{"data":{"schemaVersion":"realm.mine-profile.v1","generatedAt":"2026-10-13T11:26:59.401Z","identity":{"mine_id":"4608875","name":"Mercer Deep Mine","status":"Abandoned and Sealed","status_date":"2007-08-24","mine_type":"Underground","coal_metal":"C","commodity":"Coal (Bituminous)","state":"WV","county":"Webster","nearest_town":"Cowen","operator_id":"0051081","operator_name":"Brooks Run Mining Company LLC","controller_id":"0137121","controller_name":"Pristine Clean Energy LLC","district":"C04","office":"Summersville WV Field Office","employees":0,"latitude":38.478611,"longitude":-80.632777},"coverage":{"contributingSources":17,"registeredSources":20,"sourceRows":1280},"relationships":{"schemaVersion":"realm.temporal-relationships.v1","temporalSemantics":{"validTime":{"granularity":"date","bounds":"inclusive","nullStart":"start date not published in the upstream history row","nullEnd":"open-ended in the upstream history row; not independent proof of present control"},"transactionTime":{"observedAt":"2026-10-13T11:19:05.459773+00:00","meaning":"time the checksum-addressed MDRS artifacts were observed by the PostgreSQL ingestion"},"derivation":{"controllerControlsOperator":"intersection of controller and operator valid-time intervals evidenced through this mine","currentIdentity":"current controller and operator are asserted only by the MDRS Mines snapshot"}},"current":{"mine":{"type":"mine","id":"4608875","name":"Mercer Deep Mine"},"operator":{"type":"operator","id":"0051081","name":"Brooks Run Mining Company LLC"},"controller":{"type":"controller","id":"0137121","name":"Pristine Clean Energy LLC"},"source":{"datasetId":"msha-mines","observedAt":"2026-10-13T11:19:05.459773+00:00"}},"edges":[{"type":"controller_controls_mine","subject":{"type":"controller","id":"C01883","name":"El Paso Energy Corp"},"object":{"type":"mine","id":"4608875","name":"Mercer Deep Mine"},"validFrom":"1979-10-01","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4608875|C01883|1979-10-01|"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"P24023","name":"Coastal Coal-West Virginia LLC"},"object":{"type":"mine","id":"4608875","name":"Mercer Deep Mine"},"validFrom":"2000-12-01","validTo":"2003-01-31","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4608875|P24023|2000-12-01|2003-01-31"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C01883","name":"El Paso Energy Corp"},"object":{"type":"operator","id":"P24023","name":"Coastal Coal-West Virginia LLC"},"validFrom":"2000-12-01","validTo":"2003-01-31","current":false,"derived":true,"evidenceMineId":"4608875","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4608875|P24023|2000-12-01|C01883|1979-10-01|56607"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"0051081","name":"Brooks Run Mining Company LLC"},"object":{"type":"mine","id":"4608875","name":"Mercer Deep Mine"},"validFrom":"2003-02-01","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4608875|0051081|2003-02-01|"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"0041211","name":"Alpha Natural Resources, Inc."},"object":{"type":"mine","id":"4608875","name":"Mercer Deep Mine"},"validFrom":"2003-02-01","validTo":"2016-07-25","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4608875|0041211|2003-02-01|2016-07-25"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"0041211","name":"Alpha Natural Resources, Inc."},"object":{"type":"operator","id":"0051081","name":"Brooks Run Mining Company LLC"},"validFrom":"2003-02-01","validTo":"2016-07-25","current":false,"derived":true,"evidenceMineId":"4608875","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4608875|0051081|2003-02-01|0041211|2003-02-01|1673"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"0127923","name":"Alpha Natural Resources Holdings, Inc"},"object":{"type":"mine","id":"4608875","name":"Mercer Deep Mine"},"validFrom":"2016-07-26","validTo":"2017-10-04","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4608875|0127923|2016-07-26|2017-10-04"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"0127923","name":"Alpha Natural Resources Holdings, Inc"},"object":{"type":"operator","id":"0051081","name":"Brooks Run Mining Company LLC"},"validFrom":"2016-07-26","validTo":"2017-10-04","current":false,"derived":true,"evidenceMineId":"4608875","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4608875|0051081|2003-02-01|0127923|2016-07-26|25089"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"0137121","name":"Pristine Clean Energy LLC"},"object":{"type":"mine","id":"4608875","name":"Mercer Deep Mine"},"validFrom":"2017-10-05","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4608875|0137121|2017-10-05|"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"0137121","name":"Pristine Clean Energy LLC"},"object":{"type":"operator","id":"0051081","name":"Brooks Run Mining Company LLC"},"validFrom":"2017-10-05","validTo":null,"current":true,"derived":true,"evidenceMineId":"4608875","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4608875|0051081|2003-02-01|0137121|2017-10-05|27638"}}],"coverage":{"historyRecords":4,"edgeCount":10,"intervalAnomalies":0,"sourceDatasetId":"msha-controller-operator-history"}},"sources":[{"id":"msha-accidents","name":"Accident, Injuries, and Illnesses","domains":["safety","contractors"],"products":["incident trends","severity rates","equipment patterns","peer denominators"],"rowCount":34,"firstDate":"2003-06-05","lastDate":"2007-04-10","metrics":{"daysLost":561,"injuries":26,"fatalities":1,"recentRows":0,"restrictedDays":244,"contractorRecords":7},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"42572","DOCUMENT_NO":"220071100012","ACCIDENT_DT":"04/10/2007","DEGREE_INJURY":"NO DYS AWY FRM WRK,NO RSTR ACT","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Struck by falling object","OCCUPATION":"Bull gang foreman, Labor foreman, Leadman, Section foreman, Shift boss","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"Employee was retrieving center line laser from the roof bolter when he was struck by falling rock causing a laceration to the left ear.  Rock fell between two (2) permanent supports.","sourceDate":"2007-04-10"},{"SOURCE_ROW_NUMBER":"34037","DOCUMENT_NO":"220062330007","ACCIDENT_DT":"08/15/2006","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","DAYS_LOST":"0","NARRATIVE":"A roof fall was discovered on the #4 entry (track) on the North Mains.  The fall measured 40' long, 19' wide, and 4.5' thick and occurred due to laminated coal and shale streaks above the 48\" full grouted roof bolts.  Ventilation and the travel of men were not affected, no injuries or equipment damage occurred as a result of the fall.  Fall was 3500' from the working section.","sourceDate":"2006-08-15"},{"SOURCE_ROW_NUMBER":"231901","DOCUMENT_NO":"220062070001","ACCIDENT_DT":"07/22/2006","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","DAYS_LOST":"0","NARRATIVE":"A roof fall measuring 30'long, 19'wide, 6'thick was discovered in the #1 return entry of out bound mains 20' inby spad 56261.  Fall occurred due to laminated shale and rock streaks above the 5' fully resin roof bolts.  Ventilation and the passage of men were not affected.  No injuries or equipment was affected by a result of a fall.","sourceDate":"2006-07-22"},{"SOURCE_ROW_NUMBER":"12558","DOCUMENT_NO":"220061990005","ACCIDENT_DT":"07/07/2006","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","DAYS_LOST":"0","NARRATIVE":"A roof fall occurred in the # 4 entry outby the 001 section at spad 56254 in a 4 way intersection.  The fall measured 33' long, 36' wide,  and 6' to 7' thick.  No equipment or people were affected.  Ventilation and the the passage of men was not affected.","sourceDate":"2006-07-07"},{"SOURCE_ROW_NUMBER":"180295","DOCUMENT_NO":"220060610004","ACCIDENT_DT":"02/24/2006","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"SLIP OR FALL OF PERSON","ACCIDENT_TYPE":"Fall onto or against objects","OCCUPATION":"Utility man, Errand boy, Service truck operator","NO_INJURIES":"1","DAYS_LOST":"16","NARRATIVE":"Employee was making a belt splice. As he stepped backward without looking, he stumbled upon the 3\" water line and twisted his left knee.","sourceDate":"2006-02-24"},{"SOURCE_ROW_NUMBER":"111220","DOCUMENT_NO":"220060440047","ACCIDENT_DT":"02/08/2006","DEGREE_INJURY":"NO DYS AWY FRM WRK,NO RSTR ACT","CLASSIFICATION":"HANDLING OF MATERIALS","ACCIDENT_TYPE":"Struck against stationary object","OCCUPATION":"Haul/Off road/Coal/Ore/Pit/Quarry/Rock/Rubber tire truck driver, Transportation truck driver","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"Driver had piece of coal hung in tailgate and tried to open it enough to get coal lump out. When he tried to open it, he pushed tailgate pin with his right hand breaking his right thumb.","sourceDate":"2006-02-08"},{"SOURCE_ROW_NUMBER":"63980","DOCUMENT_NO":"220053340011","ACCIDENT_DT":"11/19/2005","DEGREE_INJURY":"NO DYS AWY FRM WRK,NO RSTR ACT","CLASSIFICATION":"MACHINERY","ACCIDENT_TYPE":"Struck by... NEC","OCCUPATION":"Roof bolter, Rock bolter,  Pinner, Mobile roof support operator (MRS)","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"Employee was setting a rib bolt when the steel stuck, his helper pulled on the steel and the steel came out and struck the small finger of the right hand causing a laceration.  The laceration required sutures, employee returned to normal duties on his next shift.","sourceDate":"2005-11-19"},{"SOURCE_ROW_NUMBER":"274813","DOCUMENT_NO":"220052990015","ACCIDENT_DT":"10/23/2005","DEGREE_INJURY":"DAYS RESTRICTED ACTIVITY ONLY","CLASSIFICATION":"SLIP OR FALL OF PERSON","ACCIDENT_TYPE":"Over-exertion NEC","OCCUPATION":"Roof bolter, Rock bolter,  Pinner, Mobile roof support operator (MRS)","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"Employee twisted left knee when he stepped from the  boom platform to the main bolter platform on the walk thru bolter.","sourceDate":"2005-10-23"},{"SOURCE_ROW_NUMBER":"102633","DOCUMENT_NO":"220052690056","ACCIDENT_DT":"09/20/2005","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","DAYS_LOST":"0","NARRATIVE":"A ROOF FALL OCCURRED IN THE #8 ENTRY OF 001 SECTION, APPROX. 120' INBY SPAD #53978.  APPROX. 90' LONG X 6-7' THICK X 18' WIDE.","sourceDate":"2005-09-20"},{"SOURCE_ROW_NUMBER":"98361","DOCUMENT_NO":"220052340104","ACCIDENT_DT":"08/13/2005","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","DAYS_LOST":"0","NARRATIVE":"A roof fall occured in #6 entry approx 50' inby spad #53498 on 2nd north parallel section, approx 50' long, 19' wide, 5 1/2' high.","sourceDate":"2005-08-13"},{"SOURCE_ROW_NUMBER":"145777","DOCUMENT_NO":"220051680024","ACCIDENT_DT":"05/25/2005","DEGREE_INJURY":"DAYS RESTRICTED ACTIVITY ONLY","CLASSIFICATION":"SLIP OR FALL OF PERSON","ACCIDENT_TYPE":"Over-exertion NEC","OCCUPATION":"Continuous miner operator, Coal mole operator","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"Employee sought medical treatment on 06/16/05 on the following:  Employee was walking from the face to the mantrip in the TRACK ENTRY when he slipped on wet mine floor and twisted his left knee.  Employee is currently working in a light duty capacity.","sourceDate":"2005-05-25"},{"SOURCE_ROW_NUMBER":"171655","DOCUMENT_NO":"220051240024","ACCIDENT_DT":"04/22/2005","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"SLIP OR FALL OF PERSON","ACCIDENT_TYPE":"Over-exertion NEC","OCCUPATION":"Laborer, Bull gang,  Parts runner, Roustabout, Roof trimmer/scaler","NO_INJURIES":"1","DAYS_LOST":"51","NARRATIVE":"STEPPED OFF OF A FLAT CAR, LEFT FOOT LANDED ON TRACK RAIL CAUSING HIM TO TWIST HIS LEFT ANKLE.","sourceDate":"2005-04-22"}]},{"id":"msha-addresses","name":"Addresses of Record","domains":["identity","logistics"],"products":["entity resolution","address history","facility geocoding"],"rowCount":1,"firstDate":"2007-08-24","lastDate":"2007-08-24","metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-assessed-violations","name":"Assessed Violations","domains":["compliance","legal"],"products":["penalty lifecycle","paid and outstanding amounts","assessment aging"],"rowCount":227,"firstDate":"2003-03-20","lastDate":"2007-08-07","metrics":{"ss":79,"delinquent":208,"recentRows":0,"paidPenalty":52154,"proposedPenalty":57952,"currentAssessment":52154},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"831802","VIOLATION_NO":"7270711","ISSUE_DT":"08/07/2007","CFR_STANDARD_CD":"75.512-2","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"138.00","CURRENT_ASSESSMENT_AMT":"138.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2007-08-07"},{"SOURCE_ROW_NUMBER":"831724","VIOLATION_NO":"7260412","ISSUE_DT":"05/02/2007","CFR_STANDARD_CD":"75.1107-4(c)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"362.00","CURRENT_ASSESSMENT_AMT":"264.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2007-05-02"},{"SOURCE_ROW_NUMBER":"831723","VIOLATION_NO":"7260402","ISSUE_DT":"04/25/2007","CFR_STANDARD_CD":"75.604(b)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"207.00","CURRENT_ASSESSMENT_AMT":"207.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2007-04-25"},{"SOURCE_ROW_NUMBER":"831699","VIOLATION_NO":"7260356","ISSUE_DT":"01/24/2007","CFR_STANDARD_CD":"75.1100-3","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"60.00","CURRENT_ASSESSMENT_AMT":"60.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2007-01-24"},{"SOURCE_ROW_NUMBER":"831698","VIOLATION_NO":"7260355","ISSUE_DT":"01/24/2007","CFR_STANDARD_CD":"75.1101-1(a)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"60.00","CURRENT_ASSESSMENT_AMT":"60.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2007-01-24"},{"SOURCE_ROW_NUMBER":"831697","VIOLATION_NO":"7260354","ISSUE_DT":"01/24/2007","CFR_STANDARD_CD":"75.807","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"60.00","CURRENT_ASSESSMENT_AMT":"60.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2007-01-24"},{"SOURCE_ROW_NUMBER":"831696","VIOLATION_NO":"7260353","ISSUE_DT":"01/24/2007","CFR_STANDARD_CD":"75.333(d)(3)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"60.00","CURRENT_ASSESSMENT_AMT":"60.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2007-01-24"},{"SOURCE_ROW_NUMBER":"831695","VIOLATION_NO":"7260350","ISSUE_DT":"01/10/2007","CFR_STANDARD_CD":"75.370(a)(1)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"60.00","CURRENT_ASSESSMENT_AMT":"60.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2007-01-10"},{"SOURCE_ROW_NUMBER":"831694","VIOLATION_NO":"7260349","ISSUE_DT":"01/10/2007","CFR_STANDARD_CD":"75.364(b)(2)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"286.00","CURRENT_ASSESSMENT_AMT":"286.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2007-01-10"},{"SOURCE_ROW_NUMBER":"831693","VIOLATION_NO":"7260348","ISSUE_DT":"01/10/2007","CFR_STANDARD_CD":"75.364(b)(4)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"60.00","CURRENT_ASSESSMENT_AMT":"60.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2007-01-10"},{"SOURCE_ROW_NUMBER":"807075","VIOLATION_NO":"7261727","ISSUE_DT":"12/18/2006","CFR_STANDARD_CD":"75.364(b)(4)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"375.00","CURRENT_ASSESSMENT_AMT":"375.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2006-12-18"},{"SOURCE_ROW_NUMBER":"807074","VIOLATION_NO":"7261726","ISSUE_DT":"12/18/2006","CFR_STANDARD_CD":"75.370(a)(1)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"60.00","CURRENT_ASSESSMENT_AMT":"60.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2006-12-18"}]},{"id":"msha-civil-penalty-dockets-decisions","name":"Civil Penalty Dockets and Decisions","domains":["compliance","legal"],"products":["docket lineage","decision outcomes","citation packet precedent"],"rowCount":7,"firstDate":"2005-10-31","lastDate":"2008-07-18","metrics":{"appeals":0,"decisions":7,"recentRows":0,"decisionPenalty":12839,"originalPenalty":18637},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"203019","VIOLATION_NO":"7260412","DOCKET_NO":"WEVA 2007-832","DECISION_DT":"07/18/2008","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"362.00","DECISION_PENALTY_AMT":"264.00","JUDGE_FIRST_NAME":"Jacqueline","JUDGE_LAST_NAME":"Bulluck","sourceDate":"2008-07-18"},{"SOURCE_ROW_NUMBER":"193766","VIOLATION_NO":"7245479","DOCKET_NO":"WEVA 2006-652","DECISION_DT":"03/13/2008","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"6900.00","DECISION_PENALTY_AMT":"5000.00","JUDGE_FIRST_NAME":"Jacqueline","JUDGE_LAST_NAME":"Bulluck","sourceDate":"2008-03-13"},{"SOURCE_ROW_NUMBER":"187045","VIOLATION_NO":"7230726","DOCKET_NO":"WEVA 2005-60","DECISION_DT":"10/31/2005","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"525.00","DECISION_PENALTY_AMT":"367.50","JUDGE_FIRST_NAME":"Avram","JUDGE_LAST_NAME":"Weisberger","sourceDate":"2005-10-31"},{"SOURCE_ROW_NUMBER":"187044","VIOLATION_NO":"7230725","DOCKET_NO":"WEVA 2005-60","DECISION_DT":"10/31/2005","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"425.00","DECISION_PENALTY_AMT":"297.50","JUDGE_FIRST_NAME":"Avram","JUDGE_LAST_NAME":"Weisberger","sourceDate":"2005-10-31"},{"SOURCE_ROW_NUMBER":"186990","VIOLATION_NO":"7230731","DOCKET_NO":"WEVA 2005-60","DECISION_DT":"10/31/2005","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"5000.00","DECISION_PENALTY_AMT":"3306.25","JUDGE_FIRST_NAME":"Avram","JUDGE_LAST_NAME":"Weisberger","sourceDate":"2005-10-31"},{"SOURCE_ROW_NUMBER":"186937","VIOLATION_NO":"7230716","DOCKET_NO":"WEVA 2005-60","DECISION_DT":"10/31/2005","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"425.00","DECISION_PENALTY_AMT":"297.50","JUDGE_FIRST_NAME":"Avram","JUDGE_LAST_NAME":"Weisberger","sourceDate":"2005-10-31"},{"SOURCE_ROW_NUMBER":"3762","VIOLATION_NO":"7230729","DOCKET_NO":"WEVA 2005-60","DECISION_DT":"10/31/2005","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"5000.00","DECISION_PENALTY_AMT":"3306.25","JUDGE_FIRST_NAME":"Avram","JUDGE_LAST_NAME":"Weisberger","sourceDate":"2005-10-31"}]},{"id":"msha-coal-dust-samples","name":"Coal Dust Samples","domains":["health","safety"],"products":["respirable dust trends","CPDM coverage","void patterns","occupation exposure"],"rowCount":250,"firstDate":"2003-04-02","lastDate":"2007-04-24","metrics":{"recentRows":0,"cpdmSamples":0,"voidSamples":42,"validSamples":208,"maxConcentration":3.733,"concentrationTotal":177.998},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"1589137","CASS_NUM":"50880742","SMP_TAKEN_DT":"4/24/2007","CONC":"1.208","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2007-04-24"},{"SOURCE_ROW_NUMBER":"285652","CASS_NUM":"50880727","SMP_TAKEN_DT":"4/16/2007","CONC":".935","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2007-04-16"},{"SOURCE_ROW_NUMBER":"985261","CASS_NUM":"50880730","SMP_TAKEN_DT":"4/12/2007","CONC":"2.327","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2007-04-12"},{"SOURCE_ROW_NUMBER":"1632144","CASS_NUM":"50880723","SMP_TAKEN_DT":"4/11/2007","CONC":"3.486","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2007-04-11"},{"SOURCE_ROW_NUMBER":"802874","CASS_NUM":"50880750","SMP_TAKEN_DT":"4/10/2007","CONC":"2.1","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2007-04-10"},{"SOURCE_ROW_NUMBER":"574506","CASS_NUM":"50880796","SMP_TAKEN_DT":"4/9/2007","CONC":"2.985","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2007-04-09"},{"SOURCE_ROW_NUMBER":"1599104","CASS_NUM":"50880736","SMP_TAKEN_DT":"1/12/2007","CONC":".912","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2007-01-12"},{"SOURCE_ROW_NUMBER":"1151677","CASS_NUM":"50880802","SMP_TAKEN_DT":"1/11/2007","CONC":"1.105","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2007-01-11"},{"SOURCE_ROW_NUMBER":"655740","CASS_NUM":"50880808","SMP_TAKEN_DT":"1/10/2007","CONC":"1.53","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2007-01-10"},{"SOURCE_ROW_NUMBER":"1486448","CASS_NUM":"50880817","SMP_TAKEN_DT":"1/9/2007","CONC":".901","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2007-01-09"},{"SOURCE_ROW_NUMBER":"656604","CASS_NUM":"50880821","SMP_TAKEN_DT":"1/8/2007","CONC":"1.48","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2007-01-08"},{"SOURCE_ROW_NUMBER":"1075647","CASS_NUM":"50880816","SMP_TAKEN_DT":"12/4/2006","CONC":"1.874","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2006-12-04"}]},{"id":"msha-conferences","name":"Conferences","domains":["compliance","legal"],"products":["conference history","post-issuance changes","citation lifecycle"],"rowCount":13,"firstDate":"2004-01-13","lastDate":"2007-01-18","metrics":{"linkedIssuances":13},"periods":{},"recentRecords":[]},{"id":"msha-contested-violations","name":"Contested Violations","domains":["compliance","legal"],"products":["contest status","time to resolution","contested-rate context"],"rowCount":7,"firstDate":"2004-04-04","lastDate":"2007-05-02","metrics":{"decisions":7,"ssChanged":0,"recentRows":0,"decisionPenalty":12839,"proposedPenalty":18637},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"401107","CITATION_NO":"7260412","CITATION_ISSUE_DT":"05/02/2007","DOCKET_NO":"WEVA 2007-832","DECISION_DT":"07/18/2008","CFR_STANDARD_CODE":"75.1107-4(c)","ORIGINAL_SIG_SUB_IND":"N","DECISION_SIG_SUB_IND":"N","PROPOSED_PENALTY_AMT":"362.00","DECISION_PENALTY_AMT":"264.00","sourceDate":"2007-05-02"},{"SOURCE_ROW_NUMBER":"2467","CITATION_NO":"7245479","CITATION_ISSUE_DT":"12/15/2005","DOCKET_NO":"WEVA 2006-652","DECISION_DT":"03/13/2008","CFR_STANDARD_CODE":"75.202(a)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"6900.00","DECISION_PENALTY_AMT":"5000.00","sourceDate":"2005-12-15"},{"SOURCE_ROW_NUMBER":"395861","CITATION_NO":"7230716","CITATION_ISSUE_DT":"04/04/2004","DOCKET_NO":"WEVA 2005-60","DECISION_DT":"10/31/2005","CFR_STANDARD_CODE":"75.333(b)(4)","ORIGINAL_SIG_SUB_IND":"N","DECISION_SIG_SUB_IND":"N","PROPOSED_PENALTY_AMT":"425.00","DECISION_PENALTY_AMT":"297.50","sourceDate":"2004-04-04"},{"SOURCE_ROW_NUMBER":"339209","CITATION_NO":"7230729","CITATION_ISSUE_DT":"04/04/2004","DOCKET_NO":"WEVA 2005-60","DECISION_DT":"10/31/2005","CFR_STANDARD_CODE":"75.400","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"5000.00","DECISION_PENALTY_AMT":"3306.25","sourceDate":"2004-04-04"},{"SOURCE_ROW_NUMBER":"112909","CITATION_NO":"7230726","CITATION_ISSUE_DT":"04/04/2004","DOCKET_NO":"WEVA 2005-60","DECISION_DT":"10/31/2005","CFR_STANDARD_CODE":"75.370(a)(1)","ORIGINAL_SIG_SUB_IND":"N","DECISION_SIG_SUB_IND":"N","PROPOSED_PENALTY_AMT":"525.00","DECISION_PENALTY_AMT":"367.50","sourceDate":"2004-04-04"},{"SOURCE_ROW_NUMBER":"56603","CITATION_NO":"7230725","CITATION_ISSUE_DT":"04/04/2004","DOCKET_NO":"WEVA 2005-60","DECISION_DT":"10/31/2005","CFR_STANDARD_CODE":"75.333(b)(2)","ORIGINAL_SIG_SUB_IND":"N","DECISION_SIG_SUB_IND":"N","PROPOSED_PENALTY_AMT":"425.00","DECISION_PENALTY_AMT":"297.50","sourceDate":"2004-04-04"},{"SOURCE_ROW_NUMBER":"778","CITATION_NO":"7230731","CITATION_ISSUE_DT":"04/04/2004","DOCKET_NO":"WEVA 2005-60","DECISION_DT":"10/31/2005","CFR_STANDARD_CODE":"75.360(a)(1)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"5000.00","DECISION_PENALTY_AMT":"3306.25","sourceDate":"2004-04-04"}]},{"id":"msha-contractor-production-quarterly","name":"Contractor Employment and Production — Quarterly","domains":["contractors","production","safety"],"products":["contractor exposure denominator","productivity","presence windows"],"rowCount":309,"firstDate":null,"lastDate":null,"metrics":{"linkedContractors":3,"notMineAttributable":1},"periods":{},"recentRecords":[]},{"id":"msha-contractor-production-yearly","name":"Contractor Employment and Production — Yearly","domains":["contractors","production","safety"],"products":["long-run contractor trend","annual denominator reconciliation"],"rowCount":40,"firstDate":null,"lastDate":null,"metrics":{"linkedContractors":3,"notMineAttributable":1},"periods":{},"recentRecords":[]},{"id":"msha-controller-operator-history","name":"Controller and Operator History","domains":["identity","compliance"],"products":["historical ownership attribution","operator transitions","valid-time joins"],"rowCount":4,"firstDate":"2000-12-01","lastDate":"2003-02-01","metrics":{"recentRows":0,"currentOperatorTenures":3,"completedOperatorTenures":1},"periods":{},"recentRecords":[]},{"id":"msha-inspections","name":"Inspections","domains":["safety","compliance"],"products":["inspection mix","on-site hours","event context","citation rate denominator"],"rowCount":37,"firstDate":"2003-02-24","lastDate":"2007-07-05","metrics":{"inspectors":81,"recentRows":0,"onSiteHours":1542,"inspectionHours":2656.25,"inspectionSamples":29},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"69636","EVENT_NO":"4116219","INSPECTION_BEGIN_DT":"07/05/2007","INSPECTION_END_DT":"09/18/2007","ACTIVITY_CODE":"E16","ACTIVITY":"Spot Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"14.5","SUM_TOTAL_ON_SITE_HOURS":"6.5","sourceDate":"2007-07-05"},{"SOURCE_ROW_NUMBER":"67078","EVENT_NO":"4116213","INSPECTION_BEGIN_DT":"04/24/2007","INSPECTION_END_DT":"07/02/2007","ACTIVITY_CODE":"E16","ACTIVITY":"Spot Inspection","NBR_INSPECTOR":"2","SUM_TOTAL_INSP_HOURS":"58.5","SUM_TOTAL_ON_SITE_HOURS":"41","sourceDate":"2007-04-24"},{"SOURCE_ROW_NUMBER":"738195","EVENT_NO":"4116206","INSPECTION_BEGIN_DT":"01/09/2007","INSPECTION_END_DT":"04/04/2007","ACTIVITY_CODE":"E16","ACTIVITY":"Spot Inspection","NBR_INSPECTOR":"2","SUM_TOTAL_INSP_HOURS":"91.5","SUM_TOTAL_ON_SITE_HOURS":"54","sourceDate":"2007-01-09"},{"SOURCE_ROW_NUMBER":"197541","EVENT_NO":"4110446","INSPECTION_BEGIN_DT":"10/27/2006","INSPECTION_END_DT":"01/05/2007","ACTIVITY_CODE":"E16","ACTIVITY":"Spot Inspection","NBR_INSPECTOR":"2","SUM_TOTAL_INSP_HOURS":"63","SUM_TOTAL_ON_SITE_HOURS":"40","sourceDate":"2006-10-27"},{"SOURCE_ROW_NUMBER":"742446","EVENT_NO":"4110437","INSPECTION_BEGIN_DT":"07/24/2006","INSPECTION_END_DT":"10/10/2006","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"4","SUM_TOTAL_INSP_HOURS":"67.5","SUM_TOTAL_ON_SITE_HOURS":"40","sourceDate":"2006-07-24"},{"SOURCE_ROW_NUMBER":"330813","EVENT_NO":"4112520","INSPECTION_BEGIN_DT":"03/06/2006","INSPECTION_END_DT":"03/13/2006","ACTIVITY_CODE":"E04","ACTIVITY":"Verbal Hazard Complaint Inspections","NBR_INSPECTOR":"2","SUM_TOTAL_INSP_HOURS":"20","SUM_TOTAL_ON_SITE_HOURS":"12","sourceDate":"2006-03-06"},{"SOURCE_ROW_NUMBER":"600596","EVENT_NO":"4112513","INSPECTION_BEGIN_DT":"02/02/2006","INSPECTION_END_DT":"03/30/2006","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"5","SUM_TOTAL_INSP_HOURS":"146.25","SUM_TOTAL_ON_SITE_HOURS":"97.75","sourceDate":"2006-02-02"},{"SOURCE_ROW_NUMBER":"405818","EVENT_NO":"4112508","INSPECTION_BEGIN_DT":"10/11/2005","INSPECTION_END_DT":"12/28/2005","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"3","SUM_TOTAL_INSP_HOURS":"149.75","SUM_TOTAL_ON_SITE_HOURS":"103","sourceDate":"2005-10-11"},{"SOURCE_ROW_NUMBER":"530791","EVENT_NO":"4106947","INSPECTION_BEGIN_DT":"07/22/2005","INSPECTION_END_DT":"09/30/2005","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"3","SUM_TOTAL_INSP_HOURS":"140","SUM_TOTAL_ON_SITE_HOURS":"85","sourceDate":"2005-07-22"},{"SOURCE_ROW_NUMBER":"901182","EVENT_NO":"4106946","INSPECTION_BEGIN_DT":"06/27/2005","INSPECTION_END_DT":"02/17/2006","ACTIVITY_CODE":"E07","ACTIVITY":"Non-Fatal Accident Investigation","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"60","SUM_TOTAL_ON_SITE_HOURS":"36.5","sourceDate":"2005-06-27"},{"SOURCE_ROW_NUMBER":"128600","EVENT_NO":"4106942","INSPECTION_BEGIN_DT":"05/12/2005","INSPECTION_END_DT":"06/01/2005","ACTIVITY_CODE":"E04","ACTIVITY":"Verbal Hazard Complaint Inspections","NBR_INSPECTOR":"2","SUM_TOTAL_INSP_HOURS":"34","SUM_TOTAL_ON_SITE_HOURS":"16","sourceDate":"2005-05-12"},{"SOURCE_ROW_NUMBER":"348182","EVENT_NO":"4106933","INSPECTION_BEGIN_DT":"04/04/2005","INSPECTION_END_DT":"06/29/2005","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"3","SUM_TOTAL_INSP_HOURS":"142.75","SUM_TOTAL_ON_SITE_HOURS":"99.5","sourceDate":"2005-04-04"}]},{"id":"msha-mine-production-quarterly","name":"Mine Employment and Production — Quarterly","domains":["production","safety","compliance"],"products":["production trend","employee hours","rate denominators","seasonality"],"rowCount":73,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2007-Q3":{"hours":612,"employees":2,"production":0},"2007-Q2":{"hours":15598,"employees":35,"production":78108},"2007-Q1":{"hours":30277,"employees":47,"production":147327},"2006-Q4":{"hours":25735,"employees":54,"production":160305},"2006-Q3":{"hours":26577,"employees":55,"production":132843},"2006-Q2":{"hours":39733,"employees":70,"production":251233},"2006-Q1":{"hours":39612,"employees":70,"production":256869},"2005-Q4":{"hours":36132,"employees":70,"production":193828},"2005-Q3":{"hours":35468,"employees":66,"production":262732},"2005-Q2":{"hours":38141,"employees":67,"production":269612},"2005-Q1":{"hours":37898,"employees":69,"production":263432},"2004-Q4":{"hours":33327,"employees":68,"production":268844}},"recentRecords":[]},{"id":"msha-mine-production-yearly","name":"Mine Employment and Production — Yearly","domains":["production","safety","compliance"],"products":["annual trend","backfill","quarterly reconciliation"],"rowCount":15,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2003":{"hours":95818,"employees":55,"production":769533},"2004":{"hours":133264,"employees":73,"production":1061282},"2005":{"hours":147639,"employees":68,"production":989604},"2006":{"hours":131657,"employees":62,"production":801250},"2007":{"hours":46487,"employees":30,"production":225435}},"recentRecords":[]},{"id":"msha-mines","name":"Mines","domains":["identity","production","logistics"],"products":["mine identity","status","commodity","location","operator and controller"],"rowCount":1,"firstDate":null,"lastDate":null,"metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-noise-samples","name":"Noise Samples","domains":["health","safety","equipment"],"products":["hearing exposure","machine and manufacturer patterns","occupation coverage"],"rowCount":9,"firstDate":"2003-09-10","lastDate":"2003-09-10","metrics":{"recentRows":0,"doseOver100":4,"actDoseTotal":931,"pelDoseTotal":743},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"247116","EVENT_NO":"4098043","SURVEY_DATE":"09/10/2003","OCCUPATION_CD_DESC":"CONTINUOUS MINER OPERATOR","MACHINE_CD":"06","MANUFACTURER_CD":"058","ACT_DOSE_85":"193","PEL_DOSE_90":"180","SURVEY_TYPE":"I","sourceDate":"2003-09-10"},{"SOURCE_ROW_NUMBER":"247115","EVENT_NO":"4098043","SURVEY_DATE":"09/10/2003","OCCUPATION_CD_DESC":"CONTINUOUS MINER OPERATOR","MACHINE_CD":"06","MANUFACTURER_CD":"058","ACT_DOSE_85":"88","PEL_DOSE_90":"73","SURVEY_TYPE":"I","sourceDate":"2003-09-10"},{"SOURCE_ROW_NUMBER":"247114","EVENT_NO":"4098043","SURVEY_DATE":"09/10/2003","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","MACHINE_CD":"37","MANUFACTURER_CD":"058","ACT_DOSE_85":"109","PEL_DOSE_90":"89","SURVEY_TYPE":"I","sourceDate":"2003-09-10"},{"SOURCE_ROW_NUMBER":"247113","EVENT_NO":"4098043","SURVEY_DATE":"09/10/2003","OCCUPATION_CD_DESC":"SECTION FOREMAN","MACHINE_CD":"40","MANUFACTURER_CD":"120","ACT_DOSE_85":"114","PEL_DOSE_90":"90","SURVEY_TYPE":"I","sourceDate":"2003-09-10"},{"SOURCE_ROW_NUMBER":"247112","EVENT_NO":"4098043","SURVEY_DATE":"09/10/2003","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","MACHINE_CD":"37","MANUFACTURER_CD":"058","ACT_DOSE_85":"91","PEL_DOSE_90":"69","SURVEY_TYPE":"I","sourceDate":"2003-09-10"},{"SOURCE_ROW_NUMBER":"247111","EVENT_NO":"4098043","SURVEY_DATE":"09/10/2003","OCCUPATION_CD_DESC":"ROOF BOLTER (MOUNTED) (RETURN SIDE)","MACHINE_CD":"30","MANUFACTURER_CD":"039","ACT_DOSE_85":"75","PEL_DOSE_90":"55","SURVEY_TYPE":"I","sourceDate":"2003-09-10"},{"SOURCE_ROW_NUMBER":"247110","EVENT_NO":"4098043","SURVEY_DATE":"09/10/2003","OCCUPATION_CD_DESC":"SCOOP CAR OPERATOR","MACHINE_CD":"38","MANUFACTURER_CD":"067","ACT_DOSE_85":"53","PEL_DOSE_90":"28","SURVEY_TYPE":"I","sourceDate":"2003-09-10"},{"SOURCE_ROW_NUMBER":"247109","EVENT_NO":"4098043","SURVEY_DATE":"09/10/2003","OCCUPATION_CD_DESC":"ROOF BOLTER (MOUNTED) (INTAKE SIDE)","MACHINE_CD":"30","MANUFACTURER_CD":"039","ACT_DOSE_85":"135","PEL_DOSE_90":"109","SURVEY_TYPE":"I","sourceDate":"2003-09-10"},{"SOURCE_ROW_NUMBER":"247108","EVENT_NO":"4098043","SURVEY_DATE":"09/10/2003","OCCUPATION_CD_DESC":"ROOF BOLTER (MOUNTED) (RETURN SIDE)","MACHINE_CD":"30","MANUFACTURER_CD":"039","ACT_DOSE_85":"73","PEL_DOSE_90":"50","SURVEY_TYPE":"I","sourceDate":"2003-09-10"}]},{"id":"msha-quartz-samples","name":"Quartz Samples — Coal","domains":["health","safety"],"products":["quartz exposure trends","occupation context","applicable-rule linkage"],"rowCount":11,"firstDate":"2003-04-16","lastDate":"2005-10-18","metrics":{"recentRows":0,"voidSamples":0,"maxQuartzPct":6.9,"validSamples":11,"quartzPctTotal":57},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"87810","CASSETTE_NO":"57500504","SAMPLE_DT":"10/18/2005","QUARTZ_PCT":"04.4","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2005-10-18"},{"SOURCE_ROW_NUMBER":"111983","CASSETTE_NO":"57500468","SAMPLE_DT":"09/13/2005","QUARTZ_PCT":"04.3","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2005-09-13"},{"SOURCE_ROW_NUMBER":"46918","CASSETTE_NO":"57500413","SAMPLE_DT":"07/27/2005","QUARTZ_PCT":"04.7","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2005-07-27"},{"SOURCE_ROW_NUMBER":"167861","CASSETTE_NO":"57497299","SAMPLE_DT":"05/04/2005","QUARTZ_PCT":"05.0","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2005-05-04"},{"SOURCE_ROW_NUMBER":"68747","CASSETTE_NO":"57497228","SAMPLE_DT":"01/21/2005","QUARTZ_PCT":"06.9","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2005-01-21"},{"SOURCE_ROW_NUMBER":"88693","CASSETTE_NO":"57453093","SAMPLE_DT":"10/31/2004","QUARTZ_PCT":"05.4","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2004-10-31"},{"SOURCE_ROW_NUMBER":"126277","CASSETTE_NO":"57452886","SAMPLE_DT":"07/27/2004","QUARTZ_PCT":"05.1","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2004-07-27"},{"SOURCE_ROW_NUMBER":"99861","CASSETTE_NO":"57395006","SAMPLE_DT":"01/09/2004","QUARTZ_PCT":"05.5","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2004-01-09"},{"SOURCE_ROW_NUMBER":"77200","CASSETTE_NO":"57394954","SAMPLE_DT":"11/06/2003","QUARTZ_PCT":"05.5","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2003-11-06"},{"SOURCE_ROW_NUMBER":"27722","CASSETTE_NO":"57423693","SAMPLE_DT":"09/19/2003","QUARTZ_PCT":"06.2","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2003-09-19"},{"SOURCE_ROW_NUMBER":"92885","CASSETTE_NO":"57423795","SAMPLE_DT":"04/16/2003","QUARTZ_PCT":"04.0","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2003-04-16"}]},{"id":"msha-violations","name":"Violations","domains":["compliance","safety","legal"],"products":["citation and order record","condition text","Title 30 linkage","abatement patterns"],"rowCount":242,"firstDate":"2003-03-20","lastDate":"2007-08-07","metrics":{"ss":80,"amountDue":52154,"contested":7,"amountPaid":52154,"recentRows":0,"section104d":3,"unterminated":0,"proposedPenalty":57952},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"2812621","VIOLATION_NO":"7270711","VIOLATION_ISSUE_DT":"08/07/2007","SIG_SUB":"N","PART_SECTION":"75.512-2","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"08/08/2007","PROPOSED_PENALTY":"138","AMOUNT_DUE":"138","AMOUNT_PAID":"138","CONTESTED_IND":"N","sourceDate":"2007-08-07"},{"SOURCE_ROW_NUMBER":"2812601","VIOLATION_NO":"7260412","VIOLATION_ISSUE_DT":"05/02/2007","SIG_SUB":"N","PART_SECTION":"75.1107-4(c)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"5","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"05/08/2007","PROPOSED_PENALTY":"362","AMOUNT_DUE":"264","AMOUNT_PAID":"264","CONTESTED_IND":"Y","DOCKET_NO":"WEVA 2007-832","sourceDate":"2007-05-02"},{"SOURCE_ROW_NUMBER":"2812600","VIOLATION_NO":"7260402","VIOLATION_ISSUE_DT":"04/25/2007","SIG_SUB":"N","PART_SECTION":"75.604(b)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"04/25/2007","PROPOSED_PENALTY":"207","AMOUNT_DUE":"207","AMOUNT_PAID":"207","CONTESTED_IND":"N","sourceDate":"2007-04-25"},{"SOURCE_ROW_NUMBER":"2812516","VIOLATION_NO":"7260356","VIOLATION_ISSUE_DT":"01/24/2007","SIG_SUB":"N","PART_SECTION":"75.1100-3","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"01/24/2007","PROPOSED_PENALTY":"60","AMOUNT_DUE":"60","AMOUNT_PAID":"60","CONTESTED_IND":"N","sourceDate":"2007-01-24"},{"SOURCE_ROW_NUMBER":"2812515","VIOLATION_NO":"7260355","VIOLATION_ISSUE_DT":"01/24/2007","SIG_SUB":"N","PART_SECTION":"75.1101-1(a)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"01/25/2007","PROPOSED_PENALTY":"60","AMOUNT_DUE":"60","AMOUNT_PAID":"60","CONTESTED_IND":"N","sourceDate":"2007-01-24"},{"SOURCE_ROW_NUMBER":"2812514","VIOLATION_NO":"7260354","VIOLATION_ISSUE_DT":"01/24/2007","SIG_SUB":"N","PART_SECTION":"75.807","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"01/25/2007","PROPOSED_PENALTY":"60","AMOUNT_DUE":"60","AMOUNT_PAID":"60","CONTESTED_IND":"N","sourceDate":"2007-01-24"},{"SOURCE_ROW_NUMBER":"2812513","VIOLATION_NO":"7260353","VIOLATION_ISSUE_DT":"01/24/2007","SIG_SUB":"N","PART_SECTION":"75.333(d)(3)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"01/24/2007","PROPOSED_PENALTY":"60","AMOUNT_DUE":"60","AMOUNT_PAID":"60","CONTESTED_IND":"N","sourceDate":"2007-01-24"},{"SOURCE_ROW_NUMBER":"2812512","VIOLATION_NO":"7260350","VIOLATION_ISSUE_DT":"01/10/2007","SIG_SUB":"N","PART_SECTION":"75.370(a)(1)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"08/23/2007","PROPOSED_PENALTY":"60","AMOUNT_DUE":"60","AMOUNT_PAID":"60","CONTESTED_IND":"N","sourceDate":"2007-01-10"},{"SOURCE_ROW_NUMBER":"2812511","VIOLATION_NO":"7260349","VIOLATION_ISSUE_DT":"01/10/2007","SIG_SUB":"Y","PART_SECTION":"75.364(b)(2)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"01/17/2007","PROPOSED_PENALTY":"286","AMOUNT_DUE":"286","AMOUNT_PAID":"286","CONTESTED_IND":"N","sourceDate":"2007-01-10"},{"SOURCE_ROW_NUMBER":"2812510","VIOLATION_NO":"7260348","VIOLATION_ISSUE_DT":"01/10/2007","SIG_SUB":"N","PART_SECTION":"75.364(b)(4)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"01/17/2007","PROPOSED_PENALTY":"60","AMOUNT_DUE":"60","AMOUNT_PAID":"60","CONTESTED_IND":"N","sourceDate":"2007-01-10"},{"SOURCE_ROW_NUMBER":"2812728","VIOLATION_NO":"7261727","VIOLATION_ISSUE_DT":"12/18/2006","SIG_SUB":"Y","PART_SECTION":"75.364(b)(4)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"Permanent","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"01/05/2007","PROPOSED_PENALTY":"375","AMOUNT_DUE":"375","AMOUNT_PAID":"375","CONTESTED_IND":"N","sourceDate":"2006-12-18"},{"SOURCE_ROW_NUMBER":"2812727","VIOLATION_NO":"7261726","VIOLATION_ISSUE_DT":"12/18/2006","SIG_SUB":"N","PART_SECTION":"75.370(a)(1)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"01/05/2007","PROPOSED_PENALTY":"60","AMOUNT_DUE":"60","AMOUNT_PAID":"60","CONTESTED_IND":"N","sourceDate":"2006-12-18"}]}],"safety":{"href":"/api/v1/mines/4608875/safety","description":"Full-period safety series, top CFR sections and paginated activity. Requires PostgreSQL."},"silica":{"href":"/api/v1/mines/4608875/silica","description":"Dedicated silica records, measurements, sample status and trends. Defaults to the snapshot year; use year=all for history."},"externalContext":{"eia":null,"title30":{"snapshot":{"chapterCount":6,"featuredSectionCount":100,"latestAmendedOn":"2026-08-14","latestIssueDate":"2026-08-14","partCount":206,"sectionCount":5954,"upToDateAsOf":"2026-08-19"},"regulations":[{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.512-2","heading":"Frequency of examinations.","id":"75.512-2","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-F/section-75.512-2","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"F","subpartHeading":"Subpart F—Electrical Equipment—General","text":"The examinations and tests required by § 75.512 shall be made at least weekly. Permissible equipment shall be examined to see that it is in permissible condition.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.1107-4","heading":"Automatic fire sensors and manual actuators; installation; minimum requirements.","id":"75.1107-4","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-L/section-75.1107-4","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"L","subpartHeading":"Subpart L—Fire Protection","text":"(a)(1) Where fire suppression devices are installed on unattended underground equipment, one or more point-type sensors or equivalent shall be installed for each 50 square feet of top surface area, or fraction thereof, of such equipment, and each sensor shall be designed to activate the first suppression system and disconnect the electrical power source to the equipment protected, and, except where sprinklers are used, there shall be in addition, a manual actuator installed to operate the system. Where sprinklers are used, provision shall be made for manual application of water to the protected equipment in lieu of a manual actuator.\n\n(2) Two or more manual actuators, where practicable, shall be installed, as provided in paragraphs (a)(2) (i) and (ii) of this section, to activate fire suppression devices on attended equipment purchased on or after the effective date of this § 75.1107-4. At least one manual actuator shall be used on equipment purchased prior to the effective date of this § 75.1107-4.\n\n(i) Manual actuators installed on attended equipment regularly operated by a miner, as provided in § 75.1107-1(c)(1) shall be located at different locations on the equipment, and at least one manual actuator shall be located within easy reach of the operator's normal operating position.\n\n(ii) Manual actuators to activate fire suppression devices on attended equipment not regularly operated by a miner, as provided in § 75.1107-1(c)(2), shall be installed at different location, and at least one manual actuator shall be installed so as to be easily reached by the miner at the jobsite or by persons approaching the equipment.\n\n(b) Sensors shall, where practicable, be installed in accordance with the recommendations set forth in National Fire Code No. 72A “Local Protective Signaling Systems” (NFPA No. 72A-1967).\n\n(c) On unattended equipment the fire suppression device shall operate independently of the power to the main motor (or equivalent) so it will remain operative if the circuit breakers (or other protective device) actuates. On attended equipment powered through a trailing cable the fire suppression device shall operate independently of the electrical power provided by the cable.\n\n(d) Point-type sensors (such as thermocouple, bimetallic strip, or rate of temperature rise) located in ventilated passageways shall be installed downwind from the equipment to be protected.\n\n(e) Sensor systems shall include a device or method for determining their operative condition.\n\n[37 FR 15301, July 29, 1972]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.604","heading":"Permanent splicing of trailing cables.","id":"75.604","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-G/section-75.604","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"G","subpartHeading":"Subpart G—Trailing Cables","text":"[Statutory Provisions]\n\nWhen permanent splices in trailing cables are made, they shall be:\n\n(a) Mechanically strong with adequate electrical conductivity and flexibility;\n\n(b) Effectively insulated and sealed so as to exclude moisture; and\n\n(c) Vulcanized or otherwise treated with suitable materials to provide flame-resistant qualities and good bonding to the outer jacket.\n\n(d) Made using splice kits accepted or approved by MSHA as flame resistant.\n\n[35 FR 17890, Nov. 20, 1970, as amended at 57 FR 61223, Dec. 23, 1992]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.1100-3","heading":"Condition and examination of firefighting equipment.","id":"75.1100-3","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-L/section-75.1100-3","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"L","subpartHeading":"Subpart L—Fire Protection","text":"All firefighting equipment shall be maintained in a usable and operative condition. Chemical extinguishers shall be examined every 6 months and the date of the examination shall be written on a permanent tag attached to the extinguisher.\n\n[35 FR 17890, Nov. 20, 1970, as amended at 60 FR 33723, June 29, 1995]","occurrenceCount":1},{"chapter":"I","heading":"Deluge-type water spray systems.","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-L/section-75.1101-1","part":"75","subchapter":"O","subpart":"L","id":"75.1101-1","citation":"30 CFR 75.1101-1","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subpartHeading":"","text":null,"occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.807","heading":"Installation of high-voltage transmission cables.","id":"75.807","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-I/section-75.807","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"I","subpartHeading":"Subpart I—Underground High-Voltage Distribution","text":"[Statutory Provisions]\n\nAll underground high-voltage transmission cables shall be installed only in regularly inspected air courses and haulageways, and shall be covered, buried, or placed so as to afford protection against damage, guarded where men regularly work or pass under them unless they are 6 1/2 feet or more above the floor or rail, securely anchored, properly insulated, and guarded at ends, and covered, insulated, or placed to prevent contact with trolley wires and other low-voltage circuits.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.333","heading":"Ventilation controls.","id":"75.333","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.333","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a) For purposes of this section, “doors” include any door frames.\n\n(b) Permanent stoppings or other permanent ventilation control devices constructed after November 15, 1992, shall be built and maintained—\n\n(1) Between intake and return air courses, except temporary controls may be used in rooms that are 600 feet or less from the centerline of the entry from which the room was developed including where continuous face haulage systems are used in such rooms. Unless otherwise approved in the ventilation plan, these stoppings or controls shall be maintained to and including the third connecting crosscut outby the working face;\n\n(2) To separate belt conveyor haulageways from return air courses, except where belt entries in areas of mines developed before March 30, 1970, are used as return air courses;\n\n(3) To separate belt conveyor haulageways from intake air courses when the air in the intake air courses is used to provide air to active working places. Temporary ventilation controls may be used in rooms that are 600 feet or less from the centerline of the entry from which the rooms were developed including where continuous face haulage systems are used in such rooms. When continuous face haulage systems are used, permanent stoppings or other permanent ventilation control devices shall be built and maintained to the outby most point of travel of the dolly or 600 feet from the point of deepest penetration in the conveyor belt entry, whichever distance is closer to the point of deepest penetration, to separate the continuous haulage entry from the intake entries;\n\n(4) To separate the primary escapeway from belt and trolley haulage entries, as required by § 75.380(g). For the purposes of § 75.380(g), the loading point for a continuous haulage system shall be the outby most point of travel of the dolly or 600 feet from the point of deepest penetration, whichever distance is less; and\n\n(5) In return air courses to direct air into adjacent worked-out areas.\n\n(c) Personnel doors shall be constructed of noncombustible material and shall be of sufficient strength to serve their intended purpose of maintaining separation and permitting travel between air courses, and shall be installed as follows in permanent stoppings constructed after November 15, 1992:\n\n(1) The distance between personnel doors shall be no more than 300 feet in seam heights below 48 inches and 600 feet in seam heights 48 inches or higher.\n\n(2) The location of all personnel doors in stoppings along escapeways shall be clearly marked so that the doors may be easily identified by anyone traveling in the escapeway and in the entries on either side of the doors.\n\n(3) When not in use, personnel doors shall be closed.\n\n(4) An airlock shall be established where the air pressure differential between air courses creates a static force exceeding 125 pounds on closed personnel doors along escapeways.\n\n(d) Doors, other than personnel doors, constructed after November 15, 1992, that are used in lieu of permanent stoppings or to control ventilation within an air course shall be:\n\n(1) Made of noncombustible material or coated on all accessible surfaces with flame-retardant materials having a flame-spread index of 25 or less, as tested under ASTM E162-87, “Standard Test Method for Surface Flammability of Materials Using a Radiant Heat Energy Source.” This publication is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.\n\n(2) Of sufficient strength to serve their intended purpose of maintaining separation and permitting travel between or within air courses or entries.\n\n(3) Installed in pairs to form an airlock. When an airlock is used, one side of the airlock shall remain closed. When not in use, both sides shall be closed.\n\n(e)(1)(i) Except as provided in paragraphs (e)(2), (3), and (4) of this section, all overcasts, undercasts, shaft partitions, permanent stoppings, and regulators, installed after June 10, 1996, shall be constructed in a traditionally accepted method and of materials that have been demonstrated to perform adequately or in a method and of materials that have been tested and shown to have a minimum strength equal to or greater than the traditionally accepted in-mine controls. Tests may be performed under ASTM E72-80, “Standard Methods of Conducting Strength Tests of Panels for Building Construction” (Section 12-Transverse Load-Specimen Vertical, load, only), or the operator may conduct comparative in-mine tests. In-mine tests shall be designed to demonstrate the comparative strength of the proposed construction and a traditionally accepted in-mine control. The publication ASTM E72-80, “Standard Methods of Conducting Strength Tests of Panels for Building Construction,” is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.\n\n(ii) All overcasts, undercasts, shaft partitions, permanent stoppings, and regulators, installed after November 15, 1992, shall be constructed of noncombustible material. Materials that are suitable for the construction of overcasts, undercasts, shaft partitions, permanent stoppings, and regulators include concrete, concrete block, brick, cinder block, tile, or steel. No ventilation controls installed after November 15, 1992, shall be constructed of aluminum.\n\n(2) In anthracite mines, permanent stoppings may be constructed of overlapping layers of hardwood mine boards, if the stoppings are a minimum 2 inches thick.\n\n(3) When timbers are used to create permanent stoppings in heaving or caving areas, the stoppings shall be coated on all accessible surfaces with a flame-retardant material having a flame-spread index of 25 or less, as tested under ASTM E162-87, “Standard Test Method for Surface Flammability of Materials Using a Radiant Heat Energy Source.” This publication is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.\n\n(4) In anthracite mines, doors and regulators may be constructed of overlapping layers of hardwood boards, if the doors, door frames, and regulators are a minimum 2 inches thick.\n\n(f) When sealants are applied to ventilation controls, the sealant shall have a flame-spread index of 25 or less under ASTM E162-87, “Standard Test Method for Surface Flammability of Materials Using a Radiant Heat Energy Source.” This publication is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.\n\n(g) Before mining is discontinued in an entry or room that is advanced more than 20 feet from the inby rib, a crosscut shall be made or line brattice shall be installed and maintained to provide adequate ventilation. When conditions such as methane liberation warrant a distance less than 20 feet, the approved ventilation plan shall specify the location of such rooms or entries and the maximum distance they will be developed before a crosscut is made or line brattice is installed.\n\n(h) All ventilation controls, including seals, shall be maintained to serve the purpose for which they were built.\n\n[61 FR 9829, Mar. 11, 1996; 61 FR 20877, May 8, 1996; 61 FR 26442, May 28, 1996; 61 FR 29288, 29289, June 10, 1996, as amended at 67 FR 38386, June 4, 2002; 71 FR 16668, Apr. 3, 2006; 73 FR 80612, Dec. 31, 2008; 80 FR 52991, Sept. 2, 2015; 91 FR 9448, Feb. 26, 2026]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.370","heading":"Mine ventilation plan; submission and approval.","id":"75.370","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.370","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a)(1) The operator shall develop and follow a ventilation plan approved by the district manager. The plan shall be designed to control methane and respirable dust and shall be suitable to the conditions and mining system at the mine. The ventilation plan shall consist of two parts, the plan content as prescribed in § 75.371 and the ventilation map with information as prescribed in § 75.372. Only that portion of the map which contains information required under § 75.371 will be subject to approval by the district manager.\n\n(2) The proposed ventilation plan and any revision to the plan shall be submitted in writing to the district manager. When revisions to a ventilation plan are proposed, only the revised pages, maps, or sketches of the plan need to be submitted. When required in writing by the district manager, the operator shall submit a fully revised plan by consolidating the plan and all revisions in an orderly manner and by deleting all outdated material.\n\n(3) (i) The mine operator shall notify the representative of miners at least 5 days prior to submission of a mine ventilation plan and any revision to a mine ventilation plan. If requested, the mine operator shall provide a copy to the representative of miners at the time of notification. In the event of a situation requiring immediate action on a plan revision, notification of the revision shall be given, and if requested, a copy of the revision shall be provided, to the representative of miners by the operator at the time of submittal;\n\n(ii) A copy of the proposed ventilation plan, and a copy of any proposed revision, submitted for approval shall be made available for inspection by the representative of miners; and\n\n(iii) A copy of the proposed ventilation plan, and a copy of any proposed revision, submitted for approval shall be posted on the mine bulletin board at the time of submittal. The proposed plan or proposed revision shall remain posted until it is approved, withdrawn or denied.\n\n(b) Following receipt of the proposed plan or proposed revision, the representative of miners may submit timely comments to the district manager, in writing, for consideration during the review process. A copy of these comments shall also be provided to the operator by the district manager upon request.\n\n(c) (1) The district manager will notify the operator in writing of the approval or denial of approval of a proposed ventilation plan or proposed revision. A copy of this notification will be sent to the representative of miners by the district manager.\n\n(2) If the district manager denies approval of a proposed plan or revision, the deficiencies of the plan or revision shall be specified in writing and the operator will be provided an opportunity to discuss the deficiencies with the district manager.\n\n(d) No proposed ventilation plan shall be implemented before it is approved by the district manager. Any intentional change to the ventilation system that alters the main air current or any split of the main air current in a manner that could materially affect the safety and health of the miners, or any change to the information required in § 75.371 shall be submitted to and approved by the district manager before implementation.\n\n(e) Before implementing an approved ventilation plan or a revision to a ventilation plan, persons affected by the revision shall be instructed by the operator in its provisions.\n\n(f) The approved ventilation plan and any revisions shall be—\n\n(1) Provided upon request to the representative of miners by the operator following notification of approval;\n\n(2) Made available for inspection by the representative of miners; and\n\n(3) Posted on the mine bulletin board within 1 working day following notification of approval. The approved plan and revisions shall remain posted on the bulletin board for the period that they are in effect.\n\n(g) The ventilation plan for each mine shall be reviewed every 6 months by an authorized representative of the Secretary to assure that it is suitable to current conditions in the mine.","occurrenceCount":2},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.364","heading":"Weekly examination.","id":"75.364","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.364","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a) Worked-out areas. (1) At least every 7 days, a certified person shall examine unsealed worked-out areas where no pillars have been recovered by traveling to the area of deepest penetration; measuring methane and oxygen concentrations and air quantities and making tests to determine if the air is moving in the proper direction in the area. The locations of measurement points where tests and measurements will be performed shall be included in the mine ventilation plan and shall be adequate in number and location to assure ventilation and air quality in the area. Air quantity measurements shall also be made where the air enters and leaves the worked-out area. An alternative method of evaluating the ventilation of the area may be approved in the ventilation plan.\n\n(2) At least every 7 days, a certified person shall evaluate the effectiveness of bleeder systems required by § 75.334 as follows:\n\n(i) Measurements of methane and oxygen concentrations and air quantity and a test to determine if the air is moving in its proper direction shall be made where air enters the worked-out area.\n\n(ii) Measurements of methane and oxygen concentrations and air quantity and a test to determine if the air is moving in the proper direction shall be made immediately before the air enters a return split of air.\n\n(iii) At least one entry of each set of bleeder entries used as part of a bleeder system under § 75.334 shall be traveled in its entirety. Measurements of methane and oxygen concentrations and air quantities and a test to determine if the air is moving in the proper direction shall be made at the measurement point locations specified in the mine ventilation plan to determine the effectiveness of the bleeder system.\n\n(iv) In lieu of the requirements of paragraphs (a)(2)(i) and (iii) of this section, an alternative method of evaluation may be specified in the ventilation plan provided the alternative method results in proper evaluation of the effectiveness of the bleeder system.\n\n(b) Hazardous conditions and violations of mandatory health or safety standards. At least every 7 days, an examination for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (b)(8) of this section shall be made by a certified person designated by the operator at the following locations:\n\n(1) In at least one entry of each intake air course, in its entirety, so that the entire air course is traveled.\n\n(2) In at least one entry of each return air course, in its entirety, so that the entire air course is traveled.\n\n(3) In each longwall or shortwall travelway in its entirety, so that the entire travelway is traveled.\n\n(4) At each seal along return and bleeder air courses and at each seal along intake air courses not examined under § 75.360(b)(5).\n\n(5) In each escapeway so that the entire escapeway is traveled.\n\n(6) On each working section not examined under § 75.360(b)(3) during the previous 7 days.\n\n(7) At each water pump not examined during a preshift examination conducted during the previous 7 days.\n\n(8) Weekly examinations shall include examinations to identify violations of the standards listed below:\n\n(i) §§ 75.202(a) and 75.220(a)(1)—roof control;\n\n(ii) §§ 75.333(h) and 75.370(a)(1)—ventilation, methane;\n\n(iii) §§ 75.400 and 75.403—accumulations of combustible materials and application of rock dust; and\n\n(iv) § 75.1403—maintenance of off track haulage roadways, and track haulage, track switches, and other components for haulage;\n\n(v) § 75.1722(a)—guarding moving machine parts; and\n\n(vi) § 75.1731(a)—maintenance of belt conveyor components.\n\n(c) Measurements and tests. At least every 7 days, a certified person shall—\n\n(1) Determine the volume of air entering the main intakes and in each intake split;\n\n(2) Determine the volume of air and test for methane in the last open crosscut in any pair or set of developing entries or rooms, in the return of each split of air immediately before it enters the main returns, and where the air leaves the main returns; and\n\n(3) Test for methane in the return entry nearest each set of seals immediately after the air passes the seals.\n\n(d) Hazardous conditions shall be corrected immediately. If the condition creates an imminent danger, everyone except those persons referred to in section 104(c) of the Act shall be withdrawn from the area affected to a safe area until the hazardous condition is corrected. Any violation of the nine mandatory health or safety standards found during a weekly examination shall be corrected.\n\n(e) The weekly examination may be conducted at the same time as the preshift or on-shift examinations.\n\n(f) (1) The weekly examination is not required during any 7 day period in which no one enters any underground area of the mine.\n\n(2) Except for certified persons required to make examinations, no one shall enter any underground area of the mine if a weekly examination has not been completed within the previous 7 days.\n\n(g) Certification. The person making the weekly examinations shall certify by initials, date, and the time that the examination was made. Certifications and times shall appear at enough locations to show that the entire area has been examined.\n\n(h) Recordkeeping. At the completion of any shift during which a portion of a weekly examination is conducted, a record of the results of each weekly examination, including a record of hazardous conditions and violations of the nine mandatory health or safety standards found during each examination and their locations, the corrective action taken, and the results and location of air and methane measurements, shall be made. The results of methane tests shall be recorded as the percentage of methane measured by the examiner. The record shall be made by the person making the examination or a person designated by the operator. If made by a person other than the examiner, the examiner shall verify the record by initials and date by or at the end of the shift for which the examination was made. The record shall be countersigned by the mine foreman or equivalent mine official by the end of the mine foreman's or equivalent mine official's next regularly scheduled working shift. The records required by this section shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.\n\n(i) Retention period. Records shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.\n\n[61 FR 9829, Mar. 11, 1996, as amended at 77 FR 20715, Apr. 6, 2012]","occurrenceCount":3}],"fullCorpus":"/data/title30-sections.json"}}},"meta":{"representation":"json","mineId":"4608875","dataSource":"postgres","snapshotId":"2026-10-13T11:19:05.459773+00:00","completedAt":"2026-10-13T11:26:59.401Z","sourceCount":20,"totalRows":17906804}}