# Garnet Project-Nancy Hanks Mine

- **MSHA mine ID:** 2402583
- **Status:** Abandoned
- **Type / commodity:** Underground / Gold Ore
- **Location:** Granite, MT
- **Operator:** GrantHartford Corp.
- **Controller:** David  Rodli
- **Public source rows linked:** 178
- **Source coverage:** 11 / 20
- **Generated:** 2026-10-17T06:17:15.228Z

## Current entity hierarchy

**David  Rodli (0112181) → GrantHartford Corp. (0118908) → Garnet Project-Nancy Hanks Mine (2402583)**

Current identity source: `msha-mines`. This is a current snapshot, not a historical claim.

## Controller and operator valid-time history

- **Eric  Sauve → GrantHartford Corp.:** 2011-06-15 through 2014-02-09; derived from co-tenure at mine 2402583; source `msha-controller-operator-history`.
- **David  Rodli et al → GrantHartford Corp.:** 2014-02-10 through current/open; derived from co-tenure at mine 2402583; source `msha-controller-operator-history`.

- History rows: 2
- Typed edges: 5
- Interval anomalies: 0
- Valid-time bounds: inclusive; date granularity; null end means open-ended in the upstream history row; not independent proof of present control.
- Transaction-time observation: 2026-10-17T05:35:58.500035+00:00.

## Assessment signals

1. **SAFETY — 0 since 2021:** Accidents and injuries 0 historical accident/injury rows; 0 coded fatalities and 0 lost days across the published record.
2. **COMPLIANCE — 0 since 2021:** Violations and penalties 33 violation rows across the full record; 2 carry an S&S flag and $3,300 appears in current assessed amounts.
3. **HEALTH — 0 samples:** Occupational health samples No published samples. 0 personal-sample rows have a published C/E ratio above 1; 0 noise rows have an action-level or PEL dose above 100%. These are separate measures, not a silica exceedance count. Silica results and sample status are shown separately.
4. **PRODUCTION — No published quarter:** Quarterly production and employment The source remains registered, but no mine-keyed quarterly production row was published.
5. **LEGAL — 8 linked rows:** Contests, conferences and decisions 4 contested-violation rows, 4 civil-penalty docket/decision rows, and 0 conference records linked by issuance number.
6. **CONTRACTORS — 1 linked entities:** Contractors Contractors are linked through this mine’s violation or accident records. Their production and hours cover all their operations, so they are not included in this mine’s totals.
7. **INSPECTIONS — 0 since 2021:** Inspections 5 inspection events and 118 published inspection hours across the historical record.

## EIA annual operating context

No matched record in the 2024 EIA coal-public workbook. This may be inapplicable for a non-coal operation.

## Recent Title 30 crosswalk

Snapshot current through 2026-08-19.

- **30 CFR 50.30 — Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-I/part-50/subpart-D/section-50.30
- **30 CFR 48.9 — Records of training.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-H/part-48/subpart-A/section-48.9
- **30 CFR 47.31 — Requirement for a HazCom program.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-H/part-47/subpart-D/section-47.31
- **30 CFR 57.4230 — Surface self-propelled equipment.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-K/part-57/subpart-C/section-57.4230
- **30 CFR 57.18002 — Examination of working places.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-K/part-57/subpart-Q/section-57.18002
- **30 CFR 57.4360 — Underground alarm systems.** (2 retained recent rows) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-K/part-57/subpart-C/section-57.4360
- **30 CFR 57.20008 — Toilet facilities.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-K/part-57/subpart-S/section-57.20008
- **30 CFR 48.3 — Training plans; time of submission; where filed; information required; time for approval; method for disapproval; commencement of training; approval of instructors.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-H/part-48/subpart-A/section-48.3
- **30 CFR 49.3 — Alternative mine rescue capability for small and remote mines.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-H/part-49/subpart-A/section-49.3
- **30 CFR 57.3203 — Rock fixtures.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-K/part-57/subpart-B/section-57.3203
- **30 CFR 57.8520 — Ventilation plan.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-K/part-57/subpart-G/section-57.8520

## Source coverage

- **Addresses of Record:** 1 rows; 2012-01-01 through 2012-01-01; source ID `msha-addresses`
- **Assessed Violations:** 33 rows; 2011-08-30 through 2012-03-12; source ID `msha-assessed-violations`
- **Civil Penalty Dockets and Decisions:** 4 rows; 2012-08-14 through 2012-08-14; source ID `msha-civil-penalty-dockets-decisions`
- **Contested Violations:** 4 rows; 2011-08-30 through 2011-08-31; source ID `msha-contested-violations`
- **Contractor Employment and Production — Quarterly:** 76 rows; unknown through unknown; source ID `msha-contractor-production-quarterly`
- **Contractor Employment and Production — Yearly:** 17 rows; unknown through unknown; source ID `msha-contractor-production-yearly`
- **Controller and Operator History:** 2 rows; 2011-06-15 through 2011-06-15; source ID `msha-controller-operator-history`
- **Inspections:** 5 rows; 2011-08-29 through 2012-03-12; source ID `msha-inspections`
- **Mine Employment and Production — Yearly:** 2 rows; unknown through unknown; source ID `msha-mine-production-yearly`
- **Mines:** 1 rows; unknown through unknown; source ID `msha-mines`
- **Violations:** 33 rows; 2011-08-30 through 2012-03-12; source ID `msha-violations`

## Caveats

- This is public-record decision support, not legal advice or an official MSHA record.
- Missing data can indicate no event, publication delay, an unresolved identity, or inapplicability.
- Contractor production data is entity-level and is not attributed to this mine.

## Alternate representations

- HTML: `/mines/garnet-project-nancy-hanks-mine-2402583`
- JSON: `/api/v1/mines/garnet-project-nancy-hanks-mine-2402583`
- Silica records, units, sample status and quarterly means: `/api/v1/mines/2402583/silica` (snapshot year by default; `?year=all` for history; `&format=csv` for all matching rows)
- Relationship JSON: `/api/v1/mines/2402583/relationships`
- MCP resource: `mine://2402583/assessment`
- Complete Title 30 corpus: `/data/title30-sections.json`
