{"data":{"schemaVersion":"realm.mine-profile.v1","generatedAt":"2026-10-13T11:26:59.401Z","identity":{"mine_id":"4608821","name":"Deep Mine No 6","status":"Abandoned and Sealed","status_date":"2004-02-27","mine_type":"Underground","coal_metal":"C","commodity":"Coal (Bituminous)","state":"WV","county":"Wayne","nearest_town":"Dunlow","operator_id":"0050985","operator_name":"Argus Energy WV, LLC","controller_id":"C11194","controller_name":"James H  Booth","district":"C04","office":"Beckley District","employees":0,"latitude":38.018055,"longitude":-82.248888},"coverage":{"contributingSources":14,"registeredSources":20,"sourceRows":1005},"relationships":{"schemaVersion":"realm.temporal-relationships.v1","temporalSemantics":{"validTime":{"granularity":"date","bounds":"inclusive","nullStart":"start date not published in the upstream history row","nullEnd":"open-ended in the upstream history row; not independent proof of present control"},"transactionTime":{"observedAt":"2026-10-13T11:19:05.459773+00:00","meaning":"time the checksum-addressed MDRS artifacts were observed by the PostgreSQL ingestion"},"derivation":{"controllerControlsOperator":"intersection of controller and operator valid-time intervals evidenced through this mine","currentIdentity":"current controller and operator are asserted only by the MDRS Mines snapshot"}},"current":{"mine":{"type":"mine","id":"4608821","name":"Deep Mine No 6"},"operator":{"type":"operator","id":"0050985","name":"Argus Energy WV, LLC"},"controller":{"type":"controller","id":"C11194","name":"James H  Booth"},"source":{"datasetId":"msha-mines","observedAt":"2026-10-13T11:19:05.459773+00:00"}},"edges":[{"type":"controller_controls_mine","subject":{"type":"controller","id":"C10596","name":"Pen Holdings Inc"},"object":{"type":"mine","id":"4608821","name":"Deep Mine No 6"},"validFrom":"1950-01-01","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4608821|C10596|1950-01-01|"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"P20719","name":"Pen Coal Corp"},"object":{"type":"mine","id":"4608821","name":"Deep Mine No 6"},"validFrom":"2000-01-01","validTo":"2002-12-19","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4608821|P20719|2000-01-01|2002-12-19"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C10596","name":"Pen Holdings Inc"},"object":{"type":"operator","id":"P20719","name":"Pen Coal Corp"},"validFrom":"2000-01-01","validTo":"2002-12-19","current":false,"derived":true,"evidenceMineId":"4608821","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4608821|P20719|2000-01-01|C10596|1950-01-01|82374"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"0050985","name":"Argus Energy WV, LLC"},"object":{"type":"mine","id":"4608821","name":"Deep Mine No 6"},"validFrom":"2002-12-20","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4608821|0050985|2002-12-20|"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"C11194","name":"James H  Booth et al"},"object":{"type":"mine","id":"4608821","name":"Deep Mine No 6"},"validFrom":"2002-12-20","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4608821|C11194|2002-12-20|"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C11194","name":"James H  Booth et al"},"object":{"type":"operator","id":"0050985","name":"Argus Energy WV, LLC"},"validFrom":"2002-12-20","validTo":null,"current":true,"derived":true,"evidenceMineId":"4608821","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4608821|0050985|2002-12-20|C11194|2002-12-20|83979"}}],"coverage":{"historyRecords":2,"edgeCount":6,"intervalAnomalies":0,"sourceDatasetId":"msha-controller-operator-history"}},"sources":[{"id":"msha-accidents","name":"Accident, Injuries, and Illnesses","domains":["safety","contractors"],"products":["incident trends","severity rates","equipment patterns","peer denominators"],"rowCount":26,"firstDate":"2000-03-28","lastDate":"2003-07-08","metrics":{"daysLost":1538,"injuries":25,"fatalities":0,"recentRows":0,"restrictedDays":0,"contractorRecords":0},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"72585","DOCUMENT_NO":"220032020011","ACCIDENT_DT":"07/08/2003","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"HANDLING OF MATERIALS","ACCIDENT_TYPE":"Over-exertion in lifting objects","OCCUPATION":"Mine manager, Mine foreman, Mine owner","NO_INJURIES":"1","DAYS_LOST":"17","NARRATIVE":"EE STATED THAT WHILE LOADING A SPOOL OF STEEL ROPE HE INJURED HIS BACK.","sourceDate":"2003-07-08"},{"SOURCE_ROW_NUMBER":"188737","DOCUMENT_NO":"220031700057","ACCIDENT_DT":"06/09/2003","DEGREE_INJURY":"NO VALUE FOUND","CLASSIFICATION":"NO VALUE FOUND","ACCIDENT_TYPE":"No Value Found","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"WHILE THE EE WAS OPERATING THE ELECTRICIAN FOUR WHEELER HE HIT A ROCK IN THE ROADWAY CAUSING THESTEERING WHEEL TO JERK OUT OF HIS HAND INJURING HIS THUMB ON HIS RIGHT HAND","sourceDate":"2003-06-09"},{"SOURCE_ROW_NUMBER":"262088","DOCUMENT_NO":"220030980004","ACCIDENT_DT":"03/24/2003","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"NO VALUE FOUND","ACCIDENT_TYPE":"No Value Found","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"1","DAYS_LOST":"294","NARRATIVE":"EE STATED THAT WHILE LIFTING A MINER CABLE HE FELT PAIN IN HIS BACK.","sourceDate":"2003-03-24"},{"SOURCE_ROW_NUMBER":"244819","DOCUMENT_NO":"220030940030","ACCIDENT_DT":"03/22/2003","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"HANDLING OF MATERIALS","ACCIDENT_TYPE":"Over-exertion in lifting objects","OCCUPATION":"Roof bolter, Rock bolter,  Pinner, Mobile roof support operator (MRS)","NO_INJURIES":"1","DAYS_LOST":"5","NARRATIVE":"THE EMPLOYEE STATED THAT WHILE HANGING THE ROOF BOLTER CABLE ACROSS THE ROADWAY HE FELT A SHARP PAIN IN HIS LEFT ARM AND SHOULDER.","sourceDate":"2003-03-22"},{"SOURCE_ROW_NUMBER":"63959","DOCUMENT_NO":"220030900025","ACCIDENT_DT":"03/20/2003","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"NO VALUE FOUND","ACCIDENT_TYPE":"No Value Found","OCCUPATION":"Clerk, Timekeeper, Office worker, Director of sales","NO_INJURIES":"1","DAYS_LOST":"288","NARRATIVE":"EE STATED THAT WHILE LIFTING A 6 VOLT BATTERY, (APPROX. 45 LBS.) HE FELT A PAIN IN HIS RIGHT ARM.","sourceDate":"2003-03-20"},{"SOURCE_ROW_NUMBER":"34022","DOCUMENT_NO":"220030710010","ACCIDENT_DT":"02/25/2003","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"POWERED HAULAGE","ACCIDENT_TYPE":"Struck against a moving object","OCCUPATION":"Shuttle car operator, Mantrip operator, Ramcar operator, Rail runner, Buggy operator","NO_INJURIES":"1","DAYS_LOST":"3","NARRATIVE":"EE STATED THAT WHILE OPERATING THE SHUTTLE CAR HE HIT A ROUGH PLACE IN THE ROADWAY AND HIT HIS SHOULDER AGAINST THE CANOPY ON THE SHUTTLE CAR.","sourceDate":"2003-02-25"},{"SOURCE_ROW_NUMBER":"150198","DOCUMENT_NO":"220023120015","ACCIDENT_DT":"10/25/2002","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Struck by falling object","OCCUPATION":"Shuttle car operator, Mantrip operator, Ramcar operator, Rail runner, Buggy operator","NO_INJURIES":"1","DAYS_LOST":"46","NARRATIVE":"EE STATED THAT WHILE HELPING TO MOVE THE MINER CABLE A PIECE OF ROCK FELL FROM THE MINE ROOF STRIKING HIM ON THE BACK.","sourceDate":"2002-10-25"},{"SOURCE_ROW_NUMBER":"201654","DOCUMENT_NO":"220023010042","ACCIDENT_DT":"10/15/2002","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"POWERED HAULAGE","ACCIDENT_TYPE":"Struck against a moving object","OCCUPATION":"Shuttle car operator, Mantrip operator, Ramcar operator, Rail runner, Buggy operator","NO_INJURIES":"1","DAYS_LOST":"3","NARRATIVE":"EE STATED THAT WHILE OPERATING THE SHUTTLE CAR HE HIT A HOLE IN THE ROADWAY AND IT BOUNCED HIM UP INJURING HIS BACK.","sourceDate":"2002-10-15"},{"SOURCE_ROW_NUMBER":"158746","DOCUMENT_NO":"220022960005","ACCIDENT_DT":"10/12/2002","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"HANDLING OF MATERIALS","ACCIDENT_TYPE":"Over-exertion in lifting objects","OCCUPATION":"Section foreman, Bullgang foreman, Labor foreman, Leadman, Shift boss","NO_INJURIES":"1","DAYS_LOST":"54","NARRATIVE":"WHILE HELPING REMOVE A PANEL FROM A SHUTTLE CAR HE FELT PAIN IN HIS NECK, BACK & LEFT SHOULDER.","sourceDate":"2002-10-12"},{"SOURCE_ROW_NUMBER":"201653","DOCUMENT_NO":"220022700013","ACCIDENT_DT":"09/16/2002","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"SLIP OR FALL OF PERSON","ACCIDENT_TYPE":"Fall onto or against objects","OCCUPATION":"Beltman, Conveyor man,  Conveyor belt worker, Mobile bridge carrierman, Feeder operator, Conveyor rider","NO_INJURIES":"1","DAYS_LOST":"12","NARRATIVE":"EE STATED THAT WHILE CLEANING THE NO.2 TAILPIECE, HIS KNEE GAVE IN CAUSING HIM TO FALL AGAINST THE TAILPIECE, INJURING HIS LOWER BACK & NECK.","sourceDate":"2002-09-16"},{"SOURCE_ROW_NUMBER":"102606","DOCUMENT_NO":"220022550051","ACCIDENT_DT":"08/26/2002","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"MACHINERY","ACCIDENT_TYPE":"Struck by falling object","OCCUPATION":"Continuous miner operator, Coal mole operator","NO_INJURIES":"1","DAYS_LOST":"4","NARRATIVE":"WHILE OPERATING THE MINER A PIECE OF ROCK FELL FROM THE MINE ROOF STRIKING THE EMPLOYEE ON THE LEFT FOOT.","sourceDate":"2002-08-26"},{"SOURCE_ROW_NUMBER":"38356","DOCUMENT_NO":"220022550049","ACCIDENT_DT":"08/22/2002","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Struck by falling object","OCCUPATION":"Continuous miner operator, Coal mole operator","NO_INJURIES":"1","DAYS_LOST":"89","NARRATIVE":"WHILE CLEANING THE SCRUBBER ON THE MINER A PIECE OF ROCK FELL FROM THE MINE ROOF STRIKING THE EMPLOYEE ON THE NECK.","sourceDate":"2002-08-22"}]},{"id":"msha-addresses","name":"Addresses of Record","domains":["identity","logistics"],"products":["entity resolution","address history","facility geocoding"],"rowCount":1,"firstDate":"2004-02-27","lastDate":"2004-02-27","metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-assessed-violations","name":"Assessed Violations","domains":["compliance","legal"],"products":["penalty lifecycle","paid and outstanding amounts","assessment aging"],"rowCount":122,"firstDate":"2000-04-04","lastDate":"2003-12-29","metrics":{"ss":79,"delinquent":122,"recentRows":0,"paidPenalty":15354,"proposedPenalty":15354,"currentAssessment":15354},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"787676","VIOLATION_NO":"4192305","ISSUE_DT":"12/29/2003","CFR_STANDARD_CD":"75.360(b)(10)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"107.00","CURRENT_ASSESSMENT_AMT":"107.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2003-12-29"},{"SOURCE_ROW_NUMBER":"784516","VIOLATION_NO":"4191745","ISSUE_DT":"07/17/2003","CFR_STANDARD_CD":"75.523-3(a)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"143.00","CURRENT_ASSESSMENT_AMT":"143.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2003-07-17"},{"SOURCE_ROW_NUMBER":"784515","VIOLATION_NO":"4191744","ISSUE_DT":"07/17/2003","CFR_STANDARD_CD":"75.400","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"133.00","CURRENT_ASSESSMENT_AMT":"133.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2003-07-17"},{"SOURCE_ROW_NUMBER":"784514","VIOLATION_NO":"4191743","ISSUE_DT":"07/17/2003","CFR_STANDARD_CD":"75.516","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"133.00","CURRENT_ASSESSMENT_AMT":"133.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2003-07-17"},{"SOURCE_ROW_NUMBER":"784513","VIOLATION_NO":"4191742","ISSUE_DT":"07/17/2003","CFR_STANDARD_CD":"75.904","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"133.00","CURRENT_ASSESSMENT_AMT":"133.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2003-07-17"},{"SOURCE_ROW_NUMBER":"784512","VIOLATION_NO":"4191741","ISSUE_DT":"07/17/2003","CFR_STANDARD_CD":"75.1100-2(e)(2)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"143.00","CURRENT_ASSESSMENT_AMT":"143.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2003-07-17"},{"SOURCE_ROW_NUMBER":"784511","VIOLATION_NO":"3568500","ISSUE_DT":"07/15/2003","CFR_STANDARD_CD":"75.523-1(a)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"189.00","CURRENT_ASSESSMENT_AMT":"189.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2003-07-15"},{"SOURCE_ROW_NUMBER":"784518","VIOLATION_NO":"7220494","ISSUE_DT":"07/14/2003","CFR_STANDARD_CD":"75.1107","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"60.00","CURRENT_ASSESSMENT_AMT":"60.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2003-07-14"},{"SOURCE_ROW_NUMBER":"784517","VIOLATION_NO":"7220493","ISSUE_DT":"07/14/2003","CFR_STANDARD_CD":"75.370","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"60.00","CURRENT_ASSESSMENT_AMT":"60.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2003-07-14"},{"SOURCE_ROW_NUMBER":"784505","VIOLATION_NO":"7215522","ISSUE_DT":"06/25/2003","CFR_STANDARD_CD":"75.1100-2(e)(1)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"214.00","CURRENT_ASSESSMENT_AMT":"214.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2003-06-25"},{"SOURCE_ROW_NUMBER":"784504","VIOLATION_NO":"7215521","ISSUE_DT":"06/24/2003","CFR_STANDARD_CD":"75.604(b)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"143.00","CURRENT_ASSESSMENT_AMT":"143.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2003-06-24"},{"SOURCE_ROW_NUMBER":"784503","VIOLATION_NO":"7215520","ISSUE_DT":"06/24/2003","CFR_STANDARD_CD":"75.523","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"143.00","CURRENT_ASSESSMENT_AMT":"143.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2003-06-24"}]},{"id":"msha-coal-dust-samples","name":"Coal Dust Samples","domains":["health","safety"],"products":["respirable dust trends","CPDM coverage","void patterns","occupation exposure"],"rowCount":426,"firstDate":"2000-09-26","lastDate":"2003-11-10","metrics":{"recentRows":0,"cpdmSamples":0,"voidSamples":44,"validSamples":382,"maxConcentration":4.621,"concentrationTotal":341.142},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"1392922","CASS_NUM":"57454590","SMP_TAKEN_DT":"11/10/2003","CONC":".262","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2003-11-10"},{"SOURCE_ROW_NUMBER":"1165499","CASS_NUM":"57454586","SMP_TAKEN_DT":"11/10/2003","CONC":"1.387","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2003-11-10"},{"SOURCE_ROW_NUMBER":"1127776","CASS_NUM":"57454521","SMP_TAKEN_DT":"11/10/2003","CONC":".352","SMP_TYPE_CD_DESC":"DESIGNATED AREA","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2003-11-10"},{"SOURCE_ROW_NUMBER":"776491","CASS_NUM":"57454587","SMP_TAKEN_DT":"11/10/2003","CONC":".579","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"UTILITY MAN","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2003-11-10"},{"SOURCE_ROW_NUMBER":"653532","CASS_NUM":"57454579","SMP_TAKEN_DT":"11/10/2003","CONC":".313","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"ROOF BOLTER (SINGLE HEAD)","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2003-11-10"},{"SOURCE_ROW_NUMBER":"238546","CASS_NUM":"57454582","SMP_TAKEN_DT":"11/10/2003","CONC":".401","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"SCOOP CAR OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2003-11-10"},{"SOURCE_ROW_NUMBER":"1449159","CASS_NUM":"57454389","SMP_TAKEN_DT":"11/3/2003","CONC":".799","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"SCOOP CAR OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2003-11-03"},{"SOURCE_ROW_NUMBER":"1445814","CASS_NUM":"57454254","SMP_TAKEN_DT":"11/3/2003","CONC":"1.147","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2003-11-03"},{"SOURCE_ROW_NUMBER":"1381624","CASS_NUM":"57454271","SMP_TAKEN_DT":"11/3/2003","CONC":".748","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"SECTION FOREMAN","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2003-11-03"},{"SOURCE_ROW_NUMBER":"1250675","CASS_NUM":"57454255","SMP_TAKEN_DT":"11/3/2003","CONC":"1.199","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"ROOF BOLTER (SINGLE HEAD)","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2003-11-03"},{"SOURCE_ROW_NUMBER":"613179","CASS_NUM":"57454438","SMP_TAKEN_DT":"11/3/2003","CONC":"1.284","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2003-11-03"},{"SOURCE_ROW_NUMBER":"524696","CASS_NUM":"57454259","SMP_TAKEN_DT":"11/3/2003","CONC":".551","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"ELECTRICIAN","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2003-11-03"}]},{"id":"msha-contractor-production-quarterly","name":"Contractor Employment and Production — Quarterly","domains":["contractors","production","safety"],"products":["contractor exposure denominator","productivity","presence windows"],"rowCount":151,"firstDate":null,"lastDate":null,"metrics":{"linkedContractors":3,"notMineAttributable":1},"periods":{},"recentRecords":[]},{"id":"msha-contractor-production-yearly","name":"Contractor Employment and Production — Yearly","domains":["contractors","production","safety"],"products":["long-run contractor trend","annual denominator reconciliation"],"rowCount":25,"firstDate":null,"lastDate":null,"metrics":{"linkedContractors":3,"notMineAttributable":1},"periods":{},"recentRecords":[]},{"id":"msha-controller-operator-history","name":"Controller and Operator History","domains":["identity","compliance"],"products":["historical ownership attribution","operator transitions","valid-time joins"],"rowCount":2,"firstDate":"2000-01-01","lastDate":"2002-12-20","metrics":{"recentRows":0,"currentOperatorTenures":1,"completedOperatorTenures":1},"periods":{},"recentRecords":[]},{"id":"msha-inspections","name":"Inspections","domains":["safety","compliance"],"products":["inspection mix","on-site hours","event context","citation rate denominator"],"rowCount":39,"firstDate":"2000-03-15","lastDate":"2004-02-26","metrics":{"inspectors":64,"recentRows":0,"onSiteHours":968.75,"inspectionHours":1779.25,"inspectionSamples":0},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"1051226","EVENT_NO":"4102495","INSPECTION_BEGIN_DT":"02/26/2004","INSPECTION_END_DT":"03/04/2004","ACTIVITY_CODE":"AAA","ACTIVITY":"Regular Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"3","SUM_TOTAL_ON_SITE_HOURS":".25","sourceDate":"2004-02-26"},{"SOURCE_ROW_NUMBER":"945395","EVENT_NO":"4102477","INSPECTION_BEGIN_DT":"10/01/2003","INSPECTION_END_DT":"12/29/2003","ACTIVITY_CODE":"AAA","ACTIVITY":"Regular Inspection","NBR_INSPECTOR":"2","SUM_TOTAL_INSP_HOURS":"41.5","SUM_TOTAL_ON_SITE_HOURS":"23","sourceDate":"2003-10-01"},{"SOURCE_ROW_NUMBER":"1037105","EVENT_NO":"4101131","INSPECTION_BEGIN_DT":"07/01/2003","INSPECTION_END_DT":"08/28/2003","ACTIVITY_CODE":"AAA","ACTIVITY":"Regular Inspection","NBR_INSPECTOR":"3","SUM_TOTAL_INSP_HOURS":"150.5","SUM_TOTAL_ON_SITE_HOURS":"79","sourceDate":"2003-07-01"},{"SOURCE_ROW_NUMBER":"23795","EVENT_NO":"4101683","INSPECTION_BEGIN_DT":"04/16/2003","INSPECTION_END_DT":"04/17/2003","ACTIVITY_CODE":"CCC","ACTIVITY":"VENTILATION TECHNICAL INSPECTION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"13","SUM_TOTAL_ON_SITE_HOURS":"5","sourceDate":"2003-04-16"},{"SOURCE_ROW_NUMBER":"1059024","EVENT_NO":"4101125","INSPECTION_BEGIN_DT":"04/01/2003","INSPECTION_END_DT":"06/30/2003","ACTIVITY_CODE":"AAA","ACTIVITY":"Regular Inspection","NBR_INSPECTOR":"3","SUM_TOTAL_INSP_HOURS":"127","SUM_TOTAL_ON_SITE_HOURS":"60.5","sourceDate":"2003-04-01"},{"SOURCE_ROW_NUMBER":"910477","EVENT_NO":"4101123","INSPECTION_BEGIN_DT":"03/24/2003","INSPECTION_END_DT":"03/25/2003","ACTIVITY_CODE":"BBB","ACTIVITY":"NOISE TECHNICAL INVESTIGATION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"8","SUM_TOTAL_ON_SITE_HOURS":"3","sourceDate":"2003-03-24"},{"SOURCE_ROW_NUMBER":"672538","EVENT_NO":"4101114","INSPECTION_BEGIN_DT":"01/06/2003","INSPECTION_END_DT":"03/24/2003","ACTIVITY_CODE":"AAA","ACTIVITY":"Regular Inspection","NBR_INSPECTOR":"3","SUM_TOTAL_INSP_HOURS":"156.5","SUM_TOTAL_ON_SITE_HOURS":"80.5","sourceDate":"2003-01-06"},{"SOURCE_ROW_NUMBER":"1060087","EVENT_NO":"4101816","INSPECTION_BEGIN_DT":"11/25/2002","INSPECTION_END_DT":"11/26/2002","ACTIVITY_CODE":"CCA","ACTIVITY":"ROOF CONTROL TECHNICAL INSPECTION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"12","SUM_TOTAL_ON_SITE_HOURS":"5","sourceDate":"2002-11-25"},{"SOURCE_ROW_NUMBER":"696056","EVENT_NO":"4101653","INSPECTION_BEGIN_DT":"10/30/2002","INSPECTION_END_DT":"10/31/2002","ACTIVITY_CODE":"CCC","ACTIVITY":"VENTILATION TECHNICAL INSPECTION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"18","SUM_TOTAL_ON_SITE_HOURS":"11","sourceDate":"2002-10-30"},{"SOURCE_ROW_NUMBER":"1155905","EVENT_NO":"4097280","INSPECTION_BEGIN_DT":"09/30/2002","INSPECTION_END_DT":"11/18/2002","ACTIVITY_CODE":"AAA","ACTIVITY":"Regular Inspection","NBR_INSPECTOR":"2","SUM_TOTAL_INSP_HOURS":"151.5","SUM_TOTAL_ON_SITE_HOURS":"87.5","sourceDate":"2002-09-30"},{"SOURCE_ROW_NUMBER":"798163","EVENT_NO":"4097281","INSPECTION_BEGIN_DT":"09/30/2002","INSPECTION_END_DT":"11/13/2002","ACTIVITY_CODE":"CDB","ACTIVITY":"ACCIDENT PREVENTION SPOT INSPECTION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"8","SUM_TOTAL_ON_SITE_HOURS":"3","sourceDate":"2002-09-30"},{"SOURCE_ROW_NUMBER":"822295","EVENT_NO":"4098864","INSPECTION_BEGIN_DT":"06/25/2002","INSPECTION_END_DT":"09/09/2002","ACTIVITY_CODE":"AAA","ACTIVITY":"Regular Inspection","NBR_INSPECTOR":"3","SUM_TOTAL_INSP_HOURS":"153.5","SUM_TOTAL_ON_SITE_HOURS":"88","sourceDate":"2002-06-25"}]},{"id":"msha-mine-production-quarterly","name":"Mine Employment and Production — Quarterly","domains":["production","safety","compliance"],"products":["production trend","employee hours","rate denominators","seasonality"],"rowCount":32,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2004-Q1":{"hours":0,"employees":0,"production":0},"2003-Q4":{"hours":16811,"employees":30,"production":66263},"2003-Q3":{"hours":27558,"employees":47,"production":180722},"2003-Q2":{"hours":30858,"employees":48,"production":239802},"2003-Q1":{"hours":27891,"employees":44,"production":222082},"2002-Q4":{"hours":30494,"employees":52,"production":201951},"2002-Q3":{"hours":30788,"employees":50,"production":193390},"2002-Q2":{"hours":34601,"employees":52,"production":189621},"2002-Q1":{"hours":29477,"employees":49,"production":181528},"2001-Q4":{"hours":26043,"employees":42,"production":130600},"2001-Q3":{"hours":25784,"employees":42,"production":140228},"2001-Q2":{"hours":28133,"employees":43,"production":197522}},"recentRecords":[]},{"id":"msha-mine-production-yearly","name":"Mine Employment and Production — Yearly","domains":["production","safety","compliance"],"products":["annual trend","backfill","quarterly reconciliation"],"rowCount":8,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2000":{"hours":18348,"employees":11,"production":87653},"2001":{"hours":107778,"employees":43,"production":656404},"2002":{"hours":125360,"employees":51,"production":766490},"2003":{"hours":103118,"employees":42,"production":708869}},"recentRecords":[]},{"id":"msha-mines","name":"Mines","domains":["identity","production","logistics"],"products":["mine identity","status","commodity","location","operator and controller"],"rowCount":1,"firstDate":null,"lastDate":null,"metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-noise-samples","name":"Noise Samples","domains":["health","safety","equipment"],"products":["hearing exposure","machine and manufacturer patterns","occupation coverage"],"rowCount":18,"firstDate":"2001-08-28","lastDate":"2003-03-24","metrics":{"recentRows":0,"doseOver100":5,"actDoseTotal":1403,"pelDoseTotal":1087},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"245640","EVENT_NO":"4101123","SURVEY_DATE":"03/24/2003","OCCUPATION_CD_DESC":"ELECTRICIAN","MACHINE_CD":"40","MANUFACTURER_CD":"120","ACT_DOSE_85":"28","PEL_DOSE_90":"14","SURVEY_TYPE":"I","sourceDate":"2003-03-24"},{"SOURCE_ROW_NUMBER":"245639","EVENT_NO":"4101123","SURVEY_DATE":"03/24/2003","OCCUPATION_CD_DESC":"SCOOP CAR OPERATOR","MACHINE_CD":"38","MANUFACTURER_CD":"067","ACT_DOSE_85":"47","PEL_DOSE_90":"24","SURVEY_TYPE":"I","sourceDate":"2003-03-24"},{"SOURCE_ROW_NUMBER":"245638","EVENT_NO":"4101123","SURVEY_DATE":"03/24/2003","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","MACHINE_CD":"37","MANUFACTURER_CD":"058","ACT_DOSE_85":"84","PEL_DOSE_90":"65","SURVEY_TYPE":"I","sourceDate":"2003-03-24"},{"SOURCE_ROW_NUMBER":"245637","EVENT_NO":"4101123","SURVEY_DATE":"03/24/2003","OCCUPATION_CD_DESC":"ROOF BOLTER (SINGLE HEAD)","MACHINE_CD":"30","MANUFACTURER_CD":"067","ACT_DOSE_85":"105","PEL_DOSE_90":"85","SURVEY_TYPE":"I","sourceDate":"2003-03-24"},{"SOURCE_ROW_NUMBER":"245636","EVENT_NO":"4101123","SURVEY_DATE":"03/24/2003","OCCUPATION_CD_DESC":"CONTINUOUS MINER OPERATOR","MACHINE_CD":"06","MANUFACTURER_CD":"058","ACT_DOSE_85":"129","PEL_DOSE_90":"112","SURVEY_TYPE":"I","sourceDate":"2003-03-24"},{"SOURCE_ROW_NUMBER":"245635","EVENT_NO":"4097106","SURVEY_DATE":"11/28/2001","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","MACHINE_CD":"37","MANUFACTURER_CD":"058","ACT_DOSE_85":"91","PEL_DOSE_90":"63","SURVEY_TYPE":"I","sourceDate":"2001-11-28"},{"SOURCE_ROW_NUMBER":"245634","EVENT_NO":"4097106","SURVEY_DATE":"11/28/2001","OCCUPATION_CD_DESC":"SCOOP CAR OPERATOR","MACHINE_CD":"38","MANUFACTURER_CD":"067","ACT_DOSE_85":"39","PEL_DOSE_90":"19","SURVEY_TYPE":"I","sourceDate":"2001-11-28"},{"SOURCE_ROW_NUMBER":"245633","EVENT_NO":"4097106","SURVEY_DATE":"11/28/2001","OCCUPATION_CD_DESC":"ROOF BOLTER (SINGLE HEAD)","MACHINE_CD":"30","MANUFACTURER_CD":"067","ACT_DOSE_85":"129","PEL_DOSE_90":"105","SURVEY_TYPE":"I","sourceDate":"2001-11-28"},{"SOURCE_ROW_NUMBER":"245632","EVENT_NO":"4097106","SURVEY_DATE":"11/28/2001","OCCUPATION_CD_DESC":"CONTINUOUS MINER OPERATOR","MACHINE_CD":"06","MANUFACTURER_CD":"058","ACT_DOSE_85":"145","PEL_DOSE_90":"133","SURVEY_TYPE":"I","sourceDate":"2001-11-28"},{"SOURCE_ROW_NUMBER":"245631","EVENT_NO":"4097106","SURVEY_DATE":"11/28/2001","OCCUPATION_CD_DESC":"CONTINUOUS MINER OPERATOR","MACHINE_CD":"06","MANUFACTURER_CD":"058","ACT_DOSE_85":"93","PEL_DOSE_90":"79","SURVEY_TYPE":"I","sourceDate":"2001-11-28"},{"SOURCE_ROW_NUMBER":"245630","EVENT_NO":"4090395","SURVEY_DATE":"08/28/2001","OCCUPATION_CD_DESC":"ELECTRICIAN","MACHINE_CD":"40","MANUFACTURER_CD":"120","ACT_DOSE_85":"37","PEL_DOSE_90":"26","SURVEY_TYPE":"I","sourceDate":"2001-08-28"},{"SOURCE_ROW_NUMBER":"245629","EVENT_NO":"4090395","SURVEY_DATE":"08/28/2001","OCCUPATION_CD_DESC":"MOTORMAN","MACHINE_CD":"25","MANUFACTURER_CD":"080","ACT_DOSE_85":"54","PEL_DOSE_90":"44","SURVEY_TYPE":"I","sourceDate":"2001-08-28"}]},{"id":"msha-quartz-samples","name":"Quartz Samples — Coal","domains":["health","safety"],"products":["quartz exposure trends","occupation context","applicable-rule linkage"],"rowCount":31,"firstDate":"2001-01-23","lastDate":"2003-11-10","metrics":{"recentRows":0,"voidSamples":1,"maxQuartzPct":19.3,"validSamples":30,"quartzPctTotal":190.7},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"138907","CASSETTE_NO":"57454586","SAMPLE_DT":"11/10/2003","QUARTZ_PCT":"09.5","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2003-11-10"},{"SOURCE_ROW_NUMBER":"82605","CASSETTE_NO":"57454438","SAMPLE_DT":"11/03/2003","QUARTZ_PCT":"06.6","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2003-11-03"},{"SOURCE_ROW_NUMBER":"24363","CASSETTE_NO":"50671837","SAMPLE_DT":"07/26/2003","QUARTZ_PCT":"06.9","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2003-07-26"},{"SOURCE_ROW_NUMBER":"73457","CASSETTE_NO":"57455112","SAMPLE_DT":"07/23/2003","QUARTZ_PCT":"05.7","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2003-07-23"},{"SOURCE_ROW_NUMBER":"103952","CASSETTE_NO":"57427919","SAMPLE_DT":"04/14/2003","QUARTZ_PCT":"03.8","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2003-04-14"},{"SOURCE_ROW_NUMBER":"140570","CASSETTE_NO":"57427904","SAMPLE_DT":"04/02/2003","QUARTZ_PCT":"03.4","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2003-04-02"},{"SOURCE_ROW_NUMBER":"5119","CASSETTE_NO":"57428156","SAMPLE_DT":"02/03/2003","QUARTZ_PCT":"03.1","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2003-02-03"},{"SOURCE_ROW_NUMBER":"38483","CASSETTE_NO":"57427773","SAMPLE_DT":"10/30/2002","QUARTZ_PCT":"04.2","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2002-10-30"},{"SOURCE_ROW_NUMBER":"39569","CASSETTE_NO":"57427678","SAMPLE_DT":"10/28/2002","QUARTZ_PCT":"06.1","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2002-10-28"},{"SOURCE_ROW_NUMBER":"37168","CASSETTE_NO":"57427684","SAMPLE_DT":"10/28/2002","QUARTZ_PCT":"07.4","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2002-10-28"},{"SOURCE_ROW_NUMBER":"136729","CASSETTE_NO":"57427522","SAMPLE_DT":"10/09/2002","QUARTZ_PCT":"09.4","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2002-10-09"},{"SOURCE_ROW_NUMBER":"40645","CASSETTE_NO":"57418712","SAMPLE_DT":"08/05/2002","QUARTZ_PCT":"06.3","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2002-08-05"}]},{"id":"msha-violations","name":"Violations","domains":["compliance","safety","legal"],"products":["citation and order record","condition text","Title 30 linkage","abatement patterns"],"rowCount":123,"firstDate":"2000-04-04","lastDate":"2003-12-29","metrics":{"ss":79,"amountDue":15354,"contested":0,"amountPaid":15354,"recentRows":0,"section104d":1,"unterminated":0,"proposedPenalty":15354},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"2801326","VIOLATION_NO":"4192305","VIOLATION_ISSUE_DT":"12/29/2003","SIG_SUB":"Y","PART_SECTION":"75.360(b)(10)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"3","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"12/29/2003","PROPOSED_PENALTY":"107","AMOUNT_DUE":"107","AMOUNT_PAID":"107","CONTESTED_IND":"N","sourceDate":"2003-12-29"},{"SOURCE_ROW_NUMBER":"2801310","VIOLATION_NO":"4191745","VIOLATION_ISSUE_DT":"07/17/2003","SIG_SUB":"Y","PART_SECTION":"75.523-3(a)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"2","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"07/21/2003","PROPOSED_PENALTY":"143","AMOUNT_DUE":"143","AMOUNT_PAID":"143","CONTESTED_IND":"N","sourceDate":"2003-07-17"},{"SOURCE_ROW_NUMBER":"2801309","VIOLATION_NO":"4191744","VIOLATION_ISSUE_DT":"07/17/2003","SIG_SUB":"Y","PART_SECTION":"75.400","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"07/21/2003","PROPOSED_PENALTY":"133","AMOUNT_DUE":"133","AMOUNT_PAID":"133","CONTESTED_IND":"N","sourceDate":"2003-07-17"},{"SOURCE_ROW_NUMBER":"2801308","VIOLATION_NO":"4191743","VIOLATION_ISSUE_DT":"07/17/2003","SIG_SUB":"Y","PART_SECTION":"75.516","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"07/18/2003","PROPOSED_PENALTY":"133","AMOUNT_DUE":"133","AMOUNT_PAID":"133","CONTESTED_IND":"N","sourceDate":"2003-07-17"},{"SOURCE_ROW_NUMBER":"2801307","VIOLATION_NO":"4191742","VIOLATION_ISSUE_DT":"07/17/2003","SIG_SUB":"Y","PART_SECTION":"75.904","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"07/18/2003","PROPOSED_PENALTY":"133","AMOUNT_DUE":"133","AMOUNT_PAID":"133","CONTESTED_IND":"N","sourceDate":"2003-07-17"},{"SOURCE_ROW_NUMBER":"2801306","VIOLATION_NO":"4191741","VIOLATION_ISSUE_DT":"07/17/2003","SIG_SUB":"Y","PART_SECTION":"75.1100-2(e)(2)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"2","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"07/17/2003","PROPOSED_PENALTY":"143","AMOUNT_DUE":"143","AMOUNT_PAID":"143","CONTESTED_IND":"N","sourceDate":"2003-07-17"},{"SOURCE_ROW_NUMBER":"2801305","VIOLATION_NO":"3568500","VIOLATION_ISSUE_DT":"07/15/2003","SIG_SUB":"Y","PART_SECTION":"75.523-1(a)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"4","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"07/17/2003","PROPOSED_PENALTY":"189","AMOUNT_DUE":"189","AMOUNT_PAID":"189","CONTESTED_IND":"N","sourceDate":"2003-07-15"},{"SOURCE_ROW_NUMBER":"2801312","VIOLATION_NO":"7220494","VIOLATION_ISSUE_DT":"07/14/2003","SIG_SUB":"N","PART_SECTION":"75.1107","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"07/14/2003","PROPOSED_PENALTY":"60","AMOUNT_DUE":"60","AMOUNT_PAID":"60","CONTESTED_IND":"N","sourceDate":"2003-07-14"},{"SOURCE_ROW_NUMBER":"2801311","VIOLATION_NO":"7220493","VIOLATION_ISSUE_DT":"07/14/2003","SIG_SUB":"N","PART_SECTION":"75.370","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"07/15/2003","PROPOSED_PENALTY":"60","AMOUNT_DUE":"60","AMOUNT_PAID":"60","CONTESTED_IND":"N","sourceDate":"2003-07-14"},{"SOURCE_ROW_NUMBER":"2801256","VIOLATION_NO":"7215522","VIOLATION_ISSUE_DT":"06/25/2003","SIG_SUB":"Y","PART_SECTION":"75.1100-2(e)(1)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"6","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"06/25/2003","PROPOSED_PENALTY":"214","AMOUNT_DUE":"214","AMOUNT_PAID":"214","CONTESTED_IND":"N","sourceDate":"2003-06-25"},{"SOURCE_ROW_NUMBER":"2801255","VIOLATION_NO":"7215521","VIOLATION_ISSUE_DT":"06/24/2003","SIG_SUB":"Y","PART_SECTION":"75.604(b)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"2","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"06/24/2003","PROPOSED_PENALTY":"143","AMOUNT_DUE":"143","AMOUNT_PAID":"143","CONTESTED_IND":"N","sourceDate":"2003-06-24"},{"SOURCE_ROW_NUMBER":"2801254","VIOLATION_NO":"7215520","VIOLATION_ISSUE_DT":"06/24/2003","SIG_SUB":"Y","PART_SECTION":"75.523","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"2","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"06/25/2003","PROPOSED_PENALTY":"143","AMOUNT_DUE":"143","AMOUNT_PAID":"143","CONTESTED_IND":"N","sourceDate":"2003-06-24"}]}],"safety":{"href":"/api/v1/mines/4608821/safety","description":"Full-period safety series, top CFR sections and paginated activity. Requires PostgreSQL."},"silica":{"href":"/api/v1/mines/4608821/silica","description":"Dedicated silica records, measurements, sample status and trends. Defaults to the snapshot year; use year=all for history."},"externalContext":{"eia":null,"title30":{"snapshot":{"chapterCount":6,"featuredSectionCount":100,"latestAmendedOn":"2026-08-14","latestIssueDate":"2026-08-14","partCount":206,"sectionCount":5954,"upToDateAsOf":"2026-08-19"},"regulations":[{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.360","heading":"Preshift examination at fixed intervals.","id":"75.360","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.360","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a)(1) Except as provided in paragraph (a)(2) of this section, a certified person designated by the operator must make a preshift examination within 3 hours preceding the beginning of any 8-hour interval during which any person is scheduled to work or travel underground. No person other than certified examiners may enter or remain in any underground area unless a preshift examination has been completed for the established 8-hour interval. The operator must establish 8-hour intervals of time subject to the required preshift examinations.\n\n(2) Preshift examinations of areas where pumpers are scheduled to work or travel shall not be required prior to the pumper entering the areas if the pumper is a certified person and the pumper conducts an examination for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (b)(11) of this section, tests for methane and oxygen deficiency, and determines if the air is moving in its proper direction in the area where the pumper works or travels. The examination of the area must be completed before the pumper performs any other work. A record of all hazardous conditions and violations of the mandatory health or safety standards found by the pumper shall be made and retained in accordance with § 75.363 of this part.\n\n(b) The person conducting the preshift examination shall examine for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (b)(11) of this section, test for methane and oxygen deficiency, and determine if the air is moving in its proper direction at the following locations:\n\n(1) Roadways, travelways and track haulageways where persons are scheduled, prior to the beginning of the preshift examination, to work or travel during the oncoming shift.\n\n(2) Belt conveyors that will be used to transport persons during the oncoming shift and the entries in which these belt conveyors are located.\n\n(3) Working sections and areas where mechanized mining equipment is being installed or removed, if anyone is scheduled to work on the section or in the area during the oncoming shift. The scope of the examination shall include the working places, approaches to worked-out areas and ventilation controls on these sections and in these areas, and the examination shall include tests of the roof, face and rib conditions on these sections and in these areas.\n\n(4) Approaches to worked-out areas along intake air courses and at the entries used to carry air into worked-out areas if the intake air passing the approaches is used to ventilate working sections where anyone is scheduled to work during the oncoming shift. The examination of the approaches to the worked-out areas shall be made in the intake air course immediately inby and outby each entry used to carry air into the worked-out area. An examination of the entries used to carry air into the worked-out areas shall be conducted at a point immediately inby the intersection of each entry with the intake air course.\n\n(5) Seals along intake air courses where intake air passes by a seal to ventilate working sections where anyone is scheduled to work during the oncoming shift.\n\n(6)(i) Entries and rooms developed after November 15, 1992, and developed more than 2 crosscuts off an intake air course without permanent ventilation controls where intake air passes through or by these entries or rooms to reach a working section where anyone is scheduled to work during the oncoming shift; and,\n\n(ii) Entries and rooms developed after November 15, 1992, and driven more than 20 feet off an intake air course without a crosscut and without permanent ventilation controls where intake air passes through or by these entries or rooms to reach a working section where anyone is scheduled to work during the oncoming shift.\n\n(7) Areas where trolley wires or trolley feeder wires are to be or will remain energized during the oncoming shift.\n\n(8) High spots along intake air courses where methane is likely to accumulate, if equipment will be operated in the area during the shift.\n\n(9) Underground electrical installations referred to in § 75.340(a), except those pumps listed in § 75.340 (b)(2) through (b)(6), and areas where compressors subject to § 75.344 are installed if the electrical installation or compressor is or will be energized during the shift.\n\n(10) Other areas where work or travel during the oncoming shift is scheduled prior to the beginning of the preshift examination.\n\n(11) Preshift examinations shall include examinations to identify violations of the standards listed below:\n\n(i) §§ 75.202(a) and 75.220(a)(1)—roof control;\n\n(ii) §§ 75.333(h) and 75.370(a)(1)—ventilation, methane;\n\n(iii) §§ 75.400 and 75.403—accumulations of combustible materials and application of rock dust;\n\n(iv) § 75.1403—other safeguards, limited to maintenance of travelways along belt conveyors, off track haulage roadways, and track haulage, track switches, and other components for haulage;\n\n(v) § 75.1722(a)—guarding moving machine parts; and\n\n(vi) § 75.1731(a)—maintenance of belt conveyor components.\n\n(c) The person conducting the preshift examination shall determine the volume of air entering each of the following areas if anyone is scheduled to work in the areas during the oncoming shift:\n\n(1) In the last open crosscut of each set of entries or rooms on each working section and areas where mechanized mining equipment is being installed or removed. The last open crosscut is the crosscut in the line of pillars containing the permanent stoppings that separate the intake air courses and the return air courses.\n\n(2) On each longwall or shortwall in the intake entry or entries at the intake end of the longwall or shortwall face immediately outby the face and the velocity of air at each end of the face at the locations specified in the approved ventilation plan.\n\n(3) At the intake end of any pillar line—\n\n(i) If a single split of air is used, in the intake entry furthest from the return air course, immediately outby the first open crosscut outby the line of pillars being mined; or\n\n(ii) If a split system is used, in the intake entries of each split immediately inby the split point.\n\n(d) The person conducting the preshift examination shall check the refuge alternative for damage, the integrity of the tamper-evident seal and the mechanisms required to deploy the refuge alternative, and the ready availability of compressed oxygen and air.\n\n(e) The district manager may require the operator to examine other areas of the mine or examine for other hazards and violations of other mandatory health or safety standards found during the preshift examination.\n\n(f) Certification. At each working place examined, the person doing the preshift examination shall certify by initials, date, and the time, that the examination was made. In areas required to be examined outby a working section, the certified person shall certify by initials, date, and the time at enough locations to show that the entire area has been examined.\n\n(g) Recordkeeping. A record of the results of each preshift examination, including a record of hazardous conditions and violations of the nine mandatory health or safety standards and their locations found by the examiner during each examination, and of the results and locations of air and methane measurements, shall be made on the surface before any persons, other than certified persons conducting examinations required by this subpart, enter any underground area of the mine. The results of methane tests shall be recorded as the percentage of methane measured by the examiner. The record shall be made by the certified person who made the examination or by a person designated by the operator. If the record is made by someone other than the examiner, the examiner shall verify the record by initials and date by or at the end of the shift for which the examination was made. A record shall also be made by a certified person of the action taken to correct hazardous conditions and violations of mandatory health or safety standards found during the preshift examination. All preshift and corrective action records shall be countersigned by the mine foreman or equivalent mine official by the end of the mine foreman's or equivalent mine official's next regularly scheduled working shift. The records required by this section shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.\n\n(h) Retention period. Records shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.\n\n[61 FR 9829, Mar. 11, 1996, as amended at 61 FR 55527, Oct. 25, 1996; 62 FR 35085, June 30, 1997; 64 FR 45170, Aug. 19, 1999; 73 FR 80697, Dec. 31, 2008; 77 FR 20714, Apr. 6, 2012]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.523-3","heading":"Automatic emergency-parking brakes.","id":"75.523-3","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-F/section-75.523-3","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"F","subpartHeading":"Subpart F—Electrical Equipment—General","text":"(a) Except for personnel carriers, rubber-tired, self-propelled electric haulage equipment used in the active workings of underground coal mines shall be equipped with automatic emergency-parking brakes in accordance with the following schedule.\n\n(1) On and after May 23, 1989—\n\n(i) All new equipment ordered; and\n\n(ii) All equipment originally furnished with or retrofitted with automatic emergency-parking brakes which meet the requirements of this section.\n\n(2) On and after May 23, 1991, all other equipment.\n\n(b) Automatic emergency-parking brakes shall—\n\n(1) Be activated immediately by the emergency deenergization device required by 30 CFR 75.523-1 and 75.523-2;\n\n(2) Engage automatically within 5.0 seconds when the equipment is deenergized;\n\n(3) Safely bring the equipment when fully loaded to a complete stop on the maximum grade on which it is operated;\n\n(4) Hold the equipment stationary despite any contraction of brake parts, exhaustion of any non-mechanical source of energy, or leakage; and\n\n(5) Release only by a manual control that does not operate any other equipment function.\n\n(c) Automatic emergency-parking brakes shall include a means in the equipment operator's compartment to—\n\n(1) Apply the brakes manually without deenergizing the equipment; and\n\n(2) Release and reengage the brakes without energizing the equipment.\n\n(d) On and after November 24, 1989, rubber-tired, self-propelled electric face equipment not covered by paragraph (a) of this section shall be equipped with a means incorporated on the equipment and operable from each tramming station to hold the equipment stationary—\n\n(1) On the maximum grade on which it is operated; and\n\n(2) Despite any contraction of components, exhaustion of any non-mechanical source of energy, or leakage.\n\n(e) The brake systems required by paragraphs (a) or (d) of this section shall be applied when the equipment operator is not at the controls of the equipment, except during movement of disabled equipment.\n\n[54 FR 12412, Mar. 24, 1989]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.400","heading":"Accumulation of combustible materials.","id":"75.400","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-E/section-75.400","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"E","subpartHeading":"Subpart E—Combustible Materials and Rock Dusting","text":"Coal dust, including float coal dust deposited on rock-dusted surfaces, loose coal, and other combustible materials, shall be cleaned up and not be permitted to accumulate in active workings, or on diesel-powered and electric equipment therein.\n\n[61 FR 55527, Oct. 25, 1996]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.516","heading":"Power wires; support.","id":"75.516","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-F/section-75.516","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"F","subpartHeading":"Subpart F—Electrical Equipment—General","text":"[Statutory Provision]\n\nAll power wires (except trailing cables on mobile equipment, specially designed cables conducting high-voltage power to underground rectifying equipment or transformers, or bare or insulated ground and return wires) shall be supported on well-insulated insulators and shall not contact combustible material, roof, or ribs.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.904","heading":"Identification of circuit breakers.","id":"75.904","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-J/section-75.904","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"J","subpartHeading":"Subpart J—Underground Low- and Medium-Voltage Alternating Current Circuits","text":"[Statutory Provisions]\n\nCircuit breakers shall be marked for identification.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.1100-2","heading":"Quantity and location of firefighting equipment.","id":"75.1100-2","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-L/section-75.1100-2","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"L","subpartHeading":"Subpart L—Fire Protection","text":"(a) Working sections. (1) Each working section of coal mines producing 300 tons or more per shift shall be provided with two portable fire extinguishers and 240 pounds of rock dust in bags or other suitable containers; waterlines shall extend to each section loading point and be equipped with enough fire hose to reach each working face unless the section loading point is provided with one of the following:\n\n(i) Two portable water cars; or\n\n(ii) Two portable chemical cars; or\n\n(iii) One portable water car or one portable chemical car, and either (a) a portable foam-generating machine or (b) a portable high-pressure rock-dusting machine fitted with at least 250 feet of hose and supplied with at least 60 sacks of rock dust.\n\n(2) Each working section of coal mines producing less than 300 tons of coal per shift shall be provided with the following:\n\n(i) Two portable fire extinguishers; and\n\n(ii) 240 pounds of rock dust in bags or other suitable containers; and\n\n(iii) At least 500 gallons of water and at least three pails of 10-quart capacity; or a waterline with sufficient hose to reach the working places; or a portable water car of at least 500-gallons capacity; or a portable, all-purpose, dry-powder chemical car of at least 125-pounds capacity.\n\n(3) As an alternative to paragraph (a)(2) of this section, each working section with no electrical equipment at the face of an anthracite coal mine producing less than 300 tons of coal per shift shall be provided with the following:\n\n(i) Portable fire extinguishers containing a total capacity of at least 30 pounds of dry chemical or 15 gallons of foam and located at the entrance to the gangway at the bottom of the slope; and\n\n(ii) Portable fire extinguishers containing a total capacity of at least 20 pounds of dry chemical or 10 gallons of foam and located within 500 feet from the working face.\n\n(b) Belt conveyors. In all coal mines, waterlines shall be installed parallel to the entire length of belt conveyors and shall be equipped with firehose outlets with valves at 300-foot intervals along each belt conveyor and at tailpieces. At least 500 feet of firehose with fittings suitable for connection with each belt conveyor waterline system shall be stored at strategic locations along the belt conveyor. Waterlines may be installed in entries adjacent to the conveyor entry belt as long as the outlets project into the belt conveyor entry.\n\n(c) Haulage tracks. (1) In mines producing 300 tons of coal or more per shift waterlines shall be installed parallel to all haulage tracks using mechanized equipment in the track or adjacent entry and shall extend to the loading point of each working section. Waterlines shall be equipped with outlet valves at intervals of not more than 500 feet, and 500 feet of firehose with fittings suitable for connection with such waterlines shall be provided at strategic locations. Two portable water cars, readily available, may be used in lieu of waterlines prescribed under this paragraph.\n\n(2) In mines producing less than 300 tons of coal per shift, there shall be provided at 500-foot intervals in all main and secondary haulage roads:\n\n(i) A tank of water of at least 55-gallon capacity with at least 3 pails of not less than 10-quart capacity; or\n\n(ii) Not less than 240 pounds of bagged rock dust.\n\n(d) Transportation. Each track or off-track locomotive, self-propelled man-trip car, or personnel carrier shall be equipped with one portable fire extinguisher.\n\n(e) Electrical installations. At each electrical installation, the operator shall provide two portable fire extinguishers that have a nominal capacity of 5 pounds of dry chemical, or one extinguisher that has a nominal capacity of at least 10 pounds of dry chemical, and which have a 2-A:10-B:C or higher rating.\n\n(f) Oil storage stations. Two portable fire extinguishers and 240 pounds of rock dust, shall be provided at each permanent underground oil storage station. One portable fire extinguisher shall be provided at each working section where 25 gallons or more of oil are stored in addition to extinguishers required under paragraph (a) of this section.\n\n(g) Welding, cutting, soldering. One portable fire extinguisher or 240 pounds of rock dust shall be provided at locations where welding, cutting, or soldering with arc or flame is being done.\n\n(h) Powerlines. At each wooden door through which powerlines pass there shall be one portable fire extinguisher or 240 pounds of rock dust within 25 feet of the door on the intake air side.\n\n(i) Emergency materials. (1) At each mine producing 300 tons of coal or more per shift there shall be readily available the following materials at locations not exceeding 2 miles from each working section:\n\n1,000 board feet of brattice boards 2 rolls of brattice cloth 2 hand saws 25 pounds of 8 d nails 25 pounds of 10 d nails 25 pounds of 16 d nails 3 claw hammers 25 bags of wood fiber plaster or 10 bags of cement (or equivalent material for stoppings) 5 tons of rock dust\n\n(2) At each mine producing less than 300 tons of coal per shift the above materials shall be available at the mine, provided, however, that the emergency materials for one or more mines may be stored at a central warehouse or building supply company and such supply must be the equivalent of that required for all mines involved and within 1-hour's delivery time from each mine. This exception shall not apply where the active working sections are more than 2 miles from the surface.\n\n[35 FR 17890, Nov. 20, 1970, as amended at 73 FR 53127, Sept. 15, 2008]","occurrenceCount":2},{"chapter":"I","heading":"Deenergization of self-propelled electric face equipment installation requirements.","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-F/section-75.523-1","part":"75","subchapter":"O","subpart":"F","id":"75.523-1","citation":"30 CFR 75.523-1","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subpartHeading":"","text":null,"occurrenceCount":1},{"chapter":"I","heading":"Fire suppression devices.","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-L/section-75.1107","part":"75","subchapter":"O","subpart":"L","id":"75.1107","citation":"30 CFR 75.1107","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subpartHeading":"","text":null,"occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.370","heading":"Mine ventilation plan; submission and approval.","id":"75.370","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.370","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a)(1) The operator shall develop and follow a ventilation plan approved by the district manager. The plan shall be designed to control methane and respirable dust and shall be suitable to the conditions and mining system at the mine. The ventilation plan shall consist of two parts, the plan content as prescribed in § 75.371 and the ventilation map with information as prescribed in § 75.372. Only that portion of the map which contains information required under § 75.371 will be subject to approval by the district manager.\n\n(2) The proposed ventilation plan and any revision to the plan shall be submitted in writing to the district manager. When revisions to a ventilation plan are proposed, only the revised pages, maps, or sketches of the plan need to be submitted. When required in writing by the district manager, the operator shall submit a fully revised plan by consolidating the plan and all revisions in an orderly manner and by deleting all outdated material.\n\n(3) (i) The mine operator shall notify the representative of miners at least 5 days prior to submission of a mine ventilation plan and any revision to a mine ventilation plan. If requested, the mine operator shall provide a copy to the representative of miners at the time of notification. In the event of a situation requiring immediate action on a plan revision, notification of the revision shall be given, and if requested, a copy of the revision shall be provided, to the representative of miners by the operator at the time of submittal;\n\n(ii) A copy of the proposed ventilation plan, and a copy of any proposed revision, submitted for approval shall be made available for inspection by the representative of miners; and\n\n(iii) A copy of the proposed ventilation plan, and a copy of any proposed revision, submitted for approval shall be posted on the mine bulletin board at the time of submittal. The proposed plan or proposed revision shall remain posted until it is approved, withdrawn or denied.\n\n(b) Following receipt of the proposed plan or proposed revision, the representative of miners may submit timely comments to the district manager, in writing, for consideration during the review process. A copy of these comments shall also be provided to the operator by the district manager upon request.\n\n(c) (1) The district manager will notify the operator in writing of the approval or denial of approval of a proposed ventilation plan or proposed revision. A copy of this notification will be sent to the representative of miners by the district manager.\n\n(2) If the district manager denies approval of a proposed plan or revision, the deficiencies of the plan or revision shall be specified in writing and the operator will be provided an opportunity to discuss the deficiencies with the district manager.\n\n(d) No proposed ventilation plan shall be implemented before it is approved by the district manager. Any intentional change to the ventilation system that alters the main air current or any split of the main air current in a manner that could materially affect the safety and health of the miners, or any change to the information required in § 75.371 shall be submitted to and approved by the district manager before implementation.\n\n(e) Before implementing an approved ventilation plan or a revision to a ventilation plan, persons affected by the revision shall be instructed by the operator in its provisions.\n\n(f) The approved ventilation plan and any revisions shall be—\n\n(1) Provided upon request to the representative of miners by the operator following notification of approval;\n\n(2) Made available for inspection by the representative of miners; and\n\n(3) Posted on the mine bulletin board within 1 working day following notification of approval. The approved plan and revisions shall remain posted on the bulletin board for the period that they are in effect.\n\n(g) The ventilation plan for each mine shall be reviewed every 6 months by an authorized representative of the Secretary to assure that it is suitable to current conditions in the mine.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.604","heading":"Permanent splicing of trailing cables.","id":"75.604","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-G/section-75.604","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"G","subpartHeading":"Subpart G—Trailing Cables","text":"[Statutory Provisions]\n\nWhen permanent splices in trailing cables are made, they shall be:\n\n(a) Mechanically strong with adequate electrical conductivity and flexibility;\n\n(b) Effectively insulated and sealed so as to exclude moisture; and\n\n(c) Vulcanized or otherwise treated with suitable materials to provide flame-resistant qualities and good bonding to the outer jacket.\n\n(d) Made using splice kits accepted or approved by MSHA as flame resistant.\n\n[35 FR 17890, Nov. 20, 1970, as amended at 57 FR 61223, Dec. 23, 1992]","occurrenceCount":1},{"chapter":"I","heading":"Electric face equipment; deenergization.","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-F/section-75.523","part":"75","subchapter":"O","subpart":"F","id":"75.523","citation":"30 CFR 75.523","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subpartHeading":"","text":null,"occurrenceCount":1}],"fullCorpus":"/data/title30-sections.json"}}},"meta":{"representation":"json","mineId":"4608821","dataSource":"postgres","snapshotId":"2026-10-13T11:19:05.459773+00:00","completedAt":"2026-10-13T11:26:59.401Z","sourceCount":20,"totalRows":17906804}}