{"data":{"schemaVersion":"realm.mine-profile.v1","generatedAt":"2026-10-13T11:26:59.401Z","identity":{"mine_id":"4608743","name":"No 55 Mine","status":"Abandoned and Sealed","status_date":"2000-08-07","mine_type":"Underground","coal_metal":"C","commodity":"Coal (Bituminous)","state":"WV","county":"Mcdowell","nearest_town":"Keystone","operator_id":"P24324","operator_name":"E Z Money Coal Company Inc","controller_id":"C15888","controller_name":"Wright Jeff","district":"C04","office":"Beckley District","employees":0,"latitude":37.4436,"longitude":-81.4292},"coverage":{"contributingSources":12,"registeredSources":20,"sourceRows":86},"relationships":{"schemaVersion":"realm.temporal-relationships.v1","temporalSemantics":{"validTime":{"granularity":"date","bounds":"inclusive","nullStart":"start date not published in the upstream history row","nullEnd":"open-ended in the upstream history row; not independent proof of present control"},"transactionTime":{"observedAt":"2026-10-13T11:19:05.459773+00:00","meaning":"time the checksum-addressed MDRS artifacts were observed by the PostgreSQL ingestion"},"derivation":{"controllerControlsOperator":"intersection of controller and operator valid-time intervals evidenced through this mine","currentIdentity":"current controller and operator are asserted only by the MDRS Mines snapshot"}},"current":{"mine":{"type":"mine","id":"4608743","name":"No 55 Mine"},"operator":{"type":"operator","id":"P24324","name":"E Z Money Coal Company Inc"},"controller":{"type":"controller","id":"C15888","name":"Wright Jeff"},"source":{"datasetId":"msha-mines","observedAt":"2026-10-13T11:19:05.459773+00:00"}},"edges":[{"type":"operator_operates_mine","subject":{"type":"operator","id":"P24011","name":"Rocky Road Coal Company Inc"},"object":{"type":"mine","id":"4608743","name":"No 55 Mine"},"validFrom":"1998-10-01","validTo":"2000-01-09","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4608743|P24011|1998-10-01|2000-01-09"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"C15749","name":"Killen Edmund & Lewis Spurrier"},"object":{"type":"mine","id":"4608743","name":"No 55 Mine"},"validFrom":"1998-10-01","validTo":"2000-01-09","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4608743|C15749|1998-10-01|2000-01-09"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C15749","name":"Killen Edmund & Lewis Spurrier"},"object":{"type":"operator","id":"P24011","name":"Rocky Road Coal Company Inc"},"validFrom":"1998-10-01","validTo":"2000-01-09","current":false,"derived":true,"evidenceMineId":"4608743","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4608743|P24011|1998-10-01|C15749|1998-10-01|96674"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"P24324","name":"E Z Money Coal Company Inc"},"object":{"type":"mine","id":"4608743","name":"No 55 Mine"},"validFrom":"2000-01-10","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4608743|P24324|2000-01-10|"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"C15888","name":"Wright Jeff"},"object":{"type":"mine","id":"4608743","name":"No 55 Mine"},"validFrom":"2000-01-10","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4608743|C15888|2000-01-10|"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C15888","name":"Wright Jeff"},"object":{"type":"operator","id":"P24324","name":"E Z Money Coal Company Inc"},"validFrom":"2000-01-10","validTo":null,"current":true,"derived":true,"evidenceMineId":"4608743","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4608743|P24324|2000-01-10|C15888|2000-01-10|97458"}}],"coverage":{"historyRecords":2,"edgeCount":6,"intervalAnomalies":0,"sourceDatasetId":"msha-controller-operator-history"}},"sources":[{"id":"msha-accidents","name":"Accident, Injuries, and Illnesses","domains":["safety","contractors"],"products":["incident trends","severity rates","equipment patterns","peer denominators"],"rowCount":2,"firstDate":"2000-06-21","lastDate":"2000-06-21","metrics":{"daysLost":78,"injuries":2,"fatalities":1,"recentRows":0,"restrictedDays":0,"contractorRecords":0},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"102556","DOCUMENT_NO":"220001850094","ACCIDENT_DT":"06/21/2000","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Struck by falling object","OCCUPATION":"Shuttle car operator, Mantrip operator, Ramcar operator, Rail runner, Buggy operator","NO_INJURIES":"1","DAYS_LOST":"78","NARRATIVE":"EMPLOYEE WAS HELPING ON MINER, MINING A LIFT OFF THE LEFT SIDE OUT BY THE NO. 5 TO NO. 6 OPEN CROSSCUT, WHEN A HORSE BACK MEASURING APPROX 28' BY 32' BY 8' FELL CRUSHING EMPLOYEE'S RIGHT LEG.","sourceDate":"2000-06-21"},{"SOURCE_ROW_NUMBER":"98286","DOCUMENT_NO":"220001850001","ACCIDENT_DT":"06/21/2000","DEGREE_INJURY":"FATALITY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Struck by falling object","OCCUPATION":"Continuous miner operator, Coal mole operator","NO_INJURIES":"1","NARRATIVE":"EMPLOYEE WAS MINING A LIFT OFF THE SOLID BARRIER(LEFT SIDE) OUT BY THE NO. 5 TO NO. 6 OPEN CROSS CUT WHEN A \"HORSE BACK\" MEASURING APPROXIMATELY28' BY 32' BY 8' FELL CRUSHING EMPLOYEE.","sourceDate":"2000-06-21"}]},{"id":"msha-addresses","name":"Addresses of Record","domains":["identity","logistics"],"products":["entity resolution","address history","facility geocoding"],"rowCount":1,"firstDate":"2000-08-07","lastDate":"2000-08-07","metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-assessed-violations","name":"Assessed Violations","domains":["compliance","legal"],"products":["penalty lifecycle","paid and outstanding amounts","assessment aging"],"rowCount":12,"firstDate":"2000-03-14","lastDate":"2000-08-21","metrics":{"ss":5,"delinquent":12,"recentRows":0,"paidPenalty":0,"proposedPenalty":110475,"currentAssessment":110475},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"751726","VIOLATION_NO":"7187526","ISSUE_DT":"08/21/2000","CFR_STANDARD_CD":"75.360(a)(1)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Order","PROPOSED_PENALTY_AMT":"35000.00","CURRENT_ASSESSMENT_AMT":"35000.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2000-08-21"},{"SOURCE_ROW_NUMBER":"751725","VIOLATION_NO":"7187525","ISSUE_DT":"08/21/2000","CFR_STANDARD_CD":"75.203(b)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Order","PROPOSED_PENALTY_AMT":"20000.00","CURRENT_ASSESSMENT_AMT":"20000.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2000-08-21"},{"SOURCE_ROW_NUMBER":"751724","VIOLATION_NO":"7187524","ISSUE_DT":"08/21/2000","CFR_STANDARD_CD":"75.220(a)(1)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"20000.00","CURRENT_ASSESSMENT_AMT":"20000.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2000-08-21"},{"SOURCE_ROW_NUMBER":"751723","VIOLATION_NO":"7187523","ISSUE_DT":"08/21/2000","CFR_STANDARD_CD":"75.203(a)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Order","PROPOSED_PENALTY_AMT":"35000.00","CURRENT_ASSESSMENT_AMT":"35000.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2000-08-21"},{"SOURCE_ROW_NUMBER":"761813","VIOLATION_NO":"7188995","ISSUE_DT":"07/06/2000","CFR_STANDARD_CD":"50.30","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"55.00","CURRENT_ASSESSMENT_AMT":"55.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2000-07-06"},{"SOURCE_ROW_NUMBER":"761812","VIOLATION_NO":"7188994","ISSUE_DT":"07/06/2000","CFR_STANDARD_CD":"75.330(b)(1)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"55.00","CURRENT_ASSESSMENT_AMT":"55.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2000-07-06"},{"SOURCE_ROW_NUMBER":"761811","VIOLATION_NO":"7184874","ISSUE_DT":"07/06/2000","CFR_STANDARD_CD":"75.332(b)(1)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"55.00","CURRENT_ASSESSMENT_AMT":"55.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2000-07-06"},{"SOURCE_ROW_NUMBER":"761810","VIOLATION_NO":"7184873","ISSUE_DT":"07/06/2000","CFR_STANDARD_CD":"75.220(a)(1)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"90.00","CURRENT_ASSESSMENT_AMT":"90.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2000-07-06"},{"SOURCE_ROW_NUMBER":"761809","VIOLATION_NO":"7184872","ISSUE_DT":"07/06/2000","CFR_STANDARD_CD":"75.1002-1(a)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"55.00","CURRENT_ASSESSMENT_AMT":"55.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2000-07-06"},{"SOURCE_ROW_NUMBER":"761808","VIOLATION_NO":"7184871","ISSUE_DT":"07/06/2000","CFR_STANDARD_CD":"75.1002-1(a)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"55.00","CURRENT_ASSESSMENT_AMT":"55.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2000-07-06"},{"SOURCE_ROW_NUMBER":"754945","VIOLATION_NO":"7188951","ISSUE_DT":"03/14/2000","CFR_STANDARD_CD":"75.523-3(c)(2)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"55.00","CURRENT_ASSESSMENT_AMT":"55.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2000-03-14"},{"SOURCE_ROW_NUMBER":"754944","VIOLATION_NO":"7188950","ISSUE_DT":"03/14/2000","CFR_STANDARD_CD":"75.370(a)(1)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"55.00","CURRENT_ASSESSMENT_AMT":"55.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2000-03-14"}]},{"id":"msha-coal-dust-samples","name":"Coal Dust Samples","domains":["health","safety"],"products":["respirable dust trends","CPDM coverage","void patterns","occupation exposure"],"rowCount":20,"firstDate":"2000-03-16","lastDate":"2000-06-02","metrics":{"recentRows":0,"cpdmSamples":0,"voidSamples":0,"validSamples":20,"maxConcentration":1.535,"concentrationTotal":6.671},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"125841","CASS_NUM":"50541100","SMP_TAKEN_DT":"6/2/2000","CONC":".093","SMP_TYPE_CD_DESC":"DESIGNATED AREA","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-06-02"},{"SOURCE_ROW_NUMBER":"1210918","CASS_NUM":"50541073","SMP_TAKEN_DT":"5/31/2000","CONC":".143","SMP_TYPE_CD_DESC":"DESIGNATED AREA","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-05-31"},{"SOURCE_ROW_NUMBER":"1547875","CASS_NUM":"57245767","SMP_TAKEN_DT":"5/3/2000","CONC":".279","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"ROOF BOLTER (SINGLE HEAD)","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-05-03"},{"SOURCE_ROW_NUMBER":"1475738","CASS_NUM":"57245863","SMP_TAKEN_DT":"5/3/2000","CONC":"1.535","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"SECTION FOREMAN","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-05-03"},{"SOURCE_ROW_NUMBER":"1148788","CASS_NUM":"57245754","SMP_TAKEN_DT":"5/3/2000","CONC":".047","SMP_TYPE_CD_DESC":"INTAKE AIR","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-05-03"},{"SOURCE_ROW_NUMBER":"1126143","CASS_NUM":"57245556","SMP_TAKEN_DT":"5/3/2000","CONC":".206","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"SHUTTLE CAR OPERATOR (OFF STANDARD)","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-05-03"},{"SOURCE_ROW_NUMBER":"1051695","CASS_NUM":"57245800","SMP_TAKEN_DT":"5/3/2000","CONC":".046","SMP_TYPE_CD_DESC":"DESIGNATED AREA","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-05-03"},{"SOURCE_ROW_NUMBER":"308666","CASS_NUM":"57245801","SMP_TAKEN_DT":"5/3/2000","CONC":".211","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-05-03"},{"SOURCE_ROW_NUMBER":"107246","CASS_NUM":"57245781","SMP_TAKEN_DT":"5/3/2000","CONC":".262","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-05-03"},{"SOURCE_ROW_NUMBER":"307389","CASS_NUM":"50513224","SMP_TAKEN_DT":"3/29/2000","CONC":".102","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-03-29"},{"SOURCE_ROW_NUMBER":"1409813","CASS_NUM":"50488369","SMP_TAKEN_DT":"3/28/2000","CONC":".152","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-03-28"},{"SOURCE_ROW_NUMBER":"1267922","CASS_NUM":"50488367","SMP_TAKEN_DT":"3/24/2000","CONC":".612","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-03-24"}]},{"id":"msha-conferences","name":"Conferences","domains":["compliance","legal"],"products":["conference history","post-issuance changes","citation lifecycle"],"rowCount":10,"firstDate":"2000-08-21","lastDate":"2000-10-10","metrics":{"linkedIssuances":10},"periods":{},"recentRecords":[]},{"id":"msha-controller-operator-history","name":"Controller and Operator History","domains":["identity","compliance"],"products":["historical ownership attribution","operator transitions","valid-time joins"],"rowCount":2,"firstDate":"1998-10-01","lastDate":"2000-01-10","metrics":{"recentRows":0,"currentOperatorTenures":1,"completedOperatorTenures":1},"periods":{},"recentRecords":[]},{"id":"msha-inspections","name":"Inspections","domains":["safety","compliance"],"products":["inspection mix","on-site hours","event context","citation rate denominator"],"rowCount":14,"firstDate":"2000-03-09","lastDate":"2000-08-29","metrics":{"inspectors":20,"recentRows":0,"onSiteHours":156,"inspectionHours":694,"inspectionSamples":0},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"367934","EVENT_NO":"4087287","INSPECTION_BEGIN_DT":"08/29/2000","INSPECTION_END_DT":"09/01/2000","ACTIVITY_CODE":"BBF","ACTIVITY":"PART 50 AUDITS","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"2","SUM_TOTAL_ON_SITE_HOURS":"0","sourceDate":"2000-08-29"},{"SOURCE_ROW_NUMBER":"659930","EVENT_NO":"4090617","INSPECTION_BEGIN_DT":"06/29/2000","INSPECTION_END_DT":"07/10/2000","ACTIVITY_CODE":"CAA","ACTIVITY":"SPOT INSPECTION","NBR_INSPECTOR":"3","SUM_TOTAL_INSP_HOURS":"47.5","SUM_TOTAL_ON_SITE_HOURS":"19","sourceDate":"2000-06-29"},{"SOURCE_ROW_NUMBER":"310748","EVENT_NO":"4087400","INSPECTION_BEGIN_DT":"06/27/2000","INSPECTION_END_DT":"07/13/2000","ACTIVITY_CODE":"CCC","ACTIVITY":"VENTILATION TECHNICAL INSPECTION","NBR_INSPECTOR":"2","SUM_TOTAL_INSP_HOURS":"17","SUM_TOTAL_ON_SITE_HOURS":"8","sourceDate":"2000-06-27"},{"SOURCE_ROW_NUMBER":"1130245","EVENT_NO":"4084671","INSPECTION_BEGIN_DT":"06/21/2000","INSPECTION_END_DT":"09/25/2000","ACTIVITY_CODE":"AFA","ACTIVITY":"FATAL ACCIDENT INVESTIGATION","NBR_INSPECTOR":"4","SUM_TOTAL_INSP_HOURS":"442.5","SUM_TOTAL_ON_SITE_HOURS":"45","sourceDate":"2000-06-21"},{"SOURCE_ROW_NUMBER":"661617","EVENT_NO":"4089716","INSPECTION_BEGIN_DT":"06/05/2000","INSPECTION_END_DT":"06/08/2000","ACTIVITY_CODE":"CCA","ACTIVITY":"ROOF CONTROL TECHNICAL INSPECTION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"13","SUM_TOTAL_ON_SITE_HOURS":"3","sourceDate":"2000-06-05"},{"SOURCE_ROW_NUMBER":"1157741","EVENT_NO":"4089712","INSPECTION_BEGIN_DT":"05/15/2000","INSPECTION_END_DT":"05/19/2000","ACTIVITY_CODE":"CCA","ACTIVITY":"ROOF CONTROL TECHNICAL INSPECTION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"13","SUM_TOTAL_ON_SITE_HOURS":"5","sourceDate":"2000-05-15"},{"SOURCE_ROW_NUMBER":"767190","EVENT_NO":"4089507","INSPECTION_BEGIN_DT":"05/15/2000","INSPECTION_END_DT":"05/16/2000","ACTIVITY_CODE":"CEF","ACTIVITY":"OTHER TECHNICAL INVESTIGATION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"2","SUM_TOTAL_ON_SITE_HOURS":"0","sourceDate":"2000-05-15"},{"SOURCE_ROW_NUMBER":"367491","EVENT_NO":"4089506","INSPECTION_BEGIN_DT":"05/10/2000","INSPECTION_END_DT":"06/05/2000","ACTIVITY_CODE":"AAA","ACTIVITY":"Regular Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"66","SUM_TOTAL_ON_SITE_HOURS":"35.5","sourceDate":"2000-05-10"},{"SOURCE_ROW_NUMBER":"304809","EVENT_NO":"4087391","INSPECTION_BEGIN_DT":"05/08/2000","INSPECTION_END_DT":"05/09/2000","ACTIVITY_CODE":"CCC","ACTIVITY":"VENTILATION TECHNICAL INSPECTION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"9","SUM_TOTAL_ON_SITE_HOURS":"1","sourceDate":"2000-05-08"},{"SOURCE_ROW_NUMBER":"742451","EVENT_NO":"4084948","INSPECTION_BEGIN_DT":"05/01/2000","INSPECTION_END_DT":"05/10/2000","ACTIVITY_CODE":"BBB","ACTIVITY":"NOISE TECHNICAL INVESTIGATION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"9.75","SUM_TOTAL_ON_SITE_HOURS":"4","sourceDate":"2000-05-01"},{"SOURCE_ROW_NUMBER":"411803","EVENT_NO":"4084949","INSPECTION_BEGIN_DT":"05/01/2000","INSPECTION_END_DT":"05/22/2000","ACTIVITY_CODE":"BAB","ACTIVITY":"RESP DUST TECH INSP - U. G. MINES","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"11.25","SUM_TOTAL_ON_SITE_HOURS":"6","sourceDate":"2000-05-01"},{"SOURCE_ROW_NUMBER":"467255","EVENT_NO":"4086897","INSPECTION_BEGIN_DT":"03/27/2000","INSPECTION_END_DT":"04/03/2000","ACTIVITY_CODE":"CCA","ACTIVITY":"ROOF CONTROL TECHNICAL INSPECTION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"13","SUM_TOTAL_ON_SITE_HOURS":"5","sourceDate":"2000-03-27"}]},{"id":"msha-mine-production-quarterly","name":"Mine Employment and Production — Quarterly","domains":["production","safety","compliance"],"products":["production trend","employee hours","rate denominators","seasonality"],"rowCount":2,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2000-Q2":{"hours":1600,"employees":6,"production":8729},"2000-Q1":{"hours":390,"employees":6,"production":4103}},"recentRecords":[]},{"id":"msha-mine-production-yearly","name":"Mine Employment and Production — Yearly","domains":["production","safety","compliance"],"products":["annual trend","backfill","quarterly reconciliation"],"rowCount":1,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2000":{"hours":1990,"employees":6,"production":12832}},"recentRecords":[]},{"id":"msha-mines","name":"Mines","domains":["identity","production","logistics"],"products":["mine identity","status","commodity","location","operator and controller"],"rowCount":1,"firstDate":null,"lastDate":null,"metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-noise-samples","name":"Noise Samples","domains":["health","safety","equipment"],"products":["hearing exposure","machine and manufacturer patterns","occupation coverage"],"rowCount":5,"firstDate":"2000-05-03","lastDate":"2000-05-03","metrics":{"recentRows":0,"doseOver100":1,"actDoseTotal":259,"pelDoseTotal":175},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"241829","EVENT_NO":"4084948","SURVEY_DATE":"05/03/2000","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (OFF STANDARD)","MACHINE_CD":"37","MANUFACTURER_CD":"058","ACT_DOSE_85":"16","PEL_DOSE_90":"5","SURVEY_TYPE":"I","sourceDate":"2000-05-03"},{"SOURCE_ROW_NUMBER":"241828","EVENT_NO":"4084948","SURVEY_DATE":"05/03/2000","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","MACHINE_CD":"37","MANUFACTURER_CD":"058","ACT_DOSE_85":"34","PEL_DOSE_90":"0","SURVEY_TYPE":"I","sourceDate":"2000-05-03"},{"SOURCE_ROW_NUMBER":"241827","EVENT_NO":"4084948","SURVEY_DATE":"05/03/2000","OCCUPATION_CD_DESC":"SECTION FOREMAN","MACHINE_CD":"40","MANUFACTURER_CD":"119","ACT_DOSE_85":"116","PEL_DOSE_90":"116","SURVEY_TYPE":"I","sourceDate":"2000-05-03"},{"SOURCE_ROW_NUMBER":"241826","EVENT_NO":"4084948","SURVEY_DATE":"05/03/2000","OCCUPATION_CD_DESC":"ROOF BOLTER (SINGLE HEAD)","MACHINE_CD":"30","MANUFACTURER_CD":"043","ACT_DOSE_85":"55","PEL_DOSE_90":"30","SURVEY_TYPE":"I","sourceDate":"2000-05-03"},{"SOURCE_ROW_NUMBER":"241825","EVENT_NO":"4084948","SURVEY_DATE":"05/03/2000","OCCUPATION_CD_DESC":"CONTINUOUS MINER OPERATOR","MACHINE_CD":"06","MANUFACTURER_CD":"058","ACT_DOSE_85":"38","PEL_DOSE_90":"24","SURVEY_TYPE":"I","sourceDate":"2000-05-03"}]},{"id":"msha-violations","name":"Violations","domains":["compliance","safety","legal"],"products":["citation and order record","condition text","Title 30 linkage","abatement patterns"],"rowCount":16,"firstDate":"2000-03-14","lastDate":"2000-08-21","metrics":{"ss":7,"amountDue":110475,"contested":0,"amountPaid":0,"recentRows":0,"section104d":4,"unterminated":0,"proposedPenalty":110475},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"2766064","VIOLATION_NO":"7187526","VIOLATION_ISSUE_DT":"08/21/2000","SIG_SUB":"Y","PART_SECTION":"75.360(a)(1)","CIT_ORD_SAFE":"Order","LIKELIHOOD":"Occurred","INJ_ILLNESS":"Fatal","NO_AFFECTED":"2","NEGLIGENCE":"HighNegligence","TERMINATION_DT":"08/21/2000","PROPOSED_PENALTY":"35000","AMOUNT_DUE":"35000","AMOUNT_PAID":"0","CONTESTED_IND":"N","sourceDate":"2000-08-21"},{"SOURCE_ROW_NUMBER":"2766063","VIOLATION_NO":"7187525","VIOLATION_ISSUE_DT":"08/21/2000","SIG_SUB":"Y","PART_SECTION":"75.203(b)","CIT_ORD_SAFE":"Order","LIKELIHOOD":"Occurred","INJ_ILLNESS":"Fatal","NO_AFFECTED":"2","NEGLIGENCE":"HighNegligence","TERMINATION_DT":"08/21/2000","PROPOSED_PENALTY":"20000","AMOUNT_DUE":"20000","AMOUNT_PAID":"0","CONTESTED_IND":"N","sourceDate":"2000-08-21"},{"SOURCE_ROW_NUMBER":"2766062","VIOLATION_NO":"7187524","VIOLATION_ISSUE_DT":"08/21/2000","SIG_SUB":"Y","PART_SECTION":"75.220(a)(1)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Occurred","INJ_ILLNESS":"Fatal","NO_AFFECTED":"2","NEGLIGENCE":"HighNegligence","TERMINATION_DT":"08/21/2000","PROPOSED_PENALTY":"20000","AMOUNT_DUE":"20000","AMOUNT_PAID":"0","CONTESTED_IND":"N","sourceDate":"2000-08-21"},{"SOURCE_ROW_NUMBER":"2766061","VIOLATION_NO":"7187523","VIOLATION_ISSUE_DT":"08/21/2000","SIG_SUB":"Y","PART_SECTION":"75.203(a)","CIT_ORD_SAFE":"Order","LIKELIHOOD":"Occurred","INJ_ILLNESS":"Fatal","NO_AFFECTED":"2","NEGLIGENCE":"HighNegligence","TERMINATION_DT":"08/21/2000","PROPOSED_PENALTY":"35000","AMOUNT_DUE":"35000","AMOUNT_PAID":"0","CONTESTED_IND":"N","sourceDate":"2000-08-21"},{"SOURCE_ROW_NUMBER":"2766070","VIOLATION_NO":"7188995","VIOLATION_ISSUE_DT":"07/06/2000","SIG_SUB":"N","PART_SECTION":"50.30","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"NoLikelihood","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"08/31/2000","PROPOSED_PENALTY":"55","AMOUNT_DUE":"55","AMOUNT_PAID":"0","CONTESTED_IND":"N","sourceDate":"2000-07-06"},{"SOURCE_ROW_NUMBER":"2766069","VIOLATION_NO":"7188994","VIOLATION_ISSUE_DT":"07/06/2000","SIG_SUB":"N","PART_SECTION":"75.330(b)(1)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"NoLikelihood","INJ_ILLNESS":"Permanent","NO_AFFECTED":"2","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"07/06/2000","PROPOSED_PENALTY":"55","AMOUNT_DUE":"55","AMOUNT_PAID":"0","CONTESTED_IND":"N","sourceDate":"2000-07-06"},{"SOURCE_ROW_NUMBER":"2766068","VIOLATION_NO":"7184874","VIOLATION_ISSUE_DT":"07/06/2000","SIG_SUB":"N","PART_SECTION":"75.332(b)(1)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"HighNegligence","TERMINATION_DT":"10/27/2000","PROPOSED_PENALTY":"55","AMOUNT_DUE":"55","AMOUNT_PAID":"0","CONTESTED_IND":"N","sourceDate":"2000-07-06"},{"SOURCE_ROW_NUMBER":"2766067","VIOLATION_NO":"7184873","VIOLATION_ISSUE_DT":"07/06/2000","SIG_SUB":"Y","PART_SECTION":"75.220(a)(1)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"Permanent","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"10/27/2000","PROPOSED_PENALTY":"90","AMOUNT_DUE":"90","AMOUNT_PAID":"0","CONTESTED_IND":"N","sourceDate":"2000-07-06"},{"SOURCE_ROW_NUMBER":"2766066","VIOLATION_NO":"7184872","VIOLATION_ISSUE_DT":"07/06/2000","SIG_SUB":"N","PART_SECTION":"75.1002-1(a)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"HighNegligence","TERMINATION_DT":"10/27/2000","PROPOSED_PENALTY":"55","AMOUNT_DUE":"55","AMOUNT_PAID":"0","CONTESTED_IND":"N","sourceDate":"2000-07-06"},{"SOURCE_ROW_NUMBER":"2766065","VIOLATION_NO":"7184871","VIOLATION_ISSUE_DT":"07/06/2000","SIG_SUB":"N","PART_SECTION":"75.1002-1(a)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"10/27/2000","PROPOSED_PENALTY":"55","AMOUNT_DUE":"55","AMOUNT_PAID":"0","CONTESTED_IND":"N","sourceDate":"2000-07-06"},{"SOURCE_ROW_NUMBER":"2766060","VIOLATION_NO":"7187520","VIOLATION_ISSUE_DT":"06/21/2000","SECTION_OF_ACT":"103(k)","CIT_ORD_SAFE":"Order","NO_AFFECTED":"0","TERMINATION_DT":"01/22/2001","CONTESTED_IND":"N","sourceDate":"2000-06-21"},{"SOURCE_ROW_NUMBER":"2766059","VIOLATION_NO":"7184868","VIOLATION_ISSUE_DT":"05/23/2000","SIG_SUB":"N","PART_SECTION":"75.380(d)(2)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"05/24/2000","CONTESTED_IND":"N","sourceDate":"2000-05-23"}]}],"safety":{"href":"/api/v1/mines/4608743/safety","description":"Full-period safety series, top CFR sections and paginated activity. Requires PostgreSQL."},"silica":{"href":"/api/v1/mines/4608743/silica","description":"Dedicated silica records, measurements, sample status and trends. Defaults to the snapshot year; use year=all for history."},"externalContext":{"eia":null,"title30":{"snapshot":{"chapterCount":6,"featuredSectionCount":100,"latestAmendedOn":"2026-08-14","latestIssueDate":"2026-08-14","partCount":206,"sectionCount":5954,"upToDateAsOf":"2026-08-19"},"regulations":[{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.360","heading":"Preshift examination at fixed intervals.","id":"75.360","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.360","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a)(1) Except as provided in paragraph (a)(2) of this section, a certified person designated by the operator must make a preshift examination within 3 hours preceding the beginning of any 8-hour interval during which any person is scheduled to work or travel underground. No person other than certified examiners may enter or remain in any underground area unless a preshift examination has been completed for the established 8-hour interval. The operator must establish 8-hour intervals of time subject to the required preshift examinations.\n\n(2) Preshift examinations of areas where pumpers are scheduled to work or travel shall not be required prior to the pumper entering the areas if the pumper is a certified person and the pumper conducts an examination for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (b)(11) of this section, tests for methane and oxygen deficiency, and determines if the air is moving in its proper direction in the area where the pumper works or travels. The examination of the area must be completed before the pumper performs any other work. A record of all hazardous conditions and violations of the mandatory health or safety standards found by the pumper shall be made and retained in accordance with § 75.363 of this part.\n\n(b) The person conducting the preshift examination shall examine for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (b)(11) of this section, test for methane and oxygen deficiency, and determine if the air is moving in its proper direction at the following locations:\n\n(1) Roadways, travelways and track haulageways where persons are scheduled, prior to the beginning of the preshift examination, to work or travel during the oncoming shift.\n\n(2) Belt conveyors that will be used to transport persons during the oncoming shift and the entries in which these belt conveyors are located.\n\n(3) Working sections and areas where mechanized mining equipment is being installed or removed, if anyone is scheduled to work on the section or in the area during the oncoming shift. The scope of the examination shall include the working places, approaches to worked-out areas and ventilation controls on these sections and in these areas, and the examination shall include tests of the roof, face and rib conditions on these sections and in these areas.\n\n(4) Approaches to worked-out areas along intake air courses and at the entries used to carry air into worked-out areas if the intake air passing the approaches is used to ventilate working sections where anyone is scheduled to work during the oncoming shift. The examination of the approaches to the worked-out areas shall be made in the intake air course immediately inby and outby each entry used to carry air into the worked-out area. An examination of the entries used to carry air into the worked-out areas shall be conducted at a point immediately inby the intersection of each entry with the intake air course.\n\n(5) Seals along intake air courses where intake air passes by a seal to ventilate working sections where anyone is scheduled to work during the oncoming shift.\n\n(6)(i) Entries and rooms developed after November 15, 1992, and developed more than 2 crosscuts off an intake air course without permanent ventilation controls where intake air passes through or by these entries or rooms to reach a working section where anyone is scheduled to work during the oncoming shift; and,\n\n(ii) Entries and rooms developed after November 15, 1992, and driven more than 20 feet off an intake air course without a crosscut and without permanent ventilation controls where intake air passes through or by these entries or rooms to reach a working section where anyone is scheduled to work during the oncoming shift.\n\n(7) Areas where trolley wires or trolley feeder wires are to be or will remain energized during the oncoming shift.\n\n(8) High spots along intake air courses where methane is likely to accumulate, if equipment will be operated in the area during the shift.\n\n(9) Underground electrical installations referred to in § 75.340(a), except those pumps listed in § 75.340 (b)(2) through (b)(6), and areas where compressors subject to § 75.344 are installed if the electrical installation or compressor is or will be energized during the shift.\n\n(10) Other areas where work or travel during the oncoming shift is scheduled prior to the beginning of the preshift examination.\n\n(11) Preshift examinations shall include examinations to identify violations of the standards listed below:\n\n(i) §§ 75.202(a) and 75.220(a)(1)—roof control;\n\n(ii) §§ 75.333(h) and 75.370(a)(1)—ventilation, methane;\n\n(iii) §§ 75.400 and 75.403—accumulations of combustible materials and application of rock dust;\n\n(iv) § 75.1403—other safeguards, limited to maintenance of travelways along belt conveyors, off track haulage roadways, and track haulage, track switches, and other components for haulage;\n\n(v) § 75.1722(a)—guarding moving machine parts; and\n\n(vi) § 75.1731(a)—maintenance of belt conveyor components.\n\n(c) The person conducting the preshift examination shall determine the volume of air entering each of the following areas if anyone is scheduled to work in the areas during the oncoming shift:\n\n(1) In the last open crosscut of each set of entries or rooms on each working section and areas where mechanized mining equipment is being installed or removed. The last open crosscut is the crosscut in the line of pillars containing the permanent stoppings that separate the intake air courses and the return air courses.\n\n(2) On each longwall or shortwall in the intake entry or entries at the intake end of the longwall or shortwall face immediately outby the face and the velocity of air at each end of the face at the locations specified in the approved ventilation plan.\n\n(3) At the intake end of any pillar line—\n\n(i) If a single split of air is used, in the intake entry furthest from the return air course, immediately outby the first open crosscut outby the line of pillars being mined; or\n\n(ii) If a split system is used, in the intake entries of each split immediately inby the split point.\n\n(d) The person conducting the preshift examination shall check the refuge alternative for damage, the integrity of the tamper-evident seal and the mechanisms required to deploy the refuge alternative, and the ready availability of compressed oxygen and air.\n\n(e) The district manager may require the operator to examine other areas of the mine or examine for other hazards and violations of other mandatory health or safety standards found during the preshift examination.\n\n(f) Certification. At each working place examined, the person doing the preshift examination shall certify by initials, date, and the time, that the examination was made. In areas required to be examined outby a working section, the certified person shall certify by initials, date, and the time at enough locations to show that the entire area has been examined.\n\n(g) Recordkeeping. A record of the results of each preshift examination, including a record of hazardous conditions and violations of the nine mandatory health or safety standards and their locations found by the examiner during each examination, and of the results and locations of air and methane measurements, shall be made on the surface before any persons, other than certified persons conducting examinations required by this subpart, enter any underground area of the mine. The results of methane tests shall be recorded as the percentage of methane measured by the examiner. The record shall be made by the certified person who made the examination or by a person designated by the operator. If the record is made by someone other than the examiner, the examiner shall verify the record by initials and date by or at the end of the shift for which the examination was made. A record shall also be made by a certified person of the action taken to correct hazardous conditions and violations of mandatory health or safety standards found during the preshift examination. All preshift and corrective action records shall be countersigned by the mine foreman or equivalent mine official by the end of the mine foreman's or equivalent mine official's next regularly scheduled working shift. The records required by this section shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.\n\n(h) Retention period. Records shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.\n\n[61 FR 9829, Mar. 11, 1996, as amended at 61 FR 55527, Oct. 25, 1996; 62 FR 35085, June 30, 1997; 64 FR 45170, Aug. 19, 1999; 73 FR 80697, Dec. 31, 2008; 77 FR 20714, Apr. 6, 2012]","occurrenceCount":1},{"chapter":"I","heading":"Mining methods.","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-C/section-75.203","part":"75","subchapter":"O","subpart":"C","id":"75.203","citation":"30 CFR 75.203","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subpartHeading":"","text":null,"occurrenceCount":2},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.220","heading":"Roof control plan.","id":"75.220","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-C/section-75.220","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"C","subpartHeading":"Subpart C—Roof Support","text":"(a)(1) Each mine operator shall develop and follow a roof control plan, approved by the District Manager, that is suitable to the prevailing geological conditions, and the mining system to be used at the mine. Additional measures shall be taken to protect persons if unusual hazards are encountered.\n\n(2) The proposed roof control plan and any revisions to the plan shall be submitted, in writing, to the District Manager. When revisions to a roof control plan are proposed, only the revised pages need to be submitted unless otherwise specified by the District Manager.\n\n(b)(1) The mine operator will be notified in writing of the approval or denial of approval of a proposed roof control plan or proposed revision.\n\n(2) When approval of a proposed plan or revision is denied, the deficiencies of the plan or revision and recommended changes will be specified and the mine operator will be afforded an opportunity to discuss the deficiencies and changes with the District Manager.\n\n(3) Before new support materials, devices or systems other than roof bolts and accessories, are used as the only means of roof support, the District Manager may require that their effectiveness be demonstrated by experimental installations.\n\n(c) No proposed roof control plan or revision to a roof control plan shall be implemented before it is approved.\n\n(d) Before implementing an approved revision to a roof control plan, all persons who are affected by the revision shall be instructed in its provisions.\n\n(e) The approved roof control plan and any revisions shall be available to the miners and representative of miners at the mine.\n\n[53 FR 2375, Jan. 27, 1988; 53 FR 11395, Apr. 6, 1988, as amended at 60 FR 33723, June 29, 1995; 71 FR 16668, Apr. 3, 2006]","occurrenceCount":2},{"chapter":"I","heading":"Preparation and submission of MSHA Form 7000-2—Quarterly Employment and Coal Production Report.","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-I/part-50/subpart-D/section-50.30","part":"50","subchapter":"I","subpart":"D","id":"50.30","citation":"30 CFR 50.30","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","subchapterHeading":"SUBCHAPTER I—ACCIDENTS, INJURIES, ILLNESSES, EMPLOYMENT, AND PRODUCTION IN MINES","partHeading":"PART 50—NOTIFICATION, INVESTIGATION, REPORTS AND RECORDS OF ACCIDENTS, INJURIES, ILLNESSES, EMPLOYMENT, AND COAL PRODUCTION IN MINES","subpartHeading":"","text":null,"occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.330","heading":"Face ventilation control devices.","id":"75.330","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.330","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a) Brattice cloth, ventilation tubing and other face ventilation control devices shall be made of flame-resistant material approved by MSHA.\n\n(b)(1) Ventilation control devices shall be used to provide ventilation to dilute, render harmless, and to carry away flammable, explosive, noxious, and harmful gases, dusts, smoke, and fumes—\n\n(i) To each working face from which coal is being cut, mined, drilled for blasting, or loaded; and\n\n(ii) To any other working places as required by the approved ventilation plan.\n\n(2) These devices shall be installed at a distance no greater than 10 feet from the area of deepest penetration to which any portion of the face has been advanced unless an alternative distance is specified and approved in the ventilation plan. Alternative distances specified shall be capable of maintaining concentrations of respirable dust, methane, and other harmful gases, in accordance with the levels specified in the applicable sections of this chapter.\n\n(c) When the line brattice or any other face ventilation control device is damaged to an extent that ventilation of the working face is inadequate, production activities in the working place shall cease until necessary repairs are made and adequate ventilation is restored.\n\n[61 FR 9828, Mar. 11, 1996; 61 FR 29288, June 10, 1996]","occurrenceCount":1},{"chapter":"I","heading":"Working sections and working places.","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.332","part":"75","subchapter":"O","subpart":"D","id":"75.332","citation":"30 CFR 75.332","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subpartHeading":"","text":null,"occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.380","heading":"Escapeways; bituminous and lignite mines.","id":"75.380","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.380","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a) Except in situations addressed in § 75.381, § 75.385 and § 75.386, at least two separate and distinct travelable passageways shall be designated as escapeways and shall meet the requirements of this section.\n\n(b) (1) Escapeways shall be provided from each working section, and each area where mechanized mining equipment is being installed or removed, continuous to the surface escape drift opening or continuous to the escape shaft or slope facilities to the surface.\n\n(2) During equipment installation, these escapeways shall begin at the projected location for the section loading point. During equipment removal, they shall begin at the location of the last loading point.\n\n(c) The two separate and distinct escapeways required by this section shall not end at a common shaft, slope, or drift opening, except that multiple compartment shafts or slopes separated by walls constructed of noncombustible material may be used as separate and distinct passageways.\n\n(d) Each escapeway shall be—\n\n(1) Maintained in a safe condition to always assure passage of anyone, including disabled persons;\n\n(2) Clearly marked to show the route and direction of travel to the surface;\n\n(3) Maintained to at least a height of 5 feet from the mine floor to the mine roof, excluding the thickness of any roof support, except that the escapeways shall be maintained to at least the height of the coalbed, excluding the thickness of any roof support, where the coalbed is less than 5 feet. In areas of mines where escapeways pass through doors, the height may be less than 5 feet, provided that sufficient height is maintained to enable miners, including disabled persons, to escape quickly in an emergency. In areas of mines developed before November 16, 1992, where escapeways pass over or under overcasts or undercasts, the height may be less than 5 feet provided that sufficient height is maintained to enable miners, including disabled persons, to escape quickly in an emergency. When there is a need to determine whether sufficient height is provided, MSHA may require a stretcher test where 4 persons carry a miner through the area in question on a stretcher;\n\n(4) Maintained at least 6 feet wide except—\n\n(i) Where necessary supplemental roof support is installed, the escapeway shall not be less than 4 feet wide; or\n\n(ii) Where the route of travel passes through doors or other permanent ventilation controls, the escapeway shall be at least 4 feet wide to enable miners to escape quickly in an emergency, or\n\n(iii) Where the alternate escapeway passes through doors or other permanent ventilation controls or where supplemental roof support is required and sufficient width is maintained to enable miners, including disabled persons, to escape quickly in an emergency. When there is a need to determine whether sufficient width is provided, MSHA may require a stretcher test where 4 persons carry a miner through the area in question on a stretcher, or\n\n(iv) Where mobile equipment near working sections, and other equipment essential to the ongoing operation of longwall sections, is necessary during normal mining operations, such as material cars containing rock dust or roof control supplies, or is to be used for the evacuation of miners off the section in the event of an emergency. In any instance, escapeways shall be of sufficient width to enable miners, including disabled persons, to escape quickly in an emergency. When there is a need to determine whether sufficient width is provided, MSHA may require a stretcher test where 4 persons carry a miner through the area in question on a stretcher;\n\n(5) Located to follow the most direct, safe and practical route to the nearest mine opening suitable for the safe evacuation of miners; and\n\n(6) Provided with ladders, stairways, ramps, or similar facilities where the escapeways cross over obstructions.\n\n(7) Provided with a continuous, durable directional lifeline or equivalent device that shall be—\n\n(i) Installed and maintained throughout the entire length of each escapeway as defined in paragraph (b)(1) of this section;\n\n(ii) Flame-resistant in accordance with the requirements of part 18 of this chapter upon replacement of existing lifelines; but in no case later than June 15, 2009;\n\n(iii) Marked with a reflective material every 25 feet;\n\n(iv) Located in such a manner for miners to use effectively to escape;\n\n(v) Equipped with one directional indicator cone securely attached to the lifeline, signifying the route of escape, placed at intervals not exceeding 100 feet. Cones shall be installed so that the tapered section points inby;\n\n(vi) Equipped with one sphere securely attached to the lifeline at each intersection where personnel doors are installed in adjacent crosscuts;\n\n(vii) Equipped with two securely attached cones, installed consecutively with the tapered section pointing inby, to signify an attached branch line is immediately ahead.\n\n(A) A branch line leading from the lifeline to an SCSR cache will be marked with four cones with the base sections in contact to form two diamond shapes. The cones must be placed within reach of the lifeline.\n\n(B) A branch line leading from the lifeline to a refuge alternative will be marked with a rigid spiraled coil at least eight inches in length. The spiraled coil must be placed within reach of the lifeline (see Illustration 1 below).\n\n(e) Surface openings shall be adequately protected to prevent surface fires, fumes, smoke, and flood water from entering the mine.\n\n(f) Primary escapeway. (1) One escapeway that is ventilated with intake air shall be designated as the primary escapeway. The primary escapeway shall have a higher ventilation pressure than the belt entry unless the mine operator submits an alternative in the mine ventilation plan to protect the integrity of the primary escapeway, based on mine specific conditions, which is approved by the district manager.\n\n(2) Paragraphs (f)(3) through (f)(7) of this section apply as follows:\n\n(i) To all areas of a primary escapeway developed on or after November 16, 1992;\n\n(ii) Effective as of June 10, 1997, to all areas of a primary escapeway developed between March 30, 1970 and November 16, 1992; and\n\n(iii) Effective as of June 10, 1997, to all areas of the primary escapeway developed prior to March 30, 1970 where separation of the belt and trolley haulage entries from the primary escapeway existed prior to November 16, 1992.\n\n(3) The following equipment is not permitted in the primary escapeway:\n\n(i) Mobile equipment hauling coal except for hauling coal incidental to cleanup or maintenance of the primary escapeway.\n\n(ii) Compressors, except—\n\n(A) Compressors necessary to maintain the escapeway in safe, travelable condition;\n\n(B) Compressors that are components of equipment such as locomotives and rock dusting machines; and\n\n(C) Compressors of less than five horsepower.\n\n(iii) Underground transformer stations, battery charging stations, substations, and rectifiers except—\n\n(A) Where necessary to maintain the escapeway in safe, travelable condition; and\n\n(B) Battery charging stations and rectifiers and power centers with transformers that are either dry-type or contain nonflammable liquid, provided they are located on or near a working section and are moved as the section advances or retreats.\n\n(iv) Water pumps, except—\n\n(A) Water pumps necessary to maintain the escapeway in safe, travelable condition;\n\n(B) Submersible pumps;\n\n(C) Permissible pumps and associated permissible switchgear;\n\n(D) Pumps located on or near a working section that are moved as the section advances or retreats;\n\n(E) Pumps installed in anthracite mines; and\n\n(F) Small portable pumps.\n\n(4) Mobile equipment operated in the primary escapeway, except for continuous miners and as provided in paragraphs (f)(5), (f)(6), and (f)(7) of this section, shall be equipped with a fire suppression system installed according to §§ 75.1107-3 through 75.1107-16 that is—\n\n(i) Manually operated and attended continuously by a person trained in the systems function and use, or\n\n(ii) A multipurpose dry chemical type capable of both automatic and manual activation.\n\n(5) Personnel carriers and small mobile equipment designed and used only for carrying people and small hand tools may be operated in primary escapeways if—\n\n(i) The equipment is provided with a multipurpose dry chemical type fire suppression system capable of both automatic and manual activation, and the suppression system is suitable for the intended application and is listed or approved by a nationally recognized independent testing laboratory, or,\n\n(ii) Battery powered and provided with two 10 pound multipurpose dry chemical portable fire extinguishers.\n\n(6) Notwithstanding the requirements of paragraph (f)(3)(i), mobile equipment not provided with a fire suppression system may operate in the primary escapeway if no one is inby except those persons directly engaged in using or moving the equipment.\n\n(7) Notwithstanding the requirements of paragraph (f)(3)(i), mobile equipment designated and used only as emergency vehicles or ambulances, may be operated in the primary escapeway without fire suppression systems.\n\n(g) Except where separation of belt and trolley haulage entries from designated escapeways did not exist before November 15, 1992, and except as provided in § 75.350(c), the primary escapeway must be separated from belt and trolley haulage entries for its entire length, to and including the first connecting crosscut outby each loading point except when a greater or lesser distance for this separation is specified and approved in the mine ventilation plan and does not pose a hazard to miners.\n\n(h) Alternate escapeway. One escapeway shall be designated as the alternate escapeway. The alternate escapeway shall be separated from the primary escapeway for its entire length, except that the alternate and primary escapeways may be ventilated from a common intake air shaft or slope opening.\n\n(i) Mechanical escape facilities shall be provided and maintained for—\n\n(1) Each shaft that is part of a designated escapeway and is greater than 50 feet in depth; and\n\n(2) Each slope from the coal seam to the surface that is part of a designated escapeway and is inclined more than 9 degrees from the horizontal.\n\n(j) Within 30 minutes after mine personnel on the surface have been notified of an emergency requiring evacuation, mechanical escape facilities provided under paragraph (i) of this section shall be operational at the bottom of shaft and slope openings that are part of escapeways.\n\n(k) Except where automatically activated hoisting equipment is used, the bottom of each shaft or slope opening that is part of a designated escapeway shall be equipped with a means of signaling a surface location where a person is always on duty when anyone is underground. When the signal is activated or the evacuation of persons underground is necessary, the person shall assure that mechanical escape facilities are operational as required by paragraph (j) of this section.\n\n(l)(1) Stairways or mechanical escape facilities shall be installed in shafts that are part of the designated escapeways and that are 50 feet or less in depth, except ladders may be used in shafts that are part of the designated escapeways and that are 5 feet or less in depth.\n\n(2) Stairways shall be constructed of concrete or metal, set on an angle not to exceed 45 degrees from the horizontal, and equipped on the open side with handrails. In addition, landing platforms that are at least 2 feet by 4 feet shall be installed at intervals not to exceed 20 vertical feet on the stairways and equipped on the open side with handrails.\n\n(3) Ladders shall be constructed of metal, anchored securely, and set on an angle not to exceed 60 degrees from the horizontal.\n\n(m) A travelway designed to prevent slippage shall be provided in slope and drift openings that are part of designated escapeways, unless mechanical escape facilities are installed.\n\n[61 FR 9829, Mar. 11, 1996; 61 FR 20877, May 8, 1996, as amended at 61 FR 55527, Oct. 25, 1996; 69 FR 17530, Apr. 2, 2004; 71 FR 12269, Mar. 9, 2006; 71 FR 71452, Dec. 8, 2006; 73 FR 80613, Dec. 31, 2008]","occurrenceCount":1}],"fullCorpus":"/data/title30-sections.json"}}},"meta":{"representation":"json","mineId":"4608743","dataSource":"postgres","snapshotId":"2026-10-13T11:19:05.459773+00:00","completedAt":"2026-10-13T11:26:59.401Z","sourceCount":20,"totalRows":17906804}}