# No 5 Mine

- **MSHA mine ID:** 0101322
- **Status:** Abandoned and Sealed
- **Type / commodity:** Underground / Coal (Bituminous)
- **Location:** Tuscaloosa, AL
- **Operator:** Jim Walter Resources Inc
- **Controller:** Walter Energy Incorporated
- **Public source rows linked:** 12,406
- **Source coverage:** 17 / 20
- **Generated:** 2026-10-13T11:26:59.401Z

## Current entity hierarchy

**Walter Energy Incorporated (C00992) → Jim Walter Resources Inc (P01155) → No 5 Mine (0101322)**

Current identity source: `msha-mines`. This is a current snapshot, not a historical claim.

## Controller and operator valid-time history

- **Walter Energy Incorporated → Jim Walter Resources Inc:** 1975-01-01 through current/open; derived from co-tenure at mine 0101322; source `msha-controller-operator-history`.

- History rows: 1
- Typed edges: 3
- Interval anomalies: 0
- Valid-time bounds: inclusive; date granularity; null end means open-ended in the upstream history row; not independent proof of present control.
- Transaction-time observation: 2026-10-13T11:19:05.459773+00:00.

## Assessment signals

1. **SAFETY — 0 since 2021:** Accidents and injuries 331 historical accident/injury rows; 13 coded fatalities and 11,425 lost days across the published record.
2. **COMPLIANCE — 0 since 2021:** Violations and penalties 2,611 violation rows across the full record; 736 carry an S&S flag and $508,478 appears in current assessed amounts.
3. **HEALTH — 3K samples:** Occupational health samples 2,444 coal dust; 149 coal quartz; 135 noise. 0 personal-sample rows have a published C/E ratio above 1; 49 noise rows have an action-level or PEL dose above 100%. These are separate measures, not a silica exceedance count. Silica results and sample status are shown separately.
4. **PRODUCTION — 0 tons:** Quarterly production and employment 4K employee hours and 5 summed average employees across reported subunits in the latest published quarter.
5. **LEGAL — 1,950 linked rows:** Contests, conferences and decisions 275 contested-violation rows, 1,137 civil-penalty docket/decision rows, and 538 conference records linked by issuance number.
6. **CONTRACTORS — 6 linked entities:** Contractors Contractors are linked through this mine’s violation or accident records. Their production and hours cover all their operations, so they are not included in this mine’s totals.
7. **INSPECTIONS — 0 since 2021:** Inspections 840 inspection events and 28K published inspection hours across the historical record.

## EIA annual operating context

No matched record in the 2024 EIA coal-public workbook. This may be inapplicable for a non-coal operation.

## Recent Title 30 crosswalk

Snapshot current through 2026-08-19.

- **30 CFR 75.220 — Roof control plan.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-C/section-75.220
- **30 CFR 75.380 — Escapeways; bituminous and lignite mines.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.380
- **30 CFR 75.333 — Ventilation controls.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.333
- **30 CFR 75.503 — Permissible electric face equipment; maintenance.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-F/section-75.503
- **30 CFR 77.1104 — Accumulations of combustible materials.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-L/section-77.1104
- **30 CFR 77.404 — Machinery and equipment; operation and maintenance.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-E/section-77.404
- **30 CFR 77.204 — Openings in surface installations; safeguards.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-C/section-77.204
- **30 CFR 75.202 — Protection from falls of roof, face and ribs.** (2 retained recent rows) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-C/section-75.202
- **30 CFR 75.1909 — Nonpermissible diesel-powered equipment; design and performance requirements.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-T/section-75.1909
- **30 CFR 75.523-3 — Automatic emergency-parking brakes.** (1 retained recent row) — https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-F/section-75.523-3

## Source coverage

- **Accident, Injuries, and Illnesses:** 331 rows; 2000-01-13 through 2006-12-18; source ID `msha-accidents`
- **Addresses of Record:** 1 rows; 2007-04-26 through 2007-04-26; source ID `msha-addresses`
- **Assessed Violations:** 2,555 rows; 2000-01-06 through 2006-12-07; source ID `msha-assessed-violations`
- **Civil Penalty Dockets and Decisions:** 1,137 rows; 2000-08-17 through 2008-05-22; source ID `msha-civil-penalty-dockets-decisions`
- **Coal Dust Samples:** 2,444 rows; 2000-01-06 through 2007-02-22; source ID `msha-coal-dust-samples`
- **Conferences:** 538 rows; 2000-05-04 through 2007-03-22; source ID `msha-conferences`
- **Contested Violations:** 275 rows; 2002-11-06 through 2006-11-14; source ID `msha-contested-violations`
- **Contractor Employment and Production — Quarterly:** 1,024 rows; unknown through unknown; source ID `msha-contractor-production-quarterly`
- **Contractor Employment and Production — Yearly:** 212 rows; unknown through unknown; source ID `msha-contractor-production-yearly`
- **Controller and Operator History:** 1 rows; 1975-01-01 through 1975-01-01; source ID `msha-controller-operator-history`
- **Inspections:** 840 rows; 2000-01-06 through 2007-02-22; source ID `msha-inspections`
- **Mine Employment and Production — Quarterly:** 120 rows; unknown through unknown; source ID `msha-mine-production-quarterly`
- **Mine Employment and Production — Yearly:** 32 rows; unknown through unknown; source ID `msha-mine-production-yearly`
- **Mines:** 1 rows; unknown through unknown; source ID `msha-mines`
- **Noise Samples:** 135 rows; 2000-01-06 through 2007-02-22; source ID `msha-noise-samples`
- **Quartz Samples — Coal:** 149 rows; 2000-01-18 through 2006-11-01; source ID `msha-quartz-samples`
- **Violations:** 2,611 rows; 2000-01-06 through 2006-12-07; source ID `msha-violations`

## Caveats

- This is public-record decision support, not legal advice or an official MSHA record.
- Missing data can indicate no event, publication delay, an unresolved identity, or inapplicability.
- Contractor production data is entity-level and is not attributed to this mine.

## Alternate representations

- HTML: `/mines/no-5-mine-0101322`
- JSON: `/api/v1/mines/no-5-mine-0101322`
- Silica records, units, sample status and quarterly means: `/api/v1/mines/0101322/silica` (snapshot year by default; `?year=all` for history; `&format=csv` for all matching rows)
- Relationship JSON: `/api/v1/mines/0101322/relationships`
- MCP resource: `mine://0101322/assessment`
- Complete Title 30 corpus: `/data/title30-sections.json`
