{"data":{"schemaVersion":"realm.mine-profile.v1","generatedAt":"2026-10-17T06:17:15.228Z","identity":{"mine_id":"4608523","name":"Camp Creek Mine No. 1","status":"Abandoned and Sealed","status_date":"2007-07-19","mine_type":"Underground","coal_metal":"C","commodity":"Coal (Bituminous)","state":"WV","county":"Boone","nearest_town":"Danville","operator_id":"0072303","operator_name":"Hobet Mining LLC","controller_id":"0071611","controller_name":"Patriot Coal Corporation","district":"C04","office":"Madison WV Field Office","employees":0,"latitude":38.133888,"longitude":-81.811666},"coverage":{"contributingSources":15,"registeredSources":20,"sourceRows":2260},"relationships":{"schemaVersion":"realm.temporal-relationships.v1","temporalSemantics":{"validTime":{"granularity":"date","bounds":"inclusive","nullStart":"start date not published in the upstream history row","nullEnd":"open-ended in the upstream history row; not independent proof of present control"},"transactionTime":{"observedAt":"2026-10-17T05:35:58.500035+00:00","meaning":"time the checksum-addressed MDRS artifacts were observed by the PostgreSQL ingestion"},"derivation":{"controllerControlsOperator":"intersection of controller and operator valid-time intervals evidenced through this mine","currentIdentity":"current controller and operator are asserted only by the MDRS Mines snapshot"}},"current":{"mine":{"type":"mine","id":"4608523","name":"Camp Creek Mine No. 1"},"operator":{"type":"operator","id":"0072303","name":"Hobet Mining LLC"},"controller":{"type":"controller","id":"0071611","name":"Patriot Coal Corporation"},"source":{"datasetId":"msha-mines","observedAt":"2026-10-17T05:35:58.500035+00:00"}},"edges":[{"type":"controller_controls_mine","subject":{"type":"controller","id":"C00012","name":"Ashland Inc et al"},"object":{"type":"mine","id":"4608523","name":"Camp Creek Mine No. 1"},"validFrom":"1977-05-01","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-17T05:35:58.500035+00:00","recordKey":"4608523|C00012|1977-05-01|"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"C14037","name":"Roger  Bell"},"object":{"type":"mine","id":"4608523","name":"Camp Creek Mine No. 1"},"validFrom":"1994-08-01","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-17T05:35:58.500035+00:00","recordKey":"4608523|C14037|1994-08-01|"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"P22860","name":"Bar-K Inc"},"object":{"type":"mine","id":"4608523","name":"Camp Creek Mine No. 1"},"validFrom":"1995-09-01","validTo":"2002-04-04","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-17T05:35:58.500035+00:00","recordKey":"4608523|P22860|1995-09-01|2002-04-04"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C14037","name":"Roger  Bell"},"object":{"type":"operator","id":"P22860","name":"Bar-K Inc"},"validFrom":"1995-09-01","validTo":"2002-04-04","current":false,"derived":true,"evidenceMineId":"4608523","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-17T05:35:58.500035+00:00","recordKey":"4608523|P22860|1995-09-01|C14037|1994-08-01|91805"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"P06873","name":"Hobet Mining, Inc."},"object":{"type":"mine","id":"4608523","name":"Camp Creek Mine No. 1"},"validFrom":"2002-04-05","validTo":"2002-04-15","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-17T05:35:58.500035+00:00","recordKey":"4608523|P06873|2002-04-05|2002-04-15"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C00012","name":"Ashland Inc et al"},"object":{"type":"operator","id":"P06873","name":"Hobet Mining, Inc."},"validFrom":"2002-04-05","validTo":"2002-04-15","current":false,"derived":true,"evidenceMineId":"4608523","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-17T05:35:58.500035+00:00","recordKey":"4608523|P06873|2002-04-05|C00012|1977-05-01|43292"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"0050458","name":"Mason Mining, LLC"},"object":{"type":"mine","id":"4608523","name":"Camp Creek Mine No. 1"},"validFrom":"2002-04-16","validTo":"2006-05-16","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-17T05:35:58.500035+00:00","recordKey":"4608523|0050458|2002-04-16|2006-05-16"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"0040814","name":"Ronnie G  Cornett et al"},"object":{"type":"mine","id":"4608523","name":"Camp Creek Mine No. 1"},"validFrom":"2002-04-16","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-17T05:35:58.500035+00:00","recordKey":"4608523|0040814|2002-04-16|"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"0040814","name":"Ronnie G  Cornett et al"},"object":{"type":"operator","id":"0050458","name":"Mason Mining, LLC"},"validFrom":"2002-04-16","validTo":"2006-05-16","current":false,"derived":true,"evidenceMineId":"4608523","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-17T05:35:58.500035+00:00","recordKey":"4608523|0050458|2002-04-16|0040814|2002-04-16|711"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"0056849","name":"Magnum Coal Company"},"object":{"type":"mine","id":"4608523","name":"Camp Creek Mine No. 1"},"validFrom":"2006-01-01","validTo":"2008-07-22","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-17T05:35:58.500035+00:00","recordKey":"4608523|0056849|2006-01-01|2008-07-22"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"0072303","name":"Hobet Mining LLC"},"object":{"type":"mine","id":"4608523","name":"Camp Creek Mine No. 1"},"validFrom":"2006-05-17","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-17T05:35:58.500035+00:00","recordKey":"4608523|0072303|2006-05-17|"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"0056849","name":"Magnum Coal Company"},"object":{"type":"operator","id":"0072303","name":"Hobet Mining LLC"},"validFrom":"2006-05-17","validTo":"2008-07-22","current":false,"derived":true,"evidenceMineId":"4608523","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-17T05:35:58.500035+00:00","recordKey":"4608523|0072303|2006-05-17|0056849|2006-01-01|7508"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"0071611","name":"Patriot Coal Corporation"},"object":{"type":"mine","id":"4608523","name":"Camp Creek Mine No. 1"},"validFrom":"2008-07-23","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-17T05:35:58.500035+00:00","recordKey":"4608523|0071611|2008-07-23|"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"0071611","name":"Patriot Coal Corporation"},"object":{"type":"operator","id":"0072303","name":"Hobet Mining LLC"},"validFrom":"2008-07-23","validTo":null,"current":true,"derived":true,"evidenceMineId":"4608523","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-17T05:35:58.500035+00:00","recordKey":"4608523|0072303|2006-05-17|0071611|2008-07-23|10376"}}],"coverage":{"historyRecords":5,"edgeCount":14,"intervalAnomalies":0,"sourceDatasetId":"msha-controller-operator-history"}},"sources":[{"id":"msha-accidents","name":"Accident, Injuries, and Illnesses","domains":["safety","contractors"],"products":["incident trends","severity rates","equipment patterns","peer denominators"],"rowCount":69,"firstDate":"2000-05-15","lastDate":"2006-08-14","metrics":{"daysLost":1560,"injuries":44,"fatalities":0,"recentRows":0,"restrictedDays":0,"contractorRecords":3},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"51033","DOCUMENT_NO":"220062300039","ACCIDENT_DT":"08/14/2006","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","DAYS_LOST":"0","NARRATIVE":"On Monday 8-14-06 at approx 8:10am, while servicing a fan, a change in the mine pressure as recorded on fan chart and water gauge was noticed. Upon investigation, a roof fall in an intersection located 2 x-cuts underground from the #4 Portal at the Camp Creek #1 portal. This fall measures 16' x 50' x 10' high.","sourceDate":"2006-08-14"},{"SOURCE_ROW_NUMBER":"20976","DOCUMENT_NO":"220062300038","ACCIDENT_DT":"08/13/2006","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","DAYS_LOST":"0","NARRATIVE":"On 8/14/06 at approx 8:10 am, while servicing the fan, a change in the mine pressure was recorded on Fan Chart and water gauge was noticed. Upon investigation, a roof fall in an intersection 3 X-Cuts from fan was discovered. This fall measures 18' x 18' x 8' and fall partially obstructs air flow and impedes travel of air course. The fan portal is located in the #5 Entry.","sourceDate":"2006-08-13"},{"SOURCE_ROW_NUMBER":"72482","DOCUMENT_NO":"220061280071","ACCIDENT_DT":"05/04/2006","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"HANDLING OF MATERIALS","ACCIDENT_TYPE":"Over-exertion in pulling or pushing objects","OCCUPATION":"Continuous miner operator, Coal mole operator","NO_INJURIES":"1","DAYS_LOST":"12","NARRATIVE":"Was moving miner cable out of #6 roadway and pulled right side mid-back","sourceDate":"2006-05-04"},{"SOURCE_ROW_NUMBER":"188631","DOCUMENT_NO":"220061230038","ACCIDENT_DT":"04/28/2006","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"SLIP OR FALL OF PERSON","ACCIDENT_TYPE":"Over-exertion NEC","OCCUPATION":"Examiner, Fire boss, Pre-shift examiner, Mine examiner","NO_INJURIES":"1","DAYS_LOST":"11","NARRATIVE":"Slipped on belt while exiting H-Ride on the south section.","sourceDate":"2006-04-28"},{"SOURCE_ROW_NUMBER":"253285","DOCUMENT_NO":"220061170027","ACCIDENT_DT":"04/22/2006","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"POWERED HAULAGE","ACCIDENT_TYPE":"Struck against a moving object","OCCUPATION":"Electrician, Lineman","NO_INJURIES":"1","DAYS_LOST":"21","NARRATIVE":"EE was operating a shuttle car and hit a hole  in the roadway #2 entry.","sourceDate":"2006-04-22"},{"SOURCE_ROW_NUMBER":"119757","DOCUMENT_NO":"220061140040","ACCIDENT_DT":"04/13/2006","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"HANDLING OF MATERIALS","ACCIDENT_TYPE":"Over-exertion in lifting objects","OCCUPATION":"Laborer, Bull gang,  Parts runner, Roustabout, Roof trimmer/scaler","NO_INJURIES":"1","DAYS_LOST":"33","NARRATIVE":"While shoveling on belt, employee possibly pulled a muscle in back.","sourceDate":"2006-04-13"},{"SOURCE_ROW_NUMBER":"150068","DOCUMENT_NO":"220060860046","ACCIDENT_DT":"03/22/2006","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"SLIP OR FALL OF PERSON","ACCIDENT_TYPE":"Fall onto or against objects","OCCUPATION":"Roof bolter, Rock bolter,  Pinner, Mobile roof support operator (MRS)","NO_INJURIES":"1","DAYS_LOST":"43","NARRATIVE":"EE WAS STANDING ON BOLTER BOOM IN DOWN POSITION, INSERTING A TUBE OF GLUE INTO A DRILLED HOLE. EE SLIPPED OFF BOLTER BOOM STRIKING HIS LEFT ELBOW AGAINST THE SIDE OF THE BOLTER.","sourceDate":"2006-03-22"},{"SOURCE_ROW_NUMBER":"145617","DOCUMENT_NO":"220060450023","ACCIDENT_DT":"01/30/2006","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"SLIP OR FALL OF PERSON","ACCIDENT_TYPE":"Fall onto or against objects","OCCUPATION":"Transit man, Surveyor/Transit worker","NO_INJURIES":"1","DAYS_LOST":"5","NARRATIVE":"EE was getting onto the mantrip to travel into the mine when he slipped and hit his left foot on the Rib.","sourceDate":"2006-01-30"},{"SOURCE_ROW_NUMBER":"162937","DOCUMENT_NO":"220053570024","ACCIDENT_DT":"12/19/2005","DEGREE_INJURY":"NO DYS AWY FRM WRK,NO RSTR ACT","CLASSIFICATION":"HANDLING OF MATERIALS","ACCIDENT_TYPE":"Over-exertion NEC","OCCUPATION":"Roof bolter, Rock bolter,  Pinner, Mobile roof support operator (MRS)","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"WHILE LIFTING WELDER OFF OF 488 SCOOP THE WELDER DROPPED & IT PULLED A MUSCLE IN THE EMPLOYEE'S SHOULDER WHILE DRAGGING UP THE ENTRY.","sourceDate":"2005-12-19"},{"SOURCE_ROW_NUMBER":"197216","DOCUMENT_NO":"220053640032","ACCIDENT_DT":"12/16/2005","DEGREE_INJURY":"NO DYS AWY FRM WRK,NO RSTR ACT","CLASSIFICATION":"POWERED HAULAGE","ACCIDENT_TYPE":"Struck against a moving object","OCCUPATION":"Haul/Off road/Coal/Ore/Pit/Quarry/Rock/Rubber tire truck driver, Transportation truck driver","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"WHILE TRAVELING SOUTH ON ST. RT. 119, TURNED HIS TURN SIGNAL ON TO TURN TO HOBERT ENTRANCE WHEN HE WAS STRUCK IN THE REAR BY ANOTHER VEHICLE. INJURED EE HAD PAIN TO HIS LOWER BACK & WAS TAKEN TO THE HOSPITAL FOR X-RAYS.","sourceDate":"2005-12-16"},{"SOURCE_ROW_NUMBER":"192955","DOCUMENT_NO":"220053180072","ACCIDENT_DT":"10/28/2005","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"HANDLING OF MATERIALS","ACCIDENT_TYPE":"Over-exertion in lifting objects","OCCUPATION":"Roof bolter, Rock bolter,  Pinner, Mobile roof support operator (MRS)","NO_INJURIES":"1","DAYS_LOST":"140","NARRATIVE":"EMPLOYEE WAS MAKING A POWER MOVE ON WEST SECTION AND WAS PULLING SLACK FROM THE FEEDER CABLE. HE ENCOUNTERED A LITTLE PAIN IN HIS RIGHT HIP.","sourceDate":"2005-10-28"},{"SOURCE_ROW_NUMBER":"231766","DOCUMENT_NO":"220052520034","ACCIDENT_DT":"08/30/2005","DEGREE_INJURY":"NO DYS AWY FRM WRK,NO RSTR ACT","CLASSIFICATION":"HANDLING OF MATERIALS","ACCIDENT_TYPE":"Over-exertion in lifting objects","OCCUPATION":"Laborer, Bull gang,  Parts runner, Roustabout, Roof trimmer/scaler","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"He was on west mains putting belt structure in scoop for a belt move, While loading structured He aledgly had hurt his back but didn't say anything til about the accident til he come out of end of shift 9-2-05. He then said he had hurt a disc in his back his kidney and right testcial.","sourceDate":"2005-08-30"}]},{"id":"msha-addresses","name":"Addresses of Record","domains":["identity","logistics"],"products":["entity resolution","address history","facility geocoding"],"rowCount":1,"firstDate":"2007-07-19","lastDate":"2007-07-19","metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-assessed-violations","name":"Assessed Violations","domains":["compliance","legal"],"products":["penalty lifecycle","paid and outstanding amounts","assessment aging"],"rowCount":454,"firstDate":"2000-01-25","lastDate":"2007-04-09","metrics":{"ss":210,"delinquent":404,"recentRows":0,"paidPenalty":23280,"proposedPenalty":98901,"currentAssessment":98901},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"832651","VIOLATION_NO":"7261235","ISSUE_DT":"04/09/2007","CFR_STANDARD_CD":"75.512","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"60.00","CURRENT_ASSESSMENT_AMT":"60.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2007-04-09"},{"SOURCE_ROW_NUMBER":"832628","VIOLATION_NO":"7261200","ISSUE_DT":"02/27/2007","CFR_STANDARD_CD":"75.333(h)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"60.00","CURRENT_ASSESSMENT_AMT":"60.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2007-02-27"},{"SOURCE_ROW_NUMBER":"832627","VIOLATION_NO":"7261196","ISSUE_DT":"02/09/2007","CFR_STANDARD_CD":"41.12","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"60.00","CURRENT_ASSESSMENT_AMT":"60.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2007-02-09"},{"SOURCE_ROW_NUMBER":"832626","VIOLATION_NO":"7261195","ISSUE_DT":"02/08/2007","CFR_STANDARD_CD":"75.364(b)(4)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"60.00","CURRENT_ASSESSMENT_AMT":"60.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2007-02-08"},{"SOURCE_ROW_NUMBER":"801853","VIOLATION_NO":"7250059","ISSUE_DT":"11/28/2006","CFR_STANDARD_CD":"75.1714-4(b)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"177.00","CURRENT_ASSESSMENT_AMT":"177.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2006-11-28"},{"SOURCE_ROW_NUMBER":"813830","VIOLATION_NO":"7251918","ISSUE_DT":"05/02/2006","CFR_STANDARD_CD":"75.403","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"60.00","CURRENT_ASSESSMENT_AMT":"60.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2006-05-02"},{"SOURCE_ROW_NUMBER":"817132","VIOLATION_NO":"7251892","ISSUE_DT":"03/28/2006","CFR_STANDARD_CD":"75.360(b)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Order","PROPOSED_PENALTY_AMT":"3700.00","CURRENT_ASSESSMENT_AMT":"3700.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2006-03-28"},{"SOURCE_ROW_NUMBER":"817131","VIOLATION_NO":"7251891","ISSUE_DT":"03/28/2006","CFR_STANDARD_CD":"75.220(a)(1)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Order","PROPOSED_PENALTY_AMT":"4800.00","CURRENT_ASSESSMENT_AMT":"4800.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2006-03-28"},{"SOURCE_ROW_NUMBER":"817130","VIOLATION_NO":"7251890","ISSUE_DT":"03/22/2006","CFR_STANDARD_CD":"75.1103-4(a)(3)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"60.00","CURRENT_ASSESSMENT_AMT":"60.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2006-03-22"},{"SOURCE_ROW_NUMBER":"817129","VIOLATION_NO":"7251889","ISSUE_DT":"03/22/2006","CFR_STANDARD_CD":"75.1101-10","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"60.00","CURRENT_ASSESSMENT_AMT":"60.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2006-03-22"},{"SOURCE_ROW_NUMBER":"817128","VIOLATION_NO":"7251888","ISSUE_DT":"03/22/2006","CFR_STANDARD_CD":"75.1100-2(b)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"203.00","CURRENT_ASSESSMENT_AMT":"203.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2006-03-22"},{"SOURCE_ROW_NUMBER":"817127","VIOLATION_NO":"7251887","ISSUE_DT":"03/22/2006","CFR_STANDARD_CD":"75.1100-2(b)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"203.00","CURRENT_ASSESSMENT_AMT":"203.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2006-03-22"}]},{"id":"msha-coal-dust-samples","name":"Coal Dust Samples","domains":["health","safety"],"products":["respirable dust trends","CPDM coverage","void patterns","occupation exposure"],"rowCount":698,"firstDate":"2000-01-10","lastDate":"2006-04-20","metrics":{"recentRows":0,"cpdmSamples":0,"voidSamples":50,"validSamples":648,"maxConcentration":9.671,"concentrationTotal":621.008},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"1658508","CASS_NUM":"50848105","SMP_TAKEN_DT":"4/20/2006","CONC":".376","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"VOID SAMPLE","VOID_CD_DESC":"EXCESS SAMPLE","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2006-04-20"},{"SOURCE_ROW_NUMBER":"1583304","CASS_NUM":"50848119","SMP_TAKEN_DT":"4/19/2006","CONC":"2.174","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"VOID SAMPLE","VOID_CD_DESC":"EXCESS SAMPLE","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2006-04-19"},{"SOURCE_ROW_NUMBER":"609755","CASS_NUM":"50848122","SMP_TAKEN_DT":"4/19/2006","CONC":".306","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2006-04-19"},{"SOURCE_ROW_NUMBER":"1301856","CASS_NUM":"50831281","SMP_TAKEN_DT":"4/18/2006","CONC":"1.654","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2006-04-18"},{"SOURCE_ROW_NUMBER":"707158","CASS_NUM":"50848098","SMP_TAKEN_DT":"4/18/2006","CONC":"1.41","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2006-04-18"},{"SOURCE_ROW_NUMBER":"614674","CASS_NUM":"50848093","SMP_TAKEN_DT":"4/14/2006","CONC":"1.86","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2006-04-14"},{"SOURCE_ROW_NUMBER":"315083","CASS_NUM":"50848108","SMP_TAKEN_DT":"4/14/2006","CONC":".917","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2006-04-14"},{"SOURCE_ROW_NUMBER":"1263444","CASS_NUM":"50837417","SMP_TAKEN_DT":"4/13/2006","CONC":"3.228","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2006-04-13"},{"SOURCE_ROW_NUMBER":"66287","CASS_NUM":"50837429","SMP_TAKEN_DT":"4/13/2006","CONC":"1.532","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2006-04-13"},{"SOURCE_ROW_NUMBER":"193471","CASS_NUM":"50837440","SMP_TAKEN_DT":"4/12/2006","CONC":"1.089","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2006-04-12"},{"SOURCE_ROW_NUMBER":"16685","CASS_NUM":"50837448","SMP_TAKEN_DT":"4/12/2006","CONC":"1.942","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2006-04-12"},{"SOURCE_ROW_NUMBER":"605455","CASS_NUM":"50837397","SMP_TAKEN_DT":"4/11/2006","CONC":".575","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2006-04-11"}]},{"id":"msha-conferences","name":"Conferences","domains":["compliance","legal"],"products":["conference history","post-issuance changes","citation lifecycle"],"rowCount":14,"firstDate":"2006-03-15","lastDate":"2007-02-28","metrics":{"linkedIssuances":14},"periods":{},"recentRecords":[]},{"id":"msha-contractor-production-quarterly","name":"Contractor Employment and Production — Quarterly","domains":["contractors","production","safety"],"products":["contractor exposure denominator","productivity","presence windows"],"rowCount":278,"firstDate":null,"lastDate":null,"metrics":{"linkedContractors":6,"notMineAttributable":1},"periods":{},"recentRecords":[]},{"id":"msha-contractor-production-yearly","name":"Contractor Employment and Production — Yearly","domains":["contractors","production","safety"],"products":["long-run contractor trend","annual denominator reconciliation"],"rowCount":55,"firstDate":null,"lastDate":null,"metrics":{"linkedContractors":5,"notMineAttributable":1},"periods":{},"recentRecords":[]},{"id":"msha-controller-operator-history","name":"Controller and Operator History","domains":["identity","compliance"],"products":["historical ownership attribution","operator transitions","valid-time joins"],"rowCount":5,"firstDate":"1995-09-01","lastDate":"2006-05-17","metrics":{"recentRows":0,"currentOperatorTenures":2,"completedOperatorTenures":3},"periods":{},"recentRecords":[]},{"id":"msha-inspections","name":"Inspections","domains":["safety","compliance"],"products":["inspection mix","on-site hours","event context","citation rate denominator"],"rowCount":87,"firstDate":"2000-01-03","lastDate":"2007-04-09","metrics":{"inspectors":138,"recentRows":0,"onSiteHours":3182.5,"inspectionHours":4719.25,"inspectionSamples":95},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"859473","EVENT_NO":"4116442","INSPECTION_BEGIN_DT":"04/09/2007","INSPECTION_END_DT":"04/10/2007","ACTIVITY_CODE":"E16","ACTIVITY":"Spot Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"8","SUM_TOTAL_ON_SITE_HOURS":"5","sourceDate":"2007-04-09"},{"SOURCE_ROW_NUMBER":"196454","EVENT_NO":"4116428","INSPECTION_BEGIN_DT":"02/08/2007","INSPECTION_END_DT":"03/16/2007","ACTIVITY_CODE":"E16","ACTIVITY":"Spot Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"34","SUM_TOTAL_ON_SITE_HOURS":"18","sourceDate":"2007-02-08"},{"SOURCE_ROW_NUMBER":"1125008","EVENT_NO":"4108639","INSPECTION_BEGIN_DT":"11/28/2006","INSPECTION_END_DT":"12/20/2006","ACTIVITY_CODE":"E16","ACTIVITY":"Spot Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"12","SUM_TOTAL_ON_SITE_HOURS":"4","sourceDate":"2006-11-28"},{"SOURCE_ROW_NUMBER":"138419","EVENT_NO":"4112967","INSPECTION_BEGIN_DT":"09/13/2006","INSPECTION_END_DT":"09/14/2006","ACTIVITY_CODE":"E08","ACTIVITY":"Non-Injury Accident Investigation","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"13","SUM_TOTAL_ON_SITE_HOURS":"5.5","sourceDate":"2006-09-13"},{"SOURCE_ROW_NUMBER":"664256","EVENT_NO":"4112270","INSPECTION_BEGIN_DT":"04/11/2006","INSPECTION_END_DT":"07/05/2006","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"2","SUM_TOTAL_INSP_HOURS":"27.5","SUM_TOTAL_ON_SITE_HOURS":"16.75","sourceDate":"2006-04-11"},{"SOURCE_ROW_NUMBER":"30939","EVENT_NO":"4113083","INSPECTION_BEGIN_DT":"03/21/2006","INSPECTION_END_DT":"03/21/2006","ACTIVITY_CODE":"E04","ACTIVITY":"Verbal Hazard Complaint Inspections","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"6","SUM_TOTAL_ON_SITE_HOURS":"3","sourceDate":"2006-03-21"},{"SOURCE_ROW_NUMBER":"1094775","EVENT_NO":"4112832","INSPECTION_BEGIN_DT":"01/24/2006","INSPECTION_END_DT":"01/25/2006","ACTIVITY_CODE":"E08","ACTIVITY":"Non-Injury Accident Investigation","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"7.5","SUM_TOTAL_ON_SITE_HOURS":"3.5","sourceDate":"2006-01-24"},{"SOURCE_ROW_NUMBER":"1098583","EVENT_NO":"4112831","INSPECTION_BEGIN_DT":"01/20/2006","INSPECTION_END_DT":"01/24/2006","ACTIVITY_CODE":"E16","ACTIVITY":"Spot Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"4","SUM_TOTAL_ON_SITE_HOURS":"4","sourceDate":"2006-01-20"},{"SOURCE_ROW_NUMBER":"1089615","EVENT_NO":"4112829","INSPECTION_BEGIN_DT":"01/20/2006","INSPECTION_END_DT":"01/25/2006","ACTIVITY_CODE":"E07","ACTIVITY":"Non-Fatal Accident Investigation","NBR_INSPECTOR":"2","SUM_TOTAL_INSP_HOURS":"20.5","SUM_TOTAL_ON_SITE_HOURS":"10.5","sourceDate":"2006-01-20"},{"SOURCE_ROW_NUMBER":"867770","EVENT_NO":"4112830","INSPECTION_BEGIN_DT":"01/20/2006","INSPECTION_END_DT":"01/24/2006","ACTIVITY_CODE":"E04","ACTIVITY":"Verbal Hazard Complaint Inspections","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"10","SUM_TOTAL_ON_SITE_HOURS":"7","sourceDate":"2006-01-20"},{"SOURCE_ROW_NUMBER":"260848","EVENT_NO":"4113073","INSPECTION_BEGIN_DT":"01/19/2006","INSPECTION_END_DT":"01/19/2006","ACTIVITY_CODE":"E04","ACTIVITY":"Verbal Hazard Complaint Inspections","NBR_INSPECTOR":"2","SUM_TOTAL_INSP_HOURS":"16","SUM_TOTAL_ON_SITE_HOURS":"9.5","sourceDate":"2006-01-19"},{"SOURCE_ROW_NUMBER":"844319","EVENT_NO":"4113413","INSPECTION_BEGIN_DT":"01/06/2006","INSPECTION_END_DT":"01/12/2006","ACTIVITY_CODE":"E04","ACTIVITY":"Verbal Hazard Complaint Inspections","NBR_INSPECTOR":"2","SUM_TOTAL_INSP_HOURS":"41","SUM_TOTAL_ON_SITE_HOURS":"20","sourceDate":"2006-01-06"}]},{"id":"msha-mine-production-quarterly","name":"Mine Employment and Production — Quarterly","domains":["production","safety","compliance"],"products":["production trend","employee hours","rate denominators","seasonality"],"rowCount":15,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2002-Q4":{"hours":8345,"employees":40,"production":29681},"2002-Q3":{"hours":0,"employees":0,"production":0},"2002-Q2":{"hours":0,"employees":0,"production":0},"2002-Q1":{"hours":21877,"employees":104,"production":63228},"2001-Q4":{"hours":48257,"employees":96,"production":153759},"2001-Q3":{"hours":36243,"employees":63,"production":91990},"2001-Q2":{"hours":36952,"employees":60,"production":145479},"2001-Q1":{"hours":39915,"employees":64,"production":170494},"2000-Q4":{"hours":36544,"employees":54,"production":124867},"2000-Q3":{"hours":34987,"employees":63,"production":123314},"2000-Q2":{"hours":39296,"employees":63,"production":155021},"2000-Q1":{"hours":30412,"employees":52,"production":151834}},"recentRecords":[]},{"id":"msha-mine-production-yearly","name":"Mine Employment and Production — Yearly","domains":["production","safety","compliance"],"products":["annual trend","backfill","quarterly reconciliation"],"rowCount":12,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2000":{"hours":141239,"employees":58,"production":555036},"2001":{"hours":161367,"employees":71,"production":561722},"2002":{"hours":30222,"employees":75,"production":92909},"2003":{"hours":118785,"employees":54,"production":443760},"2004":{"hours":116666,"employees":53,"production":291157},"2005":{"hours":146581,"employees":69,"production":243687},"2006":{"hours":69484,"employees":67,"production":92993}},"recentRecords":[]},{"id":"msha-mines","name":"Mines","domains":["identity","production","logistics"],"products":["mine identity","status","commodity","location","operator and controller"],"rowCount":1,"firstDate":null,"lastDate":null,"metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-noise-samples","name":"Noise Samples","domains":["health","safety","equipment"],"products":["hearing exposure","machine and manufacturer patterns","occupation coverage"],"rowCount":33,"firstDate":"2000-02-29","lastDate":"2006-02-23","metrics":{"recentRows":0,"doseOver100":15,"actDoseTotal":103350,"pelDoseTotal":102680},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"238196","EVENT_NO":"4113069","SURVEY_DATE":"02/23/2006","OCCUPATION_CD_DESC":"CONTINUOUS MINER HELPER","MACHINE_CD":"06","MANUFACTURER_CD":"058","ACT_DOSE_85":"81","PEL_DOSE_90":"69","SURVEY_TYPE":"I","sourceDate":"2006-02-23"},{"SOURCE_ROW_NUMBER":"238195","EVENT_NO":"4113069","SURVEY_DATE":"02/23/2006","OCCUPATION_CD_DESC":"SCOOP CAR OPERATOR","MACHINE_CD":"38","MANUFACTURER_CD":"067","ACT_DOSE_85":"49","PEL_DOSE_90":"27","SURVEY_TYPE":"I","sourceDate":"2006-02-23"},{"SOURCE_ROW_NUMBER":"238194","EVENT_NO":"4113069","SURVEY_DATE":"02/23/2006","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","MACHINE_CD":"37","MANUFACTURER_CD":"058","ACT_DOSE_85":"55","PEL_DOSE_90":"40","SURVEY_TYPE":"I","sourceDate":"2006-02-23"},{"SOURCE_ROW_NUMBER":"238193","EVENT_NO":"4113069","SURVEY_DATE":"02/23/2006","OCCUPATION_CD_DESC":"CONTINUOUS MINER OPERATOR","MACHINE_CD":"06","MANUFACTURER_CD":"058","ACT_DOSE_85":"112","PEL_DOSE_90":"100","SURVEY_TYPE":"I","sourceDate":"2006-02-23"},{"SOURCE_ROW_NUMBER":"238192","EVENT_NO":"4106839","SURVEY_DATE":"09/28/2005","OCCUPATION_CD_DESC":"ROOF BOLTER (SINGLE HEAD)","MACHINE_CD":"30","MANUFACTURER_CD":"039","ACT_DOSE_85":"98","PEL_DOSE_90":"79","SURVEY_TYPE":"I","sourceDate":"2005-09-28"},{"SOURCE_ROW_NUMBER":"238191","EVENT_NO":"4106839","SURVEY_DATE":"09/28/2005","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","MACHINE_CD":"37","MANUFACTURER_CD":"058","ACT_DOSE_85":"85","PEL_DOSE_90":"73","SURVEY_TYPE":"I","sourceDate":"2005-09-28"},{"SOURCE_ROW_NUMBER":"238190","EVENT_NO":"4106839","SURVEY_DATE":"09/28/2005","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","MACHINE_CD":"37","MANUFACTURER_CD":"058","ACT_DOSE_85":"97","PEL_DOSE_90":"88","SURVEY_TYPE":"I","sourceDate":"2005-09-28"},{"SOURCE_ROW_NUMBER":"238189","EVENT_NO":"4106839","SURVEY_DATE":"09/28/2005","OCCUPATION_CD_DESC":"CONTINUOUS MINER HELPER","MACHINE_CD":"06","MANUFACTURER_CD":"058","ACT_DOSE_85":"125","PEL_DOSE_90":"110","SURVEY_TYPE":"I","sourceDate":"2005-09-28"},{"SOURCE_ROW_NUMBER":"238188","EVENT_NO":"4106839","SURVEY_DATE":"09/28/2005","OCCUPATION_CD_DESC":"CONTINUOUS MINER OPERATOR","MACHINE_CD":"06","MANUFACTURER_CD":"058","ACT_DOSE_85":"129","PEL_DOSE_90":"118","SURVEY_TYPE":"I","sourceDate":"2005-09-28"},{"SOURCE_ROW_NUMBER":"238187","EVENT_NO":"4106810","SURVEY_DATE":"05/25/2004","OCCUPATION_CD_DESC":"ELECTRICIAN","MACHINE_CD":"38","MANUFACTURER_CD":"098","ACT_DOSE_85":"34","PEL_DOSE_90":"14","SURVEY_TYPE":"I","sourceDate":"2004-05-25"},{"SOURCE_ROW_NUMBER":"238186","EVENT_NO":"4106810","SURVEY_DATE":"05/25/2004","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","MACHINE_CD":"37","MANUFACTURER_CD":"058","ACT_DOSE_85":"84","PEL_DOSE_90":"56","SURVEY_TYPE":"I","sourceDate":"2004-05-25"},{"SOURCE_ROW_NUMBER":"238185","EVENT_NO":"4106810","SURVEY_DATE":"05/25/2004","OCCUPATION_CD_DESC":"ROOF BOLTER (SINGLE HEAD)","MACHINE_CD":"30","MANUFACTURER_CD":"039","ACT_DOSE_85":"137","PEL_DOSE_90":"58","SURVEY_TYPE":"I","sourceDate":"2004-05-25"}]},{"id":"msha-quartz-samples","name":"Quartz Samples — Coal","domains":["health","safety"],"products":["quartz exposure trends","occupation context","applicable-rule linkage"],"rowCount":74,"firstDate":"2000-02-07","lastDate":"2006-02-22","metrics":{"recentRows":0,"voidSamples":3,"maxQuartzPct":11,"validSamples":71,"quartzPctTotal":417.1},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"116536","CASSETTE_NO":"57568841","SAMPLE_DT":"02/22/2006","QUARTZ_PCT":"04.7","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2006-02-22"},{"SOURCE_ROW_NUMBER":"24474","CASSETTE_NO":"57568816","SAMPLE_DT":"02/22/2006","QUARTZ_PCT":"06.8","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2006-02-22"},{"SOURCE_ROW_NUMBER":"42079","CASSETTE_NO":"50799783","SAMPLE_DT":"11/22/2005","QUARTZ_PCT":"05.1","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2005-11-22"},{"SOURCE_ROW_NUMBER":"159901","CASSETTE_NO":"50799325","SAMPLE_DT":"11/21/2005","QUARTZ_PCT":"04.9","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2005-11-21"},{"SOURCE_ROW_NUMBER":"84402","CASSETTE_NO":"57568096","SAMPLE_DT":"11/02/2005","QUARTZ_PCT":"05.1","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2005-11-02"},{"SOURCE_ROW_NUMBER":"70923","CASSETTE_NO":"57568162","SAMPLE_DT":"11/02/2005","QUARTZ_PCT":"06.8","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2005-11-02"},{"SOURCE_ROW_NUMBER":"75902","CASSETTE_NO":"57568158","SAMPLE_DT":"09/28/2005","QUARTZ_PCT":"06.8","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2005-09-28"},{"SOURCE_ROW_NUMBER":"66107","CASSETTE_NO":"57568372","SAMPLE_DT":"09/28/2005","QUARTZ_PCT":"04.8","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2005-09-28"},{"SOURCE_ROW_NUMBER":"162410","CASSETTE_NO":"57503990","SAMPLE_DT":"05/25/2005","QUARTZ_PCT":"05.4","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2005-05-25"},{"SOURCE_ROW_NUMBER":"21024","CASSETTE_NO":"57503770","SAMPLE_DT":"05/24/2005","QUARTZ_PCT":"06.2","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2005-05-24"},{"SOURCE_ROW_NUMBER":"10188","CASSETTE_NO":"57503780","SAMPLE_DT":"05/24/2005","QUARTZ_PCT":"11.0","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2005-05-24"},{"SOURCE_ROW_NUMBER":"4481","CASSETTE_NO":"57502058","SAMPLE_DT":"12/16/2004","QUARTZ_PCT":"07.1","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2004-12-16"}]},{"id":"msha-violations","name":"Violations","domains":["compliance","safety","legal"],"products":["citation and order record","condition text","Title 30 linkage","abatement patterns"],"rowCount":464,"firstDate":"2000-01-25","lastDate":"2007-04-09","metrics":{"ss":211,"amountDue":98901,"contested":0,"amountPaid":23280,"recentRows":0,"section104d":17,"unterminated":3,"proposedPenalty":98901},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"2729938","VIOLATION_NO":"7261235","VIOLATION_ISSUE_DT":"04/09/2007","SIG_SUB":"N","PART_SECTION":"75.512","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"3","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"04/10/2007","PROPOSED_PENALTY":"60","AMOUNT_DUE":"60","AMOUNT_PAID":"60","CONTESTED_IND":"N","sourceDate":"2007-04-09"},{"SOURCE_ROW_NUMBER":"2729882","VIOLATION_NO":"7261200","VIOLATION_ISSUE_DT":"02/27/2007","SIG_SUB":"N","PART_SECTION":"75.333(h)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"5","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"03/26/2007","PROPOSED_PENALTY":"60","AMOUNT_DUE":"60","AMOUNT_PAID":"60","CONTESTED_IND":"N","sourceDate":"2007-02-27"},{"SOURCE_ROW_NUMBER":"2729881","VIOLATION_NO":"7261196","VIOLATION_ISSUE_DT":"02/09/2007","SIG_SUB":"N","PART_SECTION":"41.12","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"NoLikelihood","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"0","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"02/13/2007","PROPOSED_PENALTY":"60","AMOUNT_DUE":"60","AMOUNT_PAID":"60","CONTESTED_IND":"N","sourceDate":"2007-02-09"},{"SOURCE_ROW_NUMBER":"2729880","VIOLATION_NO":"7261195","VIOLATION_ISSUE_DT":"02/08/2007","SIG_SUB":"N","PART_SECTION":"75.364(b)(4)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"5","NEGLIGENCE":"HighNegligence","TERMINATION_DT":"02/27/2007","PROPOSED_PENALTY":"60","AMOUNT_DUE":"60","AMOUNT_PAID":"60","CONTESTED_IND":"N","sourceDate":"2007-02-08"},{"SOURCE_ROW_NUMBER":"2730203","VIOLATION_NO":"7250059","VIOLATION_ISSUE_DT":"11/28/2006","SIG_SUB":"Y","PART_SECTION":"75.1714-4(b)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"7","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"12/07/2006","PROPOSED_PENALTY":"177","AMOUNT_DUE":"177","AMOUNT_PAID":"177","CONTESTED_IND":"N","sourceDate":"2006-11-28"},{"SOURCE_ROW_NUMBER":"2729939","VIOLATION_NO":"7251833","VIOLATION_ISSUE_DT":"05/18/2006","PART_SECTION":"75.203(e)(2)","CIT_ORD_SAFE":"Order","NO_AFFECTED":"0","TERMINATION_DT":"06/21/2006","CONTESTED_IND":"N","sourceDate":"2006-05-18"},{"SOURCE_ROW_NUMBER":"2729940","VIOLATION_NO":"7251918","VIOLATION_ISSUE_DT":"05/02/2006","SIG_SUB":"N","PART_SECTION":"75.403","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"05/02/2006","PROPOSED_PENALTY":"60","AMOUNT_DUE":"60","AMOUNT_PAID":"0","CONTESTED_IND":"N","sourceDate":"2006-05-02"},{"SOURCE_ROW_NUMBER":"2729865","VIOLATION_NO":"7251892","VIOLATION_ISSUE_DT":"03/28/2006","SIG_SUB":"Y","PART_SECTION":"75.360(b)","CIT_ORD_SAFE":"Order","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"9","NEGLIGENCE":"HighNegligence","TERMINATION_DT":"03/28/2006","PROPOSED_PENALTY":"3700","AMOUNT_DUE":"3700","AMOUNT_PAID":"0","CONTESTED_IND":"N","sourceDate":"2006-03-28"},{"SOURCE_ROW_NUMBER":"2729864","VIOLATION_NO":"7251891","VIOLATION_ISSUE_DT":"03/28/2006","SIG_SUB":"Y","PART_SECTION":"75.220(a)(1)","CIT_ORD_SAFE":"Order","LIKELIHOOD":"Highly","INJ_ILLNESS":"LostDays","NO_AFFECTED":"9","NEGLIGENCE":"HighNegligence","TERMINATION_DT":"03/28/2006","PROPOSED_PENALTY":"4800","AMOUNT_DUE":"4800","AMOUNT_PAID":"0","CONTESTED_IND":"N","sourceDate":"2006-03-28"},{"SOURCE_ROW_NUMBER":"2729863","VIOLATION_NO":"7251890","VIOLATION_ISSUE_DT":"03/22/2006","SIG_SUB":"N","PART_SECTION":"75.1103-4(a)(3)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"03/23/2006","PROPOSED_PENALTY":"60","AMOUNT_DUE":"60","AMOUNT_PAID":"0","CONTESTED_IND":"N","sourceDate":"2006-03-22"},{"SOURCE_ROW_NUMBER":"2729862","VIOLATION_NO":"7251889","VIOLATION_ISSUE_DT":"03/22/2006","SIG_SUB":"N","PART_SECTION":"75.1101-10","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"03/23/2006","PROPOSED_PENALTY":"60","AMOUNT_DUE":"60","AMOUNT_PAID":"0","CONTESTED_IND":"N","sourceDate":"2006-03-22"},{"SOURCE_ROW_NUMBER":"2729861","VIOLATION_NO":"7251888","VIOLATION_ISSUE_DT":"03/22/2006","SIG_SUB":"Y","PART_SECTION":"75.1100-2(b)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"03/23/2006","PROPOSED_PENALTY":"203","AMOUNT_DUE":"203","AMOUNT_PAID":"0","CONTESTED_IND":"N","sourceDate":"2006-03-22"}]}],"safety":{"href":"/api/v1/mines/4608523/safety","description":"Full-period safety series, top CFR sections and paginated activity. Requires PostgreSQL."},"silica":{"href":"/api/v1/mines/4608523/silica","description":"Dedicated silica records, measurements, sample status and trends. Defaults to the snapshot year; use year=all for history."},"externalContext":{"eia":null,"title30":{"snapshot":{"chapterCount":6,"featuredSectionCount":100,"latestAmendedOn":"2026-08-14","latestIssueDate":"2026-08-14","partCount":206,"sectionCount":5954,"upToDateAsOf":"2026-08-19"},"regulations":[{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.512","heading":"Electric equipment; examination, testing and maintenance.","id":"75.512","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-F/section-75.512","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"F","subpartHeading":"Subpart F—Electrical Equipment—General","text":"[Statutory Provision]\n\nAll electric equipment shall be frequently examined, tested, and properly maintained by a qualified person to assure safe operating conditions. When a potentially dangerous condition is found on electric equipment, such equipment shall be removed from service until such condition is corrected. A record of such examinations shall be kept and made available to an authorized representative of the Secretary and to the miners in such mine.\n\n[35 FR 17890, Nov. 20, 1970, as amended at 60 FR 33723, June 29, 1995]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.333","heading":"Ventilation controls.","id":"75.333","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.333","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a) For purposes of this section, “doors” include any door frames.\n\n(b) Permanent stoppings or other permanent ventilation control devices constructed after November 15, 1992, shall be built and maintained—\n\n(1) Between intake and return air courses, except temporary controls may be used in rooms that are 600 feet or less from the centerline of the entry from which the room was developed including where continuous face haulage systems are used in such rooms. Unless otherwise approved in the ventilation plan, these stoppings or controls shall be maintained to and including the third connecting crosscut outby the working face;\n\n(2) To separate belt conveyor haulageways from return air courses, except where belt entries in areas of mines developed before March 30, 1970, are used as return air courses;\n\n(3) To separate belt conveyor haulageways from intake air courses when the air in the intake air courses is used to provide air to active working places. Temporary ventilation controls may be used in rooms that are 600 feet or less from the centerline of the entry from which the rooms were developed including where continuous face haulage systems are used in such rooms. When continuous face haulage systems are used, permanent stoppings or other permanent ventilation control devices shall be built and maintained to the outby most point of travel of the dolly or 600 feet from the point of deepest penetration in the conveyor belt entry, whichever distance is closer to the point of deepest penetration, to separate the continuous haulage entry from the intake entries;\n\n(4) To separate the primary escapeway from belt and trolley haulage entries, as required by § 75.380(g). For the purposes of § 75.380(g), the loading point for a continuous haulage system shall be the outby most point of travel of the dolly or 600 feet from the point of deepest penetration, whichever distance is less; and\n\n(5) In return air courses to direct air into adjacent worked-out areas.\n\n(c) Personnel doors shall be constructed of noncombustible material and shall be of sufficient strength to serve their intended purpose of maintaining separation and permitting travel between air courses, and shall be installed as follows in permanent stoppings constructed after November 15, 1992:\n\n(1) The distance between personnel doors shall be no more than 300 feet in seam heights below 48 inches and 600 feet in seam heights 48 inches or higher.\n\n(2) The location of all personnel doors in stoppings along escapeways shall be clearly marked so that the doors may be easily identified by anyone traveling in the escapeway and in the entries on either side of the doors.\n\n(3) When not in use, personnel doors shall be closed.\n\n(4) An airlock shall be established where the air pressure differential between air courses creates a static force exceeding 125 pounds on closed personnel doors along escapeways.\n\n(d) Doors, other than personnel doors, constructed after November 15, 1992, that are used in lieu of permanent stoppings or to control ventilation within an air course shall be:\n\n(1) Made of noncombustible material or coated on all accessible surfaces with flame-retardant materials having a flame-spread index of 25 or less, as tested under ASTM E162-87, “Standard Test Method for Surface Flammability of Materials Using a Radiant Heat Energy Source.” This publication is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.\n\n(2) Of sufficient strength to serve their intended purpose of maintaining separation and permitting travel between or within air courses or entries.\n\n(3) Installed in pairs to form an airlock. When an airlock is used, one side of the airlock shall remain closed. When not in use, both sides shall be closed.\n\n(e)(1)(i) Except as provided in paragraphs (e)(2), (3), and (4) of this section, all overcasts, undercasts, shaft partitions, permanent stoppings, and regulators, installed after June 10, 1996, shall be constructed in a traditionally accepted method and of materials that have been demonstrated to perform adequately or in a method and of materials that have been tested and shown to have a minimum strength equal to or greater than the traditionally accepted in-mine controls. Tests may be performed under ASTM E72-80, “Standard Methods of Conducting Strength Tests of Panels for Building Construction” (Section 12-Transverse Load-Specimen Vertical, load, only), or the operator may conduct comparative in-mine tests. In-mine tests shall be designed to demonstrate the comparative strength of the proposed construction and a traditionally accepted in-mine control. The publication ASTM E72-80, “Standard Methods of Conducting Strength Tests of Panels for Building Construction,” is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.\n\n(ii) All overcasts, undercasts, shaft partitions, permanent stoppings, and regulators, installed after November 15, 1992, shall be constructed of noncombustible material. Materials that are suitable for the construction of overcasts, undercasts, shaft partitions, permanent stoppings, and regulators include concrete, concrete block, brick, cinder block, tile, or steel. No ventilation controls installed after November 15, 1992, shall be constructed of aluminum.\n\n(2) In anthracite mines, permanent stoppings may be constructed of overlapping layers of hardwood mine boards, if the stoppings are a minimum 2 inches thick.\n\n(3) When timbers are used to create permanent stoppings in heaving or caving areas, the stoppings shall be coated on all accessible surfaces with a flame-retardant material having a flame-spread index of 25 or less, as tested under ASTM E162-87, “Standard Test Method for Surface Flammability of Materials Using a Radiant Heat Energy Source.” This publication is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.\n\n(4) In anthracite mines, doors and regulators may be constructed of overlapping layers of hardwood boards, if the doors, door frames, and regulators are a minimum 2 inches thick.\n\n(f) When sealants are applied to ventilation controls, the sealant shall have a flame-spread index of 25 or less under ASTM E162-87, “Standard Test Method for Surface Flammability of Materials Using a Radiant Heat Energy Source.” This publication is incorporated by reference and may be inspected at any MSHA Coal Mine Safety and Health District Office, or at MSHA's Office of Standards, Regulations, and Variances, 200 Constitution Avenue NW, Washington, DC 20210; 202-693-9440; and at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html. In addition, copies of the document can be purchased from the American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA 19428-2959; 610-832-9500; http://www.astm.org. This incorporation by reference was approved by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51.\n\n(g) Before mining is discontinued in an entry or room that is advanced more than 20 feet from the inby rib, a crosscut shall be made or line brattice shall be installed and maintained to provide adequate ventilation. When conditions such as methane liberation warrant a distance less than 20 feet, the approved ventilation plan shall specify the location of such rooms or entries and the maximum distance they will be developed before a crosscut is made or line brattice is installed.\n\n(h) All ventilation controls, including seals, shall be maintained to serve the purpose for which they were built.\n\n[61 FR 9829, Mar. 11, 1996; 61 FR 20877, May 8, 1996; 61 FR 26442, May 28, 1996; 61 FR 29288, 29289, June 10, 1996, as amended at 67 FR 38386, June 4, 2002; 71 FR 16668, Apr. 3, 2006; 73 FR 80612, Dec. 31, 2008; 80 FR 52991, Sept. 2, 2015; 91 FR 9448, Feb. 26, 2026]","occurrenceCount":1},{"chapter":"I","heading":"Changes; notification by operator.","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-G/part-41/subpart-B/section-41.12","part":"41","subchapter":"G","subpart":"B","id":"41.12","citation":"30 CFR 41.12","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","subchapterHeading":"SUBCHAPTER G—FILING AND OTHER ADMINISTRATIVE REQUIREMENTS","partHeading":"PART 41—NOTIFICATION OF LEGAL IDENTITY","subpartHeading":"","text":null,"occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.364","heading":"Weekly examination.","id":"75.364","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.364","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a) Worked-out areas. (1) At least every 7 days, a certified person shall examine unsealed worked-out areas where no pillars have been recovered by traveling to the area of deepest penetration; measuring methane and oxygen concentrations and air quantities and making tests to determine if the air is moving in the proper direction in the area. The locations of measurement points where tests and measurements will be performed shall be included in the mine ventilation plan and shall be adequate in number and location to assure ventilation and air quality in the area. Air quantity measurements shall also be made where the air enters and leaves the worked-out area. An alternative method of evaluating the ventilation of the area may be approved in the ventilation plan.\n\n(2) At least every 7 days, a certified person shall evaluate the effectiveness of bleeder systems required by § 75.334 as follows:\n\n(i) Measurements of methane and oxygen concentrations and air quantity and a test to determine if the air is moving in its proper direction shall be made where air enters the worked-out area.\n\n(ii) Measurements of methane and oxygen concentrations and air quantity and a test to determine if the air is moving in the proper direction shall be made immediately before the air enters a return split of air.\n\n(iii) At least one entry of each set of bleeder entries used as part of a bleeder system under § 75.334 shall be traveled in its entirety. Measurements of methane and oxygen concentrations and air quantities and a test to determine if the air is moving in the proper direction shall be made at the measurement point locations specified in the mine ventilation plan to determine the effectiveness of the bleeder system.\n\n(iv) In lieu of the requirements of paragraphs (a)(2)(i) and (iii) of this section, an alternative method of evaluation may be specified in the ventilation plan provided the alternative method results in proper evaluation of the effectiveness of the bleeder system.\n\n(b) Hazardous conditions and violations of mandatory health or safety standards. At least every 7 days, an examination for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (b)(8) of this section shall be made by a certified person designated by the operator at the following locations:\n\n(1) In at least one entry of each intake air course, in its entirety, so that the entire air course is traveled.\n\n(2) In at least one entry of each return air course, in its entirety, so that the entire air course is traveled.\n\n(3) In each longwall or shortwall travelway in its entirety, so that the entire travelway is traveled.\n\n(4) At each seal along return and bleeder air courses and at each seal along intake air courses not examined under § 75.360(b)(5).\n\n(5) In each escapeway so that the entire escapeway is traveled.\n\n(6) On each working section not examined under § 75.360(b)(3) during the previous 7 days.\n\n(7) At each water pump not examined during a preshift examination conducted during the previous 7 days.\n\n(8) Weekly examinations shall include examinations to identify violations of the standards listed below:\n\n(i) §§ 75.202(a) and 75.220(a)(1)—roof control;\n\n(ii) §§ 75.333(h) and 75.370(a)(1)—ventilation, methane;\n\n(iii) §§ 75.400 and 75.403—accumulations of combustible materials and application of rock dust; and\n\n(iv) § 75.1403—maintenance of off track haulage roadways, and track haulage, track switches, and other components for haulage;\n\n(v) § 75.1722(a)—guarding moving machine parts; and\n\n(vi) § 75.1731(a)—maintenance of belt conveyor components.\n\n(c) Measurements and tests. At least every 7 days, a certified person shall—\n\n(1) Determine the volume of air entering the main intakes and in each intake split;\n\n(2) Determine the volume of air and test for methane in the last open crosscut in any pair or set of developing entries or rooms, in the return of each split of air immediately before it enters the main returns, and where the air leaves the main returns; and\n\n(3) Test for methane in the return entry nearest each set of seals immediately after the air passes the seals.\n\n(d) Hazardous conditions shall be corrected immediately. If the condition creates an imminent danger, everyone except those persons referred to in section 104(c) of the Act shall be withdrawn from the area affected to a safe area until the hazardous condition is corrected. Any violation of the nine mandatory health or safety standards found during a weekly examination shall be corrected.\n\n(e) The weekly examination may be conducted at the same time as the preshift or on-shift examinations.\n\n(f) (1) The weekly examination is not required during any 7 day period in which no one enters any underground area of the mine.\n\n(2) Except for certified persons required to make examinations, no one shall enter any underground area of the mine if a weekly examination has not been completed within the previous 7 days.\n\n(g) Certification. The person making the weekly examinations shall certify by initials, date, and the time that the examination was made. Certifications and times shall appear at enough locations to show that the entire area has been examined.\n\n(h) Recordkeeping. At the completion of any shift during which a portion of a weekly examination is conducted, a record of the results of each weekly examination, including a record of hazardous conditions and violations of the nine mandatory health or safety standards found during each examination and their locations, the corrective action taken, and the results and location of air and methane measurements, shall be made. The results of methane tests shall be recorded as the percentage of methane measured by the examiner. The record shall be made by the person making the examination or a person designated by the operator. If made by a person other than the examiner, the examiner shall verify the record by initials and date by or at the end of the shift for which the examination was made. The record shall be countersigned by the mine foreman or equivalent mine official by the end of the mine foreman's or equivalent mine official's next regularly scheduled working shift. The records required by this section shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.\n\n(i) Retention period. Records shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.\n\n[61 FR 9829, Mar. 11, 1996, as amended at 77 FR 20715, Apr. 6, 2012]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.1714-4","heading":"Additional self-contained self-rescuers (SCSRs).","id":"75.1714-4","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-R/section-75.1714-4","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"R","subpartHeading":"Subpart R—Miscellaneous","text":"(a) Additional SCSRs in work places. In addition to the requirements in §§ 75.1714, 75.1714-1, 75.1714-2, and 75.1714-3 of this part, the mine operator shall provide the following:\n\n(1) At least one additional SCSR, which provides protection for a period of one hour or longer, for each person at a fixed underground work location.\n\n(2) Additional SCSRs along the normal travel routes for pumpers, examiners, and other persons who do not have a fixed work location to be stored at a distance an average miner could walk in 30 minutes. The SCSR storage locations shall be determined by using one of the methods found under paragraph (c)(2) of this section.\n\n(b) Additional SCSRs on mantrips. If a mantrip or mobile equipment is used to enter or exit the mine, at least one additional SCSR, which provides protection for a period of one hour or longer, shall be available for each person who uses such transportation from portal to portal.\n\n(c) Additional SCSRs in escapeways. When each person underground cannot safely evacuate the mine within 30 minutes, the mine operator shall provide additional SCSRs stored in each required escapeway.\n\n(1) Each storage location shall contain at least one SCSR, which provides protection for a period of one hour or longer, for every person who will be inby that location.\n\n(2) Storage locations shall be spaced along each escapeway at 30-minute travel distances no greater than the distances determined by—\n\n(i) Calculating the distance an average miner walks in 30 minutes by using the time necessary for each miner in a sample of typical miners to walk a typical length of each escapeway; or\n\n(ii) Using the SCSR storage location spacing specified in the following table, except for escapeways with grades over 5 percent.\n\nAverage entry height Maximum distancebetween SCSR storage locations (in ft.) <40 in. (Crawl) 2,200 >40-<50 in. (Duck Walk) 3,300 >50-<65 in. (Walk Head Bent) 4,400 >65 in. (Walk Erect) 5,700\n\n(d) Additional SCSRs in hardened rooms. As an alternative to providing SCSR storage locations in each escapeway, the mine operator may store SCSRs in a hardened room located between adjacent escapeways.\n\n(1) The hardened room shall be designed and constructed to the same explosion force criteria as seals.\n\n(2) The hardened room shall include a means to provide independent, positive pressure ventilation from the surface during an emergency.\n\n(3) The District Manager shall approve the design and construction of hardened rooms in the ventilation plan.\n\n(4) These SCSR storage locations shall be spaced in accordance with paragraph (c) of this section.\n\n(e) Storage location accessibility. All SCSRs required under this section shall be stored according to the manufacturers' instructions, in conspicuous locations readily accessible by each person in the mine.\n\n(f) Storage location signs. A sign made of reflective material with the words “SCSRs” or “SELF-RESCUERS” shall be conspicuously posted at each storage location. Direction signs made of a reflective material shall be posted leading to each storage location.\n\n[71 FR 71454, Dec. 8, 2006]","occurrenceCount":1},{"chapter":"I","heading":"Mining methods.","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-C/section-75.203","part":"75","subchapter":"O","subpart":"C","id":"75.203","citation":"30 CFR 75.203","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subpartHeading":"","text":null,"occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.403","heading":"Maintenance of incombustible content of rock dust.","id":"75.403","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-E/section-75.403","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"E","subpartHeading":"Subpart E—Combustible Materials and Rock Dusting","text":"Where rock dust is required to be applied, it shall be distributed upon the top, floor, and sides of all underground areas of a coal mine and maintained in such quantities that the incombustible content of the combined coal dust, rock dust, and other dust shall be not less than 80 percent. Where methane is present in any ventilating current, the percent of incombustible content of such combined dust shall be increased 0.4 percent for each 0.1 percent of methane.\n\n[75 FR 57857, Sept. 23, 2010; 76 FR 35978, June 21, 2011]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.360","heading":"Preshift examination at fixed intervals.","id":"75.360","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.360","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a)(1) Except as provided in paragraph (a)(2) of this section, a certified person designated by the operator must make a preshift examination within 3 hours preceding the beginning of any 8-hour interval during which any person is scheduled to work or travel underground. No person other than certified examiners may enter or remain in any underground area unless a preshift examination has been completed for the established 8-hour interval. The operator must establish 8-hour intervals of time subject to the required preshift examinations.\n\n(2) Preshift examinations of areas where pumpers are scheduled to work or travel shall not be required prior to the pumper entering the areas if the pumper is a certified person and the pumper conducts an examination for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (b)(11) of this section, tests for methane and oxygen deficiency, and determines if the air is moving in its proper direction in the area where the pumper works or travels. The examination of the area must be completed before the pumper performs any other work. A record of all hazardous conditions and violations of the mandatory health or safety standards found by the pumper shall be made and retained in accordance with § 75.363 of this part.\n\n(b) The person conducting the preshift examination shall examine for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (b)(11) of this section, test for methane and oxygen deficiency, and determine if the air is moving in its proper direction at the following locations:\n\n(1) Roadways, travelways and track haulageways where persons are scheduled, prior to the beginning of the preshift examination, to work or travel during the oncoming shift.\n\n(2) Belt conveyors that will be used to transport persons during the oncoming shift and the entries in which these belt conveyors are located.\n\n(3) Working sections and areas where mechanized mining equipment is being installed or removed, if anyone is scheduled to work on the section or in the area during the oncoming shift. The scope of the examination shall include the working places, approaches to worked-out areas and ventilation controls on these sections and in these areas, and the examination shall include tests of the roof, face and rib conditions on these sections and in these areas.\n\n(4) Approaches to worked-out areas along intake air courses and at the entries used to carry air into worked-out areas if the intake air passing the approaches is used to ventilate working sections where anyone is scheduled to work during the oncoming shift. The examination of the approaches to the worked-out areas shall be made in the intake air course immediately inby and outby each entry used to carry air into the worked-out area. An examination of the entries used to carry air into the worked-out areas shall be conducted at a point immediately inby the intersection of each entry with the intake air course.\n\n(5) Seals along intake air courses where intake air passes by a seal to ventilate working sections where anyone is scheduled to work during the oncoming shift.\n\n(6)(i) Entries and rooms developed after November 15, 1992, and developed more than 2 crosscuts off an intake air course without permanent ventilation controls where intake air passes through or by these entries or rooms to reach a working section where anyone is scheduled to work during the oncoming shift; and,\n\n(ii) Entries and rooms developed after November 15, 1992, and driven more than 20 feet off an intake air course without a crosscut and without permanent ventilation controls where intake air passes through or by these entries or rooms to reach a working section where anyone is scheduled to work during the oncoming shift.\n\n(7) Areas where trolley wires or trolley feeder wires are to be or will remain energized during the oncoming shift.\n\n(8) High spots along intake air courses where methane is likely to accumulate, if equipment will be operated in the area during the shift.\n\n(9) Underground electrical installations referred to in § 75.340(a), except those pumps listed in § 75.340 (b)(2) through (b)(6), and areas where compressors subject to § 75.344 are installed if the electrical installation or compressor is or will be energized during the shift.\n\n(10) Other areas where work or travel during the oncoming shift is scheduled prior to the beginning of the preshift examination.\n\n(11) Preshift examinations shall include examinations to identify violations of the standards listed below:\n\n(i) §§ 75.202(a) and 75.220(a)(1)—roof control;\n\n(ii) §§ 75.333(h) and 75.370(a)(1)—ventilation, methane;\n\n(iii) §§ 75.400 and 75.403—accumulations of combustible materials and application of rock dust;\n\n(iv) § 75.1403—other safeguards, limited to maintenance of travelways along belt conveyors, off track haulage roadways, and track haulage, track switches, and other components for haulage;\n\n(v) § 75.1722(a)—guarding moving machine parts; and\n\n(vi) § 75.1731(a)—maintenance of belt conveyor components.\n\n(c) The person conducting the preshift examination shall determine the volume of air entering each of the following areas if anyone is scheduled to work in the areas during the oncoming shift:\n\n(1) In the last open crosscut of each set of entries or rooms on each working section and areas where mechanized mining equipment is being installed or removed. The last open crosscut is the crosscut in the line of pillars containing the permanent stoppings that separate the intake air courses and the return air courses.\n\n(2) On each longwall or shortwall in the intake entry or entries at the intake end of the longwall or shortwall face immediately outby the face and the velocity of air at each end of the face at the locations specified in the approved ventilation plan.\n\n(3) At the intake end of any pillar line—\n\n(i) If a single split of air is used, in the intake entry furthest from the return air course, immediately outby the first open crosscut outby the line of pillars being mined; or\n\n(ii) If a split system is used, in the intake entries of each split immediately inby the split point.\n\n(d) The person conducting the preshift examination shall check the refuge alternative for damage, the integrity of the tamper-evident seal and the mechanisms required to deploy the refuge alternative, and the ready availability of compressed oxygen and air.\n\n(e) The district manager may require the operator to examine other areas of the mine or examine for other hazards and violations of other mandatory health or safety standards found during the preshift examination.\n\n(f) Certification. At each working place examined, the person doing the preshift examination shall certify by initials, date, and the time, that the examination was made. In areas required to be examined outby a working section, the certified person shall certify by initials, date, and the time at enough locations to show that the entire area has been examined.\n\n(g) Recordkeeping. A record of the results of each preshift examination, including a record of hazardous conditions and violations of the nine mandatory health or safety standards and their locations found by the examiner during each examination, and of the results and locations of air and methane measurements, shall be made on the surface before any persons, other than certified persons conducting examinations required by this subpart, enter any underground area of the mine. The results of methane tests shall be recorded as the percentage of methane measured by the examiner. The record shall be made by the certified person who made the examination or by a person designated by the operator. If the record is made by someone other than the examiner, the examiner shall verify the record by initials and date by or at the end of the shift for which the examination was made. A record shall also be made by a certified person of the action taken to correct hazardous conditions and violations of mandatory health or safety standards found during the preshift examination. All preshift and corrective action records shall be countersigned by the mine foreman or equivalent mine official by the end of the mine foreman's or equivalent mine official's next regularly scheduled working shift. The records required by this section shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.\n\n(h) Retention period. Records shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.\n\n[61 FR 9829, Mar. 11, 1996, as amended at 61 FR 55527, Oct. 25, 1996; 62 FR 35085, June 30, 1997; 64 FR 45170, Aug. 19, 1999; 73 FR 80697, Dec. 31, 2008; 77 FR 20714, Apr. 6, 2012]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.220","heading":"Roof control plan.","id":"75.220","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-C/section-75.220","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"C","subpartHeading":"Subpart C—Roof Support","text":"(a)(1) Each mine operator shall develop and follow a roof control plan, approved by the District Manager, that is suitable to the prevailing geological conditions, and the mining system to be used at the mine. Additional measures shall be taken to protect persons if unusual hazards are encountered.\n\n(2) The proposed roof control plan and any revisions to the plan shall be submitted, in writing, to the District Manager. When revisions to a roof control plan are proposed, only the revised pages need to be submitted unless otherwise specified by the District Manager.\n\n(b)(1) The mine operator will be notified in writing of the approval or denial of approval of a proposed roof control plan or proposed revision.\n\n(2) When approval of a proposed plan or revision is denied, the deficiencies of the plan or revision and recommended changes will be specified and the mine operator will be afforded an opportunity to discuss the deficiencies and changes with the District Manager.\n\n(3) Before new support materials, devices or systems other than roof bolts and accessories, are used as the only means of roof support, the District Manager may require that their effectiveness be demonstrated by experimental installations.\n\n(c) No proposed roof control plan or revision to a roof control plan shall be implemented before it is approved.\n\n(d) Before implementing an approved revision to a roof control plan, all persons who are affected by the revision shall be instructed in its provisions.\n\n(e) The approved roof control plan and any revisions shall be available to the miners and representative of miners at the mine.\n\n[53 FR 2375, Jan. 27, 1988; 53 FR 11395, Apr. 6, 1988, as amended at 60 FR 33723, June 29, 1995; 71 FR 16668, Apr. 3, 2006]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.1103-4","heading":"Automatic fire sensor and warning device systems; installation; minimum requirements.","id":"75.1103-4","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-L/section-75.1103-4","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"L","subpartHeading":"Subpart L—Fire Protection","text":"(a) Effective December 31, 2009, automatic fire sensor and warning device systems that use carbon monoxide sensors shall provide identification of fire along all belt conveyors.\n\n(1) Carbon monoxide sensors shall be installed at the following locations:\n\n(i) Not more than 100 feet downwind of each belt drive unit, each tailpiece transfer point, and each belt take-up. If the belt drive, tailpiece, and/or take-up for a single transfer point are installed together in the same air course, and the distance between the units is less than 100 feet, they may be monitored with one sensor downwind of the last component. If the distance between the units exceeds 100 feet, additional sensors are required downwind of each belt drive unit, each tailpiece transfer point, and each belt take-up;\n\n(ii) Not more than 100 feet downwind of each section loading point;\n\n(iii) Along the belt entry so that the spacing between sensors does not exceed 1,000 feet. Where air velocities are less than 50 feet per minute, spacing must not exceed 350 feet; and\n\n(iv) The mine operator shall indicate the locations of all carbon monoxide sensors on the mine maps required by §§ 75.1200 and 75.1505 of this part.\n\n(2) Where used, sensors responding to radiation, smoke, gases, or other indications of fire, shall be spaced at regular intervals to provide protection equivalent to carbon monoxide sensors, and installed within the time specified in paragraph (a)(3) of this section.\n\n(3) When the distance from the tailpiece at loading points to the first outby sensor reaches the spacing requirements in § 75.1103-4(a)(1)(iii), an additional sensor shall be installed and put in operation within 24 production shift hours. When sensors of the kind described in paragraph (a)(2) of this section are used, they shall be installed and put in operation within 24 production shift hours after the equivalent distance which has been established for the sensor from the tailpiece at loading points to the first outby sensor is first reached.\n\n(b) Automatic fire sensor and warning device systems shall be installed so as to minimize the possibility of damage from roof falls and the moving belt and its load. Sensors must be installed near the center in the upper third of the entry, in a manner that does not expose personnel working on the system to unsafe conditions. Sensors must not be located in abnormally high areas or in other locations where air flow patterns do not permit products of combustion to be carried to the sensors.\n\n(c) Infrared, ultraviolet, and other sensors whose effectiveness is impaired by contamination shall be protected from dust, dirt, and moisture.\n\n(d) The voltage of automatic fire sensor and warning device systems shall not exceed 120 volts.\n\n(e) Except when power must be cut off in the mine under the provisions of § 75.313, automatic fire sensor and warning device systems shall be capable of giving warning of fire for a minimum of 4 hours after the source of power to the belt is removed unless the belt haulageway is examined for hot rollers and fire as provided in paragraph (e) (1) or (2) of this section.\n\n(1) When an unplanned removal of power from the belt occurs an examination for hot rollers and fire in the operating belts of a conveyor system shall be completed within 2 hours after the belt has stopped.\n\n(2) When a preplanned removal of power from the belt occurs an examination for hot rollers and fire on the operating belts of a conveyor system may commence not more than 30 minutes before the belts are stopped and shall be completed within 2 hours after the examination is commenced, or the examination shall be commenced when the belts are stopped and completed within 2 hours after the belts are stopped.\n\n[37 FR 16545, Aug. 16, 1972, as amended at 57 FR 20928, May 15, 1992; 73 FR 80614, Dec. 31, 2008]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.1101-10","heading":"Water sprinkler systems; fire warning devices at belt drives.","id":"75.1101-10","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-L/section-75.1101-10","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"L","subpartHeading":"Subpart L—Fire Protection","text":"Each water sprinkler system shall be equipped with a device designed to stop the belt drive in the event of a rise in temperature and each such warning device shall be capable of giving both an audible and visual warning when a fire occurs.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.1100-2","heading":"Quantity and location of firefighting equipment.","id":"75.1100-2","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-L/section-75.1100-2","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"L","subpartHeading":"Subpart L—Fire Protection","text":"(a) Working sections. (1) Each working section of coal mines producing 300 tons or more per shift shall be provided with two portable fire extinguishers and 240 pounds of rock dust in bags or other suitable containers; waterlines shall extend to each section loading point and be equipped with enough fire hose to reach each working face unless the section loading point is provided with one of the following:\n\n(i) Two portable water cars; or\n\n(ii) Two portable chemical cars; or\n\n(iii) One portable water car or one portable chemical car, and either (a) a portable foam-generating machine or (b) a portable high-pressure rock-dusting machine fitted with at least 250 feet of hose and supplied with at least 60 sacks of rock dust.\n\n(2) Each working section of coal mines producing less than 300 tons of coal per shift shall be provided with the following:\n\n(i) Two portable fire extinguishers; and\n\n(ii) 240 pounds of rock dust in bags or other suitable containers; and\n\n(iii) At least 500 gallons of water and at least three pails of 10-quart capacity; or a waterline with sufficient hose to reach the working places; or a portable water car of at least 500-gallons capacity; or a portable, all-purpose, dry-powder chemical car of at least 125-pounds capacity.\n\n(3) As an alternative to paragraph (a)(2) of this section, each working section with no electrical equipment at the face of an anthracite coal mine producing less than 300 tons of coal per shift shall be provided with the following:\n\n(i) Portable fire extinguishers containing a total capacity of at least 30 pounds of dry chemical or 15 gallons of foam and located at the entrance to the gangway at the bottom of the slope; and\n\n(ii) Portable fire extinguishers containing a total capacity of at least 20 pounds of dry chemical or 10 gallons of foam and located within 500 feet from the working face.\n\n(b) Belt conveyors. In all coal mines, waterlines shall be installed parallel to the entire length of belt conveyors and shall be equipped with firehose outlets with valves at 300-foot intervals along each belt conveyor and at tailpieces. At least 500 feet of firehose with fittings suitable for connection with each belt conveyor waterline system shall be stored at strategic locations along the belt conveyor. Waterlines may be installed in entries adjacent to the conveyor entry belt as long as the outlets project into the belt conveyor entry.\n\n(c) Haulage tracks. (1) In mines producing 300 tons of coal or more per shift waterlines shall be installed parallel to all haulage tracks using mechanized equipment in the track or adjacent entry and shall extend to the loading point of each working section. Waterlines shall be equipped with outlet valves at intervals of not more than 500 feet, and 500 feet of firehose with fittings suitable for connection with such waterlines shall be provided at strategic locations. Two portable water cars, readily available, may be used in lieu of waterlines prescribed under this paragraph.\n\n(2) In mines producing less than 300 tons of coal per shift, there shall be provided at 500-foot intervals in all main and secondary haulage roads:\n\n(i) A tank of water of at least 55-gallon capacity with at least 3 pails of not less than 10-quart capacity; or\n\n(ii) Not less than 240 pounds of bagged rock dust.\n\n(d) Transportation. Each track or off-track locomotive, self-propelled man-trip car, or personnel carrier shall be equipped with one portable fire extinguisher.\n\n(e) Electrical installations. At each electrical installation, the operator shall provide two portable fire extinguishers that have a nominal capacity of 5 pounds of dry chemical, or one extinguisher that has a nominal capacity of at least 10 pounds of dry chemical, and which have a 2-A:10-B:C or higher rating.\n\n(f) Oil storage stations. Two portable fire extinguishers and 240 pounds of rock dust, shall be provided at each permanent underground oil storage station. One portable fire extinguisher shall be provided at each working section where 25 gallons or more of oil are stored in addition to extinguishers required under paragraph (a) of this section.\n\n(g) Welding, cutting, soldering. One portable fire extinguisher or 240 pounds of rock dust shall be provided at locations where welding, cutting, or soldering with arc or flame is being done.\n\n(h) Powerlines. At each wooden door through which powerlines pass there shall be one portable fire extinguisher or 240 pounds of rock dust within 25 feet of the door on the intake air side.\n\n(i) Emergency materials. (1) At each mine producing 300 tons of coal or more per shift there shall be readily available the following materials at locations not exceeding 2 miles from each working section:\n\n1,000 board feet of brattice boards 2 rolls of brattice cloth 2 hand saws 25 pounds of 8 d nails 25 pounds of 10 d nails 25 pounds of 16 d nails 3 claw hammers 25 bags of wood fiber plaster or 10 bags of cement (or equivalent material for stoppings) 5 tons of rock dust\n\n(2) At each mine producing less than 300 tons of coal per shift the above materials shall be available at the mine, provided, however, that the emergency materials for one or more mines may be stored at a central warehouse or building supply company and such supply must be the equivalent of that required for all mines involved and within 1-hour's delivery time from each mine. This exception shall not apply where the active working sections are more than 2 miles from the surface.\n\n[35 FR 17890, Nov. 20, 1970, as amended at 73 FR 53127, Sept. 15, 2008]","occurrenceCount":1}],"fullCorpus":"/data/title30-sections.json"}}},"meta":{"representation":"json","mineId":"4608523","dataSource":"postgres","snapshotId":"2026-10-17T05:35:58.500035+00:00","completedAt":"2026-10-17T06:17:15.228Z","sourceCount":20,"totalRows":15450873}}