{"data":{"schemaVersion":"realm.mine-profile.v1","generatedAt":"2026-10-13T11:26:59.401Z","identity":{"mine_id":"4406719","name":"Mine No 27","status":"Abandoned and Sealed","status_date":"2000-12-19","mine_type":"Underground","coal_metal":"C","commodity":"Coal (Bituminous)","state":"VA","county":"Buchanan","nearest_town":"Vansant","operator_id":"P10904","operator_name":"Dominion Coal Corporation","controller_id":"0104093","controller_name":"SunCoke Energy Incorporated","district":"C05","office":"Vansant VA Field Office","employees":0,"latitude":37.2058,"longitude":-82.1028},"coverage":{"contributingSources":12,"registeredSources":20,"sourceRows":76},"relationships":{"schemaVersion":"realm.temporal-relationships.v1","temporalSemantics":{"validTime":{"granularity":"date","bounds":"inclusive","nullStart":"start date not published in the upstream history row","nullEnd":"open-ended in the upstream history row; not independent proof of present control"},"transactionTime":{"observedAt":"2026-10-13T11:19:05.459773+00:00","meaning":"time the checksum-addressed MDRS artifacts were observed by the PostgreSQL ingestion"},"derivation":{"controllerControlsOperator":"intersection of controller and operator valid-time intervals evidenced through this mine","currentIdentity":"current controller and operator are asserted only by the MDRS Mines snapshot"}},"current":{"mine":{"type":"mine","id":"4406719","name":"Mine No 27"},"operator":{"type":"operator","id":"P10904","name":"Dominion Coal Corporation"},"controller":{"type":"controller","id":"0104093","name":"SunCoke Energy Incorporated"},"source":{"datasetId":"msha-mines","observedAt":"2026-10-13T11:19:05.459773+00:00"}},"edges":[{"type":"controller_controls_mine","subject":{"type":"controller","id":"C01767","name":"Sunoco, Inc."},"object":{"type":"mine","id":"4406719","name":"Mine No 27"},"validFrom":"1979-10-29","validTo":"2012-01-16","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4406719|C01767|1979-10-29|2012-01-16"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"C08919","name":"James Wayne  Estep"},"object":{"type":"mine","id":"4406719","name":"Mine No 27"},"validFrom":"1991-11-01","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4406719|C08919|1991-11-01|"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"P10904","name":"Dominion Coal Corporation"},"object":{"type":"mine","id":"4406719","name":"Mine No 27"},"validFrom":"1992-10-01","validTo":"1993-02-07","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4406719|P10904|1992-10-01|1993-02-07"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C01767","name":"Sunoco, Inc."},"object":{"type":"operator","id":"P10904","name":"Dominion Coal Corporation"},"validFrom":"1992-10-01","validTo":"1993-02-07","current":false,"derived":true,"evidenceMineId":"4406719","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4406719|P10904|1992-10-01|C01767|1979-10-29|55909"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"P21867","name":"Warren Coal Company Inc"},"object":{"type":"mine","id":"4406719","name":"Mine No 27"},"validFrom":"1993-02-08","validTo":"1993-05-20","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4406719|P21867|1993-02-08|1993-05-20"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C08919","name":"James Wayne  Estep"},"object":{"type":"operator","id":"P21867","name":"Warren Coal Company Inc"},"validFrom":"1993-02-08","validTo":"1993-05-20","current":false,"derived":true,"evidenceMineId":"4406719","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4406719|P21867|1993-02-08|C08919|1991-11-01|78441"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"P10904","name":"Dominion Coal Corporation"},"object":{"type":"mine","id":"4406719","name":"Mine No 27"},"validFrom":"1993-05-21","validTo":"1994-04-12","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4406719|P10904|1993-05-21|1994-04-12"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C01767","name":"Sunoco, Inc."},"object":{"type":"operator","id":"P10904","name":"Dominion Coal Corporation"},"validFrom":"1993-05-21","validTo":"1994-04-12","current":false,"derived":true,"evidenceMineId":"4406719","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4406719|P10904|1993-05-21|C01767|1979-10-29|55910"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"P22753","name":"Red Baron Inc"},"object":{"type":"mine","id":"4406719","name":"Mine No 27"},"validFrom":"1994-04-13","validTo":"2000-09-04","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4406719|P22753|1994-04-13|2000-09-04"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"C14837","name":"Rodney K  Roberts et al"},"object":{"type":"mine","id":"4406719","name":"Mine No 27"},"validFrom":"1994-04-13","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4406719|C14837|1994-04-13|"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C14837","name":"Rodney K  Roberts et al"},"object":{"type":"operator","id":"P22753","name":"Red Baron Inc"},"validFrom":"1994-04-13","validTo":"2000-09-04","current":false,"derived":true,"evidenceMineId":"4406719","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4406719|P22753|1994-04-13|C14837|1994-04-13|94028"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C14837","name":"Jimmy D  Dye et al"},"object":{"type":"operator","id":"P22753","name":"Red Baron Inc"},"validFrom":"1994-04-13","validTo":"2000-09-04","current":false,"derived":true,"evidenceMineId":"4406719","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4406719|P22753|1994-04-13|C14837|1994-04-13|94029"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"P10904","name":"Dominion Coal Corporation"},"object":{"type":"mine","id":"4406719","name":"Mine No 27"},"validFrom":"2000-09-05","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4406719|P10904|2000-09-05|"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C01767","name":"Sunoco, Inc."},"object":{"type":"operator","id":"P10904","name":"Dominion Coal Corporation"},"validFrom":"2000-09-05","validTo":"2012-01-16","current":false,"derived":true,"evidenceMineId":"4406719","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4406719|P10904|2000-09-05|C01767|1979-10-29|55911"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"0104093","name":"SunCoke Energy Incorporated"},"object":{"type":"mine","id":"4406719","name":"Mine No 27"},"validFrom":"2012-01-17","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4406719|0104093|2012-01-17|"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"0104093","name":"SunCoke Energy Incorporated"},"object":{"type":"operator","id":"P10904","name":"Dominion Coal Corporation"},"validFrom":"2012-01-17","validTo":"1993-02-07","current":false,"derived":true,"evidenceMineId":"4406719","intervalAnomaly":true,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4406719|P10904|1992-10-01|0104093|2012-01-17|18058"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"0104093","name":"SunCoke Energy Incorporated"},"object":{"type":"operator","id":"P10904","name":"Dominion Coal Corporation"},"validFrom":"2012-01-17","validTo":"1994-04-12","current":false,"derived":true,"evidenceMineId":"4406719","intervalAnomaly":true,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4406719|P10904|1993-05-21|0104093|2012-01-17|18059"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"0104093","name":"SunCoke Energy Incorporated"},"object":{"type":"operator","id":"P10904","name":"Dominion Coal Corporation"},"validFrom":"2012-01-17","validTo":null,"current":true,"derived":true,"evidenceMineId":"4406719","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4406719|P10904|2000-09-05|0104093|2012-01-17|18060"}}],"coverage":{"historyRecords":9,"edgeCount":18,"intervalAnomalies":2,"sourceDatasetId":"msha-controller-operator-history"}},"sources":[{"id":"msha-accidents","name":"Accident, Injuries, and Illnesses","domains":["safety","contractors"],"products":["incident trends","severity rates","equipment patterns","peer denominators"],"rowCount":1,"firstDate":"2000-03-15","lastDate":"2000-03-15","metrics":{"daysLost":45,"injuries":1,"fatalities":0,"recentRows":0,"restrictedDays":0,"contractorRecords":0},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"29088","DOCUMENT_NO":"220000810019","ACCIDENT_DT":"03/15/2000","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"HANDLING OF MATERIALS","ACCIDENT_TYPE":"Over-exertion in pulling or pushing objects","OCCUPATION":"Roof bolter, Rock bolter,  Pinner, Mobile roof support operator (MRS)","NO_INJURIES":"1","DAYS_LOST":"45","NARRATIVE":"PULLING CABLE OFF CABLE REEL ON BOLTER HURT BACK.","sourceDate":"2000-03-15"}]},{"id":"msha-addresses","name":"Addresses of Record","domains":["identity","logistics"],"products":["entity resolution","address history","facility geocoding"],"rowCount":1,"firstDate":"2000-12-19","lastDate":"2000-12-19","metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-assessed-violations","name":"Assessed Violations","domains":["compliance","legal"],"products":["penalty lifecycle","paid and outstanding amounts","assessment aging"],"rowCount":4,"firstDate":"2000-01-18","lastDate":"2000-05-18","metrics":{"ss":0,"delinquent":4,"recentRows":0,"paidPenalty":220,"proposedPenalty":220,"currentAssessment":220},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"898200","VIOLATION_NO":"7303790","ISSUE_DT":"05/18/2000","CFR_STANDARD_CD":"75.364(a)(2)(iii)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"55.00","CURRENT_ASSESSMENT_AMT":"55.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2000-05-18"},{"SOURCE_ROW_NUMBER":"908493","VIOLATION_NO":"7304978","ISSUE_DT":"04/19/2000","CFR_STANDARD_CD":"75.360(b)(3)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"55.00","CURRENT_ASSESSMENT_AMT":"55.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2000-04-19"},{"SOURCE_ROW_NUMBER":"908328","VIOLATION_NO":"7308349","ISSUE_DT":"01/31/2000","CFR_STANDARD_CD":"75.1107-4(a)(2)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"55.00","CURRENT_ASSESSMENT_AMT":"55.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2000-01-31"},{"SOURCE_ROW_NUMBER":"908327","VIOLATION_NO":"7300200","ISSUE_DT":"01/18/2000","CFR_STANDARD_CD":"75.383(b)(2)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"55.00","CURRENT_ASSESSMENT_AMT":"55.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2000-01-18"}]},{"id":"msha-coal-dust-samples","name":"Coal Dust Samples","domains":["health","safety"],"products":["respirable dust trends","CPDM coverage","void patterns","occupation exposure"],"rowCount":27,"firstDate":"2000-01-19","lastDate":"2000-04-19","metrics":{"recentRows":0,"cpdmSamples":0,"voidSamples":0,"validSamples":27,"maxConcentration":1.97,"concentrationTotal":15.776},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"1527404","CASS_NUM":"57243412","SMP_TAKEN_DT":"4/19/2000","CONC":".975","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-04-19"},{"SOURCE_ROW_NUMBER":"1227003","CASS_NUM":"57243447","SMP_TAKEN_DT":"4/19/2000","CONC":".381","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER HELPER","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-04-19"},{"SOURCE_ROW_NUMBER":"1045209","CASS_NUM":"57243438","SMP_TAKEN_DT":"4/19/2000","CONC":".219","SMP_TYPE_CD_DESC":"DESIGNATED AREA","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-04-19"},{"SOURCE_ROW_NUMBER":"853087","CASS_NUM":"57243464","SMP_TAKEN_DT":"4/19/2000","CONC":".892","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-04-19"},{"SOURCE_ROW_NUMBER":"712265","CASS_NUM":"57243406","SMP_TAKEN_DT":"4/19/2000","CONC":".77","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-04-19"},{"SOURCE_ROW_NUMBER":"183288","CASS_NUM":"57243460","SMP_TAKEN_DT":"4/19/2000","CONC":"1.97","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"UTILITY MAN","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-04-19"},{"SOURCE_ROW_NUMBER":"1336502","CASS_NUM":"50457882","SMP_TAKEN_DT":"4/3/2000","CONC":".888","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-04-03"},{"SOURCE_ROW_NUMBER":"412289","CASS_NUM":"50512149","SMP_TAKEN_DT":"4/3/2000","CONC":".24","SMP_TYPE_CD_DESC":"DESIGNATED AREA","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-04-03"},{"SOURCE_ROW_NUMBER":"1214882","CASS_NUM":"50457889","SMP_TAKEN_DT":"3/31/2000","CONC":".55","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-03-31"},{"SOURCE_ROW_NUMBER":"1634616","CASS_NUM":"50457986","SMP_TAKEN_DT":"3/30/2000","CONC":".559","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-03-30"},{"SOURCE_ROW_NUMBER":"1094920","CASS_NUM":"50457981","SMP_TAKEN_DT":"3/29/2000","CONC":".241","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-03-29"},{"SOURCE_ROW_NUMBER":"1428238","CASS_NUM":"50512173","SMP_TAKEN_DT":"3/28/2000","CONC":".552","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-03-28"}]},{"id":"msha-controller-operator-history","name":"Controller and Operator History","domains":["identity","compliance"],"products":["historical ownership attribution","operator transitions","valid-time joins"],"rowCount":9,"firstDate":"1992-10-01","lastDate":"2000-09-05","metrics":{"recentRows":0,"currentOperatorTenures":2,"completedOperatorTenures":7},"periods":{},"recentRecords":[]},{"id":"msha-inspections","name":"Inspections","domains":["safety","compliance"],"products":["inspection mix","on-site hours","event context","citation rate denominator"],"rowCount":15,"firstDate":"2000-01-03","lastDate":"2000-08-14","metrics":{"inspectors":17,"recentRows":0,"onSiteHours":142.25,"inspectionHours":225.5,"inspectionSamples":0},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"89810","EVENT_NO":"4152084","INSPECTION_BEGIN_DT":"08/14/2000","INSPECTION_END_DT":"08/28/2000","ACTIVITY_CODE":"AAA","ACTIVITY":"Regular Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"3","SUM_TOTAL_ON_SITE_HOURS":"1","sourceDate":"2000-08-14"},{"SOURCE_ROW_NUMBER":"45898","EVENT_NO":"4148945","INSPECTION_BEGIN_DT":"06/12/2000","INSPECTION_END_DT":"06/28/2000","ACTIVITY_CODE":"AAA","ACTIVITY":"Regular Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"11","SUM_TOTAL_ON_SITE_HOURS":"8","sourceDate":"2000-06-12"},{"SOURCE_ROW_NUMBER":"1151553","EVENT_NO":"4148944","INSPECTION_BEGIN_DT":"06/05/2000","INSPECTION_END_DT":"06/28/2000","ACTIVITY_CODE":"CAA","ACTIVITY":"SPOT INSPECTION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"8","SUM_TOTAL_ON_SITE_HOURS":"6","sourceDate":"2000-06-05"},{"SOURCE_ROW_NUMBER":"915183","EVENT_NO":"4142931","INSPECTION_BEGIN_DT":"05/30/2000","INSPECTION_END_DT":"06/16/2000","ACTIVITY_CODE":"CEC","ACTIVITY":"VENTILATION TECHNICAL INVESTIGATION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"16","SUM_TOTAL_ON_SITE_HOURS":"8.5","sourceDate":"2000-05-30"},{"SOURCE_ROW_NUMBER":"450223","EVENT_NO":"4149183","INSPECTION_BEGIN_DT":"05/16/2000","INSPECTION_END_DT":"05/24/2000","ACTIVITY_CODE":"CDA","ACTIVITY":"ROOF CONTROL SPOT INSPECTION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"16","SUM_TOTAL_ON_SITE_HOURS":"10","sourceDate":"2000-05-16"},{"SOURCE_ROW_NUMBER":"797789","EVENT_NO":"4142926","INSPECTION_BEGIN_DT":"05/05/2000","INSPECTION_END_DT":"05/19/2000","ACTIVITY_CODE":"CCC","ACTIVITY":"VENTILATION TECHNICAL INSPECTION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"25","SUM_TOTAL_ON_SITE_HOURS":"14","sourceDate":"2000-05-05"},{"SOURCE_ROW_NUMBER":"510725","EVENT_NO":"4142925","INSPECTION_BEGIN_DT":"05/05/2000","INSPECTION_END_DT":"05/05/2000","ACTIVITY_CODE":"CAA","ACTIVITY":"SPOT INSPECTION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"5","SUM_TOTAL_ON_SITE_HOURS":"1.5","sourceDate":"2000-05-05"},{"SOURCE_ROW_NUMBER":"243164","EVENT_NO":"4149113","INSPECTION_BEGIN_DT":"04/19/2000","INSPECTION_END_DT":"04/27/2000","ACTIVITY_CODE":"BAB","ACTIVITY":"RESP DUST TECH INSP - U. G. MINES","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"14.5","SUM_TOTAL_ON_SITE_HOURS":"9.5","sourceDate":"2000-04-19"},{"SOURCE_ROW_NUMBER":"470433","EVENT_NO":"4152019","INSPECTION_BEGIN_DT":"04/12/2000","INSPECTION_END_DT":"04/18/2000","ACTIVITY_CODE":"CBC","ACTIVITY":"ELECTRICAL SPOT INSPECTION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"3","SUM_TOTAL_ON_SITE_HOURS":"1","sourceDate":"2000-04-12"},{"SOURCE_ROW_NUMBER":"657671","EVENT_NO":"4148977","INSPECTION_BEGIN_DT":"03/15/2000","INSPECTION_END_DT":"03/16/2000","ACTIVITY_CODE":"BBB","ACTIVITY":"NOISE TECHNICAL INVESTIGATION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"10.5","SUM_TOTAL_ON_SITE_HOURS":"6.75","sourceDate":"2000-03-15"},{"SOURCE_ROW_NUMBER":"497339","EVENT_NO":"4146081","INSPECTION_BEGIN_DT":"03/08/2000","INSPECTION_END_DT":"03/10/2000","ACTIVITY_CODE":"CDA","ACTIVITY":"ROOF CONTROL SPOT INSPECTION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"10","SUM_TOTAL_ON_SITE_HOURS":"5","sourceDate":"2000-03-08"},{"SOURCE_ROW_NUMBER":"805980","EVENT_NO":"4148973","INSPECTION_BEGIN_DT":"02/24/2000","INSPECTION_END_DT":"03/06/2000","ACTIVITY_CODE":"BAF","ACTIVITY":"RESP DUST TECH INSP - SURFACE MINES","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"5","SUM_TOTAL_ON_SITE_HOURS":"2.25","sourceDate":"2000-02-24"}]},{"id":"msha-mine-production-quarterly","name":"Mine Employment and Production — Quarterly","domains":["production","safety","compliance"],"products":["production trend","employee hours","rate denominators","seasonality"],"rowCount":5,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2000-Q4":{"hours":0,"employees":0,"production":0},"2000-Q2":{"hours":9987,"employees":22,"production":16440},"2000-Q1":{"hours":8481,"employees":20,"production":18659}},"recentRecords":[]},{"id":"msha-mine-production-yearly","name":"Mine Employment and Production — Yearly","domains":["production","safety","compliance"],"products":["annual trend","backfill","quarterly reconciliation"],"rowCount":2,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2000":{"hours":18468,"employees":21,"production":35099}},"recentRecords":[]},{"id":"msha-mines","name":"Mines","domains":["identity","production","logistics"],"products":["mine identity","status","commodity","location","operator and controller"],"rowCount":1,"firstDate":null,"lastDate":null,"metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-noise-samples","name":"Noise Samples","domains":["health","safety","equipment"],"products":["hearing exposure","machine and manufacturer patterns","occupation coverage"],"rowCount":5,"firstDate":"2000-03-15","lastDate":"2000-03-15","metrics":{"recentRows":0,"doseOver100":1,"actDoseTotal":440,"pelDoseTotal":339},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"200670","EVENT_NO":"4148977","SURVEY_DATE":"03/15/2000","OCCUPATION_CD_DESC":"CONTINUOUS MINER OPERATOR","MACHINE_CD":"06","MANUFACTURER_CD":"058","ACT_DOSE_85":"130","PEL_DOSE_90":"117","SURVEY_TYPE":"I","sourceDate":"2000-03-15"},{"SOURCE_ROW_NUMBER":"200669","EVENT_NO":"4148977","SURVEY_DATE":"03/15/2000","OCCUPATION_CD_DESC":"ROOF BOLTER (SINGLE HEAD)","MACHINE_CD":"30","MANUFACTURER_CD":"039","ACT_DOSE_85":"76","PEL_DOSE_90":"54","SURVEY_TYPE":"I","sourceDate":"2000-03-15"},{"SOURCE_ROW_NUMBER":"200668","EVENT_NO":"4148977","SURVEY_DATE":"03/15/2000","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","MACHINE_CD":"37","MANUFACTURER_CD":"058","ACT_DOSE_85":"79","PEL_DOSE_90":"50","SURVEY_TYPE":"I","sourceDate":"2000-03-15"},{"SOURCE_ROW_NUMBER":"200667","EVENT_NO":"4148977","SURVEY_DATE":"03/15/2000","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (OFF STANDARD)","MACHINE_CD":"37","MANUFACTURER_CD":"058","ACT_DOSE_85":"71","PEL_DOSE_90":"49","SURVEY_TYPE":"I","sourceDate":"2000-03-15"},{"SOURCE_ROW_NUMBER":"200666","EVENT_NO":"4148977","SURVEY_DATE":"03/15/2000","OCCUPATION_CD_DESC":"CONTINUOUS MINER HELPER","MACHINE_CD":"06","MANUFACTURER_CD":"058","ACT_DOSE_85":"84","PEL_DOSE_90":"69","SURVEY_TYPE":"I","sourceDate":"2000-03-15"}]},{"id":"msha-quartz-samples","name":"Quartz Samples — Coal","domains":["health","safety"],"products":["quartz exposure trends","occupation context","applicable-rule linkage"],"rowCount":2,"firstDate":"2000-01-19","lastDate":"2000-04-19","metrics":{"recentRows":0,"voidSamples":0,"maxQuartzPct":7,"validSamples":2,"quartzPctTotal":10.7},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"129199","CASSETTE_NO":"57243464","SAMPLE_DT":"04/19/2000","QUARTZ_PCT":"03.7","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2000-04-19"},{"SOURCE_ROW_NUMBER":"128969","CASSETTE_NO":"57219956","SAMPLE_DT":"01/19/2000","QUARTZ_PCT":"07.0","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2000-01-19"}]},{"id":"msha-violations","name":"Violations","domains":["compliance","safety","legal"],"products":["citation and order record","condition text","Title 30 linkage","abatement patterns"],"rowCount":4,"firstDate":"2000-01-18","lastDate":"2000-05-18","metrics":{"ss":0,"amountDue":220,"contested":0,"amountPaid":220,"recentRows":0,"section104d":0,"unterminated":0,"proposedPenalty":220},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"2354795","VIOLATION_NO":"7303790","VIOLATION_ISSUE_DT":"05/18/2000","SIG_SUB":"N","PART_SECTION":"75.364(a)(2)(iii)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"06/16/2000","PROPOSED_PENALTY":"55","AMOUNT_DUE":"55","AMOUNT_PAID":"55","CONTESTED_IND":"N","sourceDate":"2000-05-18"},{"SOURCE_ROW_NUMBER":"2354794","VIOLATION_NO":"7304978","VIOLATION_ISSUE_DT":"04/19/2000","SIG_SUB":"N","PART_SECTION":"75.360(b)(3)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"04/19/2000","PROPOSED_PENALTY":"55","AMOUNT_DUE":"55","AMOUNT_PAID":"55","CONTESTED_IND":"N","sourceDate":"2000-04-19"},{"SOURCE_ROW_NUMBER":"2354793","VIOLATION_NO":"7308349","VIOLATION_ISSUE_DT":"01/31/2000","SIG_SUB":"N","PART_SECTION":"75.1107-4(a)(2)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"01/31/2000","PROPOSED_PENALTY":"55","AMOUNT_DUE":"55","AMOUNT_PAID":"55","CONTESTED_IND":"N","sourceDate":"2000-01-31"},{"SOURCE_ROW_NUMBER":"2354792","VIOLATION_NO":"7300200","VIOLATION_ISSUE_DT":"01/18/2000","SIG_SUB":"N","PART_SECTION":"75.383(b)(2)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"8","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"01/31/2000","PROPOSED_PENALTY":"55","AMOUNT_DUE":"55","AMOUNT_PAID":"55","CONTESTED_IND":"N","sourceDate":"2000-01-18"}]}],"safety":{"href":"/api/v1/mines/4406719/safety","description":"Full-period safety series, top CFR sections and paginated activity. Requires PostgreSQL."},"silica":{"href":"/api/v1/mines/4406719/silica","description":"Dedicated silica records, measurements, sample status and trends. Defaults to the snapshot year; use year=all for history."},"externalContext":{"eia":null,"title30":{"snapshot":{"chapterCount":6,"featuredSectionCount":100,"latestAmendedOn":"2026-08-14","latestIssueDate":"2026-08-14","partCount":206,"sectionCount":5954,"upToDateAsOf":"2026-08-19"},"regulations":[{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.364","heading":"Weekly examination.","id":"75.364","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.364","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a) Worked-out areas. (1) At least every 7 days, a certified person shall examine unsealed worked-out areas where no pillars have been recovered by traveling to the area of deepest penetration; measuring methane and oxygen concentrations and air quantities and making tests to determine if the air is moving in the proper direction in the area. The locations of measurement points where tests and measurements will be performed shall be included in the mine ventilation plan and shall be adequate in number and location to assure ventilation and air quality in the area. Air quantity measurements shall also be made where the air enters and leaves the worked-out area. An alternative method of evaluating the ventilation of the area may be approved in the ventilation plan.\n\n(2) At least every 7 days, a certified person shall evaluate the effectiveness of bleeder systems required by § 75.334 as follows:\n\n(i) Measurements of methane and oxygen concentrations and air quantity and a test to determine if the air is moving in its proper direction shall be made where air enters the worked-out area.\n\n(ii) Measurements of methane and oxygen concentrations and air quantity and a test to determine if the air is moving in the proper direction shall be made immediately before the air enters a return split of air.\n\n(iii) At least one entry of each set of bleeder entries used as part of a bleeder system under § 75.334 shall be traveled in its entirety. Measurements of methane and oxygen concentrations and air quantities and a test to determine if the air is moving in the proper direction shall be made at the measurement point locations specified in the mine ventilation plan to determine the effectiveness of the bleeder system.\n\n(iv) In lieu of the requirements of paragraphs (a)(2)(i) and (iii) of this section, an alternative method of evaluation may be specified in the ventilation plan provided the alternative method results in proper evaluation of the effectiveness of the bleeder system.\n\n(b) Hazardous conditions and violations of mandatory health or safety standards. At least every 7 days, an examination for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (b)(8) of this section shall be made by a certified person designated by the operator at the following locations:\n\n(1) In at least one entry of each intake air course, in its entirety, so that the entire air course is traveled.\n\n(2) In at least one entry of each return air course, in its entirety, so that the entire air course is traveled.\n\n(3) In each longwall or shortwall travelway in its entirety, so that the entire travelway is traveled.\n\n(4) At each seal along return and bleeder air courses and at each seal along intake air courses not examined under § 75.360(b)(5).\n\n(5) In each escapeway so that the entire escapeway is traveled.\n\n(6) On each working section not examined under § 75.360(b)(3) during the previous 7 days.\n\n(7) At each water pump not examined during a preshift examination conducted during the previous 7 days.\n\n(8) Weekly examinations shall include examinations to identify violations of the standards listed below:\n\n(i) §§ 75.202(a) and 75.220(a)(1)—roof control;\n\n(ii) §§ 75.333(h) and 75.370(a)(1)—ventilation, methane;\n\n(iii) §§ 75.400 and 75.403—accumulations of combustible materials and application of rock dust; and\n\n(iv) § 75.1403—maintenance of off track haulage roadways, and track haulage, track switches, and other components for haulage;\n\n(v) § 75.1722(a)—guarding moving machine parts; and\n\n(vi) § 75.1731(a)—maintenance of belt conveyor components.\n\n(c) Measurements and tests. At least every 7 days, a certified person shall—\n\n(1) Determine the volume of air entering the main intakes and in each intake split;\n\n(2) Determine the volume of air and test for methane in the last open crosscut in any pair or set of developing entries or rooms, in the return of each split of air immediately before it enters the main returns, and where the air leaves the main returns; and\n\n(3) Test for methane in the return entry nearest each set of seals immediately after the air passes the seals.\n\n(d) Hazardous conditions shall be corrected immediately. If the condition creates an imminent danger, everyone except those persons referred to in section 104(c) of the Act shall be withdrawn from the area affected to a safe area until the hazardous condition is corrected. Any violation of the nine mandatory health or safety standards found during a weekly examination shall be corrected.\n\n(e) The weekly examination may be conducted at the same time as the preshift or on-shift examinations.\n\n(f) (1) The weekly examination is not required during any 7 day period in which no one enters any underground area of the mine.\n\n(2) Except for certified persons required to make examinations, no one shall enter any underground area of the mine if a weekly examination has not been completed within the previous 7 days.\n\n(g) Certification. The person making the weekly examinations shall certify by initials, date, and the time that the examination was made. Certifications and times shall appear at enough locations to show that the entire area has been examined.\n\n(h) Recordkeeping. At the completion of any shift during which a portion of a weekly examination is conducted, a record of the results of each weekly examination, including a record of hazardous conditions and violations of the nine mandatory health or safety standards found during each examination and their locations, the corrective action taken, and the results and location of air and methane measurements, shall be made. The results of methane tests shall be recorded as the percentage of methane measured by the examiner. The record shall be made by the person making the examination or a person designated by the operator. If made by a person other than the examiner, the examiner shall verify the record by initials and date by or at the end of the shift for which the examination was made. The record shall be countersigned by the mine foreman or equivalent mine official by the end of the mine foreman's or equivalent mine official's next regularly scheduled working shift. The records required by this section shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.\n\n(i) Retention period. Records shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.\n\n[61 FR 9829, Mar. 11, 1996, as amended at 77 FR 20715, Apr. 6, 2012]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.360","heading":"Preshift examination at fixed intervals.","id":"75.360","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.360","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a)(1) Except as provided in paragraph (a)(2) of this section, a certified person designated by the operator must make a preshift examination within 3 hours preceding the beginning of any 8-hour interval during which any person is scheduled to work or travel underground. No person other than certified examiners may enter or remain in any underground area unless a preshift examination has been completed for the established 8-hour interval. The operator must establish 8-hour intervals of time subject to the required preshift examinations.\n\n(2) Preshift examinations of areas where pumpers are scheduled to work or travel shall not be required prior to the pumper entering the areas if the pumper is a certified person and the pumper conducts an examination for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (b)(11) of this section, tests for methane and oxygen deficiency, and determines if the air is moving in its proper direction in the area where the pumper works or travels. The examination of the area must be completed before the pumper performs any other work. A record of all hazardous conditions and violations of the mandatory health or safety standards found by the pumper shall be made and retained in accordance with § 75.363 of this part.\n\n(b) The person conducting the preshift examination shall examine for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (b)(11) of this section, test for methane and oxygen deficiency, and determine if the air is moving in its proper direction at the following locations:\n\n(1) Roadways, travelways and track haulageways where persons are scheduled, prior to the beginning of the preshift examination, to work or travel during the oncoming shift.\n\n(2) Belt conveyors that will be used to transport persons during the oncoming shift and the entries in which these belt conveyors are located.\n\n(3) Working sections and areas where mechanized mining equipment is being installed or removed, if anyone is scheduled to work on the section or in the area during the oncoming shift. The scope of the examination shall include the working places, approaches to worked-out areas and ventilation controls on these sections and in these areas, and the examination shall include tests of the roof, face and rib conditions on these sections and in these areas.\n\n(4) Approaches to worked-out areas along intake air courses and at the entries used to carry air into worked-out areas if the intake air passing the approaches is used to ventilate working sections where anyone is scheduled to work during the oncoming shift. The examination of the approaches to the worked-out areas shall be made in the intake air course immediately inby and outby each entry used to carry air into the worked-out area. An examination of the entries used to carry air into the worked-out areas shall be conducted at a point immediately inby the intersection of each entry with the intake air course.\n\n(5) Seals along intake air courses where intake air passes by a seal to ventilate working sections where anyone is scheduled to work during the oncoming shift.\n\n(6)(i) Entries and rooms developed after November 15, 1992, and developed more than 2 crosscuts off an intake air course without permanent ventilation controls where intake air passes through or by these entries or rooms to reach a working section where anyone is scheduled to work during the oncoming shift; and,\n\n(ii) Entries and rooms developed after November 15, 1992, and driven more than 20 feet off an intake air course without a crosscut and without permanent ventilation controls where intake air passes through or by these entries or rooms to reach a working section where anyone is scheduled to work during the oncoming shift.\n\n(7) Areas where trolley wires or trolley feeder wires are to be or will remain energized during the oncoming shift.\n\n(8) High spots along intake air courses where methane is likely to accumulate, if equipment will be operated in the area during the shift.\n\n(9) Underground electrical installations referred to in § 75.340(a), except those pumps listed in § 75.340 (b)(2) through (b)(6), and areas where compressors subject to § 75.344 are installed if the electrical installation or compressor is or will be energized during the shift.\n\n(10) Other areas where work or travel during the oncoming shift is scheduled prior to the beginning of the preshift examination.\n\n(11) Preshift examinations shall include examinations to identify violations of the standards listed below:\n\n(i) §§ 75.202(a) and 75.220(a)(1)—roof control;\n\n(ii) §§ 75.333(h) and 75.370(a)(1)—ventilation, methane;\n\n(iii) §§ 75.400 and 75.403—accumulations of combustible materials and application of rock dust;\n\n(iv) § 75.1403—other safeguards, limited to maintenance of travelways along belt conveyors, off track haulage roadways, and track haulage, track switches, and other components for haulage;\n\n(v) § 75.1722(a)—guarding moving machine parts; and\n\n(vi) § 75.1731(a)—maintenance of belt conveyor components.\n\n(c) The person conducting the preshift examination shall determine the volume of air entering each of the following areas if anyone is scheduled to work in the areas during the oncoming shift:\n\n(1) In the last open crosscut of each set of entries or rooms on each working section and areas where mechanized mining equipment is being installed or removed. The last open crosscut is the crosscut in the line of pillars containing the permanent stoppings that separate the intake air courses and the return air courses.\n\n(2) On each longwall or shortwall in the intake entry or entries at the intake end of the longwall or shortwall face immediately outby the face and the velocity of air at each end of the face at the locations specified in the approved ventilation plan.\n\n(3) At the intake end of any pillar line—\n\n(i) If a single split of air is used, in the intake entry furthest from the return air course, immediately outby the first open crosscut outby the line of pillars being mined; or\n\n(ii) If a split system is used, in the intake entries of each split immediately inby the split point.\n\n(d) The person conducting the preshift examination shall check the refuge alternative for damage, the integrity of the tamper-evident seal and the mechanisms required to deploy the refuge alternative, and the ready availability of compressed oxygen and air.\n\n(e) The district manager may require the operator to examine other areas of the mine or examine for other hazards and violations of other mandatory health or safety standards found during the preshift examination.\n\n(f) Certification. At each working place examined, the person doing the preshift examination shall certify by initials, date, and the time, that the examination was made. In areas required to be examined outby a working section, the certified person shall certify by initials, date, and the time at enough locations to show that the entire area has been examined.\n\n(g) Recordkeeping. A record of the results of each preshift examination, including a record of hazardous conditions and violations of the nine mandatory health or safety standards and their locations found by the examiner during each examination, and of the results and locations of air and methane measurements, shall be made on the surface before any persons, other than certified persons conducting examinations required by this subpart, enter any underground area of the mine. The results of methane tests shall be recorded as the percentage of methane measured by the examiner. The record shall be made by the certified person who made the examination or by a person designated by the operator. If the record is made by someone other than the examiner, the examiner shall verify the record by initials and date by or at the end of the shift for which the examination was made. A record shall also be made by a certified person of the action taken to correct hazardous conditions and violations of mandatory health or safety standards found during the preshift examination. All preshift and corrective action records shall be countersigned by the mine foreman or equivalent mine official by the end of the mine foreman's or equivalent mine official's next regularly scheduled working shift. The records required by this section shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.\n\n(h) Retention period. Records shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.\n\n[61 FR 9829, Mar. 11, 1996, as amended at 61 FR 55527, Oct. 25, 1996; 62 FR 35085, June 30, 1997; 64 FR 45170, Aug. 19, 1999; 73 FR 80697, Dec. 31, 2008; 77 FR 20714, Apr. 6, 2012]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.1107-4","heading":"Automatic fire sensors and manual actuators; installation; minimum requirements.","id":"75.1107-4","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-L/section-75.1107-4","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"L","subpartHeading":"Subpart L—Fire Protection","text":"(a)(1) Where fire suppression devices are installed on unattended underground equipment, one or more point-type sensors or equivalent shall be installed for each 50 square feet of top surface area, or fraction thereof, of such equipment, and each sensor shall be designed to activate the first suppression system and disconnect the electrical power source to the equipment protected, and, except where sprinklers are used, there shall be in addition, a manual actuator installed to operate the system. Where sprinklers are used, provision shall be made for manual application of water to the protected equipment in lieu of a manual actuator.\n\n(2) Two or more manual actuators, where practicable, shall be installed, as provided in paragraphs (a)(2) (i) and (ii) of this section, to activate fire suppression devices on attended equipment purchased on or after the effective date of this § 75.1107-4. At least one manual actuator shall be used on equipment purchased prior to the effective date of this § 75.1107-4.\n\n(i) Manual actuators installed on attended equipment regularly operated by a miner, as provided in § 75.1107-1(c)(1) shall be located at different locations on the equipment, and at least one manual actuator shall be located within easy reach of the operator's normal operating position.\n\n(ii) Manual actuators to activate fire suppression devices on attended equipment not regularly operated by a miner, as provided in § 75.1107-1(c)(2), shall be installed at different location, and at least one manual actuator shall be installed so as to be easily reached by the miner at the jobsite or by persons approaching the equipment.\n\n(b) Sensors shall, where practicable, be installed in accordance with the recommendations set forth in National Fire Code No. 72A “Local Protective Signaling Systems” (NFPA No. 72A-1967).\n\n(c) On unattended equipment the fire suppression device shall operate independently of the power to the main motor (or equivalent) so it will remain operative if the circuit breakers (or other protective device) actuates. On attended equipment powered through a trailing cable the fire suppression device shall operate independently of the electrical power provided by the cable.\n\n(d) Point-type sensors (such as thermocouple, bimetallic strip, or rate of temperature rise) located in ventilated passageways shall be installed downwind from the equipment to be protected.\n\n(e) Sensor systems shall include a device or method for determining their operative condition.\n\n[37 FR 15301, July 29, 1972]","occurrenceCount":1}],"fullCorpus":"/data/title30-sections.json"}}},"meta":{"representation":"json","mineId":"4406719","dataSource":"postgres","snapshotId":"2026-10-13T11:19:05.459773+00:00","completedAt":"2026-10-13T11:26:59.401Z","sourceCount":20,"totalRows":17906804}}