# SMITH #1

- **MSHA mine ID:** 1519924
- **Status:** Abandoned and Sealed
- **Type / commodity:** Underground / Coal (Bituminous)
- **Location:** Harlan, KY
- **Operator:** JRL COAL INC
- **Controller:** Tim B  Lusby
- **Public source rows linked:** 50
- **Source coverage:** 13 / 20
- **Generated:** 2026-10-13T11:26:59.401Z

## Current entity hierarchy

**Tim B  Lusby (0131601) → JRL COAL INC (0149674) → SMITH #1 (1519924)**

Current identity source: `msha-mines`. This is a current snapshot, not a historical claim.

## Controller and operator valid-time history

- **Tim B  Lusby → JRL COAL INC:** 2022-07-26 through current/open; derived from co-tenure at mine 1519924; source `msha-controller-operator-history`.

- History rows: 1
- Typed edges: 3
- Interval anomalies: 0
- Valid-time bounds: inclusive; date granularity; null end means open-ended in the upstream history row; not independent proof of present control.
- Transaction-time observation: 2026-10-13T11:19:05.459773+00:00.

## Assessment signals

1. **SAFETY — 0 since 2021:** Accidents and injuries 0 historical accident/injury rows; 0 coded fatalities and 0 lost days across the published record.
2. **COMPLIANCE — 7 since 2021:** Violations and penalties 7 violation rows across the full record; 2 carry an S&S flag and $1,916 appears in current assessed amounts.
3. **HEALTH — 12 samples:** Occupational health samples 7 coal dust; 5 noise. 0 personal-sample rows have a published C/E ratio above 1; 0 noise rows have an action-level or PEL dose above 100%. These are separate measures, not a silica exceedance count. Silica results and sample status are shown separately.
4. **PRODUCTION — 0 tons:** Quarterly production and employment 4K employee hours and 8 summed average employees across reported subunits in the latest published quarter.
5. **LEGAL — 5 linked rows:** Contests, conferences and decisions 2 contested-violation rows, 2 civil-penalty docket/decision rows, and 1 conference records linked by issuance number.
6. **CONTRACTORS — 0 linked entities:** Contractors Contractors are linked through this mine’s violation or accident records. Their production and hours cover all their operations, so they are not included in this mine’s totals.
7. **INSPECTIONS — 7 since 2021:** Inspections 7 inspection events and 140 published inspection hours across the historical record.

## EIA annual operating context

No matched record in the 2024 EIA coal-public workbook. This may be inapplicable for a non-coal operation.

## Recent Title 30 crosswalk

Snapshot current through 2026-08-19.

- **30 CFR 75.372 — Mine ventilation map.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.372
- **30 CFR 75.1714-3 — Self-rescue devices; inspection, testing, maintenance, repair, and recordkeeping.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-R/section-75.1714-3
- **30 CFR 75.400-2 — Cleanup program.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-E/section-75.400-2
- **30 CFR 75.512 — Electric equipment; examination, testing and maintenance.** (2 retained recent rows) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-F/section-75.512
- **30 CFR 75.400 — Accumulation of combustible materials.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-E/section-75.400

## Source coverage

- **Addresses of Record:** 1 rows; 2023-12-12 through 2023-12-12; source ID `msha-addresses`
- **Assessed Violations:** 6 rows; 2022-11-22 through 2022-12-07; source ID `msha-assessed-violations`
- **Civil Penalty Dockets and Decisions:** 2 rows; 2023-06-29 through 2023-06-29; source ID `msha-civil-penalty-dockets-decisions`
- **Coal Dust Samples:** 7 rows; 2022-12-05 through 2022-12-05; source ID `msha-coal-dust-samples`
- **Conferences:** 1 rows; 2023-03-13 through 2023-03-13; source ID `msha-conferences`
- **Contested Violations:** 2 rows; 2022-11-22 through 2022-11-22; source ID `msha-contested-violations`
- **Controller and Operator History:** 1 rows; 2022-07-26 through 2022-07-26; source ID `msha-controller-operator-history`
- **Inspections:** 7 rows; 2022-09-27 through 2023-12-04; source ID `msha-inspections`
- **Mine Employment and Production — Quarterly:** 6 rows; unknown through unknown; source ID `msha-mine-production-quarterly`
- **Mine Employment and Production — Yearly:** 4 rows; unknown through unknown; source ID `msha-mine-production-yearly`
- **Mines:** 1 rows; unknown through unknown; source ID `msha-mines`
- **Noise Samples:** 5 rows; 2022-12-05 through 2022-12-05; source ID `msha-noise-samples`
- **Violations:** 7 rows; 2022-11-22 through 2022-12-07; source ID `msha-violations`

## Caveats

- This is public-record decision support, not legal advice or an official MSHA record.
- Missing data can indicate no event, publication delay, an unresolved identity, or inapplicability.
- Contractor production data is entity-level and is not attributed to this mine.

## Alternate representations

- HTML: `/mines/smith-1-1519924`
- JSON: `/api/v1/mines/smith-1-1519924`
- Silica records, units, sample status and quarterly means: `/api/v1/mines/1519924/silica` (snapshot year by default; `?year=all` for history; `&format=csv` for all matching rows)
- Relationship JSON: `/api/v1/mines/1519924/relationships`
- MCP resource: `mine://1519924/assessment`
- Complete Title 30 corpus: `/data/title30-sections.json`
