# Relationship history for MSHA mine 4605456

Current hierarchy: **Mc Clung Harold C → Cool Ridge Mining → Cool Ridge No 1 Surface**

- Valid-time bounds: inclusive, date granularity
- Null end: open-ended in the upstream history row; not independent proof of present control
- Transaction-time observation: 2026-10-13T11:19:05.459773+00:00

## Valid-time edges

- **operator_operates_mine:** Cool Ridge Mining → Cool Ridge No 1 Surface; 1977-03-01 to current/open; source msha-controller-operator-history
- **controller_controls_mine:** Mc Clung Harold C → Cool Ridge No 1 Surface; 1977-03-01 to current/open; source msha-controller-operator-history
- **controller_controls_operator:** Mc Clung Harold C → Cool Ridge Mining; 1977-03-01 to current/open; source msha-controller-operator-history
