08-22 through 2025-10-15; source ID `msha-violations`

## Caveats

- This is public-record decision support, not legal advice or an official MSHA record.
- Missing data can indicate no event, publication delay, an unresolved identity, or inapplicability.
- Contractor production data is entity-level and is not attributed to this mine.

## Alternate representations

- HTML: `/mines/jeddo-no-8-preparation-plant-3608649`
- JSON: `/api/v1/mines/jeddo-no-8-preparation-plant-3608649`
- Silica records, units, sample status and quarterly means: `/api/v1/mines/3608649/silica` (snapshot year by default; `?year=all` for history; `&format=csv` for all matching rows)
- Relationship JSON: `/api/v1/mines/3608649/relationships`
- MCP resource: `mine://3608649/assessment`
- Complete Title 30 corpus: `/data/title30-sections.json`
