{"entity":{"kind":"mine","id":"4801215","name":"Coal Creek Mine","memberCount":1,"coalMineCount":1},"window":{"period":"latest-12","start":"2025-08-01","end":"2026-07-01","availableMonths":["2025-08-01","2025-09-01","2025-10-01","2025-11-01","2025-12-01","2026-01-01","2026-02-01","2026-03-01","2026-04-01","2026-05-01","2026-06-01","2026-07-01"],"latestAvailableMonth":"2026-07","options":[{"value":"latest-12","label":"Latest 12 published months"},{"value":"all","label":"All imported years"},{"value":"2026","label":"2026"},{"value":"2025","label":"2025"},{"value":"2024","label":"2024"},{"value":"2023","label":"2023"},{"value":"2022","label":"2022"},{"value":"2021","label":"2021"},{"value":"2020","label":"2020"},{"value":"2019","label":"2019"},{"value":"2018","label":"2018"},{"value":"2017","label":"2017"},{"value":"2016","label":"2016"},{"value":"2015","label":"2015"},{"value":"2014","label":"2014"},{"value":"2013","label":"2013"},{"value":"2012","label":"2012"},{"value":"2011","label":"2011"},{"value":"2010","label":"2010"},{"value":"2009","label":"2009"},{"value":"2008","label":"2008"}]},"summary":{"tons":1656563,"mines":1,"ashPct":6.355229411739849,"plants":2,"records":35,"sulfurPct":0.35084959642343816,"pricedTons":1656563,"heatBtuPerLb":8318.536666278313,"deliveredUsdPerTon":24.018140288828736,"deliveredUsdPerMmbtu":1.4436517654717738,"disclosedDeliveredValueUsd":39787562.531283},"quarters":[{"quarter":"2025-Q3","publishedMonths":2,"partial":true,"tons":289489,"mines":1,"ashPct":6.422149718987596,"plants":2,"records":6,"sulfurPct":0.3700641475151042,"pricedTons":289489,"heatBtuPerLb":8307.156817702918,"deliveredUsdPerTon":23.643307689549516,"deliveredUsdPerMmbtu":1.4230685785998758,"disclosedDeliveredValueUsd":6844477.49974},{"quarter":"2025-Q4","publishedMonths":3,"partial":false,"tons":323362,"mines":1,"ashPct":5.98778675292706,"plants":2,"records":6,"sulfurPct":0.3305908239063341,"pricedTons":323362,"heatBtuPerLb":8276.056937735417,"deliveredUsdPerTon":25.15384338794602,"deliveredUsdPerMmbtu":1.5196755880964783,"disclosedDeliveredValueUsd":8133797.105613},{"quarter":"2026-Q1","publishedMonths":3,"partial":false,"tons":434668,"mines":1,"ashPct":6.435352498918715,"plants":2,"records":11,"sulfurPct":0.34072418489513834,"pricedTons":434668,"heatBtuPerLb":8360.772491878859,"deliveredUsdPerTon":24.211027965656548,"deliveredUsdPerMmbtu":1.4478941981242555,"disclosedDeliveredValueUsd":10523759.103776},{"quarter":"2026-Q2","publishedMonths":3,"partial":false,"tons":464168,"mines":1,"ashPct":6.38296134158322,"plants":2,"records":9,"sulfurPct":0.3543871400010341,"pricedTons":464168,"heatBtuPerLb":8323.363333965288,"deliveredUsdPerTon":23.58606390667603,"deliveredUsdPerMmbtu":1.416858964358073,"disclosedDeliveredValueUsd":10947896.111434},{"quarter":"2026-Q3","publishedMonths":1,"partial":true,"tons":144876,"mines":1,"ashPct":6.712397498550485,"plants":2,"records":3,"sulfurPct":0.3767178828791518,"pricedTons":144876,"heatBtuPerLb":8293.906806510395,"deliveredUsdPerTon":23.037857966260802,"deliveredUsdPerMmbtu":1.3888423455745234,"disclosedDeliveredValueUsd":3337632.71072}],"receipts":{"data":[{"raw":{"year":2026,"month":7,"ba_code":"PACE","plant_id":4158,"quantity":79783,"supplier":"THUNDER BASIN","fuel_cost":109.2,"regulated":"REG","fuel_group":"Coal","plant_name":"Dave Johnston","operator_id":14354,"plant_state":"WY","coalmine_name":"COAL CREEK MINE","coalmine_type":"S","energy_source":"SUB","operator_name":"PacifiCorp","purchase_type":"C","coalmine_state":"WY","coalmine_county":5,"chlorine_content":0,"coalmine_msha_id":"4801215","moisture_content":29.9,"average_ash_content":6.6,"average_heat_content":16.625,"average_sulfur_content":0.37,"average_mercury_content":0,"contract_expiration_date":1226,"primary_transportation_mode":"RR","secondary_transportation_mode":"","natural_gas_supply_contract_type":"","natural_gas_delivery_contract_type":""},"period":"2026-07-01","ash_pct":6.6,"mine_id":"4801215","plant_id":4158,"supplier":"THUNDER BASIN","coal_rank":"SUB","mine_name":"COAL CREEK MINE","mine_type":"S","mine_state":"WY","plant_name":"Dave Johnston","source_row":11966,"sulfur_pct":0.37,"cost_status":"published","mercury_ppm":0,"mine_county":"5","plant_state":"WY","source_year":2026,"chlorine_pct":0,"moisture_pct":29.9,"purchase_type":"C","quantity_tons":79783,"transport_primary":"RR","heat_mmbtu_per_ton":16.625,"contract_expiration":"1226","reporting_frequency":"not_reported","transport_secondary":"","delivered_cost_cents_per_mmbtu":109.2},{"raw":{"year":2026,"month":7,"ba_code":"ERCO","plant_id":6179,"quantity":32651,"supplier":"ARCH","fuel_cost":175.7,"regulated":"REG","fuel_group":"Coal","plant_name":"Fayette Power Project","operator_id":11269,"plant_state":"TX","coalmine_name":"COAL CREEK MINE","coalmine_type":"S","energy_source":"SUB","operator_name":"Lower Colorado River Authority","purchase_type":"S","coalmine_state":"WY","coalmine_county":5,"chlorine_content":33,"coalmine_msha_id":"4801215","moisture_content":30.23,"average_ash_content":6.9,"average_heat_content":16.46,"average_sulfur_content":0.37,"average_mercury_content":0.078,"contract_expiration_date":".","primary_transportation_mode":"RR","secondary_transportation_mode":"","natural_gas_supply_contract_type":"","natural_gas_delivery_contract_type":""},"period":"2026-07-01","ash_pct":6.9,"mine_id":"4801215","plant_id":6179,"supplier":"ARCH","coal_rank":"SUB","mine_name":"COAL CREEK MINE","mine_type":"S","mine_state":"WY","plant_name":"Fayette Power Project","source_row":12150,"sulfur_pct":0.37,"cost_status":"published","mercury_ppm":0.078,"mine_county":"5","plant_state":"TX","source_year":2026,"chlorine_pct":33,"moisture_pct":30.23,"purchase_type":"S","quantity_tons":32651,"transport_primary":"RR","heat_mmbtu_per_ton":16.46,"contract_expiration":".","reporting_frequency":"not_reported","transport_secondary":"","delivered_cost_cents_per_mmbtu":175.7},{"raw":{"year":2026,"month":7,"ba_code":"ERCO","plant_id":6179,"quantity":32442,"supplier":"ARCH","fuel_cost":175.2,"regulated":"REG","fuel_group":"Coal","plant_name":"Fayette Power Project","operator_id":11269,"plant_state":"TX","coalmine_name":"COAL CREEK MINE","coalmine_type":"S","energy_source":"SUB","operator_name":"Lower Colorado River Authority","purchase_type":"S","coalmine_state":"WY","coalmine_county":5,"chlorine_content":32,"coalmine_msha_id":"4801215","moisture_content":29.55,"average_ash_content":6.8,"average_heat_content":16.625,"average_sulfur_content":0.4,"average_mercury_content":0.077,"contract_expiration_date":".","primary_transportation_mode":"RR","secondary_transportation_mode":"","natural_gas_supply_contract_type":"","natural_gas_delivery_contract_type":""},"period":"2026-07-01","ash_pct":6.8,"mine_id":"4801215","plant_id":6179,"supplier":"ARCH","coal_rank":"SUB","mine_name":"COAL CREEK MINE","mine_type":"S","mine_state":"WY","plant_name":"Fayette Power Project","source_row":12151,"sulfur_pct":0.4,"cost_status":"published","mercury_ppm":0.077,"mine_county":"5","plant_state":"TX","source_year":2026,"chlorine_pct":32,"moisture_pct":29.55,"purchase_type":"S","quantity_tons":32442,"transport_primary":"RR","heat_mmbtu_per_ton":16.625,"contract_expiration":".","reporting_frequency":"not_reported","transport_secondary":"","delivered_cost_cents_per_mmbtu":175.2},{"raw":{"year":2026,"month":6,"ba_code":"PACE","plant_id":4158,"quantity":63012,"supplier":"THUNDER BASIN","fuel_cost":120.7,"regulated":"REG","fuel_group":"Coal","plant_name":"Dave Johnston","operator_id":14354,"plant_state":"WY","coalmine_name":"COAL CREEK MINE","coalmine_type":"S","energy_source":"SUB","operator_name":"PacifiCorp","purchase_type":"C","coalmine_state":"WY","coalmine_county":5,"chlorine_content":0,"coalmine_msha_id":"4801215","moisture_content":30.12,"average_ash_content":5.2,"average_heat_content":16.608,"average_sulfur_content":0.32,"average_mercury_content":0,"contract_expiration_date":1226,"primary_transportation_mode":"RR","secondary_transportation_mode":"","natural_gas_supply_contract_type":"","natural_gas_delivery_contract_type":""},"period":"2026-06-01","ash_pct":5.2,"mine_id":"4801215","plant_id":4158,"supplier":"THUNDER BASIN","coal_rank":"SUB","mine_name":"COAL CREEK MINE","mine_type":"S","mine_state":"WY","plant_name":"Dave Johnston","source_row":10069,"sulfur_pct":0.32,"cost_status":"published","mercury_ppm":0,"mine_county":"5","plant_state":"WY","source_year":2026,"chlorine_pct":0,"moisture_pct":30.12,"purchase_type":"C","quantity_tons":63012,"transport_primary":"RR","heat_mmbtu_per_ton":16.608,"contract_expiration":"1226","reporting_frequency":"not_reported","transport_secondary":"","delivered_cost_cents_per_mmbtu":120.7},{"raw":{"year":2026,"month":6,"ba_code":"ERCO","plant_id":6179,"quantity":16190,"supplier":"ARCH COAL SALES","fuel_cost":172.1,"regulated":"REG","fuel_group":"Coal","plant_name":"Fayette Power Project","operator_id":11269,"plant_state":"TX","coalmine_name":"COAL CREEK MINE","coalmine_type":"S","energy_source":"SUB","operator_name":"Lower Colorado River Authority","purchase_type":"S","coalmine_state":"WY","coalmine_county":5,"chlorine_content":33,"coalmine_msha_id":"4801215","moisture_content":29.44,"average_ash_content":6.7,"average_heat_content":16.73,"average_sulfur_content":0.35,"average_mercury_content":0.08,"contract_expiration_date":".","primary_transportation_mode":"RR","secondary_transportation_mode":"","natural_gas_supply_contract_type":"","natural_gas_delivery_contract_type":""},"period":"2026-06-01","ash_pct":6.7,"mine_id":"4801215","plant_id":6179,"supplier":"ARCH COAL SALES","coal_rank":"SUB","mine_name":"COAL CREEK MINE","mine_type":"S","mine_state":"WY","plant_name":"Fayette Power Project","source_row":10239,"sulfur_pct":0.35,"cost_status":"published","mercury_ppm":0.08,"mine_county":"5","plant_state":"TX","source_year":2026,"chlorine_pct":33,"moisture_pct":29.44,"purchase_type":"S","quantity_tons":16190,"transport_primary":"RR","heat_mmbtu_per_ton":16.73,"contract_expiration":".","reporting_frequency":"not_reported","transport_secondary":"","delivered_cost_cents_per_mmbtu":172.1},{"raw":{"year":2026,"month":6,"ba_code":"ERCO","plant_id":6179,"quantity":65277,"supplier":"ARCH COAL SALES","fuel_cost":171.2,"regulated":"REG","fuel_group":"Coal","plant_name":"Fayette Power Project","operator_id":11269,"plant_state":"TX","coalmine_name":"COAL CREEK MINE","coalmine_type":"S","energy_source":"SUB","operator_name":"Lower Colorado River Authority","purchase_type":"S","coalmine_state":"WY","coalmine_county":5,"chlorine_content":33,"coalmine_msha_id":"4801215","moisture_content":30.07,"average_ash_content":6.5,"average_heat_content":16.655,"average_sulfur_content":0.4,"average_mercury_content":0.08,"contract_expiration_date":".","primary_transportation_mode":"RR","secondary_transportation_mode":"","natural_gas_supply_contract_type":"","natural_gas_delivery_contract_type":""},"period":"2026-06-01","ash_pct":6.5,"mine_id":"4801215","plant_id":6179,"supplier":"ARCH COAL SALES","coal_rank":"SUB","mine_name":"COAL CREEK MINE","mine_type":"S","mine_state":"WY","plant_name":"Fayette Power Project","source_row":10241,"sulfur_pct":0.4,"cost_status":"published","mercury_ppm":0.08,"mine_county":"5","plant_state":"TX","source_year":2026,"chlorine_pct":33,"moisture_pct":30.07,"purchase_type":"S","quantity_tons":65277,"transport_primary":"RR","heat_mmbtu_per_ton":16.655,"contract_expiration":".","reporting_frequency":"not_reported","transport_secondary":"","delivered_cost_cents_per_mmbtu":171.2},{"raw":{"year":2026,"month":5,"ba_code":"PACE","plant_id":4158,"quantity":78844,"supplier":"THUNDER BASIN","fuel_cost":119.6,"regulated":"REG","fuel_group":"Coal","plant_name":"Dave Johnston","operator_id":14354,"plant_state":"WY","coalmine_name":"COAL CREEK MINE","coalmine_type":"S","energy_source":"SUB","operator_name":"PacifiCorp","purchase_type":"C","coalmine_state":"WY","coalmine_county":5,"chlorine_content":0,"coalmine_msha_id":"4801215","moisture_content":29.99,"average_ash_content":6.4,"average_heat_content":16.745,"average_sulfur_content":0.36,"average_mercury_content":0,"contract_expiration_date":1226,"primary_transportation_mode":"RR","secondary_transportation_mode":"","natural_gas_supply_contract_type":"","natural_gas_delivery_contract_type":""},"period":"2026-05-01","ash_pct":6.4,"mine_id":"4801215","plant_id":4158,"supplier":"THUNDER BASIN","coal_rank":"SUB","mine_name":"COAL CREEK MINE","mine_type":"S","mine_state":"WY","plant_name":"Dave Johnston","source_row":8227,"sulfur_pct":0.36,"cost_status":"published","mercury_ppm":0,"mine_county":"5","plant_state":"WY","source_year":2026,"chlorine_pct":0,"moisture_pct":29.99,"purchase_type":"C","quantity_tons":78844,"transport_primary":"RR","heat_mmbtu_per_ton":16.745,"contract_expiration":"1226","reporting_frequency":"not_reported","transport_secondary":"","delivered_cost_cents_per_mmbtu":119.6},{"raw":{"year":2026,"month":5,"ba_code":"ERCO","plant_id":6179,"quantity":65138,"supplier":"ARCH","fuel_cost":163.1,"regulated":"REG","fuel_group":"Coal","plant_name":"Fayette Power Project","operator_id":11269,"plant_state":"TX","coalmine_name":"COAL CREEK MINE","coalmine_type":"S","energy_source":"SUB","operator_name":"Lower Colorado River Authority","purchase_type":"S","coalmine_state":"WY","coalmine_county":5,"chlorine_content":35,"coalmine_msha_id":"4801215","moisture_content":30.19,"average_ash_content":6.8,"average_heat_content":16.548,"average_sulfur_content":0.35,"average_mercury_content":0.078,"contract_expiration_date":".","primary_transportation_mode":"RR","secondary_transportation_mode":"","natural_gas_supply_contract_type":"","natural_gas_delivery_contract_type":""},"period":"2026-05-01","ash_pct":6.8,"mine_id":"4801215","plant_id":6179,"supplier":"ARCH","coal_rank":"SUB","mine_name":"COAL CREEK MINE","mine_type":"S","mine_state":"WY","plant_name":"Fayette Power Project","source_row":8383,"sulfur_pct":0.35,"cost_status":"published","mercury_ppm":0.078,"mine_county":"5","plant_state":"TX","source_year":2026,"chlorine_pct":35,"moisture_pct":30.19,"purchase_type":"S","quantity_tons":65138,"transport_primary":"RR","heat_mmbtu_per_ton":16.548,"contract_expiration":".","reporting_frequency":"not_reported","transport_secondary":"","delivered_cost_cents_per_mmbtu":163.1},{"raw":{"year":2026,"month":5,"ba_code":"ERCO","plant_id":6179,"quantity":32531,"supplier":"ARCH","fuel_cost":157,"regulated":"REG","fuel_group":"Coal","plant_name":"Fayette Power Project","operator_id":11269,"plant_state":"TX","coalmine_name":"COAL CREEK MINE","coalmine_type":"S","energy_source":"SUB","operator_name":"Lower Colorado River Authority","purchase_type":"S","coalmine_state":"WY","coalmine_county":5,"chlorine_content":37,"coalmine_msha_id":"4801215","moisture_content":29.43,"average_ash_content":6.4,"average_heat_content":16.853,"average_sulfur_content":0.35,"average_mercury_content":0.075,"contract_expiration_date":".","primary_transportation_mode":"RR","secondary_transportation_mode":"","natural_gas_supply_contract_type":"","natural_gas_delivery_contract_type":""},"period":"2026-05-01","ash_pct":6.4,"mine_id":"4801215","plant_id":6179,"supplier":"ARCH","coal_rank":"SUB","mine_name":"COAL CREEK MINE","mine_type":"S","mine_state":"WY","plant_name":"Fayette Power Project","source_row":8385,"sulfur_pct":0.35,"cost_status":"published","mercury_ppm":0.075,"mine_county":"5","plant_state":"TX","source_year":2026,"chlorine_pct":37,"moisture_pct":29.43,"purchase_type":"S","quantity_tons":32531,"transport_primary":"RR","heat_mmbtu_per_ton":16.853,"contract_expiration":".","reporting_frequency":"not_reported","transport_secondary":"","delivered_cost_cents_per_mmbtu":157},{"raw":{"year":2026,"month":4,"ba_code":"PACE","plant_id":4158,"quantity":77866,"supplier":"THUNDER BASIN","fuel_cost":117.5,"regulated":"REG","fuel_group":"Coal","plant_name":"Dave Johnston","operator_id":14354,"plant_state":"WY","coalmine_name":"COAL CREEK MINE","coalmine_type":"S","energy_source":"SUB","operator_name":"PacifiCorp","purchase_type":"C","coalmine_state":"WY","coalmine_county":5,"chlorine_content":0,"coalmine_msha_id":"4801215","moisture_content":30.45,"average_ash_content":6.6,"average_heat_content":16.527,"average_sulfur_content":0.34,"average_mercury_content":0,"contract_expiration_date":1226,"primary_transportation_mode":"RR","secondary_transportation_mode":"","natural_gas_supply_contract_type":"","natural_gas_delivery_contract_type":""},"period":"2026-04-01","ash_pct":6.6,"mine_id":"4801215","plant_id":4158,"supplier":"THUNDER BASIN","coal_rank":"SUB","mine_name":"COAL CREEK MINE","mine_type":"S","mine_state":"WY","plant_name":"Dave Johnston","source_row":6412,"sulfur_pct":0.34,"cost_status":"published","mercury_ppm":0,"mine_county":"5","plant_state":"WY","source_year":2026,"chlorine_pct":0,"moisture_pct":30.45,"purchase_type":"C","quantity_tons":77866,"transport_primary":"RR","heat_mmbtu_per_ton":16.527,"contract_expiration":"1226","reporting_frequency":"not_reported","transport_secondary":"","delivered_cost_cents_per_mmbtu":117.5},{"raw":{"year":2026,"month":4,"ba_code":"ERCO","plant_id":6179,"quantity":48987,"supplier":"ARCH COAL SALES","fuel_cost":151,"regulated":"REG","fuel_group":"Coal","plant_name":"Fayette Power Project","operator_id":11269,"plant_state":"TX","coalmine_name":"COAL CREEK MINE","coalmine_type":"S","energy_source":"SUB","operator_name":"Lower Colorado River Authority","purchase_type":"S","coalmine_state":"WY","coalmine_county":5,"chlorine_content":39,"coalmine_msha_id":"4801215","moisture_content":30.02,"average_ash_content":6.5,"average_heat_content":16.698,"average_sulfur_content":0.36,"average_mercury_content":0.07,"contract_expiration_date":".","primary_transportation_mode":"RR","secondary_transportation_mode":"","natural_gas_supply_contract_type":"","natural_gas_delivery_contract_type":""},"period":"2026-04-01","ash_pct":6.5,"mine_id":"4801215","plant_id":6179,"supplier":"ARCH COAL SALES","coal_rank":"SUB","mine_name":"COAL CREEK MINE","mine_type":"S","mine_state":"WY","plant_name":"Fayette Power Project","source_row":6580,"sulfur_pct":0.36,"cost_status":"published","mercury_ppm":0.07,"mine_county":"5","plant_state":"TX","source_year":2026,"chlorine_pct":39,"moisture_pct":30.02,"purchase_type":"S","quantity_tons":48987,"transport_primary":"RR","heat_mmbtu_per_ton":16.698,"contract_expiration":".","reporting_frequency":"not_reported","transport_secondary":"","delivered_cost_cents_per_mmbtu":151},{"raw":{"year":2026,"month":4,"ba_code":"ERCO","plant_id":6179,"quantity":16323,"supplier":"ARCH COAL SALES","fuel_cost":152.1,"regulated":"REG","fuel_group":"Coal","plant_name":"Fayette Power Project","operator_id":11269,"plant_state":"TX","coalmine_name":"COAL CREEK MINE","coalmine_type":"S","energy_source":"SUB","operator_name":"Lower Colorado River Authority","purchase_type":"S","coalmine_state":"WY","coalmine_county":5,"chlorine_content":39,"coalmine_msha_id":"4801215","moisture_content":30,"average_ash_content":7,"average_heat_content":16.606,"average_sulfur_content":0.36,"average_mercury_content":0.07,"contract_expiration_date":".","primary_transportation_mode":"RR","secondary_transportation_mode":"","natural_gas_supply_contract_type":"","natural_gas_delivery_contract_type":""},"period":"2026-04-01","ash_pct":7,"mine_id":"4801215","plant_id":6179,"supplier":"ARCH COAL SALES","coal_rank":"SUB","mine_name":"COAL CREEK MINE","mine_type":"S","mine_state":"WY","plant_name":"Fayette Power Project","source_row":6585,"sulfur_pct":0.36,"cost_status":"published","mercury_ppm":0.07,"mine_county":"5","plant_state":"TX","source_year":2026,"chlorine_pct":39,"moisture_pct":30,"purchase_type":"S","quantity_tons":16323,"transport_primary":"RR","heat_mmbtu_per_ton":16.606,"contract_expiration":".","reporting_frequency":"not_reported","transport_secondary":"","delivered_cost_cents_per_mmbtu":152.1},{"raw":{"year":2026,"month":3,"ba_code":"PACE","plant_id":4158,"quantity":46795,"supplier":"THUNDER BASIN","fuel_cost":118.3,"regulated":"REG","fuel_group":"Coal","plant_name":"Dave Johnston","operator_id":14354,"plant_state":"WY","coalmine_name":"COAL CREEK MINE","coalmine_type":"S","energy_source":"SUB","operator_name":"PacifiCorp","purchase_type":"C","coalmine_state":"WY","coalmine_county":5,"chlorine_content":0,"coalmine_msha_id":"4801215","moisture_content":30.31,"average_ash_content":6.2,"average_heat_content":16.769,"average_sulfur_content":0.35,"average_mercury_content":0,"contract_expiration_date":1226,"primary_transportation_mode":"RR","secondary_transportation_mode":"","natural_gas_supply_contract_type":"","natural_gas_delivery_contract_type":""},"period":"2026-03-01","ash_pct":6.2,"mine_id":"4801215","plant_id":4158,"supplier":"THUNDER BASIN","coal_rank":"SUB","mine_name":"COAL CREEK MINE","mine_type":"S","mine_state":"WY","plant_name":"Dave Johnston","source_row":4604,"sulfur_pct":0.35,"cost_status":"published","mercury_ppm":0,"mine_county":"5","plant_state":"WY","source_year":2026,"chlorine_pct":0,"moisture_pct":30.31,"purchase_type":"C","quantity_tons":46795,"transport_primary":"RR","heat_mmbtu_per_ton":16.769,"contract_expiration":"1226","reporting_frequency":"not_reported","transport_secondary":"","delivered_cost_cents_per_mmbtu":118.3},{"raw":{"year":2026,"month":3,"ba_code":"ERCO","plant_id":6179,"quantity":64398,"supplier":"ARCH COAL SALES","fuel_cost":147.7,"regulated":"REG","fuel_group":"Coal","plant_name":"Fayette Power Project","operator_id":11269,"plant_state":"TX","coalmine_name":"COAL CREEK MINE","coalmine_type":"S","energy_source":"SUB","operator_name":"Lower Colorado River Authority","purchase_type":"S","coalmine_state":"WY","coalmine_county":5,"chlorine_content":32,"coalmine_msha_id":"4801215","moisture_content":30.14,"average_ash_content":5.9,"average_heat_content":16.852,"average_sulfur_content":0.36,"average_mercury_content":0.063,"contract_expiration_date":".","primary_transportation_mode":"RR","secondary_transportation_mode":"","natural_gas_supply_contract_type":"","natural_gas_delivery_contract_type":""},"period":"2026-03-01","ash_pct":5.9,"mine_id":"4801215","plant_id":6179,"supplier":"ARCH COAL SALES","coal_rank":"SUB","mine_name":"COAL CREEK MINE","mine_type":"S","mine_state":"WY","plant_name":"Fayette Power Project","source_row":4756,"sulfur_pct":0.36,"cost_status":"published","mercury_ppm":0.063,"mine_county":"5","plant_state":"TX","source_year":2026,"chlorine_pct":32,"moisture_pct":30.14,"purchase_type":"S","quantity_tons":64398,"transport_primary":"RR","heat_mmbtu_per_ton":16.852,"contract_expiration":".","reporting_frequency":"not_reported","transport_secondary":"","delivered_cost_cents_per_mmbtu":147.7},{"raw":{"year":2026,"month":3,"ba_code":"ERCO","plant_id":6179,"quantity":16238,"supplier":"ARCH COAL SALES","fuel_cost":151.3,"regulated":"REG","fuel_group":"Coal","plant_name":"Fayette Power Project","operator_id":11269,"plant_state":"TX","coalmine_name":"COAL CREEK MINE","coalmine_type":"S","energy_source":"SUB","operator_name":"Lower Colorado River Authority","purchase_type":"S","coalmine_state":"WY","coalmine_county":5,"chlorine_content":32,"coalmine_msha_id":"4801215","moisture_content":28.78,"average_ash_content":6.8,"average_heat_content":16.95,"average_sulfur_content":0.34,"average_mercury_content":0.06,"contract_expiration_date":".","primary_transportation_mode":"RR","secondary_transportation_mode":"","natural_gas_supply_contract_type":"","natural_gas_delivery_contract_type":""},"period":"2026-03-01","ash_pct":6.8,"mine_id":"4801215","plant_id":6179,"supplier":"ARCH COAL SALES","coal_rank":"SUB","mine_name":"COAL CREEK MINE","mine_type":"S","mine_state":"WY","plant_name":"Fayette Power Project","source_row":4758,"sulfur_pct":0.34,"cost_status":"published","mercury_ppm":0.06,"mine_county":"5","plant_state":"TX","source_year":2026,"chlorine_pct":32,"moisture_pct":28.78,"purchase_type":"S","quantity_tons":16238,"transport_primary":"RR","heat_mmbtu_per_ton":16.95,"contract_expiration":".","reporting_frequency":"not_reported","transport_secondary":"","delivered_cost_cents_per_mmbtu":151.3},{"raw":{"year":2026,"month":3,"ba_code":"ERCO","plant_id":6179,"quantity":32614,"supplier":"ARCH COAL SALES","fuel_cost":149.6,"regulated":"REG","fuel_group":"Coal","plant_name":"Fayette Power Project","operator_id":11269,"plant_state":"TX","coalmine_name":"COAL CREEK MINE","coalmine_type":"S","energy_source":"SUB","operator_name":"Lower Colorado River Authority","purchase_type":"S","coalmine_state":"WY","coalmine_county":5,"chlorine_content":32,"coalmine_msha_id":"4801215","moisture_content":30.63,"average_ash_content":6.3,"average_heat_content":16.551,"average_sulfur_content":0.35,"average_mercury_content":0.06,"contract_expiration_date":".","primary_transportation_mode":"RR","secondary_transportation_mode":"","natural_gas_supply_contract_type":"","natural_gas_delivery_contract_type":""},"period":"2026-03-01","ash_pct":6.3,"mine_id":"4801215","plant_id":6179,"supplier":"ARCH COAL SALES","coal_rank":"SUB","mine_name":"COAL CREEK MINE","mine_type":"S","mine_state":"WY","plant_name":"Fayette Power Project","source_row":4761,"sulfur_pct":0.35,"cost_status":"published","mercury_ppm":0.06,"mine_county":"5","plant_state":"TX","source_year":2026,"chlorine_pct":32,"moisture_pct":30.63,"purchase_type":"S","quantity_tons":32614,"transport_primary":"RR","heat_mmbtu_per_ton":16.551,"contract_expiration":".","reporting_frequency":"not_reported","transport_secondary":"","delivered_cost_cents_per_mmbtu":149.6},{"raw":{"year":2026,"month":2,"ba_code":"PACE","plant_id":4158,"quantity":31644,"supplier":"THUNDER BASIN","fuel_cost":114.5,"regulated":"REG","fuel_group":"Coal","plant_name":"Dave Johnston","operator_id":14354,"plant_state":"WY","coalmine_name":"COAL CREEK MINE","coalmine_type":"S","energy_source":"SUB","operator_name":"PacifiCorp","purchase_type":"C","coalmine_state":"WY","coalmine_county":5,"chlorine_content":0,"coalmine_msha_id":"4801215","moisture_content":29.55,"average_ash_content":6.3,"average_heat_content":16.965,"average_sulfur_content":0.32,"average_mercury_content":0,"contract_expiration_date":1226,"primary_transportation_mode":"RR","secondary_transportation_mode":"","natural_gas_supply_contract_type":"","natural_gas_delivery_contract_type":""},"period":"2026-02-01","ash_pct":6.3,"mine_id":"4801215","plant_id":4158,"supplier":"THUNDER BASIN","coal_rank":"SUB","mine_name":"COAL CREEK MINE","mine_type":"S","mine_state":"WY","plant_name":"Dave Johnston","source_row":2646,"sulfur_pct":0.32,"cost_status":"published","mercury_ppm":0,"mine_county":"5","plant_state":"WY","source_year":2026,"chlorine_pct":0,"moisture_pct":29.55,"purchase_type":"C","quantity_tons":31644,"transport_primary":"RR","heat_mmbtu_per_ton":16.965,"contract_expiration":"1226","reporting_frequency":"not_reported","transport_secondary":"","delivered_cost_cents_per_mmbtu":114.5},{"raw":{"year":2026,"month":2,"ba_code":"ERCO","plant_id":6179,"quantity":64855,"supplier":"ARCH COAL SALES","fuel_cost":151,"regulated":"REG","fuel_group":"Coal","plant_name":"Fayette Power Project","operator_id":11269,"plant_state":"TX","coalmine_name":"COAL CREEK MINE","coalmine_type":"S","energy_source":"SUB","operator_name":"Lower Colorado River Authority","purchase_type":"S","coalmine_state":"WY","coalmine_county":5,"chlorine_content":33,"coalmine_msha_id":"4801215","moisture_content":30.21,"average_ash_content":6.9,"average_heat_content":16.544,"average_sulfur_content":0.34,"average_mercury_content":0.065,"contract_expiration_date":".","primary_transportation_mode":"RR","secondary_transportation_mode":"","natural_gas_supply_contract_type":"","natural_gas_delivery_contract_type":""},"period":"2026-02-01","ash_pct":6.9,"mine_id":"4801215","plant_id":6179,"supplier":"ARCH COAL SALES","coal_rank":"SUB","mine_name":"COAL CREEK MINE","mine_type":"S","mine_state":"WY","plant_name":"Fayette Power Project","source_row":2825,"sulfur_pct":0.34,"cost_status":"published","mercury_ppm":0.065,"mine_county":"5","plant_state":"TX","source_year":2026,"chlorine_pct":33,"moisture_pct":30.21,"purchase_type":"S","quantity_tons":64855,"transport_primary":"RR","heat_mmbtu_per_ton":16.544,"contract_expiration":".","reporting_frequency":"not_reported","transport_secondary":"","delivered_cost_cents_per_mmbtu":151},{"raw":{"year":2026,"month":2,"ba_code":"ERCO","plant_id":6179,"quantity":32163,"supplier":"ARCH COAL SALES","fuel_cost":148.8,"regulated":"REG","fuel_group":"Coal","plant_name":"Fayette Power Project","operator_id":11269,"plant_state":"TX","coalmine_name":"COAL CREEK MINE","coalmine_type":"S","energy_source":"SUB","operator_name":"Lower Colorado River Authority","purchase_type":"S","coalmine_state":"WY","coalmine_county":5,"chlorine_content":32,"coalmine_msha_id":"4801215","moisture_content":29.95,"average_ash_content":6.2,"average_heat_content":16.903,"average_sulfur_content":0.34,"average_mercury_content":0.07,"contract_expiration_date":".","primary_transportation_mode":"RR","secondary_transportation_mode":"","natural_gas_supply_contract_type":"","natural_gas_delivery_contract_type":""},"period":"2026-02-01","ash_pct":6.2,"mine_id":"4801215","plant_id":6179,"supplier":"ARCH COAL SALES","coal_rank":"SUB","mine_name":"COAL CREEK MINE","mine_type":"S","mine_state":"WY","plant_name":"Fayette Power Project","source_row":2827,"sulfur_pct":0.34,"cost_status":"published","mercury_ppm":0.07,"mine_county":"5","plant_state":"TX","source_year":2026,"chlorine_pct":32,"moisture_pct":29.95,"purchase_type":"S","quantity_tons":32163,"transport_primary":"RR","heat_mmbtu_per_ton":16.903,"contract_expiration":".","reporting_frequency":"not_reported","transport_secondary":"","delivered_cost_cents_per_mmbtu":148.8},{"raw":{"year":2026,"month":2,"ba_code":"ERCO","plant_id":6179,"quantity":32411,"supplier":"ARCH COAL SALES","fuel_cost":155.1,"regulated":"REG","fuel_group":"Coal","plant_name":"Fayette Power Project","operator_id":11269,"plant_state":"TX","coalmine_name":"COAL CREEK MINE","coalmine_type":"S","energy_source":"SUB","operator_name":"Lower Colorado River Authority","purchase_type":"S","coalmine_state":"WY","coalmine_county":5,"chlorine_content":32,"coalmine_msha_id":"4801215","moisture_content":31.24,"average_ash_content":6.8,"average_heat_content":16.302,"average_sulfur_content":0.34,"average_mercury_content":0.07,"contract_expiration_date":".","primary_transportation_mode":"RR","secondary_transportation_mode":"","natural_gas_supply_contract_type":"","natural_gas_delivery_contract_type":""},"period":"2026-02-01","ash_pct":6.8,"mine_id":"4801215","plant_id":6179,"supplier":"ARCH COAL SALES","coal_rank":"SUB","mine_name":"COAL CREEK MINE","mine_type":"S","mine_state":"WY","plant_name":"Fayette Power Project","source_row":2828,"sulfur_pct":0.34,"cost_status":"published","mercury_ppm":0.07,"mine_county":"5","plant_state":"TX","source_year":2026,"chlorine_pct":32,"moisture_pct":31.24,"purchase_type":"S","quantity_tons":32411,"transport_primary":"RR","heat_mmbtu_per_ton":16.302,"contract_expiration":".","reporting_frequency":"not_reported","transport_secondary":"","delivered_cost_cents_per_mmbtu":155.1},{"raw":{"year":2026,"month":1,"ba_code":"ERCO","plant_id":6179,"quantity":16306,"supplier":"ARCH COAL SALES","fuel_cost":152.4,"regulated":"REG","fuel_group":"Coal","plant_name":"Fayette Power Project","operator_id":11269,"plant_state":"TX","coalmine_name":"COAL CREEK MINE","coalmine_type":"S","energy_source":"SUB","operator_name":"Lower Colorado River Authority","purchase_type":"NC","coalmine_state":"WY","coalmine_county":5,"chlorine_content":37,"coalmine_msha_id":"4801215","moisture_content":30.55,"average_ash_content":7.2,"average_heat_content":16.41,"average_sulfur_content":0.36,"average_mercury_content":0.05,"contract_expiration_date":1226,"primary_transportation_mode":"RR","secondary_transportation_mode":"","natural_gas_supply_contract_type":"","natural_gas_delivery_contract_type":""},"period":"2026-01-01","ash_pct":7.2,"mine_id":"4801215","plant_id":6179,"supplier":"ARCH COAL SALES","coal_rank":"SUB","mine_name":"COAL CREEK MINE","mine_type":"S","mine_state":"WY","plant_name":"Fayette Power Project","source_row":845,"sulfur_pct":0.36,"cost_status":"published","mercury_ppm":0.05,"mine_county":"5","plant_state":"TX","source_year":2026,"chlorine_pct":37,"moisture_pct":30.55,"purchase_type":"NC","quantity_tons":16306,"transport_primary":"RR","heat_mmbtu_per_ton":16.41,"contract_expiration":"1226","reporting_frequency":"not_reported","transport_secondary":"","delivered_cost_cents_per_mmbtu":152.4},{"raw":{"year":2026,"month":1,"ba_code":"ERCO","plant_id":6179,"quantity":48585,"supplier":"ARCH COAL SALES","fuel_cost":152.8,"regulated":"REG","fuel_group":"Coal","plant_name":"Fayette Power Project","operator_id":11269,"plant_state":"TX","coalmine_name":"COAL CREEK MINE","coalmine_type":"S","energy_source":"SUB","operator_name":"Lower Colorado River Authority","purchase_type":"NC","coalmine_state":"WY","coalmine_county":5,"chlorine_content":37,"coalmine_msha_id":"4801215","moisture_content":30.51,"average_ash_content":6.6,"average_heat_content":16.654,"average_sulfur_content":0.35,"average_mercury_content":0.05,"contract_expiration_date":1226,"primary_transportation_mode":"RR","secondary_transportation_mode":"","natural_gas_supply_contract_type":"","natural_gas_delivery_contract_type":""},"period":"2026-01-01","ash_pct":6.6,"mine_id":"4801215","plant_id":6179,"supplier":"ARCH COAL SALES","coal_rank":"SUB","mine_name":"COAL CREEK MINE","mine_type":"S","mine_state":"WY","plant_name":"Fayette Power Project","source_row":848,"sulfur_pct":0.35,"cost_status":"published","mercury_ppm":0.05,"mine_county":"5","plant_state":"TX","source_year":2026,"chlorine_pct":37,"moisture_pct":30.51,"purchase_type":"NC","quantity_tons":48585,"transport_primary":"RR","heat_mmbtu_per_ton":16.654,"contract_expiration":"1226","reporting_frequency":"not_reported","transport_secondary":"","delivered_cost_cents_per_mmbtu":152.8},{"raw":{"year":2026,"month":1,"ba_code":"ERCO","plant_id":6179,"quantity":48659,"supplier":"ARCH COAL SALES","fuel_cost":152.9,"regulated":"REG","fuel_group":"Coal","plant_name":"Fayette Power Project","operator_id":11269,"plant_state":"TX","coalmine_name":"COAL CREEK MINE","coalmine_type":"S","energy_source":"SUB","operator_name":"Lower Colorado River Authority","purchase_type":"S","coalmine_state":"WY","coalmine_county":5,"chlorine_content":35,"coalmine_msha_id":"4801215","moisture_content":29.67,"average_ash_content":6.3,"average_heat_content":16.951,"average_sulfur_content":0.3,"average_mercury_content":0.053,"contract_expiration_date":".","primary_transportation_mode":"RR","secondary_transportation_mode":"","natural_gas_supply_contract_type":"","natural_gas_delivery_contract_type":""},"period":"2026-01-01","ash_pct":6.3,"mine_id":"4801215","plant_id":6179,"supplier":"ARCH COAL SALES","coal_rank":"SUB","mine_name":"COAL CREEK MINE","mine_type":"S","mine_state":"WY","plant_name":"Fayette Power Project","source_row":852,"sulfur_pct":0.3,"cost_status":"published","mercury_ppm":0.053,"mine_county":"5","plant_state":"TX","source_year":2026,"chlorine_pct":35,"moisture_pct":29.67,"purchase_type":"S","quantity_tons":48659,"transport_primary":"RR","heat_mmbtu_per_ton":16.951,"contract_expiration":".","reporting_frequency":"not_reported","transport_secondary":"","delivered_cost_cents_per_mmbtu":152.9},{"raw":{"year":2025,"month":12,"plant_id":4158,"quantity":15851,"supplier":"THUNDER BASIN","fuel_cost":113.5,"regulated":"REG","fuel_group":"Coal","plant_name":"Dave Johnston","operator_id":14354,"plant_state":"WY","coalmine_name":"COAL CREEK MINE","coalmine_type":"S","energy_source":"SUB","operator_name":"PacifiCorp","purchase_type":"C","coalmine_state":"WY","coalmine_county":5,"chlorine_content":0,"coalmine_msha_id":"4801215","moisture_content":29.16,"average_ash_content":7,"reporting_frequency":"M","average_heat_content":16.786,"average_sulfur_content":0.29,"average_mercury_content":0,"balancing_authority_code":"PACE","contract_expiration_date":1226,"primary_transportation_mode":"RR","secondary_transportation_mode":"","natural_gas_supply_contract_type":"","natural_gas_delivery_contract_type":""},"period":"2025-12-01","ash_pct":7,"mine_id":"4801215","plant_id":4158,"supplier":"THUNDER BASIN","coal_rank":"SUB","mine_name":"COAL CREEK MINE","mine_type":"S","mine_state":"WY","plant_name":"Dave Johnston","source_row":34707,"sulfur_pct":0.29,"cost_status":"published","mercury_ppm":0,"mine_county":"5","plant_state":"WY","source_year":2025,"chlorine_pct":0,"moisture_pct":29.16,"purchase_type":"C","quantity_tons":15851,"transport_primary":"RR","heat_mmbtu_per_ton":16.786,"contract_expiration":"1226","reporting_frequency":"M","transport_secondary":"","delivered_cost_cents_per_mmbtu":113.5},{"raw":{"year":2025,"month":12,"plant_id":6179,"quantity":96937,"supplier":"ARCH COAL SALES","fuel_cost":151.9,"regulated":"REG","fuel_group":"Coal","plant_name":"Fayette Power Project","operator_id":11269,"plant_state":"TX","coalmine_name":"COAL CREEK MINE","coalmine_type":"S","energy_source":"SUB","operator_name":"Lower Colorado River Authority","purchase_type":"S","coalmine_state":"WY","coalmine_county":5,"chlorine_content":32,"coalmine_msha_id":"4801215","moisture_content":29.89,"average_ash_content":6.4,"reporting_frequency":"M","average_heat_content":16.755,"average_sulfur_content":0.29,"average_mercury_content":0.062,"balancing_authority_code":"ERCO","contract_expiration_date":".","primary_transportation_mode":"RR","secondary_transportation_mode":"","natural_gas_supply_contract_type":"","natural_gas_delivery_contract_type":""},"period":"2025-12-01","ash_pct":6.4,"mine_id":"4801215","plant_id":6179,"supplier":"ARCH COAL SALES","coal_rank":"SUB","mine_name":"COAL CREEK MINE","mine_type":"S","mine_state":"WY","plant_name":"Fayette Power Project","source_row":34880,"sulfur_pct":0.29,"cost_status":"published","mercury_ppm":0.062,"mine_county":"5","plant_state":"TX","source_year":2025,"chlorine_pct":32,"moisture_pct":29.89,"purchase_type":"S","quantity_tons":96937,"transport_primary":"RR","heat_mmbtu_per_ton":16.755,"contract_expiration":".","reporting_frequency":"M","transport_secondary":"","delivered_cost_cents_per_mmbtu":151.9}],"page":1,"pageSize":25,"totalRows":35,"totalPages":2},"meta":{"mineStatus":"all","dataSource":"postgres","sourceDatasetId":"eia-923-coal-receipts","scope":"exact_msha_mine_id","sourceCheckedAt":"2026-10-18T05:30:22.946Z","latestAvailableMonth":"2026-07","importedFirstMonth":"2008-01","sources":[{"url":"https://www.eia.gov/electricity/data/eia923/xls/f923_2026.zip","etag":"\"801dd7ce644bdd1:0\"","rows":3609,"tons":"213135979","year":2026,"sheet":"Page 5 Fuel Receipts and Costs","months":["2026-01-01","2026-02-01","2026-03-01","2026-04-01","2026-05-01","2026-06-01","2026-07-01"],"sha256":"63199a3dbefda8759d4cfa20e4bbcc650ff5420a8dfc1491a2463d6974fd952c","status":"preliminary","workbook":"EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx","checkedAt":"2026-10-18T05:30:24.916952+00:00","lastPeriod":"2026-07-01","firstPeriod":"2026-01-01","downloadedAt":"2026-10-13T14:55:49.137982+00:00","lastModified":"Wed, 23 Sep 2026 14:07:03 GMT","parserVersion":2,"rowsWithMineId":3554},{"url":"https://www.eia.gov/electricity/data/eia923/xls/f923_2025.zip","etag":"\"8016471f141dd1:0\"","rows":6652,"tons":"395582645","year":2025,"sheet":"Page 5 Fuel Receipts and Costs","months":["2025-01-01","2025-02-01","2025-03-01","2025-04-01","2025-05-01","2025-06-01","2025-07-01","2025-08-01","2025-09-01","2025-10-01","2025-11-01","2025-12-01"],"sha256":"1bff7092a86f6678c069c986829da5a23104048fc1aafb65b0776e3c904284de","status":"final","workbook":"EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx","checkedAt":"2026-10-18T05:30:22.946198+00:00","lastPeriod":"2025-12-01","firstPeriod":"2025-01-01","downloadedAt":"2026-10-13T14:55:42.984363+00:00","lastModified":"Fri, 11 Sep 2026 13:28:33 GMT","parserVersion":2,"rowsWithMineId":6545}],"matchedMineCount":1,"indexUrl":"https://www.eia.gov/electricity/data/eia923/index.php","instructionsUrl":"https://www.eia.gov/survey/form/eia_923/instructions.pdf","units":{"quantity":"short tons","heat":"Btu/lb","sulfur":"percent by weight","ash":"percent by weight","deliveredCost":"USD per short ton, including transport"},"notes":["Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.","Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.","Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.","Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.","USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.","Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments."]}}