# Universal Materials Skousen Pit

- **MSHA mine ID:** 0202940
- **Status:** Abandoned
- **Type / commodity:** Surface / Construction Sand and Gravel
- **Location:** Pinal, AZ
- **Operator:** Universal Materials Inc
- **Controller:** Larry  Farnsworth; Suzanna  Lines
- **Public source rows linked:** 275
- **Source coverage:** 12 / 20
- **Generated:** 2026-10-13T11:26:59.401Z

## Current entity hierarchy

**Larry  Farnsworth; Suzanna  Lines (M14359) → Universal Materials Inc (L18649) → Universal Materials Skousen Pit (0202940)**

Current identity source: `msha-mines`. This is a current snapshot, not a historical claim.

## Controller and operator valid-time history

- **Larry  Farnsworth et al → Universal Materials Inc:** 2001-04-01 through current/open; derived from co-tenure at mine 0202940; source `msha-controller-operator-history`.
- **Suzanna  Lines et al → Universal Materials Inc:** 2001-04-01 through current/open; derived from co-tenure at mine 0202940; source `msha-controller-operator-history`.

- History rows: 2
- Typed edges: 4
- Interval anomalies: 0
- Valid-time bounds: inclusive; date granularity; null end means open-ended in the upstream history row; not independent proof of present control.
- Transaction-time observation: 2026-10-13T11:19:05.459773+00:00.

## Assessment signals

1. **SAFETY — 0 since 2021:** Accidents and injuries 2 historical accident/injury rows; 0 coded fatalities and 80 lost days across the published record.
2. **COMPLIANCE — 0 since 2021:** Violations and penalties 102 violation rows across the full record; 42 carry an S&S flag and $36,040 appears in current assessed amounts.
3. **HEALTH — 3 samples:** Occupational health samples 3 personal. 0 personal-sample rows have a published C/E ratio above 1; 0 noise rows have an action-level or PEL dose above 100%. These are separate measures, not a silica exceedance count. Silica results and sample status are shown separately.
4. **PRODUCTION — 0 tons:** Quarterly production and employment 7K employee hours and 13 summed average employees across reported subunits in the latest published quarter.
5. **LEGAL — 11 linked rows:** Contests, conferences and decisions 4 contested-violation rows, 7 civil-penalty docket/decision rows, and 0 conference records linked by issuance number.
6. **CONTRACTORS — 0 linked entities:** Contractors Contractors are linked through this mine’s violation or accident records. Their production and hours cover all their operations, so they are not included in this mine’s totals.
7. **INSPECTIONS — 0 since 2021:** Inspections 13 inspection events and 250 published inspection hours across the historical record.

## EIA annual operating context

No matched record in the 2024 EIA coal-public workbook. This may be inapplicable for a non-coal operation.

## Recent Title 30 crosswalk

Snapshot current through 2026-08-19.

- **30 CFR 50.30 — Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-I/part-50/subpart-D/section-50.30
- **30 CFR 56.1000 — Notification of commencement of operations and closing of mines.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-K/part-56/subpart-A/section-56.1000
- **30 CFR 56.12023 — Guarding electrical connections and resistor grids.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-K/part-56/subpart-K/section-56.12023
- **30 CFR 56.12032 — Inspection and cover plates.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-K/part-56/subpart-K/section-56.12032
- **30 CFR 56.12028 — Testing grounding systems.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-K/part-56/subpart-K/section-56.12028
- **30 CFR 56.15020 — Life jackets and belts.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-K/part-56/subpart-N/section-56.15020
- **30 CFR 56.4201 — Inspection.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-K/part-56/subpart-C/section-56.4201
- **30 CFR 56.18010 — First aid.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-K/part-56/subpart-Q/section-56.18010
- **30 CFR 50.20 — Preparation and submission of MSHA Report Form 7000-1—Mine Accident, Injury, and Illness Report.** (2 retained recent rows) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-I/part-50/subpart-C/section-50.20
- **30 CFR 46.8 — Annual refresher training.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-H/part-46/section-46.8
- **30 CFR 56.12005 — Protection of power conductors from mobile equipment.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-K/part-56/subpart-K/section-56.12005

## Source coverage

- **Accident, Injuries, and Illnesses:** 2 rows; 2003-09-21 through 2003-09-21; source ID `msha-accidents`
- **Addresses of Record:** 1 rows; 2005-11-21 through 2005-11-21; source ID `msha-addresses`
- **Assessed Violations:** 99 rows; 2002-04-23 through 2005-12-28; source ID `msha-assessed-violations`
- **Civil Penalty Dockets and Decisions:** 7 rows; 2003-05-05 through 2005-11-07; source ID `msha-civil-penalty-dockets-decisions`
- **Contested Violations:** 4 rows; 2004-11-22 through 2004-12-07; source ID `msha-contested-violations`
- **Controller and Operator History:** 2 rows; 2001-04-01 through 2001-04-01; source ID `msha-controller-operator-history`
- **Inspections:** 13 rows; 2002-04-23 through 2005-12-28; source ID `msha-inspections`
- **Mine Employment and Production — Quarterly:** 31 rows; unknown through unknown; source ID `msha-mine-production-quarterly`
- **Mine Employment and Production — Yearly:** 10 rows; unknown through unknown; source ID `msha-mine-production-yearly`
- **Mines:** 1 rows; unknown through unknown; source ID `msha-mines`
- **Metal and Nonmetal Personal Health Samples:** 3 rows; 2004-11-22 through 2004-11-22; source ID `msha-personal-health-samples`
- **Violations:** 102 rows; 2002-04-23 through 2005-12-28; source ID `msha-violations`

## Caveats

- This is public-record decision support, not legal advice or an official MSHA record.
- Missing data can indicate no event, publication delay, an unresolved identity, or inapplicability.
- Contractor production data is entity-level and is not attributed to this mine.

## Alternate representations

- HTML: `/mines/universal-materials-skousen-pit-0202940`
- JSON: `/api/v1/mines/universal-materials-skousen-pit-0202940`
- Silica records, units, sample status and quarterly means: `/api/v1/mines/0202940/silica` (snapshot year by default; `?year=all` for history; `&format=csv` for all matching rows)
- Relationship JSON: `/api/v1/mines/0202940/relationships`
- MCP resource: `mine://0202940/assessment`
- Complete Title 30 corpus: `/data/title30-sections.json`
