# No. 7

- **MSHA mine ID:** 1518709
- **Status:** Abandoned and Sealed
- **Type / commodity:** Underground / Coal (Bituminous)
- **Location:** Floyd, KY
- **Operator:** Marshall Mining Inc
- **Controller:** Carl  Kirk
- **Public source rows linked:** 861
- **Source coverage:** 17 / 20
- **Generated:** 2026-10-13T11:26:59.401Z

## Current entity hierarchy

**Carl  Kirk (C05558) → Marshall Mining Inc (P24381) → No. 7 (1518709)**

Current identity source: `msha-mines`. This is a current snapshot, not a historical claim.

## Controller and operator valid-time history

- **CONSOL Energy Inc → Consol of Kentucky, Inc.:** 2004-01-29 through 2005-05-02; derived from co-tenure at mine 1518709; source `msha-controller-operator-history`.
- **Baily  Allred et al → Gateway Energy Inc:** 2005-05-03 through 2005-08-30; derived from co-tenure at mine 1518709; source `msha-controller-operator-history`.
- **Carl  Kirk et al → Marshall Mining Inc:** 2005-08-31 through current/open; derived from co-tenure at mine 1518709; source `msha-controller-operator-history`.

- History rows: 3
- Typed edges: 9
- Interval anomalies: 0
- Valid-time bounds: inclusive; date granularity; null end means open-ended in the upstream history row; not independent proof of present control.
- Transaction-time observation: 2026-10-13T11:19:05.459773+00:00.

## Assessment signals

1. **SAFETY — 0 since 2021:** Accidents and injuries 12 historical accident/injury rows; 0 coded fatalities and 55 lost days across the published record.
2. **COMPLIANCE — 0 since 2021:** Violations and penalties 192 violation rows across the full record; 75 carry an S&S flag and $32,633 appears in current assessed amounts.
3. **HEALTH — 175 samples:** Occupational health samples 145 coal dust; 10 coal quartz; 20 noise. 0 personal-sample rows have a published C/E ratio above 1; 1 noise rows have an action-level or PEL dose above 100%. These are separate measures, not a silica exceedance count. Silica results and sample status are shown separately.
4. **PRODUCTION — 0 tons:** Quarterly production and employment 27 employee hours and 2 summed average employees across reported subunits in the latest published quarter.
5. **LEGAL — 80 linked rows:** Contests, conferences and decisions 14 contested-violation rows, 14 civil-penalty docket/decision rows, and 52 conference records linked by issuance number.
6. **CONTRACTORS — 1 linked entities:** Contractors Contractors are linked through this mine’s violation or accident records. Their production and hours cover all their operations, so they are not included in this mine’s totals.
7. **INSPECTIONS — 0 since 2021:** Inspections 48 inspection events and 2K published inspection hours across the historical record.

## EIA annual operating context

No matched record in the 2024 EIA coal-public workbook. This may be inapplicable for a non-coal operation.

## Recent Title 30 crosswalk

Snapshot current through 2026-08-19.

- **30 CFR 75.202 — Protection from falls of roof, face and ribs.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-C/section-75.202
- **30 CFR 75.1714-6 — Emergency tethers.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-R/section-75.1714-6
- **30 CFR 75.1505 — Escapeway maps.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-P/section-75.1505
- **30 CFR 75.1100-2 — Quantity and location of firefighting equipment.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-L/section-75.1100-2
- **30 CFR 75.400 — Accumulation of combustible materials.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-E/section-75.400
- **30 CFR 75.604 — Permanent splicing of trailing cables.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-G/section-75.604
- **30 CFR 75.503 — Permissible electric face equipment; maintenance.** (2 retained recent rows) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-F/section-75.503
- **30 CFR 75.523-3 — Automatic emergency-parking brakes.** (2 retained recent rows) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-F/section-75.523-3
- **30 CFR 75.603 — Temporary splice of trailing cable.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-G/section-75.603

## Source coverage

- **Accident, Injuries, and Illnesses:** 12 rows; 2004-07-26 through 2008-10-09; source ID `msha-accidents`
- **Addresses of Record:** 1 rows; 2009-05-07 through 2009-05-07; source ID `msha-addresses`
- **Assessed Violations:** 183 rows; 2004-03-03 through 2008-10-09; source ID `msha-assessed-violations`
- **Civil Penalty Dockets and Decisions:** 14 rows; 2009-10-29 through 2013-02-13; source ID `msha-civil-penalty-dockets-decisions`
- **Coal Dust Samples:** 145 rows; 2004-03-29 through 2008-09-09; source ID `msha-coal-dust-samples`
- **Conferences:** 52 rows; 2006-02-01 through 2007-10-12; source ID `msha-conferences`
- **Contested Violations:** 14 rows; 2008-08-27 through 2008-10-09; source ID `msha-contested-violations`
- **Contractor Employment and Production — Quarterly:** 80 rows; unknown through unknown; source ID `msha-contractor-production-quarterly`
- **Contractor Employment and Production — Yearly:** 18 rows; unknown through unknown; source ID `msha-contractor-production-yearly`
- **Controller and Operator History:** 3 rows; 2004-01-29 through 2005-08-31; source ID `msha-controller-operator-history`
- **Inspections:** 48 rows; 2004-02-02 through 2009-04-22; source ID `msha-inspections`
- **Mine Employment and Production — Quarterly:** 53 rows; unknown through unknown; source ID `msha-mine-production-quarterly`
- **Mine Employment and Production — Yearly:** 15 rows; unknown through unknown; source ID `msha-mine-production-yearly`
- **Mines:** 1 rows; unknown through unknown; source ID `msha-mines`
- **Noise Samples:** 20 rows; 2004-09-10 through 2008-09-09; source ID `msha-noise-samples`
- **Quartz Samples — Coal:** 10 rows; 2004-07-28 through 2008-09-09; source ID `msha-quartz-samples`
- **Violations:** 192 rows; 2004-03-03 through 2008-10-09; source ID `msha-violations`

## Caveats

- This is public-record decision support, not legal advice or an official MSHA record.
- Missing data can indicate no event, publication delay, an unresolved identity, or inapplicability.
- Contractor production data is entity-level and is not attributed to this mine.

## Alternate representations

- HTML: `/mines/no-7-1518709`
- JSON: `/api/v1/mines/no-7-1518709`
- Silica records, units, sample status and quarterly means: `/api/v1/mines/1518709/silica` (snapshot year by default; `?year=all` for history; `&format=csv` for all matching rows)
- Relationship JSON: `/api/v1/mines/1518709/relationships`
- MCP resource: `mine://1518709/assessment`
- Complete Title 30 corpus: `/data/title30-sections.json`
