{"data":{"schemaVersion":"realm.mine-profile.v1","generatedAt":"2026-10-13T11:26:59.401Z","identity":{"mine_id":"4608537","name":"Jims Branch No 1","status":"Abandoned and Sealed","status_date":"2002-09-10","mine_type":"Underground","coal_metal":"C","commodity":"Coal (Bituminous)","state":"WV","county":"Wyoming","nearest_town":"New Richmond","operator_id":"P22311","operator_name":"Baylor Mining Inc","controller_id":"C14826","controller_name":"Robert L  Worley","district":"C04","office":"Beckley District","employees":0,"latitude":37.579167,"longitude":-81.480278},"coverage":{"contributingSources":13,"registeredSources":20,"sourceRows":584},"relationships":{"schemaVersion":"realm.temporal-relationships.v1","temporalSemantics":{"validTime":{"granularity":"date","bounds":"inclusive","nullStart":"start date not published in the upstream history row","nullEnd":"open-ended in the upstream history row; not independent proof of present control"},"transactionTime":{"observedAt":"2026-10-13T11:19:05.459773+00:00","meaning":"time the checksum-addressed MDRS artifacts were observed by the PostgreSQL ingestion"},"derivation":{"controllerControlsOperator":"intersection of controller and operator valid-time intervals evidenced through this mine","currentIdentity":"current controller and operator are asserted only by the MDRS Mines snapshot"}},"current":{"mine":{"type":"mine","id":"4608537","name":"Jims Branch No 1"},"operator":{"type":"operator","id":"P22311","name":"Baylor Mining Inc"},"controller":{"type":"controller","id":"C14826","name":"Robert L  Worley"},"source":{"datasetId":"msha-mines","observedAt":"2026-10-13T11:19:05.459773+00:00"}},"edges":[{"type":"controller_controls_mine","subject":{"type":"controller","id":"C14826","name":"Robert L  Worley"},"object":{"type":"mine","id":"4608537","name":"Jims Branch No 1"},"validFrom":"1993-01-01","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4608537|C14826|1993-01-01|"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"P23312","name":"Tazz Mining Inc"},"object":{"type":"mine","id":"4608537","name":"Jims Branch No 1"},"validFrom":"1995-11-01","validTo":"1999-02-28","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4608537|P23312|1995-11-01|1999-02-28"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"C10294","name":"Chris  Cline"},"object":{"type":"mine","id":"4608537","name":"Jims Branch No 1"},"validFrom":"1995-11-01","validTo":"2001-04-08","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4608537|C10294|1995-11-01|2001-04-08"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C10294","name":"Chris  Cline"},"object":{"type":"operator","id":"P23312","name":"Tazz Mining Inc"},"validFrom":"1995-11-01","validTo":"1999-02-28","current":false,"derived":true,"evidenceMineId":"4608537","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4608537|P23312|1995-11-01|C10294|1995-11-01|81663"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"P22311","name":"Baylor Mining Inc"},"object":{"type":"mine","id":"4608537","name":"Jims Branch No 1"},"validFrom":"1999-03-01","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4608537|P22311|1999-03-01|"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C14826","name":"Robert L  Worley"},"object":{"type":"operator","id":"P22311","name":"Baylor Mining Inc"},"validFrom":"1999-03-01","validTo":null,"current":true,"derived":true,"evidenceMineId":"4608537","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4608537|P22311|1999-03-01|C14826|1993-01-01|93978"}}],"coverage":{"historyRecords":2,"edgeCount":6,"intervalAnomalies":0,"sourceDatasetId":"msha-controller-operator-history"}},"sources":[{"id":"msha-accidents","name":"Accident, Injuries, and Illnesses","domains":["safety","contractors"],"products":["incident trends","severity rates","equipment patterns","peer denominators"],"rowCount":19,"firstDate":"2000-01-21","lastDate":"2002-06-14","metrics":{"daysLost":900,"injuries":15,"fatalities":0,"recentRows":0,"restrictedDays":0,"contractorRecords":0},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"137001","DOCUMENT_NO":"220021690009","ACCIDENT_DT":"06/14/2002","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"FALL OF FACE/RIB/PILLAR/SIDE/HIGHWALL","ACCIDENT_TYPE":"Struck by rolling or sliding object","OCCUPATION":"Continuous miner operator, Coal mole operator","NO_INJURIES":"1","DAYS_LOST":"62","NARRATIVE":"TRAMMING MINER OUT OF PILLAR LIFT WHEN RIB ROLLED OUT. TWISTED LT. KNEE.","sourceDate":"2002-06-14"},{"SOURCE_ROW_NUMBER":"223119","DOCUMENT_NO":"220021830124","ACCIDENT_DT":"03/06/2002","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","NARRATIVE":"ROCK FALL 2 1/2 BRKS INBY SPAD 1278 #5 ENTRY NE MAINS 2ND LIFT. ROOF FALL WAS RECEIVED ON 3/8/02.","sourceDate":"2002-03-06"},{"SOURCE_ROW_NUMBER":"16634","DOCUMENT_NO":"220013090060","ACCIDENT_DT":"11/01/2001","DEGREE_INJURY":"NO DYS AWY FRM WRK,NO RSTR ACT","CLASSIFICATION":"POWERED HAULAGE","ACCIDENT_TYPE":"Struck against stationary object","OCCUPATION":"Laborer, Bull gang, Faceman, Parts runner, Roustabout, Roof trimmer/scaler","NO_INJURIES":"1","NARRATIVE":"EEW WAS RIDING IN MANTRIP, RAISED UP AND STRUCK HIS HEAD ON ROOF OF MINE, INJURING HIS NECK.","sourceDate":"2001-11-01"},{"SOURCE_ROW_NUMBER":"51035","DOCUMENT_NO":"220011430035","ACCIDENT_DT":"05/15/2001","DEGREE_INJURY":"NO DYS AWY FRM WRK,NO RSTR ACT","CLASSIFICATION":"HANDLING OF MATERIALS","ACCIDENT_TYPE":"Struck by falling object","OCCUPATION":"Section foreman, Bullgang foreman, Labor foreman, Leadman, Shift boss","NO_INJURIES":"1","NARRATIVE":"BUILDING INTAKE STOPPING WHEN BLOCK ROLLED OVER ON RT HAND.","sourceDate":"2001-05-15"},{"SOURCE_ROW_NUMBER":"158634","DOCUMENT_NO":"220011300005","ACCIDENT_DT":"05/07/2001","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"SLIP OR FALL OF PERSON","ACCIDENT_TYPE":"Fall to the walkway or working surface","OCCUPATION":"Roof bolter, Rock bolter,  Pinner, Mobile roof support operator (MRS)","NO_INJURIES":"1","DAYS_LOST":"49","NARRATIVE":"EE WAS HANGING CABLE WHEN HIS FEET SLIPPED OUT FROM UNDER HIM. BOTTOM SLICK. HURT HIS BACK.","sourceDate":"2001-05-07"},{"SOURCE_ROW_NUMBER":"123914","DOCUMENT_NO":"220011210029","ACCIDENT_DT":"04/27/2001","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"MACHINERY","ACCIDENT_TYPE":"Struck by falling object","OCCUPATION":"Roof bolter, Rock bolter,  Pinner, Mobile roof support operator (MRS)","NO_INJURIES":"1","DAYS_LOST":"294","NARRATIVE":"EE HAD WENT INTO FACE OF #4 ENTRY WITH BOLTER OPERATOR & BOLTER AND WAS REMOVING REFLECTOR FROM 2ND ROW OF BOLTS, WHEN A PIECE OF DRAW ROCK FELL, STRIKING EE ON THE HEAD AND DRIVING HIM DOWN T O THE BOTTOM, BREAKING HIS LOWER LEG AND POSSIBLY HIS THIGH. (RT. LEG)","sourceDate":"2001-04-27"},{"SOURCE_ROW_NUMBER":"253280","DOCUMENT_NO":"220020030020","ACCIDENT_DT":"04/06/2001","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"POWERED HAULAGE","ACCIDENT_TYPE":"Struck against a moving object","OCCUPATION":"Electrician, Lineman","NO_INJURIES":"1","DAYS_LOST":"5","NARRATIVE":"TRANSPORTING 2 MEN AND OVERLOADED MAC 8 (PERSONEL CARRIER) UP HILL WHEN AXLE STRIPPED CAUSING IT TO ROLL BACKWARDS HITTING RIB. EMPLOYEE COMPLAINING OF BACK, RIBS HIP.","sourceDate":"2001-04-06"},{"SOURCE_ROW_NUMBER":"244674","DOCUMENT_NO":"220010590020","ACCIDENT_DT":"02/23/2001","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"FALL OF FACE/RIB/PILLAR/SIDE/HIGHWALL","ACCIDENT_TYPE":"Struck by rolling or sliding object","OCCUPATION":"Continuous miner operator, Coal mole operator","NO_INJURIES":"1","DAYS_LOST":"64","NARRATIVE":"IN THE PROCESS OF RESETTING MINER TO GET #3 LIFTWHEN SMALL PIECE OF COAL RIB ROLLED OVER, STRIKING HIM ON RIGHT ANKLE. POSSIBLE BROKEN ANKLE.","sourceDate":"2001-02-23"},{"SOURCE_ROW_NUMBER":"51034","DOCUMENT_NO":"220011410177","ACCIDENT_DT":"02/15/2001","DEGREE_INJURY":"NO DYS AWY FRM WRK,NO RSTR ACT","CLASSIFICATION":"POWERED HAULAGE","ACCIDENT_TYPE":"Struck against stationary object","OCCUPATION":"Beltman, Conveyor man,  Conveyor belt worker, Mobile bridge carrierman, Feeder operator, Conveyor rider","NO_INJURIES":"1","NARRATIVE":"OPERATING RAILRUNNER-WAS LOOKING DOWN. WHEN HE RAISED UP AND HIT HIS HEAD ON A CABLE GOING ACROSS ENTRY. HE HAS PAIN IN MIDDLE OF BACK BETWEEN SHOULDER BLADES & NUMBNESS IN BOTH HANDS.","sourceDate":"2001-02-15"},{"SOURCE_ROW_NUMBER":"266159","DOCUMENT_NO":"220010230017","ACCIDENT_DT":"01/19/2001","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"SLIP OR FALL OF PERSON","ACCIDENT_TYPE":"Over-exertion NEC","OCCUPATION":"Electrician, Lineman","NO_INJURIES":"1","DAYS_LOST":"363","NARRATIVE":"EMPLOYEE WAS WALKING T 3 WHEEL MANTRIP WHEN HE LOST HIS FOOTING AND SLIPPED ON SLICK FLOOR, TWISTING HIS RIGHT KNEE.","sourceDate":"2001-01-19"},{"SOURCE_ROW_NUMBER":"162931","DOCUMENT_NO":"220002850033","ACCIDENT_DT":"10/02/2000","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"HANDLING OF MATERIALS","ACCIDENT_TYPE":"Over-exertion in lifting objects","OCCUPATION":"Laborer, Bull gang, Faceman, Parts runner, Roustabout, Roof trimmer/scaler","NO_INJURIES":"1","DAYS_LOST":"5","NARRATIVE":"HANG MINER CABLE WHEN HE PULLED SOMETHING IN STOMACH. ACCIDENT REPORTED ON 10-9-00.","sourceDate":"2000-10-02"},{"SOURCE_ROW_NUMBER":"81188","DOCUMENT_NO":"220011130179","ACCIDENT_DT":"08/11/2000","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"SLIP OR FALL OF PERSON","ACCIDENT_TYPE":"Fall from machine","OCCUPATION":"Roof bolter, Rock bolter,  Pinner, Mobile roof support operator (MRS)","NO_INJURIES":"1","DAYS_LOST":"5","NARRATIVE":"FELL GETTING OUT ON MANTRIP ON SLICK ROCK BOTTOM.","sourceDate":"2000-08-11"}]},{"id":"msha-addresses","name":"Addresses of Record","domains":["identity","logistics"],"products":["entity resolution","address history","facility geocoding"],"rowCount":1,"firstDate":"2002-09-10","lastDate":"2002-09-10","metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-assessed-violations","name":"Assessed Violations","domains":["compliance","legal"],"products":["penalty lifecycle","paid and outstanding amounts","assessment aging"],"rowCount":81,"firstDate":"2000-01-10","lastDate":"2002-07-17","metrics":{"ss":32,"delinquent":81,"recentRows":0,"paidPenalty":6594,"proposedPenalty":6594,"currentAssessment":6594},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"779159","VIOLATION_NO":"7214394","ISSUE_DT":"07/17/2002","CFR_STANDARD_CD":"75.370(a)(1)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"97.00","CURRENT_ASSESSMENT_AMT":"97.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2002-07-17"},{"SOURCE_ROW_NUMBER":"779158","VIOLATION_NO":"7214393","ISSUE_DT":"07/09/2002","CFR_STANDARD_CD":"75.517","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"55.00","CURRENT_ASSESSMENT_AMT":"55.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2002-07-09"},{"SOURCE_ROW_NUMBER":"779157","VIOLATION_NO":"7214392","ISSUE_DT":"07/03/2002","CFR_STANDARD_CD":"75.364(g)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"55.00","CURRENT_ASSESSMENT_AMT":"55.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2002-07-03"},{"SOURCE_ROW_NUMBER":"779137","VIOLATION_NO":"7214386","ISSUE_DT":"05/13/2002","CFR_STANDARD_CD":"75.1103-4(a)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"55.00","CURRENT_ASSESSMENT_AMT":"55.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2002-05-13"},{"SOURCE_ROW_NUMBER":"779136","VIOLATION_NO":"7214385","ISSUE_DT":"05/09/2002","CFR_STANDARD_CD":"75.517","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"55.00","CURRENT_ASSESSMENT_AMT":"55.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2002-05-09"},{"SOURCE_ROW_NUMBER":"779135","VIOLATION_NO":"7214384","ISSUE_DT":"05/07/2002","CFR_STANDARD_CD":"75.1722(b)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"55.00","CURRENT_ASSESSMENT_AMT":"55.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2002-05-07"},{"SOURCE_ROW_NUMBER":"767308","VIOLATION_NO":"7193708","ISSUE_DT":"12/17/2001","CFR_STANDARD_CD":"75.517","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"66.00","CURRENT_ASSESSMENT_AMT":"66.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2001-12-17"},{"SOURCE_ROW_NUMBER":"767307","VIOLATION_NO":"7193707","ISSUE_DT":"12/17/2001","CFR_STANDARD_CD":"75.342(a)(4)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"55.00","CURRENT_ASSESSMENT_AMT":"55.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2001-12-17"},{"SOURCE_ROW_NUMBER":"767322","VIOLATION_NO":"7193699","ISSUE_DT":"11/19/2001","CFR_STANDARD_CD":"75.370(a)(1)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"55.00","CURRENT_ASSESSMENT_AMT":"55.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2001-11-19"},{"SOURCE_ROW_NUMBER":"767321","VIOLATION_NO":"7193673","ISSUE_DT":"10/04/2001","CFR_STANDARD_CD":"75.400","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"90.00","CURRENT_ASSESSMENT_AMT":"90.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2001-10-04"},{"SOURCE_ROW_NUMBER":"767320","VIOLATION_NO":"7193672","ISSUE_DT":"10/04/2001","CFR_STANDARD_CD":"75.333(d)(3)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"55.00","CURRENT_ASSESSMENT_AMT":"55.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2001-10-04"},{"SOURCE_ROW_NUMBER":"769684","VIOLATION_NO":"7201689","ISSUE_DT":"09/04/2001","CFR_STANDARD_CD":"48.31","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"55.00","CURRENT_ASSESSMENT_AMT":"55.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2001-09-04"}]},{"id":"msha-coal-dust-samples","name":"Coal Dust Samples","domains":["health","safety"],"products":["respirable dust trends","CPDM coverage","void patterns","occupation exposure"],"rowCount":202,"firstDate":"2000-01-06","lastDate":"2002-11-07","metrics":{"recentRows":0,"cpdmSamples":0,"voidSamples":29,"validSamples":173,"maxConcentration":7.485,"concentrationTotal":133.435},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"520540","CASS_NUM":"50677783","SMP_TAKEN_DT":"11/7/2002","CONC":".067","SMP_TYPE_CD_DESC":"DESIGNATED AREA","SMP_USE_CD_DESC":"VOID SAMPLE","VOID_CD_DESC":"DA NOT IN PRODUCING STATUS","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2002-11-07"},{"SOURCE_ROW_NUMBER":"70584","CASS_NUM":"50646344","SMP_TAKEN_DT":"7/22/2002","CONC":".089","SMP_TYPE_CD_DESC":"DESIGNATED AREA","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2002-07-22"},{"SOURCE_ROW_NUMBER":"1423540","CASS_NUM":"50645350","SMP_TAKEN_DT":"6/24/2002","CONC":".947","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2002-06-24"},{"SOURCE_ROW_NUMBER":"706204","CASS_NUM":"50645358","SMP_TAKEN_DT":"6/12/2002","CONC":".081","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2002-06-12"},{"SOURCE_ROW_NUMBER":"739802","CASS_NUM":"50645323","SMP_TAKEN_DT":"6/11/2002","CONC":".189","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2002-06-11"},{"SOURCE_ROW_NUMBER":"684403","CASS_NUM":"50645354","SMP_TAKEN_DT":"6/11/2002","CONC":"0","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"VOID SAMPLE","VOID_CD_DESC":"CONTAMINATED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2002-06-11"},{"SOURCE_ROW_NUMBER":"719986","CASS_NUM":"50645363","SMP_TAKEN_DT":"6/10/2002","CONC":".513","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2002-06-10"},{"SOURCE_ROW_NUMBER":"902272","CASS_NUM":"50645348","SMP_TAKEN_DT":"6/6/2002","CONC":"1.28","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2002-06-06"},{"SOURCE_ROW_NUMBER":"1432565","CASS_NUM":"57397877","SMP_TAKEN_DT":"5/7/2002","CONC":".43","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2002-05-07"},{"SOURCE_ROW_NUMBER":"802848","CASS_NUM":"57397875","SMP_TAKEN_DT":"5/7/2002","CONC":".2","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"SCOOP CAR OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2002-05-07"},{"SOURCE_ROW_NUMBER":"766237","CASS_NUM":"57397884","SMP_TAKEN_DT":"5/7/2002","CONC":".25","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"SHUTTLE CAR OPERATOR (OFF STANDARD)","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2002-05-07"},{"SOURCE_ROW_NUMBER":"722307","CASS_NUM":"57397809","SMP_TAKEN_DT":"5/7/2002","CONC":"2.283","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"SHUTTLE CAR OPERATOR (OFF STANDARD)","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2002-05-07"}]},{"id":"msha-contractor-production-quarterly","name":"Contractor Employment and Production — Quarterly","domains":["contractors","production","safety"],"products":["contractor exposure denominator","productivity","presence windows"],"rowCount":49,"firstDate":null,"lastDate":null,"metrics":{"linkedContractors":1,"notMineAttributable":1},"periods":{},"recentRecords":[]},{"id":"msha-contractor-production-yearly","name":"Contractor Employment and Production — Yearly","domains":["contractors","production","safety"],"products":["long-run contractor trend","annual denominator reconciliation"],"rowCount":15,"firstDate":null,"lastDate":null,"metrics":{"linkedContractors":1,"notMineAttributable":1},"periods":{},"recentRecords":[]},{"id":"msha-controller-operator-history","name":"Controller and Operator History","domains":["identity","compliance"],"products":["historical ownership attribution","operator transitions","valid-time joins"],"rowCount":2,"firstDate":"1995-11-01","lastDate":"1999-03-01","metrics":{"recentRows":0,"currentOperatorTenures":1,"completedOperatorTenures":1},"periods":{},"recentRecords":[]},{"id":"msha-inspections","name":"Inspections","domains":["safety","compliance"],"products":["inspection mix","on-site hours","event context","citation rate denominator"],"rowCount":81,"firstDate":"2000-01-03","lastDate":"2003-01-03","metrics":{"inspectors":95,"recentRows":0,"onSiteHours":1131.75,"inspectionHours":1699,"inspectionSamples":0},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"1011659","EVENT_NO":"4100138","INSPECTION_BEGIN_DT":"01/03/2003","INSPECTION_END_DT":"01/03/2003","ACTIVITY_CODE":"CCC","ACTIVITY":"VENTILATION TECHNICAL INSPECTION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"3","SUM_TOTAL_ON_SITE_HOURS":"2","sourceDate":"2003-01-03"},{"SOURCE_ROW_NUMBER":"227234","EVENT_NO":"4098422","INSPECTION_BEGIN_DT":"07/26/2002","INSPECTION_END_DT":"07/26/2002","ACTIVITY_CODE":"ABE","ACTIVITY":"103(I) SPOT (15 DAY) INSPECTION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"8","SUM_TOTAL_ON_SITE_HOURS":"5","sourceDate":"2002-07-26"},{"SOURCE_ROW_NUMBER":"1054392","EVENT_NO":"4098421","INSPECTION_BEGIN_DT":"07/09/2002","INSPECTION_END_DT":"07/22/2002","ACTIVITY_CODE":"AAA","ACTIVITY":"Regular Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"47","SUM_TOTAL_ON_SITE_HOURS":"26.5","sourceDate":"2002-07-09"},{"SOURCE_ROW_NUMBER":"15802","EVENT_NO":"4098420","INSPECTION_BEGIN_DT":"07/03/2002","INSPECTION_END_DT":"07/03/2002","ACTIVITY_CODE":"ABE","ACTIVITY":"103(I) SPOT (15 DAY) INSPECTION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"8","SUM_TOTAL_ON_SITE_HOURS":"4","sourceDate":"2002-07-03"},{"SOURCE_ROW_NUMBER":"381846","EVENT_NO":"4098416","INSPECTION_BEGIN_DT":"06/18/2002","INSPECTION_END_DT":"06/18/2002","ACTIVITY_CODE":"CDB","ACTIVITY":"ACCIDENT PREVENTION SPOT INSPECTION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"8","SUM_TOTAL_ON_SITE_HOURS":"5","sourceDate":"2002-06-18"},{"SOURCE_ROW_NUMBER":"1018780","EVENT_NO":"4098141","INSPECTION_BEGIN_DT":"06/07/2002","INSPECTION_END_DT":"06/07/2002","ACTIVITY_CODE":"ABE","ACTIVITY":"103(I) SPOT (15 DAY) INSPECTION","NBR_INSPECTOR":"0","SUM_TOTAL_INSP_HOURS":"0","SUM_TOTAL_ON_SITE_HOURS":"0","sourceDate":"2002-06-07"},{"SOURCE_ROW_NUMBER":"837538","EVENT_NO":"4098414","INSPECTION_BEGIN_DT":"06/07/2002","INSPECTION_END_DT":"06/07/2002","ACTIVITY_CODE":"ABE","ACTIVITY":"103(I) SPOT (15 DAY) INSPECTION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"8","SUM_TOTAL_ON_SITE_HOURS":"4.5","sourceDate":"2002-06-07"},{"SOURCE_ROW_NUMBER":"1024363","EVENT_NO":"4100111","INSPECTION_BEGIN_DT":"06/03/2002","INSPECTION_END_DT":"06/05/2002","ACTIVITY_CODE":"CCC","ACTIVITY":"VENTILATION TECHNICAL INSPECTION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"12","SUM_TOTAL_ON_SITE_HOURS":"6.5","sourceDate":"2002-06-03"},{"SOURCE_ROW_NUMBER":"1140442","EVENT_NO":"4098413","INSPECTION_BEGIN_DT":"05/20/2002","INSPECTION_END_DT":"05/20/2002","ACTIVITY_CODE":"ABE","ACTIVITY":"103(I) SPOT (15 DAY) INSPECTION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"8","SUM_TOTAL_ON_SITE_HOURS":"4","sourceDate":"2002-05-20"},{"SOURCE_ROW_NUMBER":"1156758","EVENT_NO":"4098412","INSPECTION_BEGIN_DT":"05/01/2002","INSPECTION_END_DT":"05/01/2002","ACTIVITY_CODE":"ABE","ACTIVITY":"103(I) SPOT (15 DAY) INSPECTION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"8","SUM_TOTAL_ON_SITE_HOURS":"5.5","sourceDate":"2002-05-01"},{"SOURCE_ROW_NUMBER":"413522","EVENT_NO":"4097996","INSPECTION_BEGIN_DT":"04/30/2002","INSPECTION_END_DT":"05/01/2002","ACTIVITY_CODE":"CDA","ACTIVITY":"ROOF CONTROL SPOT INSPECTION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"10","SUM_TOTAL_ON_SITE_HOURS":"6","sourceDate":"2002-04-30"},{"SOURCE_ROW_NUMBER":"415171","EVENT_NO":"4098411","INSPECTION_BEGIN_DT":"04/11/2002","INSPECTION_END_DT":"04/11/2002","ACTIVITY_CODE":"ABE","ACTIVITY":"103(I) SPOT (15 DAY) INSPECTION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"8","SUM_TOTAL_ON_SITE_HOURS":"3.5","sourceDate":"2002-04-11"}]},{"id":"msha-mine-production-quarterly","name":"Mine Employment and Production — Quarterly","domains":["production","safety","compliance"],"products":["production trend","employee hours","rate denominators","seasonality"],"rowCount":22,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2002-Q3":{"hours":4188,"employees":25,"production":18509},"2002-Q2":{"hours":16980,"employees":25,"production":82281},"2002-Q1":{"hours":6040,"employees":28,"production":76489},"2001-Q4":{"hours":18829,"employees":28,"production":77763},"2001-Q3":{"hours":18997,"employees":31,"production":71249},"2001-Q2":{"hours":19037,"employees":31,"production":65749},"2001-Q1":{"hours":20334,"employees":29,"production":91190},"2000-Q4":{"hours":21076,"employees":32,"production":86284},"2000-Q3":{"hours":18740,"employees":32,"production":34578},"2000-Q2":{"hours":19366,"employees":30,"production":60408},"2000-Q1":{"hours":19011,"employees":31,"production":93668}},"recentRecords":[]},{"id":"msha-mine-production-yearly","name":"Mine Employment and Production — Yearly","domains":["production","safety","compliance"],"products":["annual trend","backfill","quarterly reconciliation"],"rowCount":5,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2000":{"hours":78193,"employees":31,"production":274938},"2001":{"hours":77197,"employees":30,"production":305951},"2002":{"hours":27208,"employees":26,"production":177279}},"recentRecords":[]},{"id":"msha-mines","name":"Mines","domains":["identity","production","logistics"],"products":["mine identity","status","commodity","location","operator and controller"],"rowCount":1,"firstDate":null,"lastDate":null,"metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-quartz-samples","name":"Quartz Samples — Coal","domains":["health","safety"],"products":["quartz exposure trends","occupation context","applicable-rule linkage"],"rowCount":23,"firstDate":"2000-01-24","lastDate":"2001-12-26","metrics":{"recentRows":0,"voidSamples":3,"maxQuartzPct":19.5,"validSamples":20,"quartzPctTotal":142.7},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"30419","CASSETTE_NO":"50557524","SAMPLE_DT":"12/26/2001","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"INSUFFICIENT WEIGHT GAIN","sourceDate":"2001-12-26"},{"SOURCE_ROW_NUMBER":"37397","CASSETTE_NO":"57356861","SAMPLE_DT":"12/09/2001","QUARTZ_PCT":"10.9","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2001-12-09"},{"SOURCE_ROW_NUMBER":"58631","CASSETTE_NO":"57357092","SAMPLE_DT":"11/15/2001","QUARTZ_PCT":"02.1","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2001-11-15"},{"SOURCE_ROW_NUMBER":"97650","CASSETTE_NO":"50610054","SAMPLE_DT":"09/10/2001","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"INSUFFICIENT WEIGHT GAIN","sourceDate":"2001-09-10"},{"SOURCE_ROW_NUMBER":"117153","CASSETTE_NO":"57334259","SAMPLE_DT":"08/29/2001","QUARTZ_PCT":"19.5","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2001-08-29"},{"SOURCE_ROW_NUMBER":"52096","CASSETTE_NO":"57334250","SAMPLE_DT":"08/29/2001","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2001-08-29"},{"SOURCE_ROW_NUMBER":"69089","CASSETTE_NO":"57334144","SAMPLE_DT":"07/30/2001","QUARTZ_PCT":"06.9","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2001-07-30"},{"SOURCE_ROW_NUMBER":"42923","CASSETTE_NO":"57334177","SAMPLE_DT":"07/30/2001","QUARTZ_PCT":"18.4","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2001-07-30"},{"SOURCE_ROW_NUMBER":"159910","CASSETTE_NO":"57303456","SAMPLE_DT":"04/23/2001","QUARTZ_PCT":"07.1","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2001-04-23"},{"SOURCE_ROW_NUMBER":"152116","CASSETTE_NO":"57294689","SAMPLE_DT":"02/05/2001","QUARTZ_PCT":"04.6","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2001-02-05"},{"SOURCE_ROW_NUMBER":"55753","CASSETTE_NO":"57294718","SAMPLE_DT":"02/05/2001","QUARTZ_PCT":"10.8","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2001-02-05"},{"SOURCE_ROW_NUMBER":"125012","CASSETTE_NO":"57281004","SAMPLE_DT":"12/07/2000","QUARTZ_PCT":"04.0","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2000-12-07"}]},{"id":"msha-violations","name":"Violations","domains":["compliance","safety","legal"],"products":["citation and order record","condition text","Title 30 linkage","abatement patterns"],"rowCount":83,"firstDate":"2000-01-10","lastDate":"2002-07-17","metrics":{"ss":32,"amountDue":6594,"contested":0,"amountPaid":6594,"recentRows":0,"section104d":0,"unterminated":0,"proposedPenalty":6594},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"2729399","VIOLATION_NO":"7214394","VIOLATION_ISSUE_DT":"07/17/2002","SIG_SUB":"Y","PART_SECTION":"75.370(a)(1)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"07/17/2002","PROPOSED_PENALTY":"97","AMOUNT_DUE":"97","AMOUNT_PAID":"97","CONTESTED_IND":"N","sourceDate":"2002-07-17"},{"SOURCE_ROW_NUMBER":"2729398","VIOLATION_NO":"7214393","VIOLATION_ISSUE_DT":"07/09/2002","SIG_SUB":"N","PART_SECTION":"75.517","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"NoNegligence","TERMINATION_DT":"07/09/2002","PROPOSED_PENALTY":"55","AMOUNT_DUE":"55","AMOUNT_PAID":"55","CONTESTED_IND":"N","sourceDate":"2002-07-09"},{"SOURCE_ROW_NUMBER":"2729386","VIOLATION_NO":"7214392","VIOLATION_ISSUE_DT":"07/03/2002","SIG_SUB":"N","PART_SECTION":"75.364(g)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"07/09/2002","PROPOSED_PENALTY":"55","AMOUNT_DUE":"55","AMOUNT_PAID":"55","CONTESTED_IND":"N","sourceDate":"2002-07-03"},{"SOURCE_ROW_NUMBER":"2729366","VIOLATION_NO":"7214386","VIOLATION_ISSUE_DT":"05/13/2002","SIG_SUB":"N","PART_SECTION":"75.1103-4(a)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"05/13/2002","PROPOSED_PENALTY":"55","AMOUNT_DUE":"55","AMOUNT_PAID":"55","CONTESTED_IND":"N","sourceDate":"2002-05-13"},{"SOURCE_ROW_NUMBER":"2729365","VIOLATION_NO":"7214385","VIOLATION_ISSUE_DT":"05/09/2002","SIG_SUB":"N","PART_SECTION":"75.517","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"NoNegligence","TERMINATION_DT":"05/09/2002","PROPOSED_PENALTY":"55","AMOUNT_DUE":"55","AMOUNT_PAID":"55","CONTESTED_IND":"N","sourceDate":"2002-05-09"},{"SOURCE_ROW_NUMBER":"2729364","VIOLATION_NO":"7214384","VIOLATION_ISSUE_DT":"05/07/2002","SIG_SUB":"N","PART_SECTION":"75.1722(b)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"05/09/2002","PROPOSED_PENALTY":"55","AMOUNT_DUE":"55","AMOUNT_PAID":"55","CONTESTED_IND":"N","sourceDate":"2002-05-07"},{"SOURCE_ROW_NUMBER":"2729406","VIOLATION_NO":"7193708","VIOLATION_ISSUE_DT":"12/17/2001","SIG_SUB":"Y","PART_SECTION":"75.517","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"NoNegligence","TERMINATION_DT":"12/17/2001","PROPOSED_PENALTY":"66","AMOUNT_DUE":"66","AMOUNT_PAID":"66","CONTESTED_IND":"N","sourceDate":"2001-12-17"},{"SOURCE_ROW_NUMBER":"2729405","VIOLATION_NO":"7193707","VIOLATION_ISSUE_DT":"12/17/2001","SIG_SUB":"N","PART_SECTION":"75.342(a)(4)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"12/17/2001","PROPOSED_PENALTY":"55","AMOUNT_DUE":"55","AMOUNT_PAID":"55","CONTESTED_IND":"N","sourceDate":"2001-12-17"},{"SOURCE_ROW_NUMBER":"2729420","VIOLATION_NO":"7193699","VIOLATION_ISSUE_DT":"11/19/2001","SIG_SUB":"N","PART_SECTION":"75.370(a)(1)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"01/22/2002","PROPOSED_PENALTY":"55","AMOUNT_DUE":"55","AMOUNT_PAID":"55","CONTESTED_IND":"N","sourceDate":"2001-11-19"},{"SOURCE_ROW_NUMBER":"2729419","VIOLATION_NO":"7193673","VIOLATION_ISSUE_DT":"10/04/2001","SIG_SUB":"Y","PART_SECTION":"75.400","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"10/15/2001","PROPOSED_PENALTY":"90","AMOUNT_DUE":"90","AMOUNT_PAID":"90","CONTESTED_IND":"N","sourceDate":"2001-10-04"},{"SOURCE_ROW_NUMBER":"2729418","VIOLATION_NO":"7193672","VIOLATION_ISSUE_DT":"10/04/2001","SIG_SUB":"N","PART_SECTION":"75.333(d)(3)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"9","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"10/31/2001","PROPOSED_PENALTY":"55","AMOUNT_DUE":"55","AMOUNT_PAID":"55","CONTESTED_IND":"N","sourceDate":"2001-10-04"},{"SOURCE_ROW_NUMBER":"2729385","VIOLATION_NO":"7201689","VIOLATION_ISSUE_DT":"09/04/2001","SIG_SUB":"N","PART_SECTION":"48.31","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"09/04/2001","PROPOSED_PENALTY":"55","AMOUNT_DUE":"55","AMOUNT_PAID":"55","CONTESTED_IND":"N","sourceDate":"2001-09-04"}]}],"safety":{"href":"/api/v1/mines/4608537/safety","description":"Full-period safety series, top CFR sections and paginated activity. Requires PostgreSQL."},"silica":{"href":"/api/v1/mines/4608537/silica","description":"Dedicated silica records, measurements, sample status and trends. Defaults to the snapshot year; use year=all for history."},"externalContext":{"eia":null,"title30":{"snapshot":{"chapterCount":6,"featuredSectionCount":100,"latestAmendedOn":"2026-08-14","latestIssueDate":"2026-08-14","partCount":206,"sectionCount":5954,"upToDateAsOf":"2026-08-19"},"regulations":[{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.370","heading":"Mine ventilation plan; submission and approval.","id":"75.370","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.370","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a)(1) The operator shall develop and follow a ventilation plan approved by the district manager. The plan shall be designed to control methane and respirable dust and shall be suitable to the conditions and mining system at the mine. The ventilation plan shall consist of two parts, the plan content as prescribed in § 75.371 and the ventilation map with information as prescribed in § 75.372. Only that portion of the map which contains information required under § 75.371 will be subject to approval by the district manager.\n\n(2) The proposed ventilation plan and any revision to the plan shall be submitted in writing to the district manager. When revisions to a ventilation plan are proposed, only the revised pages, maps, or sketches of the plan need to be submitted. When required in writing by the district manager, the operator shall submit a fully revised plan by consolidating the plan and all revisions in an orderly manner and by deleting all outdated material.\n\n(3) (i) The mine operator shall notify the representative of miners at least 5 days prior to submission of a mine ventilation plan and any revision to a mine ventilation plan. If requested, the mine operator shall provide a copy to the representative of miners at the time of notification. In the event of a situation requiring immediate action on a plan revision, notification of the revision shall be given, and if requested, a copy of the revision shall be provided, to the representative of miners by the operator at the time of submittal;\n\n(ii) A copy of the proposed ventilation plan, and a copy of any proposed revision, submitted for approval shall be made available for inspection by the representative of miners; and\n\n(iii) A copy of the proposed ventilation plan, and a copy of any proposed revision, submitted for approval shall be posted on the mine bulletin board at the time of submittal. The proposed plan or proposed revision shall remain posted until it is approved, withdrawn or denied.\n\n(b) Following receipt of the proposed plan or proposed revision, the representative of miners may submit timely comments to the district manager, in writing, for consideration during the review process. A copy of these comments shall also be provided to the operator by the district manager upon request.\n\n(c) (1) The district manager will notify the operator in writing of the approval or denial of approval of a proposed ventilation plan or proposed revision. A copy of this notification will be sent to the representative of miners by the district manager.\n\n(2) If the district manager denies approval of a proposed plan or revision, the deficiencies of the plan or revision shall be specified in writing and the operator will be provided an opportunity to discuss the deficiencies with the district manager.\n\n(d) No proposed ventilation plan shall be implemented before it is approved by the district manager. Any intentional change to the ventilation system that alters the main air current or any split of the main air current in a manner that could materially affect the safety and health of the miners, or any change to the information required in § 75.371 shall be submitted to and approved by the district manager before implementation.\n\n(e) Before implementing an approved ventilation plan or a revision to a ventilation plan, persons affected by the revision shall be instructed by the operator in its provisions.\n\n(f) The approved ventilation plan and any revisions shall be—\n\n(1) Provided upon request to the representative of miners by the operator following notification of approval;\n\n(2) Made available for inspection by the representative of miners; and\n\n(3) Posted on the mine bulletin board within 1 working day following notification of approval. The approved plan and revisions shall remain posted on the bulletin board for the period that they are in effect.\n\n(g) The ventilation plan for each mine shall be reviewed every 6 months by an authorized representative of the Secretary to assure that it is suitable to current conditions in the mine.","occurrenceCount":2},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.517","heading":"Power wires and cables; insulation and protection.","id":"75.517","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-F/section-75.517","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"F","subpartHeading":"Subpart F—Electrical Equipment—General","text":"[Statutory Provisions]\n\nPower wires and cables, except trolley wires, trolley feeder wires, and bare signal wires, shall be insulated adequately and fully protected.","occurrenceCount":3},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.364","heading":"Weekly examination.","id":"75.364","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.364","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a) Worked-out areas. (1) At least every 7 days, a certified person shall examine unsealed worked-out areas where no pillars have been recovered by traveling to the area of deepest penetration; measuring methane and oxygen concentrations and air quantities and making tests to determine if the air is moving in the proper direction in the area. The locations of measurement points where tests and measurements will be performed shall be included in the mine ventilation plan and shall be adequate in number and location to assure ventilation and air quality in the area. Air quantity measurements shall also be made where the air enters and leaves the worked-out area. An alternative method of evaluating the ventilation of the area may be approved in the ventilation plan.\n\n(2) At least every 7 days, a certified person shall evaluate the effectiveness of bleeder systems required by § 75.334 as follows:\n\n(i) Measurements of methane and oxygen concentrations and air quantity and a test to determine if the air is moving in its proper direction shall be made where air enters the worked-out area.\n\n(ii) Measurements of methane and oxygen concentrations and air quantity and a test to determine if the air is moving in the proper direction shall be made immediately before the air enters a return split of air.\n\n(iii) At least one entry of each set of bleeder entries used as part of a bleeder system under § 75.334 shall be traveled in its entirety. Measurements of methane and oxygen concentrations and air quantities and a test to determine if the air is moving in the proper direction shall be made at the measurement point locations specified in the mine ventilation plan to determine the effectiveness of the bleeder system.\n\n(iv) In lieu of the requirements of paragraphs (a)(2)(i) and (iii) of this section, an alternative method of evaluation may be specified in the ventilation plan provided the alternative method results in proper evaluation of the effectiveness of the bleeder system.\n\n(b) Hazardous conditions and violations of mandatory health or safety standards. At least every 7 days, an examination for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (b)(8) of this section shall be made by a certified person designated by the operator at the following locations:\n\n(1) In at least one entry of each intake air course, in its entirety, so that the entire air course is traveled.\n\n(2) In at least one entry of each return air course, in its entirety, so that the entire air course is traveled.\n\n(3) In each longwall or shortwall travelway in its entirety, so that the entire travelway is traveled.\n\n(4) At each seal along return and bleeder air courses and at each seal along intake air courses not examined under § 75.360(b)(5).\n\n(5) In each escapeway so that the entire escapeway is traveled.\n\n(6) On each working section not examined under § 75.360(b)(3) during the previous 7 days.\n\n(7) At each water pump not examined during a preshift examination conducted during the previous 7 days.\n\n(8) Weekly examinations shall include examinations to identify violations of the standards listed below:\n\n(i) §§ 75.202(a) and 75.220(a)(1)—roof control;\n\n(ii) §§ 75.333(h) and 75.370(a)(1)—ventilation, methane;\n\n(iii) §§ 75.400 and 75.403—accumulations of combustible materials and application of rock dust; and\n\n(iv) § 75.1403—maintenance of off track haulage roadways, and track haulage, track switches, and other components for haulage;\n\n(v) § 75.1722(a)—guarding moving machine parts; and\n\n(vi) § 75.1731(a)—maintenance of belt conveyor components.\n\n(c) Measurements and tests. At least every 7 days, a certified person shall—\n\n(1) Determine the volume of air entering the main intakes and in each intake split;\n\n(2) Determine the volume of air and test for methane in the last open crosscut in any pair or set of developing entries or rooms, in the return of each split of air immediately before it enters the main returns, and where the air leaves the main returns; and\n\n(3) Test for methane in the return entry nearest each set of seals immediately after the air passes the seals.\n\n(d) Hazardous conditions shall be corrected immediately. If the condition creates an imminent danger, everyone except those persons referred to in section 104(c) of the Act shall be withdrawn from the area affected to a safe area until the hazardous condition is corrected. Any violation of the nine mandatory health or safety standards found during a weekly examination shall be corrected.\n\n(e) The weekly examination may be conducted at the same time as the preshift or on-shift examinations.\n\n(f) (1) The weekly examination is not required during any 7 day period in which no one enters any underground area of the mine.\n\n(2) Except for certified persons required to make examinations, no one shall enter any underground area of the mine if a weekly examination has not been completed within the previous 7 days.\n\n(g) Certification. The person making the weekly examinations shall certify by initials, date, and the time that the examination was made. Certifications and times shall appear at enough locations to show that the entire area has been examined.\n\n(h) Recordkeeping. At the completion of any shift during which a portion of a weekly examination is conducted, a record of the results of each weekly examination, including a record of hazardous conditions and violations of the nine mandatory health or safety standards found during each examination and their locations, the corrective action taken, and the results and location of air and methane measurements, shall be made. The results of methane tests shall be recorded as the percentage of methane measured by the examiner. The record shall be made by the person making the examination or a person designated by the operator. If made by a person other than the examiner, the examiner shall verify the record by initials and date by or at the end of the shift for which the examination was made. The record shall be countersigned by the mine foreman or equivalent mine official by the end of the mine foreman's or equivalent mine official's next regularly scheduled working shift. The records required by this section shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.\n\n(i) Retention period. Records shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.\n\n[61 FR 9829, Mar. 11, 1996, as amended at 77 FR 20715, Apr. 6, 2012]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.1103-4","heading":"Automatic fire sensor and warning device systems; installation; minimum requirements.","id":"75.1103-4","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-L/section-75.1103-4","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"L","subpartHeading":"Subpart L—Fire Protection","text":"(a) Effective December 31, 2009, automatic fire sensor and warning device systems that use carbon monoxide sensors shall provide identification of fire along all belt conveyors.\n\n(1) Carbon monoxide sensors shall be installed at the following locations:\n\n(i) Not more than 100 feet downwind of each belt drive unit, each tailpiece transfer point, and each belt take-up. If the belt drive, tailpiece, and/or take-up for a single transfer point are installed together in the same air course, and the distance between the units is less than 100 feet, they may be monitored with one sensor downwind of the last component. If the distance between the units exceeds 100 feet, additional sensors are required downwind of each belt drive unit, each tailpiece transfer point, and each belt take-up;\n\n(ii) Not more than 100 feet downwind of each section loading point;\n\n(iii) Along the belt entry so that the spacing between sensors does not exceed 1,000 feet. Where air velocities are less than 50 feet per minute, spacing must not exceed 350 feet; and\n\n(iv) The mine operator shall indicate the locations of all carbon monoxide sensors on the mine maps required by §§ 75.1200 and 75.1505 of this part.\n\n(2) Where used, sensors responding to radiation, smoke, gases, or other indications of fire, shall be spaced at regular intervals to provide protection equivalent to carbon monoxide sensors, and installed within the time specified in paragraph (a)(3) of this section.\n\n(3) When the distance from the tailpiece at loading points to the first outby sensor reaches the spacing requirements in § 75.1103-4(a)(1)(iii), an additional sensor shall be installed and put in operation within 24 production shift hours. When sensors of the kind described in paragraph (a)(2) of this section are used, they shall be installed and put in operation within 24 production shift hours after the equivalent distance which has been established for the sensor from the tailpiece at loading points to the first outby sensor is first reached.\n\n(b) Automatic fire sensor and warning device systems shall be installed so as to minimize the possibility of damage from roof falls and the moving belt and its load. Sensors must be installed near the center in the upper third of the entry, in a manner that does not expose personnel working on the system to unsafe conditions. Sensors must not be located in abnormally high areas or in other locations where air flow patterns do not permit products of combustion to be carried to the sensors.\n\n(c) Infrared, ultraviolet, and other sensors whose effectiveness is impaired by contamination shall be protected from dust, dirt, and moisture.\n\n(d) The voltage of automatic fire sensor and warning device systems shall not exceed 120 volts.\n\n(e) Except when power must be cut off in the mine under the provisions of § 75.313, automatic fire sensor and warning device systems shall be capable of giving warning of fire for a minimum of 4 hours after the source of power to the belt is removed unless the belt haulageway is examined for hot rollers and fire as provided in paragraph (e) (1) or (2) of this section.\n\n(1) When an unplanned removal of power from the belt occurs an examination for hot rollers and fire in the operating belts of a conveyor system shall be completed within 2 hours after the belt has stopped.\n\n(2) When a preplanned removal of power from the belt occurs an examination for hot rollers and fire on the operating belts of a conveyor system may commence not more than 30 minutes before the belts are stopped and shall be completed within 2 hours after the examination is commenced, or the examination shall be commenced when the belts are stopped and completed within 2 hours after the belts are stopped.\n\n[37 FR 16545, Aug. 16, 1972, as amended at 57 FR 20928, May 15, 1992; 73 FR 80614, Dec. 31, 2008]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.1722","heading":"Mechanical equipment guards.","id":"75.1722","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-R/section-75.1722","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"R","subpartHeading":"Subpart R—Miscellaneous","text":"(a) Gears; sprockets; chains; drive, head, tail, and takeup pulleys; flywheels; couplings, shafts; sawblades; fan inlets; and similar exposed moving machine parts which may be contacted by persons, and which may cause injury to persons shall be guarded.\n\n(b) Guards at conveyor-drive, conveyor-head, and conveyor-tail pulleys shall extend a distance sufficient to prevent a person from reaching behind the guard and becoming caught between the belt and the pulley.\n\n(c) Except when testing the machinery, guards shall be securely in place while machinery is being operated.\n\n[38 FR 4976, Feb. 23, 1973]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.342","heading":"Methane monitors.","id":"75.342","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.342","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a)(1) MSHA approved methane monitors shall be installed on all face cutting machines, continuous miners, longwall face equipment, loading machines, and other mechanized equipment used to extract or load coal within the working place.\n\n(2) The sensing device for methane monitors on longwall shearing machines shall be installed at the return air end of the longwall face. An additional sensing device also shall be installed on the longwall shearing machine, downwind and as close to the cutting head as practicable. An alternative location or locations for the sensing device required on the longwall shearing machine may be approved in the ventilation plan.\n\n(3) The sensing devices of methane monitors shall be installed as close to the working face as practicable.\n\n(4) Methane monitors shall be maintained in permissible and proper operating condition and shall be calibrated with a known air-methane mixture at least once every 31 days. To assure that methane monitors are properly maintained and calibrated, the operator shall:\n\n(i) Use persons properly trained in the maintenance, calibration, and permissibility of methane monitors to calibrate and maintain the devices.\n\n(ii) Maintain a record of all calibration tests of methane monitors. Records shall be maintained in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.\n\n(iii) Retain the record of calibration tests for 1 year from the date of the test. Records shall be retained at a surface location at the mine and made available for inspection by authorized representatives of the Secretary and the representative of miners.\n\n(b)(1) When the methane concentration at any methane monitor reaches 1.0 percent the monitor shall give a warning signal.\n\n(2) The warning signal device of the methane monitor shall be visible to a person who can deenergize electric equipment or shut down diesel-powered equipment on which the monitor is mounted.\n\n(c) The methane monitor shall automatically deenergize electric equipment or shut down diesel-powered equipment on which it is mounted when—\n\n(1) The methane concentration at any methane monitor reaches 2.0 percent; or\n\n(2) The monitor is not operating properly.\n\n[61 FR 9829, Mar. 11, 1996, as amended at 61 FR 55527, Oct. 25, 1996]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.400","heading":"Accumulation of combustible materials.","id":"75.400","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-E/section-75.400","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"E","subpartHeading":"Subpart E—Combustible Materials and Rock Dusting","text":"Coal dust, including float coal dust deposited on rock-dusted surfaces, loose coal, and other combustible materials, shall be cleaned up and not be permitted to accumulate in active workings, or on diesel-powered and electric equipment therein.\n\n[61 FR 55527, Oct. 25, 1996]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.333","heading":"Ventilation controls.","id":"75.333","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.333","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a) For purposes of this section, “doors” include any door frames.\n\n(b) Permanent stoppings or other permanent ventilation control devices constructed after November 15, 1992, shall be built and maintained—\n\n(1) Between intake and return air courses, except temporary controls may be used in rooms that are 600 feet or less from the centerline of the entry from which the room was developed including where continuous face haulage systems are used in such rooms. Unless otherwise approved in the ventilation plan, these stoppings or controls shall be maintained to and including the third connecting crosscut outby the working face;\n\n(2) To separate belt conveyor haulageways from return air courses, except where belt entries in areas of mines developed before March 30, 1970, are used as return air courses;\n\n(3) To separate belt conveyor haulageways from intake air courses when the air in the intake air courses is used to provide air to active working places. Temporary ventilation controls may be used in rooms that are 600 feet or less from the centerline of the entry from which the rooms were developed including where continuous face haulage systems are used in such rooms. When continuous face haulage systems are used, permanent stoppings or other permanent ventilation control devices shall be built and maintained to the outby most point of travel of the dolly or 600 feet from the point of deepest penetration in the conveyor belt entry, whichever distance is closer to the point of deepest penetration, to separate the continuous haulage entry from the intake entries;\n\n(4) To separate the primary escapeway from belt and trolley haulage entries, as required by § 75.380(g). For the purposes of § 75.380(g), the loading point for a continuous haulage system shall be the outby most point of travel of the dolly or 600 feet from the point of deepest penetration, whichever distance is less; and\n\n(5) In return air courses to direct air into adjacent worked-out areas.\n\n(c) Personnel doors shall be constructed of noncombustible material and shall be of sufficient strength to serve their intended purpose of maintaining separation and permitting travel between air courses, and shall be installed as follows in permanent stoppings constructed after November 15, 1992:\n\n(1) The distance between personnel doors shall be no more than 300 feet in seam heights below 48 inches and 600 feet in seam heights 48 inches or higher.\n\n(2) The location of all personnel doors in stoppings along escapeways shall be clearly marked so that the doors may be easily identified by anyone traveling in the escapeway and in the entries on either side of the doors.\n\n(3) When not in use, personnel doors shall be closed.\n\n(4) An airlock shall be established where the air pressure differential between air courses creates a static force exceeding 125 pounds on closed personnel doors along escapeways.\n\n(d) Doors, other than personnel doors, constructed after November 15, 1992, that are used in lieu of permanent stoppings or to control ventilation within an air course shall be:\n\n(1) Made of noncombustible material or coated on all accessible surfaces with flame-retardant materials having a flame-spread index of 25 or less, as tested under ASTM E162-87, “Standard Test Method for Surface Flammability of Materials Using a Radiant Heat Energy Source.” This publication is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.\n\n(2) Of sufficient strength to serve their intended purpose of maintaining separation and permitting travel between or within air courses or entries.\n\n(3) Installed in pairs to form an airlock. When an airlock is used, one side of the airlock shall remain closed. When not in use, both sides shall be closed.\n\n(e)(1)(i) Except as provided in paragraphs (e)(2), (3), and (4) of this section, all overcasts, undercasts, shaft partitions, permanent stoppings, and regulators, installed after June 10, 1996, shall be constructed in a traditionally accepted method and of materials that have been demonstrated to perform adequately or in a method and of materials that have been tested and shown to have a minimum strength equal to or greater than the traditionally accepted in-mine controls. Tests may be performed under ASTM E72-80, “Standard Methods of Conducting Strength Tests of Panels for Building Construction” (Section 12-Transverse Load-Specimen Vertical, load, only), or the operator may conduct comparative in-mine tests. In-mine tests shall be designed to demonstrate the comparative strength of the proposed construction and a traditionally accepted in-mine control. The publication ASTM E72-80, “Standard Methods of Conducting Strength Tests of Panels for Building Construction,” is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.\n\n(ii) All overcasts, undercasts, shaft partitions, permanent stoppings, and regulators, installed after November 15, 1992, shall be constructed of noncombustible material. Materials that are suitable for the construction of overcasts, undercasts, shaft partitions, permanent stoppings, and regulators include concrete, concrete block, brick, cinder block, tile, or steel. No ventilation controls installed after November 15, 1992, shall be constructed of aluminum.\n\n(2) In anthracite mines, permanent stoppings may be constructed of overlapping layers of hardwood mine boards, if the stoppings are a minimum 2 inches thick.\n\n(3) When timbers are used to create permanent stoppings in heaving or caving areas, the stoppings shall be coated on all accessible surfaces with a flame-retardant material having a flame-spread index of 25 or less, as tested under ASTM E162-87, “Standard Test Method for Surface Flammability of Materials Using a Radiant Heat Energy Source.” This publication is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.\n\n(4) In anthracite mines, doors and regulators may be constructed of overlapping layers of hardwood boards, if the doors, door frames, and regulators are a minimum 2 inches thick.\n\n(f) When sealants are applied to ventilation controls, the sealant shall have a flame-spread index of 25 or less under ASTM E162-87, “Standard Test Method for Surface Flammability of Materials Using a Radiant Heat Energy Source.” This publication is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.\n\n(g) Before mining is discontinued in an entry or room that is advanced more than 20 feet from the inby rib, a crosscut shall be made or line brattice shall be installed and maintained to provide adequate ventilation. When conditions such as methane liberation warrant a distance less than 20 feet, the approved ventilation plan shall specify the location of such rooms or entries and the maximum distance they will be developed before a crosscut is made or line brattice is installed.\n\n(h) All ventilation controls, including seals, shall be maintained to serve the purpose for which they were built.\n\n[61 FR 9829, Mar. 11, 1996; 61 FR 20877, May 8, 1996; 61 FR 26442, May 28, 1996; 61 FR 29288, 29289, June 10, 1996, as amended at 67 FR 38386, June 4, 2002; 71 FR 16668, Apr. 3, 2006; 73 FR 80612, Dec. 31, 2008; 80 FR 52991, Sept. 2, 2015; 91 FR 9448, Feb. 26, 2026]","occurrenceCount":1},{"chapter":"I","heading":"Hazard training.","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-H/part-48/subpart-B/section-48.31","part":"48","subchapter":"H","subpart":"B","id":"48.31","citation":"30 CFR 48.31","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","subchapterHeading":"SUBCHAPTER H—EDUCATION AND TRAINING","partHeading":"PART 48—TRAINING AND RETRAINING OF MINERS","subpartHeading":"","text":null,"occurrenceCount":1}],"fullCorpus":"/data/title30-sections.json"}}},"meta":{"representation":"json","mineId":"4608537","dataSource":"postgres","snapshotId":"2026-10-13T11:19:05.459773+00:00","completedAt":"2026-10-13T11:26:59.401Z","sourceCount":20,"totalRows":17906804}}