{"data":{"schemaVersion":"realm.mine-profile.v1","generatedAt":"2026-10-13T11:26:59.401Z","identity":{"mine_id":"4407183","name":"The Banner Mine","status":"Abandoned and Sealed","status_date":"2009-09-30","mine_type":"Underground","coal_metal":"C","commodity":"Coal (Bituminous)","state":"VA","county":"Russell","nearest_town":"Honaker","operator_id":"0052677","operator_name":"Omega Mining Inc","controller_id":"C04140","controller_name":"(Harold) Lynn  Keene; Larry  Stinson","district":"C05","office":"Vansant VA Field Office","employees":0,"latitude":37.074166,"longitude":-81.979444},"coverage":{"contributingSources":16,"registeredSources":20,"sourceRows":504},"relationships":{"schemaVersion":"realm.temporal-relationships.v1","temporalSemantics":{"validTime":{"granularity":"date","bounds":"inclusive","nullStart":"start date not published in the upstream history row","nullEnd":"open-ended in the upstream history row; not independent proof of present control"},"transactionTime":{"observedAt":"2026-10-13T11:19:05.459773+00:00","meaning":"time the checksum-addressed MDRS artifacts were observed by the PostgreSQL ingestion"},"derivation":{"controllerControlsOperator":"intersection of controller and operator valid-time intervals evidenced through this mine","currentIdentity":"current controller and operator are asserted only by the MDRS Mines snapshot"}},"current":{"mine":{"type":"mine","id":"4407183","name":"The Banner Mine"},"operator":{"type":"operator","id":"0052677","name":"Omega Mining Inc"},"controller":{"type":"controller","id":"C04140","name":"(Harold) Lynn  Keene; Larry  Stinson"},"source":{"datasetId":"msha-mines","observedAt":"2026-10-13T11:19:05.459773+00:00"}},"edges":[{"type":"controller_controls_mine","subject":{"type":"controller","id":"C04140","name":"(Harold) Lynn  Keene et al"},"object":{"type":"mine","id":"4407183","name":"The Banner Mine"},"validFrom":"2004-06-08","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4407183|C04140|2004-06-08|"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"0052677","name":"Omega Mining Inc"},"object":{"type":"mine","id":"4407183","name":"The Banner Mine"},"validFrom":"2006-08-16","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4407183|0052677|2006-08-16|"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C04140","name":"(Harold) Lynn  Keene et al"},"object":{"type":"operator","id":"0052677","name":"Omega Mining Inc"},"validFrom":"2006-08-16","validTo":null,"current":true,"derived":true,"evidenceMineId":"4407183","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4407183|0052677|2006-08-16|C04140|2004-06-08|64927"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C04140","name":"Larry  Stinson et al"},"object":{"type":"operator","id":"0052677","name":"Omega Mining Inc"},"validFrom":"2006-08-16","validTo":null,"current":true,"derived":true,"evidenceMineId":"4407183","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4407183|0052677|2006-08-16|C04140|2004-06-08|64928"}}],"coverage":{"historyRecords":2,"edgeCount":4,"intervalAnomalies":0,"sourceDatasetId":"msha-controller-operator-history"}},"sources":[{"id":"msha-accidents","name":"Accident, Injuries, and Illnesses","domains":["safety","contractors"],"products":["incident trends","severity rates","equipment patterns","peer denominators"],"rowCount":1,"firstDate":"2007-01-24","lastDate":"2007-01-24","metrics":{"daysLost":0,"injuries":0,"fatalities":0,"recentRows":0,"restrictedDays":0,"contractorRecords":0},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"153892","DOCUMENT_NO":"220071580028","ACCIDENT_DT":"01/24/2007","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FIRE","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","DAYS_LOST":"0","NARRATIVE":"Fire was set and belt burned.","sourceDate":"2007-01-24"}]},{"id":"msha-addresses","name":"Addresses of Record","domains":["identity","logistics"],"products":["entity resolution","address history","facility geocoding"],"rowCount":1,"firstDate":"2009-09-30","lastDate":"2009-09-30","metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-assessed-violations","name":"Assessed Violations","domains":["compliance","legal"],"products":["penalty lifecycle","paid and outstanding amounts","assessment aging"],"rowCount":125,"firstDate":"2007-02-15","lastDate":"2009-05-12","metrics":{"ss":29,"delinquent":125,"recentRows":0,"paidPenalty":16972,"proposedPenalty":17556,"currentAssessment":16972},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"1337623","VIOLATION_NO":"8162432","ISSUE_DT":"05/12/2009","CFR_STANDARD_CD":"75.502","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2009-05-12"},{"SOURCE_ROW_NUMBER":"1346938","VIOLATION_NO":"8161065","ISSUE_DT":"11/19/2008","CFR_STANDARD_CD":"75.1100-2(e)(2)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2008-11-19"},{"SOURCE_ROW_NUMBER":"1346937","VIOLATION_NO":"8161064","ISSUE_DT":"11/19/2008","CFR_STANDARD_CD":"75.1722(b)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2008-11-19"},{"SOURCE_ROW_NUMBER":"1346936","VIOLATION_NO":"8161063","ISSUE_DT":"11/19/2008","CFR_STANDARD_CD":"75.606","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2008-11-19"},{"SOURCE_ROW_NUMBER":"1334492","VIOLATION_NO":"8157635","ISSUE_DT":"10/30/2008","CFR_STANDARD_CD":"75.362(c)(4)(ii)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2008-10-30"},{"SOURCE_ROW_NUMBER":"1334491","VIOLATION_NO":"8157634","ISSUE_DT":"10/30/2008","CFR_STANDARD_CD":"75.606","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2008-10-30"},{"SOURCE_ROW_NUMBER":"1336754","VIOLATION_NO":"6641082","ISSUE_DT":"10/22/2008","CFR_STANDARD_CD":"72.630(b)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2008-10-22"},{"SOURCE_ROW_NUMBER":"1336753","VIOLATION_NO":"6641081","ISSUE_DT":"10/22/2008","CFR_STANDARD_CD":"75.400","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2008-10-22"},{"SOURCE_ROW_NUMBER":"1336752","VIOLATION_NO":"6641080","ISSUE_DT":"10/22/2008","CFR_STANDARD_CD":"75.360(f)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2008-10-22"},{"SOURCE_ROW_NUMBER":"1336751","VIOLATION_NO":"6641079","ISSUE_DT":"10/22/2008","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2008-10-22"},{"SOURCE_ROW_NUMBER":"1336750","VIOLATION_NO":"6641078","ISSUE_DT":"10/22/2008","CFR_STANDARD_CD":"75.1715","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2008-10-22"},{"SOURCE_ROW_NUMBER":"1336749","VIOLATION_NO":"6640870","ISSUE_DT":"10/16/2008","CFR_STANDARD_CD":"75.503","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"108.00","CURRENT_ASSESSMENT_AMT":"108.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2008-10-16"}]},{"id":"msha-civil-penalty-dockets-decisions","name":"Civil Penalty Dockets and Decisions","domains":["compliance","legal"],"products":["docket lineage","decision outcomes","citation packet precedent"],"rowCount":36,"firstDate":"2008-11-04","lastDate":"2009-11-18","metrics":{"appeals":0,"decisions":36,"recentRows":0,"decisionPenalty":4398,"originalPenalty":4982},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"24351","VIOLATION_NO":"6631794","DOCKET_NO":"VA 2008-324","DECISION_DT":"11/18/2009","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"100.00","DECISION_PENALTY_AMT":"100.00","JUDGE_FIRST_NAME":"Gary","JUDGE_LAST_NAME":"Melick","sourceDate":"2009-11-18"},{"SOURCE_ROW_NUMBER":"221684","VIOLATION_NO":"6628757","DOCKET_NO":"VA 2008-325","DECISION_DT":"11/03/2009","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"150.00","DECISION_PENALTY_AMT":"127.00","JUDGE_FIRST_NAME":"Robert","JUDGE_LAST_NAME":"Lesnick","sourceDate":"2009-11-03"},{"SOURCE_ROW_NUMBER":"221525","VIOLATION_NO":"6631795","DOCKET_NO":"VA 2008-325","DECISION_DT":"11/03/2009","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"263.00","DECISION_PENALTY_AMT":"118.00","JUDGE_FIRST_NAME":"Robert","JUDGE_LAST_NAME":"Lesnick","sourceDate":"2009-11-03"},{"SOURCE_ROW_NUMBER":"221524","VIOLATION_NO":"6628642","DOCKET_NO":"VA 2008-325","DECISION_DT":"11/03/2009","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"392.00","DECISION_PENALTY_AMT":"334.00","JUDGE_FIRST_NAME":"Robert","JUDGE_LAST_NAME":"Lesnick","sourceDate":"2009-11-03"},{"SOURCE_ROW_NUMBER":"221523","VIOLATION_NO":"6628634","DOCKET_NO":"VA 2008-325","DECISION_DT":"11/03/2009","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"127.00","DECISION_PENALTY_AMT":"127.00","JUDGE_FIRST_NAME":"Robert","JUDGE_LAST_NAME":"Lesnick","sourceDate":"2009-11-03"},{"SOURCE_ROW_NUMBER":"221401","VIOLATION_NO":"6632065","DOCKET_NO":"VA 2008-325","DECISION_DT":"11/03/2009","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"100.00","DECISION_PENALTY_AMT":"100.00","JUDGE_FIRST_NAME":"Robert","JUDGE_LAST_NAME":"Lesnick","sourceDate":"2009-11-03"},{"SOURCE_ROW_NUMBER":"221144","VIOLATION_NO":"6632063","DOCKET_NO":"VA 2008-325","DECISION_DT":"11/03/2009","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"100.00","DECISION_PENALTY_AMT":"100.00","JUDGE_FIRST_NAME":"Robert","JUDGE_LAST_NAME":"Lesnick","sourceDate":"2009-11-03"},{"SOURCE_ROW_NUMBER":"221143","VIOLATION_NO":"6631793","DOCKET_NO":"VA 2008-325","DECISION_DT":"11/03/2009","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"100.00","DECISION_PENALTY_AMT":"100.00","JUDGE_FIRST_NAME":"Robert","JUDGE_LAST_NAME":"Lesnick","sourceDate":"2009-11-03"},{"SOURCE_ROW_NUMBER":"220974","VIOLATION_NO":"6628635","DOCKET_NO":"VA 2008-325","DECISION_DT":"11/03/2009","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"127.00","DECISION_PENALTY_AMT":"100.00","JUDGE_FIRST_NAME":"Robert","JUDGE_LAST_NAME":"Lesnick","sourceDate":"2009-11-03"},{"SOURCE_ROW_NUMBER":"220899","VIOLATION_NO":"6628648","DOCKET_NO":"VA 2008-325","DECISION_DT":"11/03/2009","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"100.00","DECISION_PENALTY_AMT":"100.00","JUDGE_FIRST_NAME":"Robert","JUDGE_LAST_NAME":"Lesnick","sourceDate":"2009-11-03"},{"SOURCE_ROW_NUMBER":"220898","VIOLATION_NO":"6628645","DOCKET_NO":"VA 2008-325","DECISION_DT":"11/03/2009","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"334.00","DECISION_PENALTY_AMT":"224.00","JUDGE_FIRST_NAME":"Robert","JUDGE_LAST_NAME":"Lesnick","sourceDate":"2009-11-03"},{"SOURCE_ROW_NUMBER":"24499","VIOLATION_NO":"6631653","DOCKET_NO":"VA 2008-325","DECISION_DT":"11/03/2009","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"100.00","DECISION_PENALTY_AMT":"100.00","JUDGE_FIRST_NAME":"Robert","JUDGE_LAST_NAME":"Lesnick","sourceDate":"2009-11-03"}]},{"id":"msha-coal-dust-samples","name":"Coal Dust Samples","domains":["health","safety"],"products":["respirable dust trends","CPDM coverage","void patterns","occupation exposure"],"rowCount":93,"firstDate":"2007-03-20","lastDate":"2008-12-08","metrics":{"recentRows":0,"cpdmSamples":0,"voidSamples":9,"validSamples":84,"maxConcentration":7.158,"concentrationTotal":94.048},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"649636","CASS_NUM":"50997000","SMP_TAKEN_DT":"12/8/2008","CONC":".723","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2008-12-08"},{"SOURCE_ROW_NUMBER":"1433982","CASS_NUM":"57774736","SMP_TAKEN_DT":"10/22/2008","CONC":".853","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2008-10-22"},{"SOURCE_ROW_NUMBER":"1318988","CASS_NUM":"57774725","SMP_TAKEN_DT":"10/22/2008","CONC":".245","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2008-10-22"},{"SOURCE_ROW_NUMBER":"1251523","CASS_NUM":"57774698","SMP_TAKEN_DT":"10/22/2008","CONC":".102","SMP_TYPE_CD_DESC":"DESIGNATED AREA","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2008-10-22"},{"SOURCE_ROW_NUMBER":"866619","CASS_NUM":"57774678","SMP_TAKEN_DT":"10/22/2008","CONC":".727","SMP_TYPE_CD_DESC":"DESIGNATED AREA","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2008-10-22"},{"SOURCE_ROW_NUMBER":"760449","CASS_NUM":"57774696","SMP_TAKEN_DT":"10/22/2008","CONC":"2.185","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER HELPER","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2008-10-22"},{"SOURCE_ROW_NUMBER":"640727","CASS_NUM":"57774684","SMP_TAKEN_DT":"10/22/2008","CONC":".017","SMP_TYPE_CD_DESC":"INTAKE AIR","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2008-10-22"},{"SOURCE_ROW_NUMBER":"620628","CASS_NUM":"57774718","SMP_TAKEN_DT":"10/22/2008","CONC":"1.17","SMP_TYPE_CD_DESC":"DESIGNATED AREA","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2008-10-22"},{"SOURCE_ROW_NUMBER":"185723","CASS_NUM":"57774689","SMP_TAKEN_DT":"10/22/2008","CONC":".241","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2008-10-22"},{"SOURCE_ROW_NUMBER":"863085","CASS_NUM":"50971439","SMP_TAKEN_DT":"10/20/2008","CONC":".713","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2008-10-20"},{"SOURCE_ROW_NUMBER":"654113","CASS_NUM":"50991913","SMP_TAKEN_DT":"10/17/2008","CONC":".238","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2008-10-17"},{"SOURCE_ROW_NUMBER":"434928","CASS_NUM":"50991870","SMP_TAKEN_DT":"10/16/2008","CONC":"1.41","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2008-10-16"}]},{"id":"msha-contested-violations","name":"Contested Violations","domains":["compliance","legal"],"products":["contest status","time to resolution","contested-rate context"],"rowCount":36,"firstDate":"2007-11-28","lastDate":"2008-05-07","metrics":{"decisions":36,"ssChanged":0,"recentRows":0,"decisionPenalty":4398,"proposedPenalty":4982},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"236870","CITATION_NO":"6631795","CITATION_ISSUE_DT":"05/07/2008","DOCKET_NO":"VA 2008-325","DECISION_DT":"11/03/2009","CFR_STANDARD_CODE":"75.1725(a)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"263.00","DECISION_PENALTY_AMT":"118.00","sourceDate":"2008-05-07"},{"SOURCE_ROW_NUMBER":"234780","CITATION_NO":"6631793","CITATION_ISSUE_DT":"05/07/2008","DOCKET_NO":"VA 2008-325","DECISION_DT":"11/03/2009","CFR_STANDARD_CODE":"75.507-1(a)","ORIGINAL_SIG_SUB_IND":"N","DECISION_SIG_SUB_IND":"N","PROPOSED_PENALTY_AMT":"100.00","DECISION_PENALTY_AMT":"100.00","sourceDate":"2008-05-07"},{"SOURCE_ROW_NUMBER":"122746","CITATION_NO":"6631794","CITATION_ISSUE_DT":"05/07/2008","DOCKET_NO":"VA 2008-324","DECISION_DT":"11/18/2009","CFR_STANDARD_CODE":"72.630(b)","ORIGINAL_SIG_SUB_IND":"N","DECISION_SIG_SUB_IND":"N","PROPOSED_PENALTY_AMT":"100.00","DECISION_PENALTY_AMT":"100.00","sourceDate":"2008-05-07"},{"SOURCE_ROW_NUMBER":"178123","CITATION_NO":"6632064","CITATION_ISSUE_DT":"04/30/2008","DOCKET_NO":"VA 2008-325","DECISION_DT":"11/03/2009","CFR_STANDARD_CODE":"75.1722(a)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"263.00","DECISION_PENALTY_AMT":"263.00","sourceDate":"2008-04-30"},{"SOURCE_ROW_NUMBER":"11165","CITATION_NO":"6632065","CITATION_ISSUE_DT":"04/30/2008","DOCKET_NO":"VA 2008-325","DECISION_DT":"11/03/2009","CFR_STANDARD_CODE":"75.370(a)(1)","ORIGINAL_SIG_SUB_IND":"N","DECISION_SIG_SUB_IND":"N","PROPOSED_PENALTY_AMT":"100.00","DECISION_PENALTY_AMT":"100.00","sourceDate":"2008-04-30"},{"SOURCE_ROW_NUMBER":"10233","CITATION_NO":"6632063","CITATION_ISSUE_DT":"04/30/2008","DOCKET_NO":"VA 2008-325","DECISION_DT":"11/03/2009","CFR_STANDARD_CODE":"75.220(a)(1)","ORIGINAL_SIG_SUB_IND":"N","DECISION_SIG_SUB_IND":"N","PROPOSED_PENALTY_AMT":"100.00","DECISION_PENALTY_AMT":"100.00","sourceDate":"2008-04-30"},{"SOURCE_ROW_NUMBER":"123450","CITATION_NO":"6628757","CITATION_ISSUE_DT":"04/25/2008","DOCKET_NO":"VA 2008-325","DECISION_DT":"11/03/2009","CFR_STANDARD_CODE":"75.403","ORIGINAL_SIG_SUB_IND":"N","DECISION_SIG_SUB_IND":"N","PROPOSED_PENALTY_AMT":"150.00","DECISION_PENALTY_AMT":"127.00","sourceDate":"2008-04-25"},{"SOURCE_ROW_NUMBER":"345521","CITATION_NO":"6628645","CITATION_ISSUE_DT":"03/17/2008","DOCKET_NO":"VA 2008-325","DECISION_DT":"11/03/2009","CFR_STANDARD_CODE":"75.1725(c)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"334.00","DECISION_PENALTY_AMT":"224.00","sourceDate":"2008-03-17"},{"SOURCE_ROW_NUMBER":"118939","CITATION_NO":"6628648","CITATION_ISSUE_DT":"03/17/2008","DOCKET_NO":"VA 2008-325","DECISION_DT":"11/03/2009","CFR_STANDARD_CODE":"75.1712-6(a)","ORIGINAL_SIG_SUB_IND":"N","DECISION_SIG_SUB_IND":"N","PROPOSED_PENALTY_AMT":"100.00","DECISION_PENALTY_AMT":"100.00","sourceDate":"2008-03-17"},{"SOURCE_ROW_NUMBER":"232146","CITATION_NO":"6628642","CITATION_ISSUE_DT":"03/14/2008","DOCKET_NO":"VA 2008-325","DECISION_DT":"11/03/2009","ORIGINAL_SIG_SUB_IND":"N","DECISION_SIG_SUB_IND":"N","PROPOSED_PENALTY_AMT":"392.00","DECISION_PENALTY_AMT":"334.00","sourceDate":"2008-03-14"},{"SOURCE_ROW_NUMBER":"344655","CITATION_NO":"6628635","CITATION_ISSUE_DT":"03/07/2008","DOCKET_NO":"VA 2008-325","DECISION_DT":"11/03/2009","CFR_STANDARD_CODE":"75.364(b)(2)","ORIGINAL_SIG_SUB_IND":"N","DECISION_SIG_SUB_IND":"N","PROPOSED_PENALTY_AMT":"127.00","DECISION_PENALTY_AMT":"100.00","sourceDate":"2008-03-07"},{"SOURCE_ROW_NUMBER":"118153","CITATION_NO":"6628634","CITATION_ISSUE_DT":"03/07/2008","DOCKET_NO":"VA 2008-325","DECISION_DT":"11/03/2009","ORIGINAL_SIG_SUB_IND":"N","DECISION_SIG_SUB_IND":"N","PROPOSED_PENALTY_AMT":"127.00","DECISION_PENALTY_AMT":"127.00","sourceDate":"2008-03-07"}]},{"id":"msha-contractor-production-quarterly","name":"Contractor Employment and Production — Quarterly","domains":["contractors","production","safety"],"products":["contractor exposure denominator","productivity","presence windows"],"rowCount":1,"firstDate":null,"lastDate":null,"metrics":{"linkedContractors":1,"notMineAttributable":1},"periods":{},"recentRecords":[]},{"id":"msha-contractor-production-yearly","name":"Contractor Employment and Production — Yearly","domains":["contractors","production","safety"],"products":["long-run contractor trend","annual denominator reconciliation"],"rowCount":1,"firstDate":null,"lastDate":null,"metrics":{"linkedContractors":1,"notMineAttributable":1},"periods":{},"recentRecords":[]},{"id":"msha-controller-operator-history","name":"Controller and Operator History","domains":["identity","compliance"],"products":["historical ownership attribution","operator transitions","valid-time joins"],"rowCount":2,"firstDate":"2006-08-16","lastDate":"2006-08-16","metrics":{"recentRows":0,"currentOperatorTenures":2,"completedOperatorTenures":0},"periods":{},"recentRecords":[]},{"id":"msha-inspections","name":"Inspections","domains":["safety","compliance"],"products":["inspection mix","on-site hours","event context","citation rate denominator"],"rowCount":33,"firstDate":"2006-09-13","lastDate":"2009-07-01","metrics":{"inspectors":58,"recentRows":0,"onSiteHours":694,"inspectionHours":1240.75,"inspectionSamples":77},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"305450","EVENT_NO":"4403853","INSPECTION_BEGIN_DT":"07/01/2009","INSPECTION_END_DT":"07/01/2009","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"7.5","SUM_TOTAL_ON_SITE_HOURS":"3","sourceDate":"2009-07-01"},{"SOURCE_ROW_NUMBER":"320137","EVENT_NO":"4403844","INSPECTION_BEGIN_DT":"05/11/2009","INSPECTION_END_DT":"05/12/2009","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"9","SUM_TOTAL_ON_SITE_HOURS":"4.5","sourceDate":"2009-05-11"},{"SOURCE_ROW_NUMBER":"622345","EVENT_NO":"4403762","INSPECTION_BEGIN_DT":"03/03/2009","INSPECTION_END_DT":"03/04/2009","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"7.5","SUM_TOTAL_ON_SITE_HOURS":"3","sourceDate":"2009-03-03"},{"SOURCE_ROW_NUMBER":"77168","EVENT_NO":"4403213","INSPECTION_BEGIN_DT":"12/09/2008","INSPECTION_END_DT":"12/09/2008","ACTIVITY_CODE":"E16","ACTIVITY":"Spot Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"6","SUM_TOTAL_ON_SITE_HOURS":"2.5","sourceDate":"2008-12-09"},{"SOURCE_ROW_NUMBER":"1077992","EVENT_NO":"4406614","INSPECTION_BEGIN_DT":"11/18/2008","INSPECTION_END_DT":"11/19/2008","ACTIVITY_CODE":"E16","ACTIVITY":"Spot Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"14.25","SUM_TOTAL_ON_SITE_HOURS":"10.75","sourceDate":"2008-11-18"},{"SOURCE_ROW_NUMBER":"831497","EVENT_NO":"4403211","INSPECTION_BEGIN_DT":"10/30/2008","INSPECTION_END_DT":"10/30/2008","ACTIVITY_CODE":"E16","ACTIVITY":"Spot Inspection","NBR_INSPECTOR":"2","SUM_TOTAL_INSP_HOURS":"20","SUM_TOTAL_ON_SITE_HOURS":"14","sourceDate":"2008-10-30"},{"SOURCE_ROW_NUMBER":"727882","EVENT_NO":"4403589","INSPECTION_BEGIN_DT":"10/01/2008","INSPECTION_END_DT":"11/13/2008","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"3","SUM_TOTAL_INSP_HOURS":"103.25","SUM_TOTAL_ON_SITE_HOURS":"68.25","sourceDate":"2008-10-01"},{"SOURCE_ROW_NUMBER":"874213","EVENT_NO":"4403574","INSPECTION_BEGIN_DT":"07/08/2008","INSPECTION_END_DT":"08/18/2008","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"4","SUM_TOTAL_INSP_HOURS":"146.5","SUM_TOTAL_ON_SITE_HOURS":"93.75","sourceDate":"2008-07-08"},{"SOURCE_ROW_NUMBER":"464240","EVENT_NO":"4403643","INSPECTION_BEGIN_DT":"06/27/2008","INSPECTION_END_DT":"06/27/2008","ACTIVITY_CODE":"E16","ACTIVITY":"Spot Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"7","SUM_TOTAL_ON_SITE_HOURS":"4","sourceDate":"2008-06-27"},{"SOURCE_ROW_NUMBER":"389493","EVENT_NO":"4403621","INSPECTION_BEGIN_DT":"06/06/2008","INSPECTION_END_DT":"06/06/2008","ACTIVITY_CODE":"E16","ACTIVITY":"Spot Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"7","SUM_TOTAL_ON_SITE_HOURS":"5","sourceDate":"2008-06-06"},{"SOURCE_ROW_NUMBER":"1068400","EVENT_NO":"4403030","INSPECTION_BEGIN_DT":"04/24/2008","INSPECTION_END_DT":"05/01/2008","ACTIVITY_CODE":"E16","ACTIVITY":"Spot Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"5.5","SUM_TOTAL_ON_SITE_HOURS":"1.5","sourceDate":"2008-04-24"},{"SOURCE_ROW_NUMBER":"472882","EVENT_NO":"4403567","INSPECTION_BEGIN_DT":"04/24/2008","INSPECTION_END_DT":"06/05/2008","ACTIVITY_CODE":"E01","ACTIVITY":"Regular Safety and Health Inspection","NBR_INSPECTOR":"5","SUM_TOTAL_INSP_HOURS":"148.5","SUM_TOTAL_ON_SITE_HOURS":"87.75","sourceDate":"2008-04-24"}]},{"id":"msha-mine-production-quarterly","name":"Mine Employment and Production — Quarterly","domains":["production","safety","compliance"],"products":["production trend","employee hours","rate denominators","seasonality"],"rowCount":22,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2009-Q3":{"hours":0,"employees":0,"production":0},"2009-Q2":{"hours":0,"employees":0,"production":0},"2009-Q1":{"hours":488,"employees":8,"production":668},"2008-Q4":{"hours":8597,"employees":13,"production":10586},"2008-Q3":{"hours":9074,"employees":13,"production":11911},"2008-Q2":{"hours":10955,"employees":16,"production":17056},"2008-Q1":{"hours":7407,"employees":12,"production":16754},"2007-Q4":{"hours":7008,"employees":12,"production":13690},"2007-Q3":{"hours":2826,"employees":9,"production":3486},"2007-Q2":{"hours":5250,"employees":9,"production":8156},"2007-Q1":{"hours":3651,"employees":6,"production":8828},"2006-Q4":{"hours":576,"employees":4,"production":918}},"recentRecords":[]},{"id":"msha-mine-production-yearly","name":"Mine Employment and Production — Yearly","domains":["production","safety","compliance"],"products":["annual trend","backfill","quarterly reconciliation"],"rowCount":4,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2006":{"hours":576,"employees":4,"production":918},"2007":{"hours":18735,"employees":9,"production":34160},"2008":{"hours":36033,"employees":14,"production":56307},"2009":{"hours":488,"employees":8,"production":668}},"recentRecords":[]},{"id":"msha-mines","name":"Mines","domains":["identity","production","logistics"],"products":["mine identity","status","commodity","location","operator and controller"],"rowCount":1,"firstDate":null,"lastDate":null,"metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-noise-samples","name":"Noise Samples","domains":["health","safety","equipment"],"products":["hearing exposure","machine and manufacturer patterns","occupation coverage"],"rowCount":14,"firstDate":"2007-09-13","lastDate":"2008-11-19","metrics":{"recentRows":0,"doseOver100":2,"actDoseTotal":967,"pelDoseTotal":694},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"210316","EVENT_NO":"4406614","SURVEY_DATE":"11/19/2008","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","MACHINE_CD":"37","MANUFACTURER_CD":"058","ACT_DOSE_85":"77","PEL_DOSE_90":"55","SURVEY_TYPE":"I","sourceDate":"2008-11-19"},{"SOURCE_ROW_NUMBER":"210315","EVENT_NO":"4406614","SURVEY_DATE":"11/19/2008","OCCUPATION_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","MACHINE_CD":"30","MANUFACTURER_CD":"039","ACT_DOSE_85":"118","PEL_DOSE_90":"95","SURVEY_TYPE":"I","sourceDate":"2008-11-19"},{"SOURCE_ROW_NUMBER":"210314","EVENT_NO":"4406614","SURVEY_DATE":"11/19/2008","OCCUPATION_CD_DESC":"SCOOP CAR OPERATOR","MACHINE_CD":"38","MANUFACTURER_CD":"098","ACT_DOSE_85":"62","PEL_DOSE_90":"41","SURVEY_TYPE":"I","sourceDate":"2008-11-19"},{"SOURCE_ROW_NUMBER":"210313","EVENT_NO":"4406614","SURVEY_DATE":"11/19/2008","OCCUPATION_CD_DESC":"CONTINUOUS MINER OPERATOR","MACHINE_CD":"06","MANUFACTURER_CD":"058","ACT_DOSE_85":"118","PEL_DOSE_90":"104","SURVEY_TYPE":"I","sourceDate":"2008-11-19"},{"SOURCE_ROW_NUMBER":"210312","EVENT_NO":"4402784","SURVEY_DATE":"12/11/2007","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","MACHINE_CD":"37","MANUFACTURER_CD":"058","ACT_DOSE_85":"51","PEL_DOSE_90":"30","SURVEY_TYPE":"I","sourceDate":"2007-12-11"},{"SOURCE_ROW_NUMBER":"210311","EVENT_NO":"4402784","SURVEY_DATE":"12/11/2007","OCCUPATION_CD_DESC":"ROOF BOLTER (MOUNTED) (RETURN SIDE)","MACHINE_CD":"30","MANUFACTURER_CD":"039","ACT_DOSE_85":"67","PEL_DOSE_90":"45","SURVEY_TYPE":"I","sourceDate":"2007-12-11"},{"SOURCE_ROW_NUMBER":"210310","EVENT_NO":"4402784","SURVEY_DATE":"12/11/2007","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","MACHINE_CD":"37","MANUFACTURER_CD":"058","ACT_DOSE_85":"48","PEL_DOSE_90":"29","SURVEY_TYPE":"I","sourceDate":"2007-12-11"},{"SOURCE_ROW_NUMBER":"210309","EVENT_NO":"4402784","SURVEY_DATE":"12/11/2007","OCCUPATION_CD_DESC":"ROOF BOLTER (MOUNTED) (INTAKE SIDE)","MACHINE_CD":"30","MANUFACTURER_CD":"039","ACT_DOSE_85":"63","PEL_DOSE_90":"44","SURVEY_TYPE":"I","sourceDate":"2007-12-11"},{"SOURCE_ROW_NUMBER":"210308","EVENT_NO":"4402784","SURVEY_DATE":"12/11/2007","OCCUPATION_CD_DESC":"CONTINUOUS MINER OPERATOR","MACHINE_CD":"06","MANUFACTURER_CD":"033","ACT_DOSE_85":"65","PEL_DOSE_90":"52","SURVEY_TYPE":"I","sourceDate":"2007-12-11"},{"SOURCE_ROW_NUMBER":"210307","EVENT_NO":"4402686","SURVEY_DATE":"09/13/2007","OCCUPATION_CD_DESC":"UTILITY MAN","MACHINE_CD":"38","MANUFACTURER_CD":"098","ACT_DOSE_85":"42","PEL_DOSE_90":"20","SURVEY_TYPE":"I","sourceDate":"2007-09-13"},{"SOURCE_ROW_NUMBER":"210306","EVENT_NO":"4402686","SURVEY_DATE":"09/13/2007","OCCUPATION_CD_DESC":"ROOF BOLTER (TWIN HEAD) (INTAKE SIDE)","MACHINE_CD":"30","MANUFACTURER_CD":"039","ACT_DOSE_85":"80","PEL_DOSE_90":"57","SURVEY_TYPE":"I","sourceDate":"2007-09-13"},{"SOURCE_ROW_NUMBER":"210305","EVENT_NO":"4402686","SURVEY_DATE":"09/13/2007","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","MACHINE_CD":"37","MANUFACTURER_CD":"058","ACT_DOSE_85":"52","PEL_DOSE_90":"33","SURVEY_TYPE":"I","sourceDate":"2007-09-13"}]},{"id":"msha-quartz-samples","name":"Quartz Samples — Coal","domains":["health","safety"],"products":["quartz exposure trends","occupation context","applicable-rule linkage"],"rowCount":7,"firstDate":"2007-12-11","lastDate":"2008-10-22","metrics":{"recentRows":0,"voidSamples":0,"maxQuartzPct":7.3,"validSamples":7,"quartzPctTotal":38.3},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"131060","CASSETTE_NO":"57774718","SAMPLE_DT":"10/22/2008","QUARTZ_PCT":"04.9","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2008-10-22"},{"SOURCE_ROW_NUMBER":"82227","CASSETTE_NO":"57774678","SAMPLE_DT":"10/22/2008","QUARTZ_PCT":"06.1","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2008-10-22"},{"SOURCE_ROW_NUMBER":"32399","CASSETTE_NO":"57774736","SAMPLE_DT":"10/22/2008","QUARTZ_PCT":"04.0","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2008-10-22"},{"SOURCE_ROW_NUMBER":"108581","CASSETTE_NO":"57743936","SAMPLE_DT":"08/07/2008","QUARTZ_PCT":"07.1","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2008-08-07"},{"SOURCE_ROW_NUMBER":"97226","CASSETTE_NO":"57743937","SAMPLE_DT":"08/07/2008","QUARTZ_PCT":"07.3","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2008-08-07"},{"SOURCE_ROW_NUMBER":"78951","CASSETTE_NO":"57743931","SAMPLE_DT":"08/07/2008","QUARTZ_PCT":"04.8","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2008-08-07"},{"SOURCE_ROW_NUMBER":"88776","CASSETTE_NO":"57683923","SAMPLE_DT":"12/11/2007","QUARTZ_PCT":"04.1","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2007-12-11"}]},{"id":"msha-violations","name":"Violations","domains":["compliance","safety","legal"],"products":["citation and order record","condition text","Title 30 linkage","abatement patterns"],"rowCount":127,"firstDate":"2007-01-24","lastDate":"2009-05-12","metrics":{"ss":29,"amountDue":16972,"contested":36,"amountPaid":16972,"recentRows":0,"section104d":0,"unterminated":0,"proposedPenalty":17556},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"2426350","VIOLATION_NO":"8162432","VIOLATION_ISSUE_DT":"05/12/2009","SIG_SUB":"N","PART_SECTION":"75.502","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"NoLikelihood","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"05/12/2009","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2009-05-12"},{"SOURCE_ROW_NUMBER":"2426391","VIOLATION_NO":"8161065","VIOLATION_ISSUE_DT":"11/19/2008","SIG_SUB":"N","PART_SECTION":"75.1100-2(e)(2)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"11/19/2008","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2008-11-19"},{"SOURCE_ROW_NUMBER":"2426390","VIOLATION_NO":"8161064","VIOLATION_ISSUE_DT":"11/19/2008","SIG_SUB":"N","PART_SECTION":"75.1722(b)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"11/19/2008","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2008-11-19"},{"SOURCE_ROW_NUMBER":"2426389","VIOLATION_NO":"8161063","VIOLATION_ISSUE_DT":"11/19/2008","SIG_SUB":"N","PART_SECTION":"75.606","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"11/19/2008","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2008-11-19"},{"SOURCE_ROW_NUMBER":"2426388","VIOLATION_NO":"8157635","VIOLATION_ISSUE_DT":"10/30/2008","SIG_SUB":"N","PART_SECTION":"75.362(c)(4)(ii)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"2","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"10/30/2008","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2008-10-30"},{"SOURCE_ROW_NUMBER":"2426387","VIOLATION_NO":"8157634","VIOLATION_ISSUE_DT":"10/30/2008","SIG_SUB":"N","PART_SECTION":"75.606","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"10/30/2008","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2008-10-30"},{"SOURCE_ROW_NUMBER":"2426386","VIOLATION_NO":"6641082","VIOLATION_ISSUE_DT":"10/22/2008","SIG_SUB":"N","PART_SECTION":"72.630(b)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"Permanent","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"10/22/2008","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2008-10-22"},{"SOURCE_ROW_NUMBER":"2426385","VIOLATION_NO":"6641081","VIOLATION_ISSUE_DT":"10/22/2008","SIG_SUB":"N","PART_SECTION":"75.400","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"10/22/2008","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2008-10-22"},{"SOURCE_ROW_NUMBER":"2426384","VIOLATION_NO":"6641080","VIOLATION_ISSUE_DT":"10/22/2008","SIG_SUB":"N","PART_SECTION":"75.360(f)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"10/22/2008","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2008-10-22"},{"SOURCE_ROW_NUMBER":"2426383","VIOLATION_NO":"6641079","VIOLATION_ISSUE_DT":"10/22/2008","SIG_SUB":"N","SECTION_OF_ACT":"316(b)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"8","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"10/22/2008","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2008-10-22"},{"SOURCE_ROW_NUMBER":"2426382","VIOLATION_NO":"6641078","VIOLATION_ISSUE_DT":"10/22/2008","SIG_SUB":"N","PART_SECTION":"75.1715","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"10/22/2008","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2008-10-22"},{"SOURCE_ROW_NUMBER":"2426381","VIOLATION_NO":"6640870","VIOLATION_ISSUE_DT":"10/16/2008","SIG_SUB":"N","PART_SECTION":"75.503","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"2","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"10/16/2008","PROPOSED_PENALTY":"108","AMOUNT_DUE":"108","AMOUNT_PAID":"108","CONTESTED_IND":"N","sourceDate":"2008-10-16"}]}],"safety":{"href":"/api/v1/mines/4407183/safety","description":"Full-period safety series, top CFR sections and paginated activity. Requires PostgreSQL."},"silica":{"href":"/api/v1/mines/4407183/silica","description":"Dedicated silica records, measurements, sample status and trends. Defaults to the snapshot year; use year=all for history."},"externalContext":{"eia":null,"title30":{"snapshot":{"chapterCount":6,"featuredSectionCount":100,"latestAmendedOn":"2026-08-14","latestIssueDate":"2026-08-14","partCount":206,"sectionCount":5954,"upToDateAsOf":"2026-08-19"},"regulations":[{"chapter":"I","heading":"Permits for noncompliance.","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-F/section-75.502","part":"75","subchapter":"O","subpart":"F","id":"75.502","citation":"30 CFR 75.502","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subpartHeading":"","text":null,"occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.1100-2","heading":"Quantity and location of firefighting equipment.","id":"75.1100-2","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-L/section-75.1100-2","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"L","subpartHeading":"Subpart L—Fire Protection","text":"(a) Working sections. (1) Each working section of coal mines producing 300 tons or more per shift shall be provided with two portable fire extinguishers and 240 pounds of rock dust in bags or other suitable containers; waterlines shall extend to each section loading point and be equipped with enough fire hose to reach each working face unless the section loading point is provided with one of the following:\n\n(i) Two portable water cars; or\n\n(ii) Two portable chemical cars; or\n\n(iii) One portable water car or one portable chemical car, and either (a) a portable foam-generating machine or (b) a portable high-pressure rock-dusting machine fitted with at least 250 feet of hose and supplied with at least 60 sacks of rock dust.\n\n(2) Each working section of coal mines producing less than 300 tons of coal per shift shall be provided with the following:\n\n(i) Two portable fire extinguishers; and\n\n(ii) 240 pounds of rock dust in bags or other suitable containers; and\n\n(iii) At least 500 gallons of water and at least three pails of 10-quart capacity; or a waterline with sufficient hose to reach the working places; or a portable water car of at least 500-gallons capacity; or a portable, all-purpose, dry-powder chemical car of at least 125-pounds capacity.\n\n(3) As an alternative to paragraph (a)(2) of this section, each working section with no electrical equipment at the face of an anthracite coal mine producing less than 300 tons of coal per shift shall be provided with the following:\n\n(i) Portable fire extinguishers containing a total capacity of at least 30 pounds of dry chemical or 15 gallons of foam and located at the entrance to the gangway at the bottom of the slope; and\n\n(ii) Portable fire extinguishers containing a total capacity of at least 20 pounds of dry chemical or 10 gallons of foam and located within 500 feet from the working face.\n\n(b) Belt conveyors. In all coal mines, waterlines shall be installed parallel to the entire length of belt conveyors and shall be equipped with firehose outlets with valves at 300-foot intervals along each belt conveyor and at tailpieces. At least 500 feet of firehose with fittings suitable for connection with each belt conveyor waterline system shall be stored at strategic locations along the belt conveyor. Waterlines may be installed in entries adjacent to the conveyor entry belt as long as the outlets project into the belt conveyor entry.\n\n(c) Haulage tracks. (1) In mines producing 300 tons of coal or more per shift waterlines shall be installed parallel to all haulage tracks using mechanized equipment in the track or adjacent entry and shall extend to the loading point of each working section. Waterlines shall be equipped with outlet valves at intervals of not more than 500 feet, and 500 feet of firehose with fittings suitable for connection with such waterlines shall be provided at strategic locations. Two portable water cars, readily available, may be used in lieu of waterlines prescribed under this paragraph.\n\n(2) In mines producing less than 300 tons of coal per shift, there shall be provided at 500-foot intervals in all main and secondary haulage roads:\n\n(i) A tank of water of at least 55-gallon capacity with at least 3 pails of not less than 10-quart capacity; or\n\n(ii) Not less than 240 pounds of bagged rock dust.\n\n(d) Transportation. Each track or off-track locomotive, self-propelled man-trip car, or personnel carrier shall be equipped with one portable fire extinguisher.\n\n(e) Electrical installations. At each electrical installation, the operator shall provide two portable fire extinguishers that have a nominal capacity of 5 pounds of dry chemical, or one extinguisher that has a nominal capacity of at least 10 pounds of dry chemical, and which have a 2-A:10-B:C or higher rating.\n\n(f) Oil storage stations. Two portable fire extinguishers and 240 pounds of rock dust, shall be provided at each permanent underground oil storage station. One portable fire extinguisher shall be provided at each working section where 25 gallons or more of oil are stored in addition to extinguishers required under paragraph (a) of this section.\n\n(g) Welding, cutting, soldering. One portable fire extinguisher or 240 pounds of rock dust shall be provided at locations where welding, cutting, or soldering with arc or flame is being done.\n\n(h) Powerlines. At each wooden door through which powerlines pass there shall be one portable fire extinguisher or 240 pounds of rock dust within 25 feet of the door on the intake air side.\n\n(i) Emergency materials. (1) At each mine producing 300 tons of coal or more per shift there shall be readily available the following materials at locations not exceeding 2 miles from each working section:\n\n1,000 board feet of brattice boards 2 rolls of brattice cloth 2 hand saws 25 pounds of 8 d nails 25 pounds of 10 d nails 25 pounds of 16 d nails 3 claw hammers 25 bags of wood fiber plaster or 10 bags of cement (or equivalent material for stoppings) 5 tons of rock dust\n\n(2) At each mine producing less than 300 tons of coal per shift the above materials shall be available at the mine, provided, however, that the emergency materials for one or more mines may be stored at a central warehouse or building supply company and such supply must be the equivalent of that required for all mines involved and within 1-hour's delivery time from each mine. This exception shall not apply where the active working sections are more than 2 miles from the surface.\n\n[35 FR 17890, Nov. 20, 1970, as amended at 73 FR 53127, Sept. 15, 2008]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.1722","heading":"Mechanical equipment guards.","id":"75.1722","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-R/section-75.1722","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"R","subpartHeading":"Subpart R—Miscellaneous","text":"(a) Gears; sprockets; chains; drive, head, tail, and takeup pulleys; flywheels; couplings, shafts; sawblades; fan inlets; and similar exposed moving machine parts which may be contacted by persons, and which may cause injury to persons shall be guarded.\n\n(b) Guards at conveyor-drive, conveyor-head, and conveyor-tail pulleys shall extend a distance sufficient to prevent a person from reaching behind the guard and becoming caught between the belt and the pulley.\n\n(c) Except when testing the machinery, guards shall be securely in place while machinery is being operated.\n\n[38 FR 4976, Feb. 23, 1973]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.606","heading":"Protection of trailing cables.","id":"75.606","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-G/section-75.606","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"G","subpartHeading":"Subpart G—Trailing Cables","text":"[Statutory Provisions]\n\nTrailing cables shall be adequately protected to prevent damage by mobile equipment.","occurrenceCount":2},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.362","heading":"On-shift examination.","id":"75.362","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.362","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a)(1) At least once during each shift, or more often if necessary for safety, a certified person designated by the operator shall conduct an on-shift examination of each section where anyone is assigned to work during the shift and any area where mechanized mining equipment is being installed or removed during the shift. The certified person shall check for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (a)(3) of this section, test for methane and oxygen deficiency, and determine if the air is moving in its proper direction.\n\n(2) A person designated by the operator shall conduct an examination and record the results and the corrective actions taken to assure compliance with the respirable dust control parameters specified in the approved mine ventilation plan. In those instances when a shift change is accomplished without an interruption in production on a section, the examination shall be made anytime within 1 hour after the shift change. In those instances when there is an interruption in production during the shift change, the examination shall be made before production begins on a section. Deficiencies in dust controls shall be corrected before production begins or resumes. The examination shall include: Air quantities and velocities; water pressures and flow rates; excessive leakage in the water delivery system; water spray numbers and orientations; section ventilation and control device placement; roof bolting machine dust collector vacuum levels; scrubber air flow rate; work practices required by the ventilation plan; and any other dust suppression measures. Measurements of the air velocity and quantity, water pressure and flow rates are not required if continuous monitoring of these controls is used and indicates that the dust controls are functioning properly.\n\n(3) On-shift examinations shall include examinations to identify violations of the standards listed below:\n\n(i) §§ 75.202(a) and 75.220(a)(1)—roof control;\n\n(ii) §§ 75.333(h) and 75.370(a)(1)—ventilation, methane;\n\n(iii) §§ 75.400 and 75.403—accumulations of combustible materials and application of rock dust;\n\n(iv) § 75.1403—other safeguards, limited to maintenance of travelways along belt conveyors, off track haulage roadways, and track haulage, track switches, and other components for haulage;\n\n(v) § 75.1722(a)—guarding moving machine parts; and\n\n(vi) § 75.1731(a)—maintenance of belt conveyor components.\n\n(b) During each shift that coal is produced, a certified person shall examine for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (a)(3) of this section along each belt conveyor haulageway where a belt conveyor is operated. This examination may be conducted at the same time as the preshift examination of belt conveyors and belt conveyor haulageways, if the examination is conducted within 3 hours before the oncoming shift.\n\n(c) Persons conducting the on-shift examination shall determine at the following locations:\n\n(1) The volume of air in the last open crosscut of each set of entries or rooms on each section and areas where mechanized mining equipment is being installed or removed. The last open crosscut is the crosscut in the line of pillars containing the permanent stoppings that separate the intake air courses and the return air courses.\n\n(2) The volume of air on a longwall or shortwall, including areas where longwall or shortwall equipment is being installed or removed, in the intake entry or entries at the intake end of the longwall or shortwall.\n\n(3) The velocity of air at each end of the longwall or shortwall face at the locations specified in the approved ventilation plan.\n\n(4) The volume of air at the intake end of any pillar line—\n\n(i) Where a single split of air is used in the intake entry furthest from the return air course immediately outby the first open crosscut outby the line of pillars being mined; or\n\n(ii) Where a split system is used in the intake entries of each split immediately inby the split point.\n\n(d) (1) A qualified person shall make tests for methane—\n\n(i) At the start of each shift at each working place before electrically operated equipment is energized; and\n\n(ii) Immediately before equipment is energized, taken into, or operated in a working place; and\n\n(iii) At 20-minute intervals, or more often if required in the approved ventilation plan at specific locations, during the operation of equipment in the working place.\n\n(2) Except as provided for in paragraph (d)(3) of this section, these methane tests shall be made at the face from under permanent roof support, using extendable probes or other acceptable means. When longwall or shortwall mining systems are used, these methane tests shall be made at the shearer, the plow, or the cutting head. When mining has been stopped for more than 20 minutes, methane tests shall be conducted prior to the start up of equipment.\n\n(3) As an alternative method of compliance with paragraph (d)(2) of this section during roof bolting, methane tests may be made by sweeping an area not less than 16 feet inby the last area of permanently supported roof, using a probe or other acceptable means. This method of testing is conditioned on meeting the following requirements:\n\n(i) The roof bolting machine must be equipped with an integral automated temporary roof support (ATRS) system that meets the requirements of 30 CFR 75.209.\n\n(ii) The roof bolting machine must have a permanently mounted, MSHA-approved methane monitor which meets the maintenance and calibration requirements of 30 CFR 75.342(a)(4), the warning signal requirements of 30 CFR 75.342(b), and the automatic de-energization requirements of 30 CFR 75.342(c).\n\n(iii) The methane monitor sensor must be mounted near the inby end and within 18 inches of the longitudinal center of the ATRS support, and positioned at least 12 inches from the roof when the ATRS is fully deployed.\n\n(iv) Manual methane tests must be made at intervals not exceeding 20 minutes. The test may be made either from under permanent roof support or from the roof bolter's work position protected by the deployed ATRS.\n\n(v) Once a methane test is made at the face, all subsequent methane tests in the same area of unsupported roof must also be made at the face, from under permanent roof support, using extendable probes or other acceptable means at intervals not exceeding 20 minutes.\n\n(vi) The district manager may require that the ventilation plan include the minimum air quantity and the position and placement of ventilation controls to be maintained during roof bolting.\n\n(e) If auxiliary fans and tubing are used, they shall be inspected frequently.\n\n(f) During each shift that coal is produced and at intervals not exceeding 4 hours, tests for methane shall be made by a certified person or by an atmospheric monitoring system (AMS) in each return split of air from each working section between the last working place, or longwall or shortwall face, ventilated by that split of air and the junction of the return air split with another air split, seal, or worked-out area. If auxiliary fans and tubing are used, the tests shall be made at a location outby the auxiliary fan discharge.\n\n(g) Certification. (1) The person conducting the on-shift examination in belt haulage entries shall certify by initials, date, and time that the examination was made. The certified person shall certify by initials, date, and the time at enough locations to show that the entire area has been examined.\n\n(2) The certified person directing the on-shift examination to assure compliance with the respirable dust control parameters specified in the approved mine ventilation plan shall:\n\n(i) Certify by initials, date, and time on a board maintained at the section load-out or similar location showing that the examination was made prior to resuming production; and\n\n(ii) Verify, by initials and date, the record of the results of the examination required under (a)(2) of this section to assure compliance with the respirable dust control parameters specified in the mine ventilation plan. The verification shall be made no later than the end of the shift for which the examination was made.\n\n(3) The mine foreman or equivalent mine official shall countersign each examination record required under (a)(2) of this section after it is verified by the certified person under (g)(2)(ii) of this section, and no later than the end of the mine foreman's or equivalent mine official's next regularly scheduled working shift. The record shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.\n\n(4) Records shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.\n\n[61 FR 9829, Mar. 11, 1996; 61 FR 26442, May 28, 1996, as amended at 68 FR 40138, July 7, 2003; 77 FR 20715, Apr. 6, 2012; 79 FR 24987, May 1, 2014]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 72.630","heading":"Drill dust control at underground areas of underground mines.","id":"72.630","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-72/subpart-E/section-72.630","part":"72","partHeading":"PART 72—HEALTH STANDARDS FOR COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"E","subpartHeading":"Subpart E—Miscellaneous","text":"(a) Dust resulting from drilling in rock shall be controlled by use of permissible dust collectors, or by water, or water with a wetting agent, or by ventilation, or by any other method or device approved by the Secretary that is as effective in controlling the dust.\n\n(b) Dust collectors. Dust collectors shall be maintained in permissible and operating condition. Dust collectors approved under Part 33—Dust Collectors for Use in Connection with Rock Drilling in Coal Mines of this title or under Bureau of Mines Schedule 25B are permissible dust collectors for the purpose of this section.\n\n(c) Water control. Water used to control dust from drilling rock shall be applied through a hollow drill steel or stem or by the flooding of vertical drill holes in the floor.\n\n(d) Ventilation control. To adequately control dust from drilling rock, the air current shall be so directed that the dust is readily dispersed and carried away from the drill operator or any other miners in the area.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.400","heading":"Accumulation of combustible materials.","id":"75.400","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-E/section-75.400","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"E","subpartHeading":"Subpart E—Combustible Materials and Rock Dusting","text":"Coal dust, including float coal dust deposited on rock-dusted surfaces, loose coal, and other combustible materials, shall be cleaned up and not be permitted to accumulate in active workings, or on diesel-powered and electric equipment therein.\n\n[61 FR 55527, Oct. 25, 1996]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.360","heading":"Preshift examination at fixed intervals.","id":"75.360","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.360","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a)(1) Except as provided in paragraph (a)(2) of this section, a certified person designated by the operator must make a preshift examination within 3 hours preceding the beginning of any 8-hour interval during which any person is scheduled to work or travel underground. No person other than certified examiners may enter or remain in any underground area unless a preshift examination has been completed for the established 8-hour interval. The operator must establish 8-hour intervals of time subject to the required preshift examinations.\n\n(2) Preshift examinations of areas where pumpers are scheduled to work or travel shall not be required prior to the pumper entering the areas if the pumper is a certified person and the pumper conducts an examination for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (b)(11) of this section, tests for methane and oxygen deficiency, and determines if the air is moving in its proper direction in the area where the pumper works or travels. The examination of the area must be completed before the pumper performs any other work. A record of all hazardous conditions and violations of the mandatory health or safety standards found by the pumper shall be made and retained in accordance with § 75.363 of this part.\n\n(b) The person conducting the preshift examination shall examine for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (b)(11) of this section, test for methane and oxygen deficiency, and determine if the air is moving in its proper direction at the following locations:\n\n(1) Roadways, travelways and track haulageways where persons are scheduled, prior to the beginning of the preshift examination, to work or travel during the oncoming shift.\n\n(2) Belt conveyors that will be used to transport persons during the oncoming shift and the entries in which these belt conveyors are located.\n\n(3) Working sections and areas where mechanized mining equipment is being installed or removed, if anyone is scheduled to work on the section or in the area during the oncoming shift. The scope of the examination shall include the working places, approaches to worked-out areas and ventilation controls on these sections and in these areas, and the examination shall include tests of the roof, face and rib conditions on these sections and in these areas.\n\n(4) Approaches to worked-out areas along intake air courses and at the entries used to carry air into worked-out areas if the intake air passing the approaches is used to ventilate working sections where anyone is scheduled to work during the oncoming shift. The examination of the approaches to the worked-out areas shall be made in the intake air course immediately inby and outby each entry used to carry air into the worked-out area. An examination of the entries used to carry air into the worked-out areas shall be conducted at a point immediately inby the intersection of each entry with the intake air course.\n\n(5) Seals along intake air courses where intake air passes by a seal to ventilate working sections where anyone is scheduled to work during the oncoming shift.\n\n(6)(i) Entries and rooms developed after November 15, 1992, and developed more than 2 crosscuts off an intake air course without permanent ventilation controls where intake air passes through or by these entries or rooms to reach a working section where anyone is scheduled to work during the oncoming shift; and,\n\n(ii) Entries and rooms developed after November 15, 1992, and driven more than 20 feet off an intake air course without a crosscut and without permanent ventilation controls where intake air passes through or by these entries or rooms to reach a working section where anyone is scheduled to work during the oncoming shift.\n\n(7) Areas where trolley wires or trolley feeder wires are to be or will remain energized during the oncoming shift.\n\n(8) High spots along intake air courses where methane is likely to accumulate, if equipment will be operated in the area during the shift.\n\n(9) Underground electrical installations referred to in § 75.340(a), except those pumps listed in § 75.340 (b)(2) through (b)(6), and areas where compressors subject to § 75.344 are installed if the electrical installation or compressor is or will be energized during the shift.\n\n(10) Other areas where work or travel during the oncoming shift is scheduled prior to the beginning of the preshift examination.\n\n(11) Preshift examinations shall include examinations to identify violations of the standards listed below:\n\n(i) §§ 75.202(a) and 75.220(a)(1)—roof control;\n\n(ii) §§ 75.333(h) and 75.370(a)(1)—ventilation, methane;\n\n(iii) §§ 75.400 and 75.403—accumulations of combustible materials and application of rock dust;\n\n(iv) § 75.1403—other safeguards, limited to maintenance of travelways along belt conveyors, off track haulage roadways, and track haulage, track switches, and other components for haulage;\n\n(v) § 75.1722(a)—guarding moving machine parts; and\n\n(vi) § 75.1731(a)—maintenance of belt conveyor components.\n\n(c) The person conducting the preshift examination shall determine the volume of air entering each of the following areas if anyone is scheduled to work in the areas during the oncoming shift:\n\n(1) In the last open crosscut of each set of entries or rooms on each working section and areas where mechanized mining equipment is being installed or removed. The last open crosscut is the crosscut in the line of pillars containing the permanent stoppings that separate the intake air courses and the return air courses.\n\n(2) On each longwall or shortwall in the intake entry or entries at the intake end of the longwall or shortwall face immediately outby the face and the velocity of air at each end of the face at the locations specified in the approved ventilation plan.\n\n(3) At the intake end of any pillar line—\n\n(i) If a single split of air is used, in the intake entry furthest from the return air course, immediately outby the first open crosscut outby the line of pillars being mined; or\n\n(ii) If a split system is used, in the intake entries of each split immediately inby the split point.\n\n(d) The person conducting the preshift examination shall check the refuge alternative for damage, the integrity of the tamper-evident seal and the mechanisms required to deploy the refuge alternative, and the ready availability of compressed oxygen and air.\n\n(e) The district manager may require the operator to examine other areas of the mine or examine for other hazards and violations of other mandatory health or safety standards found during the preshift examination.\n\n(f) Certification. At each working place examined, the person doing the preshift examination shall certify by initials, date, and the time, that the examination was made. In areas required to be examined outby a working section, the certified person shall certify by initials, date, and the time at enough locations to show that the entire area has been examined.\n\n(g) Recordkeeping. A record of the results of each preshift examination, including a record of hazardous conditions and violations of the nine mandatory health or safety standards and their locations found by the examiner during each examination, and of the results and locations of air and methane measurements, shall be made on the surface before any persons, other than certified persons conducting examinations required by this subpart, enter any underground area of the mine. The results of methane tests shall be recorded as the percentage of methane measured by the examiner. The record shall be made by the certified person who made the examination or by a person designated by the operator. If the record is made by someone other than the examiner, the examiner shall verify the record by initials and date by or at the end of the shift for which the examination was made. A record shall also be made by a certified person of the action taken to correct hazardous conditions and violations of mandatory health or safety standards found during the preshift examination. All preshift and corrective action records shall be countersigned by the mine foreman or equivalent mine official by the end of the mine foreman's or equivalent mine official's next regularly scheduled working shift. The records required by this section shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.\n\n(h) Retention period. Records shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.\n\n[61 FR 9829, Mar. 11, 1996, as amended at 61 FR 55527, Oct. 25, 1996; 62 FR 35085, June 30, 1997; 64 FR 45170, Aug. 19, 1999; 73 FR 80697, Dec. 31, 2008; 77 FR 20714, Apr. 6, 2012]","occurrenceCount":1},{"chapter":"I","heading":"Identification check system.","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-R/section-75.1715","part":"75","subchapter":"O","subpart":"R","id":"75.1715","citation":"30 CFR 75.1715","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subpartHeading":"","text":null,"occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.503","heading":"Permissible electric face equipment; maintenance.","id":"75.503","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-F/section-75.503","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"F","subpartHeading":"Subpart F—Electrical Equipment—General","text":"[Statutory Provisions]\n\nThe operator of each coal mine shall maintain in permissible condition all electric face equipment required by §§ 75.500, 75.501, 75.504 to be permissible which is taken into or used inby the last open crosscut of any such mine.","occurrenceCount":1}],"fullCorpus":"/data/title30-sections.json"}}},"meta":{"representation":"json","mineId":"4407183","dataSource":"postgres","snapshotId":"2026-10-13T11:19:05.459773+00:00","completedAt":"2026-10-13T11:26:59.401Z","sourceCount":20,"totalRows":17906804}}