{"data":{"schemaVersion":"realm.mine-profile.v1","generatedAt":"2026-10-13T11:26:59.401Z","identity":{"mine_id":"4404946","name":"No 2","status":"Abandoned and Sealed","status_date":"2009-12-31","mine_type":"Underground","coal_metal":"C","commodity":"Coal (Bituminous)","state":"VA","county":"Dickenson","nearest_town":"Bee","operator_id":"0056997","operator_name":"Black Dog Coal Corporation","controller_id":"0041211","controller_name":"Alpha Natural Resources, Inc.","district":"C05","office":"Norton VA Field Office","employees":0,"latitude":37.084444,"longitude":-82.225833},"coverage":{"contributingSources":17,"registeredSources":20,"sourceRows":3774},"relationships":{"schemaVersion":"realm.temporal-relationships.v1","temporalSemantics":{"validTime":{"granularity":"date","bounds":"inclusive","nullStart":"start date not published in the upstream history row","nullEnd":"open-ended in the upstream history row; not independent proof of present control"},"transactionTime":{"observedAt":"2026-10-13T11:19:05.459773+00:00","meaning":"time the checksum-addressed MDRS artifacts were observed by the PostgreSQL ingestion"},"derivation":{"controllerControlsOperator":"intersection of controller and operator valid-time intervals evidenced through this mine","currentIdentity":"current controller and operator are asserted only by the MDRS Mines snapshot"}},"current":{"mine":{"type":"mine","id":"4404946","name":"No 2"},"operator":{"type":"operator","id":"0056997","name":"Black Dog Coal Corporation"},"controller":{"type":"controller","id":"0041211","name":"Alpha Natural Resources, Inc."},"source":{"datasetId":"msha-mines","observedAt":"2026-10-13T11:19:05.459773+00:00"}},"edges":[{"type":"controller_controls_mine","subject":{"type":"controller","id":"C00230","name":"Pittston Company"},"object":{"type":"mine","id":"4404946","name":"No 2"},"validFrom":"1950-01-01","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4404946|C00230|1950-01-01|"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"P00653","name":"Clinchfield Coal Company"},"object":{"type":"mine","id":"4404946","name":"No 2"},"validFrom":"1977-10-01","validTo":"2002-12-12","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4404946|P00653|1977-10-01|2002-12-12"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C00230","name":"Pittston Company"},"object":{"type":"operator","id":"P00653","name":"Clinchfield Coal Company"},"validFrom":"1977-10-01","validTo":"2002-12-12","current":false,"derived":true,"evidenceMineId":"4404946","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4404946|P00653|1977-10-01|C00230|1950-01-01|45098"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"C14938","name":"Ronnie A  Edwards"},"object":{"type":"mine","id":"4404946","name":"No 2"},"validFrom":"1993-11-16","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4404946|C14938|1993-11-16|"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"0050878","name":"Dickenson-Russell Coal Company, LLC"},"object":{"type":"mine","id":"4404946","name":"No 2"},"validFrom":"2002-12-13","validTo":"2003-04-23","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4404946|0050878|2002-12-13|2003-04-23"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"0041211","name":"Alpha Natural Resources, Inc."},"object":{"type":"mine","id":"4404946","name":"No 2"},"validFrom":"2002-12-13","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4404946|0041211|2002-12-13|"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"0041211","name":"Alpha Natural Resources, Inc."},"object":{"type":"operator","id":"0050878","name":"Dickenson-Russell Coal Company, LLC"},"validFrom":"2002-12-13","validTo":"2003-04-23","current":false,"derived":true,"evidenceMineId":"4404946","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4404946|0050878|2002-12-13|0041211|2002-12-13|1577"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"P22536","name":"Black Dog Coal Corp"},"object":{"type":"mine","id":"4404946","name":"No 2"},"validFrom":"2003-04-24","validTo":"2005-01-31","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4404946|P22536|2003-04-24|2005-01-31"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C14938","name":"Ronnie A  Edwards"},"object":{"type":"operator","id":"P22536","name":"Black Dog Coal Corp"},"validFrom":"2003-04-24","validTo":"2005-01-31","current":false,"derived":true,"evidenceMineId":"4404946","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4404946|P22536|2003-04-24|C14938|1993-11-16|94294"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"0056997","name":"Black Dog Coal Corporation"},"object":{"type":"mine","id":"4404946","name":"No 2"},"validFrom":"2005-02-01","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4404946|0056997|2005-02-01|"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"0041211","name":"Alpha Natural Resources, Inc."},"object":{"type":"mine","id":"4404946","name":"No 2"},"validFrom":"2005-02-01","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4404946|0041211|2005-02-01|"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"0041211","name":"Alpha Natural Resources, Inc."},"object":{"type":"operator","id":"0056997","name":"Black Dog Coal Corporation"},"validFrom":"2005-02-01","validTo":null,"current":true,"derived":true,"evidenceMineId":"4404946","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4404946|0056997|2005-02-01|0041211|2005-02-01|1734"}}],"coverage":{"historyRecords":4,"edgeCount":12,"intervalAnomalies":0,"sourceDatasetId":"msha-controller-operator-history"}},"sources":[{"id":"msha-accidents","name":"Accident, Injuries, and Illnesses","domains":["safety","contractors"],"products":["incident trends","severity rates","equipment patterns","peer denominators"],"rowCount":59,"firstDate":"2000-01-14","lastDate":"2009-03-04","metrics":{"daysLost":1192,"injuries":35,"fatalities":0,"recentRows":0,"restrictedDays":155,"contractorRecords":1},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"192467","DOCUMENT_NO":"220090650006","ACCIDENT_DT":"03/04/2009","DEGREE_INJURY":"NO DYS AWY FRM WRK,NO RSTR ACT","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Struck by falling object","OCCUPATION":"Laborer, Bull gang, Faceman, Parts runner, Roustabout, Roof trimmer/scaler","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"While unloading empty glue boxes off drill, a piece of rock fell and struck him causing a laceration to his ear, requiring stitches.  Rock measured 24\" x 40\" x 3\".","sourceDate":"2009-03-04"},{"SOURCE_ROW_NUMBER":"166744","DOCUMENT_NO":"220082960011","ACCIDENT_DT":"10/20/2008","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","DAYS_LOST":"0","NARRATIVE":"A non-intentional, non-injury roof fall occured at spad 2706,  The fall was in the intersection and through the left break.  Size of the fall measured 50' long x 4.5' - 5' thick x 7' -10' wide.  Roof support was 4' fully grouted 75 grade resin bolts.  No equipment was involved.  Ventilation was not affected.   Fall will not be cleaned up.","sourceDate":"2008-10-20"},{"SOURCE_ROW_NUMBER":"71977","DOCUMENT_NO":"220082350008","ACCIDENT_DT":"08/18/2008","DEGREE_INJURY":"NO DYS AWY FRM WRK,NO RSTR ACT","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Struck by falling object","OCCUPATION":"Laborer, Bull gang, Faceman, Parts runner, Roustabout, Roof trimmer/scaler","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"Draw rock fell striking employee on right arm causing a cut requiring 2 stitches.","sourceDate":"2008-08-18"},{"SOURCE_ROW_NUMBER":"231248","DOCUMENT_NO":"220081370037","ACCIDENT_DT":"05/15/2008","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"SLIP OR FALL OF PERSON","ACCIDENT_TYPE":"Fall to the walkway or working surface","OCCUPATION":"Motorman, Motor person, Swamper, Switchman, Locomotive operator","NO_INJURIES":"1","DAYS_LOST":"63","NARRATIVE":"Employee was preparing to load a used scoop tire, using pinner steel inserted in rim of tire to set tire upright when the coupler on the end of steel broke just as tire was upright, tire flipped back, employee lost balance and fell backwards, catching himself with left hand, fracturing wrist.","sourceDate":"2008-05-15"},{"SOURCE_ROW_NUMBER":"110584","DOCUMENT_NO":"220080710006","ACCIDENT_DT":"03/07/2008","DEGREE_INJURY":"NO DYS AWY FRM WRK,NO RSTR ACT","CLASSIFICATION":"HANDTOOLS (NONPOWERED)","ACCIDENT_TYPE":"Caught in, under or between a moving and a stationary object","OCCUPATION":"Laborer, Bull gang, Faceman, Parts runner, Roustabout, Roof trimmer/scaler","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"Employee was jacking up supply car, when jack kicked out and car fell, contacting his right foot.","sourceDate":"2008-03-07"},{"SOURCE_ROW_NUMBER":"218344","DOCUMENT_NO":"220080710003","ACCIDENT_DT":"03/03/2008","DEGREE_INJURY":"NO DYS AWY FRM WRK,NO RSTR ACT","CLASSIFICATION":"HANDTOOLS (NONPOWERED)","ACCIDENT_TYPE":"Struck by... NEC","OCCUPATION":"Laborer, Bull gang, Faceman, Parts runner, Roustabout, Roof trimmer/scaler","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"Two employee's were using a block hammer and pick hammer to split a timber. The injured was holding the timber, when a sliver of metal from the hammer 1/4\" long, entered the employee's left hand.","sourceDate":"2008-03-03"},{"SOURCE_ROW_NUMBER":"110583","DOCUMENT_NO":"220072610012","ACCIDENT_DT":"09/14/2007","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","DAYS_LOST":"0","NARRATIVE":"A fall of the roof 40' long, 24' wide and 16' to 20' high occurred in the No. 2 heading covering the Joy 14-10 continuous miner JM505 on the 001 section 80' inby SS# 1847.","sourceDate":"2007-09-14"},{"SOURCE_ROW_NUMBER":"188158","DOCUMENT_NO":"220071500007","ACCIDENT_DT":"05/24/2007","DEGREE_INJURY":"NO DYS AWY FRM WRK,NO RSTR ACT","CLASSIFICATION":"MACHINERY","ACCIDENT_TYPE":"Struck by... NEC","OCCUPATION":"Laborer, Bull gang, Faceman, Parts runner, Roustabout, Roof trimmer/scaler","NO_INJURIES":"1","DAYS_LOST":"0","NARRATIVE":"Employee was installing curtain board, put pressure on 18\" bolt which bent and kick around, causing the bolt plate to strike employee above the right eye, causing a laceration.","sourceDate":"2007-05-24"},{"SOURCE_ROW_NUMBER":"226961","DOCUMENT_NO":"220071090015","ACCIDENT_DT":"04/18/2007","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","DAYS_LOST":"0","NARRATIVE":"A fall occurred in the # 6 entry of Southwest Mains, 1 break inby spad # 1452.  The fall goes through 6 right into 7 right breal.  This is an abandoned area of the mine.  The fall is approximately 10' to 15' high and 120\" long.  Was discovered today.  Actual date of fall is unknown.","sourceDate":"2007-04-18"},{"SOURCE_ROW_NUMBER":"196658","DOCUMENT_NO":"220070400012","ACCIDENT_DT":"01/15/2007","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"FALL OF ROOF OR BACK","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","DAYS_LOST":"0","NARRATIVE":"A fall occurred in the #5 heading of the 2 Northwest Mains section at spad 1562.  This is approximately 350' outby the active working section. No equipment, no ventilation disturbed, no injuries.  Fall will not be cleaned.","sourceDate":"2007-01-15"},{"SOURCE_ROW_NUMBER":"171086","DOCUMENT_NO":"220070400015","ACCIDENT_DT":"01/12/2007","DEGREE_INJURY":"ACCIDENT ONLY","CLASSIFICATION":"IGNITION OR EXPLOSION OF GAS OR DUST","ACCIDENT_TYPE":"Accident type, without injuries","OCCUPATION":"NO VALUE FOUND","NO_INJURIES":"0","DAYS_LOST":"0","NARRATIVE":"A methane ignition was suspected to have occurred on 01/12/2007 on the active working 002 section while coal was being extracted with the Joy 14CM15 mining machine.  No one was injured.","sourceDate":"2007-01-12"},{"SOURCE_ROW_NUMBER":"132107","DOCUMENT_NO":"220070030100","ACCIDENT_DT":"12/21/2006","DEGREE_INJURY":"DAYS AWAY FROM WORK ONLY","CLASSIFICATION":"POWERED HAULAGE","ACCIDENT_TYPE":"Caught in, under or between a moving and a stationary object","OCCUPATION":"Utility man, Errand boy, Service truck operator","NO_INJURIES":"1","DAYS_LOST":"48","NARRATIVE":"Employee stated he was unloading supplies off flat car with scoop, had hand over top of scoop canopy, raised scoop up with bucket, caught hand between scoop and mine roof.","sourceDate":"2006-12-21"}]},{"id":"msha-addresses","name":"Addresses of Record","domains":["identity","logistics"],"products":["entity resolution","address history","facility geocoding"],"rowCount":1,"firstDate":"2009-12-31","lastDate":"2009-12-31","metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-assessed-violations","name":"Assessed Violations","domains":["compliance","legal"],"products":["penalty lifecycle","paid and outstanding amounts","assessment aging"],"rowCount":680,"firstDate":"2000-01-10","lastDate":"2009-10-08","metrics":{"ss":363,"delinquent":679,"recentRows":0,"paidPenalty":212562,"proposedPenalty":243560,"currentAssessment":212562},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"935170","VIOLATION_NO":"8161853","ISSUE_DT":"10/08/2009","CFR_STANDARD_CD":"77.502","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"1304.00","CURRENT_ASSESSMENT_AMT":"176.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2009-10-08"},{"SOURCE_ROW_NUMBER":"935169","VIOLATION_NO":"8161852","ISSUE_DT":"10/08/2009","CFR_STANDARD_CD":"77.205(b)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"392.00","CURRENT_ASSESSMENT_AMT":"176.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2009-10-08"},{"SOURCE_ROW_NUMBER":"935168","VIOLATION_NO":"8161851","ISSUE_DT":"10/08/2009","CFR_STANDARD_CD":"75.1100-3","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2009-10-08"},{"SOURCE_ROW_NUMBER":"935167","VIOLATION_NO":"8161850","ISSUE_DT":"10/08/2009","CFR_STANDARD_CD":"75.503","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"585.00","CURRENT_ASSESSMENT_AMT":"263.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2009-10-08"},{"SOURCE_ROW_NUMBER":"935166","VIOLATION_NO":"8161849","ISSUE_DT":"10/07/2009","CFR_STANDARD_CD":"75.360(a)(1)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2009-10-07"},{"SOURCE_ROW_NUMBER":"1343278","VIOLATION_NO":"8164104","ISSUE_DT":"08/04/2009","CFR_STANDARD_CD":"75.1100-3","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2009-08-04"},{"SOURCE_ROW_NUMBER":"935143","VIOLATION_NO":"8161847","ISSUE_DT":"07/27/2009","CFR_STANDARD_CD":"75.362(g)(1)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2009-07-27"},{"SOURCE_ROW_NUMBER":"935142","VIOLATION_NO":"8161846","ISSUE_DT":"07/27/2009","CFR_STANDARD_CD":"75.1731(b)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2009-07-27"},{"SOURCE_ROW_NUMBER":"935141","VIOLATION_NO":"8161845","ISSUE_DT":"07/27/2009","CFR_STANDARD_CD":"75.400","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2009-07-27"},{"SOURCE_ROW_NUMBER":"935140","VIOLATION_NO":"8161844","ISSUE_DT":"07/27/2009","CFR_STANDARD_CD":"75.1731(b)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2009-07-27"},{"SOURCE_ROW_NUMBER":"935133","VIOLATION_NO":"8161843","ISSUE_DT":"07/21/2009","CFR_STANDARD_CD":"75.517","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"176.00","CURRENT_ASSESSMENT_AMT":"176.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2009-07-21"},{"SOURCE_ROW_NUMBER":"935132","VIOLATION_NO":"8161842","ISSUE_DT":"07/21/2009","CFR_STANDARD_CD":"75.601-1","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"100.00","CURRENT_ASSESSMENT_AMT":"100.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2009-07-21"}]},{"id":"msha-civil-penalty-dockets-decisions","name":"Civil Penalty Dockets and Decisions","domains":["compliance","legal"],"products":["docket lineage","decision outcomes","citation packet precedent"],"rowCount":17,"firstDate":"2007-11-01","lastDate":"2010-11-02","metrics":{"appeals":0,"decisions":17,"recentRows":0,"decisionPenalty":19702,"originalPenalty":50700},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"263193","VIOLATION_NO":"8161853","DOCKET_NO":"VA 2010-163","DECISION_DT":"11/02/2010","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"1304.00","DECISION_PENALTY_AMT":"176.00","JUDGE_FIRST_NAME":"Robert","JUDGE_LAST_NAME":"Lesnick","sourceDate":"2010-11-02"},{"SOURCE_ROW_NUMBER":"263192","VIOLATION_NO":"8161850","DOCKET_NO":"VA 2010-163","DECISION_DT":"11/02/2010","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"585.00","DECISION_PENALTY_AMT":"263.00","JUDGE_FIRST_NAME":"Robert","JUDGE_LAST_NAME":"Lesnick","sourceDate":"2010-11-02"},{"SOURCE_ROW_NUMBER":"262987","VIOLATION_NO":"8161852","DOCKET_NO":"VA 2010-163","DECISION_DT":"11/02/2010","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"392.00","DECISION_PENALTY_AMT":"176.00","JUDGE_FIRST_NAME":"Robert","JUDGE_LAST_NAME":"Lesnick","sourceDate":"2010-11-02"},{"SOURCE_ROW_NUMBER":"246349","VIOLATION_NO":"6631137","DOCKET_NO":"VA 2009-271","DECISION_DT":"11/18/2009","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"499.00","DECISION_PENALTY_AMT":"224.00","JUDGE_FIRST_NAME":"Robert","JUDGE_LAST_NAME":"Lesnick","sourceDate":"2009-11-18"},{"SOURCE_ROW_NUMBER":"231567","VIOLATION_NO":"6638120","DOCKET_NO":"VA 2009-67","DECISION_DT":"11/18/2009","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"1412.00","DECISION_PENALTY_AMT":"460.00","JUDGE_FIRST_NAME":"Robert","JUDGE_LAST_NAME":"Lesnick","sourceDate":"2009-11-18"},{"SOURCE_ROW_NUMBER":"39595","VIOLATION_NO":"7317957","DOCKET_NO":"VA 2009-271","DECISION_DT":"11/18/2009","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"176.00","DECISION_PENALTY_AMT":"100.00","JUDGE_FIRST_NAME":"Robert","JUDGE_LAST_NAME":"Lesnick","sourceDate":"2009-11-18"},{"SOURCE_ROW_NUMBER":"39087","VIOLATION_NO":"6631136","DOCKET_NO":"VA 2009-271","DECISION_DT":"11/18/2009","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"745.00","DECISION_PENALTY_AMT":"285.00","JUDGE_FIRST_NAME":"Robert","JUDGE_LAST_NAME":"Lesnick","sourceDate":"2009-11-18"},{"SOURCE_ROW_NUMBER":"39086","VIOLATION_NO":"6631132","DOCKET_NO":"VA 2009-271","DECISION_DT":"11/18/2009","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"1944.00","DECISION_PENALTY_AMT":"540.00","JUDGE_FIRST_NAME":"Robert","JUDGE_LAST_NAME":"Lesnick","sourceDate":"2009-11-18"},{"SOURCE_ROW_NUMBER":"39085","VIOLATION_NO":"6631131","DOCKET_NO":"VA 2009-271","DECISION_DT":"11/18/2009","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"1944.00","DECISION_PENALTY_AMT":"540.00","JUDGE_FIRST_NAME":"Robert","JUDGE_LAST_NAME":"Lesnick","sourceDate":"2009-11-18"},{"SOURCE_ROW_NUMBER":"226634","VIOLATION_NO":"6637921","DOCKET_NO":"VA 2008-412","DECISION_DT":"10/15/2009","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"1530.00","DECISION_PENALTY_AMT":"687.00","JUDGE_FIRST_NAME":"Gary","JUDGE_LAST_NAME":"Melick","sourceDate":"2009-10-15"},{"SOURCE_ROW_NUMBER":"211264","VIOLATION_NO":"6630553","DOCKET_NO":"VA 2008-160","DECISION_DT":"11/17/2008","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"3143.00","DECISION_PENALTY_AMT":"634.00","JUDGE_FIRST_NAME":"Jerold","JUDGE_LAST_NAME":"Feldman","sourceDate":"2008-11-17"},{"SOURCE_ROW_NUMBER":"211103","VIOLATION_NO":"6630552","DOCKET_NO":"VA 2008-160","DECISION_DT":"11/17/2008","DECISION_TYPE_CODE_DESC":"Settlement","ORIGINAL_PENALTY_AMT":"3143.00","DECISION_PENALTY_AMT":"634.00","JUDGE_FIRST_NAME":"Jerold","JUDGE_LAST_NAME":"Feldman","sourceDate":"2008-11-17"}]},{"id":"msha-coal-dust-samples","name":"Coal Dust Samples","domains":["health","safety"],"products":["respirable dust trends","CPDM coverage","void patterns","occupation exposure"],"rowCount":1061,"firstDate":"2000-01-24","lastDate":"2009-09-03","metrics":{"recentRows":0,"cpdmSamples":0,"voidSamples":77,"validSamples":984,"maxConcentration":90.748,"concentrationTotal":841.196},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"295320","CASS_NUM":"51041660","SMP_TAKEN_DT":"9/3/2009","CONC":".107","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2009-09-03"},{"SOURCE_ROW_NUMBER":"1488122","CASS_NUM":"51041673","SMP_TAKEN_DT":"9/2/2009","CONC":".562","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2009-09-02"},{"SOURCE_ROW_NUMBER":"748797","CASS_NUM":"51041637","SMP_TAKEN_DT":"9/2/2009","CONC":".338","SMP_TYPE_CD_DESC":"DESIGNATED AREA","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2009-09-02"},{"SOURCE_ROW_NUMBER":"549443","CASS_NUM":"51012725","SMP_TAKEN_DT":"9/2/2009","CONC":".36","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2009-09-02"},{"SOURCE_ROW_NUMBER":"920696","CASS_NUM":"51041670","SMP_TAKEN_DT":"9/1/2009","CONC":".287","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2009-09-01"},{"SOURCE_ROW_NUMBER":"265905","CASS_NUM":"51041650","SMP_TAKEN_DT":"9/1/2009","CONC":".159","SMP_TYPE_CD_DESC":"DESIGNATED AREA","SMP_USE_CD_DESC":"BIMONTHLY CYCLE/TRANSITION PERIOD SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2009-09-01"},{"SOURCE_ROW_NUMBER":"205743","CASS_NUM":"51041684","SMP_TAKEN_DT":"9/1/2009","CONC":"0","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"VOID SAMPLE","VOID_CD_DESC":"CASSETTE DID NOT MATCH CARD","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2009-09-01"},{"SOURCE_ROW_NUMBER":"1538129","CASS_NUM":"57808959","SMP_TAKEN_DT":"8/25/2009","CONC":".31","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"LABORER","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2009-08-25"},{"SOURCE_ROW_NUMBER":"1467356","CASS_NUM":"57809171","SMP_TAKEN_DT":"8/25/2009","CONC":".211","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"SCOOP CAR OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2009-08-25"},{"SOURCE_ROW_NUMBER":"1361381","CASS_NUM":"57809102","SMP_TAKEN_DT":"8/25/2009","CONC":".064","SMP_TYPE_CD_DESC":"INTAKE AIR","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"INVALID OR MISSING TIME","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2009-08-25"},{"SOURCE_ROW_NUMBER":"1163526","CASS_NUM":"57808968","SMP_TAKEN_DT":"8/25/2009","CONC":".332","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2009-08-25"},{"SOURCE_ROW_NUMBER":"647310","CASS_NUM":"57809111","SMP_TAKEN_DT":"8/25/2009","CONC":".294","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2009-08-25"}]},{"id":"msha-conferences","name":"Conferences","domains":["compliance","legal"],"products":["conference history","post-issuance changes","citation lifecycle"],"rowCount":26,"firstDate":"2000-02-09","lastDate":"2008-01-30","metrics":{"linkedIssuances":26},"periods":{},"recentRecords":[]},{"id":"msha-contested-violations","name":"Contested Violations","domains":["compliance","legal"],"products":["contest status","time to resolution","contested-rate context"],"rowCount":17,"firstDate":"2006-10-17","lastDate":"2009-10-08","metrics":{"decisions":17,"ssChanged":1,"recentRows":0,"decisionPenalty":19702,"proposedPenalty":50700},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"355663","CITATION_NO":"8161852","CITATION_ISSUE_DT":"10/08/2009","DOCKET_NO":"VA 2010-163","DECISION_DT":"11/02/2010","CFR_STANDARD_CODE":"77.205(b)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"392.00","DECISION_PENALTY_AMT":"176.00","sourceDate":"2009-10-08"},{"SOURCE_ROW_NUMBER":"184488","CITATION_NO":"8161853","CITATION_ISSUE_DT":"10/08/2009","DOCKET_NO":"VA 2010-163","DECISION_DT":"11/02/2010","CFR_STANDARD_CODE":"77.502","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"1304.00","DECISION_PENALTY_AMT":"176.00","sourceDate":"2009-10-08"},{"SOURCE_ROW_NUMBER":"16898","CITATION_NO":"8161850","CITATION_ISSUE_DT":"10/08/2009","DOCKET_NO":"VA 2010-163","DECISION_DT":"11/02/2010","CFR_STANDARD_CODE":"75.503","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"585.00","DECISION_PENALTY_AMT":"263.00","sourceDate":"2009-10-08"},{"SOURCE_ROW_NUMBER":"12001","CITATION_NO":"7317957","CITATION_ISSUE_DT":"03/24/2009","DOCKET_NO":"VA 2009-271","DECISION_DT":"11/18/2009","CFR_STANDARD_CODE":"75.351(a)","ORIGINAL_SIG_SUB_IND":"N","DECISION_SIG_SUB_IND":"N","PROPOSED_PENALTY_AMT":"176.00","DECISION_PENALTY_AMT":"100.00","sourceDate":"2009-03-24"},{"SOURCE_ROW_NUMBER":"238467","CITATION_NO":"6631137","CITATION_ISSUE_DT":"03/16/2009","DOCKET_NO":"VA 2009-271","DECISION_DT":"11/18/2009","CFR_STANDARD_CODE":"75.1914(e)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"499.00","DECISION_PENALTY_AMT":"224.00","sourceDate":"2009-03-16"},{"SOURCE_ROW_NUMBER":"238459","CITATION_NO":"6631136","CITATION_ISSUE_DT":"03/16/2009","DOCKET_NO":"VA 2009-271","DECISION_DT":"11/18/2009","CFR_STANDARD_CODE":"75.1911(b)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"745.00","DECISION_PENALTY_AMT":"285.00","sourceDate":"2009-03-16"},{"SOURCE_ROW_NUMBER":"70363","CITATION_NO":"6631132","CITATION_ISSUE_DT":"03/16/2009","DOCKET_NO":"VA 2009-271","DECISION_DT":"11/18/2009","CFR_STANDARD_CODE":"75.400","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"1944.00","DECISION_PENALTY_AMT":"540.00","sourceDate":"2009-03-16"},{"SOURCE_ROW_NUMBER":"70362","CITATION_NO":"6631131","CITATION_ISSUE_DT":"03/16/2009","DOCKET_NO":"VA 2009-271","DECISION_DT":"11/18/2009","CFR_STANDARD_CODE":"75.400","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"1944.00","DECISION_PENALTY_AMT":"540.00","sourceDate":"2009-03-16"},{"SOURCE_ROW_NUMBER":"348719","CITATION_NO":"6638120","CITATION_ISSUE_DT":"08/25/2008","DOCKET_NO":"VA 2009-67","DECISION_DT":"11/18/2009","CFR_STANDARD_CODE":"75.400","ORIGINAL_SIG_SUB_IND":"N","DECISION_SIG_SUB_IND":"N","PROPOSED_PENALTY_AMT":"1412.00","DECISION_PENALTY_AMT":"460.00","sourceDate":"2008-08-25"},{"SOURCE_ROW_NUMBER":"179663","CITATION_NO":"6637921","CITATION_ISSUE_DT":"07/22/2008","DOCKET_NO":"VA 2008-412","DECISION_DT":"10/15/2009","CFR_STANDARD_CODE":"75.604(b)","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"1530.00","DECISION_PENALTY_AMT":"687.00","sourceDate":"2008-07-22"},{"SOURCE_ROW_NUMBER":"285991","CITATION_NO":"6630571","CITATION_ISSUE_DT":"10/23/2007","DOCKET_NO":"VA 2008-160","DECISION_DT":"11/17/2008","CFR_STANDARD_CODE":"75.1102","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"Y","PROPOSED_PENALTY_AMT":"3689.00","DECISION_PENALTY_AMT":"1657.00","sourceDate":"2007-10-23"},{"SOURCE_ROW_NUMBER":"398894","CITATION_NO":"6630552","CITATION_ISSUE_DT":"10/15/2007","DOCKET_NO":"VA 2008-160","DECISION_DT":"11/17/2008","CFR_STANDARD_CODE":"75.400","ORIGINAL_SIG_SUB_IND":"Y","DECISION_SIG_SUB_IND":"N","PROPOSED_PENALTY_AMT":"3143.00","DECISION_PENALTY_AMT":"634.00","sourceDate":"2007-10-15"}]},{"id":"msha-contractor-production-quarterly","name":"Contractor Employment and Production — Quarterly","domains":["contractors","production","safety"],"products":["contractor exposure denominator","productivity","presence windows"],"rowCount":346,"firstDate":null,"lastDate":null,"metrics":{"linkedContractors":3,"notMineAttributable":1},"periods":{},"recentRecords":[]},{"id":"msha-contractor-production-yearly","name":"Contractor Employment and Production — Yearly","domains":["contractors","production","safety"],"products":["long-run contractor trend","annual denominator reconciliation"],"rowCount":75,"firstDate":null,"lastDate":null,"metrics":{"linkedContractors":3,"notMineAttributable":1},"periods":{},"recentRecords":[]},{"id":"msha-controller-operator-history","name":"Controller and Operator History","domains":["identity","compliance"],"products":["historical ownership attribution","operator transitions","valid-time joins"],"rowCount":4,"firstDate":"1977-10-01","lastDate":"2005-02-01","metrics":{"recentRows":0,"currentOperatorTenures":1,"completedOperatorTenures":3},"periods":{},"recentRecords":[]},{"id":"msha-inspections","name":"Inspections","domains":["safety","compliance"],"products":["inspection mix","on-site hours","event context","citation rate denominator"],"rowCount":480,"firstDate":"2000-01-06","lastDate":"2009-12-22","metrics":{"inspectors":596,"recentRows":0,"onSiteHours":5919.75,"inspectionHours":10398.25,"inspectionSamples":537},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"261146","EVENT_NO":"4407421","INSPECTION_BEGIN_DT":"12/22/2009","INSPECTION_END_DT":"12/22/2009","ACTIVITY_CODE":"E16","ACTIVITY":"Spot Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"4","SUM_TOTAL_ON_SITE_HOURS":"1","sourceDate":"2009-12-22"},{"SOURCE_ROW_NUMBER":"950957","EVENT_NO":"4407417","INSPECTION_BEGIN_DT":"11/30/2009","INSPECTION_END_DT":"11/30/2009","ACTIVITY_CODE":"E16","ACTIVITY":"Spot Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"5.5","SUM_TOTAL_ON_SITE_HOURS":"1.5","sourceDate":"2009-11-30"},{"SOURCE_ROW_NUMBER":"439162","EVENT_NO":"4159596","INSPECTION_BEGIN_DT":"11/23/2009","INSPECTION_END_DT":"11/23/2009","ACTIVITY_CODE":"E02","ACTIVITY":"103(i) Spot Inspections","NBR_INSPECTOR":"2","SUM_TOTAL_INSP_HOURS":"16","SUM_TOTAL_ON_SITE_HOURS":"10","sourceDate":"2009-11-23"},{"SOURCE_ROW_NUMBER":"218188","EVENT_NO":"4407306","INSPECTION_BEGIN_DT":"11/19/2009","INSPECTION_END_DT":"11/19/2009","ACTIVITY_CODE":"E02","ACTIVITY":"103(i) Spot Inspections","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"8","SUM_TOTAL_ON_SITE_HOURS":"5","sourceDate":"2009-11-19"},{"SOURCE_ROW_NUMBER":"752853","EVENT_NO":"4407416","INSPECTION_BEGIN_DT":"11/16/2009","INSPECTION_END_DT":"11/16/2009","ACTIVITY_CODE":"E02","ACTIVITY":"103(i) Spot Inspections","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"8","SUM_TOTAL_ON_SITE_HOURS":"4.75","sourceDate":"2009-11-16"},{"SOURCE_ROW_NUMBER":"628941","EVENT_NO":"4159276","INSPECTION_BEGIN_DT":"11/10/2009","INSPECTION_END_DT":"11/10/2009","ACTIVITY_CODE":"E02","ACTIVITY":"103(i) Spot Inspections","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"9","SUM_TOTAL_ON_SITE_HOURS":"4","sourceDate":"2009-11-10"},{"SOURCE_ROW_NUMBER":"426784","EVENT_NO":"4159593","INSPECTION_BEGIN_DT":"11/04/2009","INSPECTION_END_DT":"11/04/2009","ACTIVITY_CODE":"E02","ACTIVITY":"103(i) Spot Inspections","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"8","SUM_TOTAL_ON_SITE_HOURS":"6","sourceDate":"2009-11-04"},{"SOURCE_ROW_NUMBER":"136513","EVENT_NO":"4407305","INSPECTION_BEGIN_DT":"10/30/2009","INSPECTION_END_DT":"10/30/2009","ACTIVITY_CODE":"E02","ACTIVITY":"103(i) Spot Inspections","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"9","SUM_TOTAL_ON_SITE_HOURS":"5.5","sourceDate":"2009-10-30"},{"SOURCE_ROW_NUMBER":"844447","EVENT_NO":"4159136","INSPECTION_BEGIN_DT":"10/27/2009","INSPECTION_END_DT":"10/27/2009","ACTIVITY_CODE":"E02","ACTIVITY":"103(i) Spot Inspections","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"9","SUM_TOTAL_ON_SITE_HOURS":"5","sourceDate":"2009-10-27"},{"SOURCE_ROW_NUMBER":"141929","EVENT_NO":"4159135","INSPECTION_BEGIN_DT":"10/21/2009","INSPECTION_END_DT":"10/21/2009","ACTIVITY_CODE":"E02","ACTIVITY":"103(i) Spot Inspections","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"10","SUM_TOTAL_ON_SITE_HOURS":"6","sourceDate":"2009-10-21"},{"SOURCE_ROW_NUMBER":"932372","EVENT_NO":"4159134","INSPECTION_BEGIN_DT":"10/15/2009","INSPECTION_END_DT":"10/15/2009","ACTIVITY_CODE":"E02","ACTIVITY":"103(i) Spot Inspections","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"10","SUM_TOTAL_ON_SITE_HOURS":"5.5","sourceDate":"2009-10-15"},{"SOURCE_ROW_NUMBER":"184644","EVENT_NO":"4159133","INSPECTION_BEGIN_DT":"10/08/2009","INSPECTION_END_DT":"10/08/2009","ACTIVITY_CODE":"E02","ACTIVITY":"103(i) Spot Inspections","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"10","SUM_TOTAL_ON_SITE_HOURS":"6.5","sourceDate":"2009-10-08"}]},{"id":"msha-mine-production-quarterly","name":"Mine Employment and Production — Quarterly","domains":["production","safety","compliance"],"products":["production trend","employee hours","rate denominators","seasonality"],"rowCount":109,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2009-Q4":{"hours":5877,"employees":11,"production":2931},"2009-Q3":{"hours":26219,"employees":47,"production":56814},"2009-Q2":{"hours":24106,"employees":49,"production":48481},"2009-Q1":{"hours":28972,"employees":52,"production":54131},"2008-Q4":{"hours":28766,"employees":56,"production":50240},"2008-Q3":{"hours":29580,"employees":54,"production":47204},"2008-Q2":{"hours":29552,"employees":57,"production":44231},"2008-Q1":{"hours":29588,"employees":52,"production":54636},"2007-Q4":{"hours":27581,"employees":52,"production":38416},"2007-Q3":{"hours":27799,"employees":55,"production":59331},"2007-Q2":{"hours":30306,"employees":55,"production":48266},"2007-Q1":{"hours":31140,"employees":58,"production":43818}},"recentRecords":[]},{"id":"msha-mine-production-yearly","name":"Mine Employment and Production — Yearly","domains":["production","safety","compliance"],"products":["annual trend","backfill","quarterly reconciliation"],"rowCount":21,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2000":{"hours":87638,"employees":42,"production":232762},"2001":{"hours":40766,"employees":20,"production":90866},"2002":{"hours":22901,"employees":22,"production":39986},"2003":{"hours":44528,"employees":27,"production":111044},"2004":{"hours":69422,"employees":32,"production":121230},"2005":{"hours":78161,"employees":45,"production":112005},"2006":{"hours":107901,"employees":53,"production":201127},"2007":{"hours":116826,"employees":55,"production":189831},"2008":{"hours":117486,"employees":55,"production":196311},"2009":{"hours":85174,"employees":40,"production":162357}},"recentRecords":[]},{"id":"msha-mines","name":"Mines","domains":["identity","production","logistics"],"products":["mine identity","status","commodity","location","operator and controller"],"rowCount":1,"firstDate":null,"lastDate":null,"metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-noise-samples","name":"Noise Samples","domains":["health","safety","equipment"],"products":["hearing exposure","machine and manufacturer patterns","occupation coverage"],"rowCount":66,"firstDate":"2000-02-03","lastDate":"2009-02-20","metrics":{"recentRows":0,"doseOver100":16,"actDoseTotal":16888,"pelDoseTotal":4592},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"197020","EVENT_NO":"4159858","SURVEY_DATE":"02/20/2009","OCCUPATION_CD_DESC":"SCOOP CAR OPERATOR","MACHINE_CD":"38","MANUFACTURER_CD":"038","ACT_DOSE_85":"98","PEL_DOSE_90":"75","SURVEY_TYPE":"I","sourceDate":"2009-02-20"},{"SOURCE_ROW_NUMBER":"197019","EVENT_NO":"4159858","SURVEY_DATE":"02/20/2009","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","MACHINE_CD":"06","MANUFACTURER_CD":"058","ACT_DOSE_85":"71","PEL_DOSE_90":"56","SURVEY_TYPE":"I","sourceDate":"2009-02-20"},{"SOURCE_ROW_NUMBER":"197018","EVENT_NO":"4159858","SURVEY_DATE":"02/20/2009","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","MACHINE_CD":"06","MANUFACTURER_CD":"058","ACT_DOSE_85":"75","PEL_DOSE_90":"64","SURVEY_TYPE":"I","sourceDate":"2009-02-20"},{"SOURCE_ROW_NUMBER":"197017","EVENT_NO":"4159858","SURVEY_DATE":"02/20/2009","OCCUPATION_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","MACHINE_CD":"30","MANUFACTURER_CD":"039","ACT_DOSE_85":"77","PEL_DOSE_90":"58","SURVEY_TYPE":"I","sourceDate":"2009-02-20"},{"SOURCE_ROW_NUMBER":"197016","EVENT_NO":"4159858","SURVEY_DATE":"02/20/2009","OCCUPATION_CD_DESC":"ROOF BOLTER (TWIN HEAD) (INTAKE SIDE)","MACHINE_CD":"30","MANUFACTURER_CD":"039","ACT_DOSE_85":"52","PEL_DOSE_90":"32","SURVEY_TYPE":"I","sourceDate":"2009-02-20"},{"SOURCE_ROW_NUMBER":"197015","EVENT_NO":"4159858","SURVEY_DATE":"02/20/2009","OCCUPATION_CD_DESC":"CONTINUOUS MINER OPERATOR","MACHINE_CD":"06","MANUFACTURER_CD":"058","ACT_DOSE_85":"124","PEL_DOSE_90":"121","SURVEY_TYPE":"I","sourceDate":"2009-02-20"},{"SOURCE_ROW_NUMBER":"197026","EVENT_NO":"4159858","SURVEY_DATE":"02/03/2009","OCCUPATION_CD_DESC":"SCOOP CAR OPERATOR","MACHINE_CD":"38","MANUFACTURER_CD":"038","ACT_DOSE_85":"83","PEL_DOSE_90":"64","SURVEY_TYPE":"I","sourceDate":"2009-02-03"},{"SOURCE_ROW_NUMBER":"197025","EVENT_NO":"4159858","SURVEY_DATE":"02/03/2009","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","MACHINE_CD":"06","MANUFACTURER_CD":"058","ACT_DOSE_85":"94","PEL_DOSE_90":"75","SURVEY_TYPE":"I","sourceDate":"2009-02-03"},{"SOURCE_ROW_NUMBER":"197024","EVENT_NO":"4159858","SURVEY_DATE":"02/03/2009","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","MACHINE_CD":"06","MANUFACTURER_CD":"058","ACT_DOSE_85":"82","PEL_DOSE_90":"62","SURVEY_TYPE":"I","sourceDate":"2009-02-03"},{"SOURCE_ROW_NUMBER":"197023","EVENT_NO":"4159858","SURVEY_DATE":"02/03/2009","OCCUPATION_CD_DESC":"ROOF BOLTER (TWIN HEAD) (RETURN SIDE)","MACHINE_CD":"30","MANUFACTURER_CD":"039","ACT_DOSE_85":"125","PEL_DOSE_90":"103","SURVEY_TYPE":"I","sourceDate":"2009-02-03"},{"SOURCE_ROW_NUMBER":"197022","EVENT_NO":"4159858","SURVEY_DATE":"02/03/2009","OCCUPATION_CD_DESC":"ROOF BOLTER (TWIN HEAD) (INTAKE SIDE)","MACHINE_CD":"30","MANUFACTURER_CD":"039","ACT_DOSE_85":"129","PEL_DOSE_90":"122","SURVEY_TYPE":"I","sourceDate":"2009-02-03"},{"SOURCE_ROW_NUMBER":"197021","EVENT_NO":"4159858","SURVEY_DATE":"02/03/2009","OCCUPATION_CD_DESC":"CONTINUOUS MINER OPERATOR","MACHINE_CD":"06","MANUFACTURER_CD":"058","ACT_DOSE_85":"116","PEL_DOSE_90":"104","SURVEY_TYPE":"I","sourceDate":"2009-02-03"}]},{"id":"msha-quartz-samples","name":"Quartz Samples — Coal","domains":["health","safety"],"products":["quartz exposure trends","occupation context","applicable-rule linkage"],"rowCount":112,"firstDate":"2000-01-25","lastDate":"2009-02-03","metrics":{"recentRows":0,"voidSamples":8,"maxQuartzPct":14.4,"validSamples":104,"quartzPctTotal":581.9},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"133300","CASSETTE_NO":"57779589","SAMPLE_DT":"02/03/2009","QUARTZ_PCT":"02.8","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2009-02-03"},{"SOURCE_ROW_NUMBER":"102876","CASSETTE_NO":"57769137","SAMPLE_DT":"12/02/2008","QUARTZ_PCT":"04.1","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2008-12-02"},{"SOURCE_ROW_NUMBER":"48071","CASSETTE_NO":"57769072","SAMPLE_DT":"10/28/2008","QUARTZ_PCT":"02.0","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2008-10-28"},{"SOURCE_ROW_NUMBER":"134678","CASSETTE_NO":"57747321","SAMPLE_DT":"07/14/2008","QUARTZ_PCT":"05.2","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2008-07-14"},{"SOURCE_ROW_NUMBER":"111833","CASSETTE_NO":"57724247","SAMPLE_DT":"01/28/2008","QUARTZ_PCT":"05.5","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2008-01-28"},{"SOURCE_ROW_NUMBER":"40480","CASSETTE_NO":"57712776","SAMPLE_DT":"10/29/2007","QUARTZ_PCT":"06.9","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2007-10-29"},{"SOURCE_ROW_NUMBER":"23995","CASSETTE_NO":"57712816","SAMPLE_DT":"10/29/2007","QUARTZ_PCT":"06.3","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2007-10-29"},{"SOURCE_ROW_NUMBER":"152650","CASSETTE_NO":"57679822","SAMPLE_DT":"08/21/2007","QUARTZ_PCT":"02.8","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2007-08-21"},{"SOURCE_ROW_NUMBER":"117612","CASSETTE_NO":"57679655","SAMPLE_DT":"08/21/2007","QUARTZ_PCT":"01.5","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"INTAKE AIR","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2007-08-21"},{"SOURCE_ROW_NUMBER":"112878","CASSETTE_NO":"57679581","SAMPLE_DT":"08/16/2007","QUARTZ_PCT":"02.7","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2007-08-16"},{"SOURCE_ROW_NUMBER":"48089","CASSETTE_NO":"57679702","SAMPLE_DT":"08/16/2007","QUARTZ_PCT":"03.4","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2007-08-16"},{"SOURCE_ROW_NUMBER":"114985","CASSETTE_NO":"57679610","SAMPLE_DT":"07/11/2007","QUARTZ_PCT":"04.1","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2007-07-11"}]},{"id":"msha-violations","name":"Violations","domains":["compliance","safety","legal"],"products":["citation and order record","condition text","Title 30 linkage","abatement patterns"],"rowCount":699,"firstDate":"2000-01-10","lastDate":"2009-10-08","metrics":{"ss":364,"amountDue":212562,"contested":17,"amountPaid":212562,"recentRows":0,"section104d":4,"unterminated":1,"proposedPenalty":243560},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"2329154","VIOLATION_NO":"8161853","VIOLATION_ISSUE_DT":"10/08/2009","SIG_SUB":"Y","PART_SECTION":"77.502","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"10/08/2009","PROPOSED_PENALTY":"1304","AMOUNT_DUE":"176","AMOUNT_PAID":"176","CONTESTED_IND":"Y","DOCKET_NO":"VA 2010-163","sourceDate":"2009-10-08"},{"SOURCE_ROW_NUMBER":"2329153","VIOLATION_NO":"8161852","VIOLATION_ISSUE_DT":"10/08/2009","SIG_SUB":"Y","PART_SECTION":"77.205(b)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"10/08/2009","PROPOSED_PENALTY":"392","AMOUNT_DUE":"176","AMOUNT_PAID":"176","CONTESTED_IND":"Y","DOCKET_NO":"VA 2010-163","sourceDate":"2009-10-08"},{"SOURCE_ROW_NUMBER":"2329152","VIOLATION_NO":"8161851","VIOLATION_ISSUE_DT":"10/08/2009","SIG_SUB":"N","PART_SECTION":"75.1100-3","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"10/08/2009","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2009-10-08"},{"SOURCE_ROW_NUMBER":"2329151","VIOLATION_NO":"8161850","VIOLATION_ISSUE_DT":"10/08/2009","SIG_SUB":"Y","PART_SECTION":"75.503","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"10/08/2009","PROPOSED_PENALTY":"585","AMOUNT_DUE":"263","AMOUNT_PAID":"263","CONTESTED_IND":"Y","DOCKET_NO":"VA 2010-163","sourceDate":"2009-10-08"},{"SOURCE_ROW_NUMBER":"2329150","VIOLATION_NO":"8161849","VIOLATION_ISSUE_DT":"10/07/2009","SIG_SUB":"N","PART_SECTION":"75.360(a)(1)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"10/08/2009","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2009-10-07"},{"SOURCE_ROW_NUMBER":"2328963","VIOLATION_NO":"8164104","VIOLATION_ISSUE_DT":"08/04/2009","SIG_SUB":"N","PART_SECTION":"75.1100-3","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"NoLikelihood","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"08/04/2009","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2009-08-04"},{"SOURCE_ROW_NUMBER":"2328958","VIOLATION_NO":"8161847","VIOLATION_ISSUE_DT":"07/27/2009","SIG_SUB":"N","PART_SECTION":"75.362(g)(1)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"07/27/2009","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2009-07-27"},{"SOURCE_ROW_NUMBER":"2328957","VIOLATION_NO":"8161846","VIOLATION_ISSUE_DT":"07/27/2009","SIG_SUB":"N","PART_SECTION":"75.1731(b)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"07/27/2009","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2009-07-27"},{"SOURCE_ROW_NUMBER":"2328956","VIOLATION_NO":"8161845","VIOLATION_ISSUE_DT":"07/27/2009","SIG_SUB":"N","PART_SECTION":"75.400","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"07/27/2009","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2009-07-27"},{"SOURCE_ROW_NUMBER":"2328955","VIOLATION_NO":"8161844","VIOLATION_ISSUE_DT":"07/27/2009","SIG_SUB":"N","PART_SECTION":"75.1731(b)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"07/27/2009","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2009-07-27"},{"SOURCE_ROW_NUMBER":"2328910","VIOLATION_NO":"8161843","VIOLATION_ISSUE_DT":"07/21/2009","SIG_SUB":"Y","PART_SECTION":"75.517","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"07/21/2009","PROPOSED_PENALTY":"176","AMOUNT_DUE":"176","AMOUNT_PAID":"176","CONTESTED_IND":"N","sourceDate":"2009-07-21"},{"SOURCE_ROW_NUMBER":"2328909","VIOLATION_NO":"8161842","VIOLATION_ISSUE_DT":"07/21/2009","SIG_SUB":"N","PART_SECTION":"75.601-1","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"LowNegligence","TERMINATION_DT":"07/21/2009","PROPOSED_PENALTY":"100","AMOUNT_DUE":"100","AMOUNT_PAID":"100","CONTESTED_IND":"N","sourceDate":"2009-07-21"}]}],"safety":{"href":"/api/v1/mines/4404946/safety","description":"Full-period safety series, top CFR sections and paginated activity. Requires PostgreSQL."},"silica":{"href":"/api/v1/mines/4404946/silica","description":"Dedicated silica records, measurements, sample status and trends. Defaults to the snapshot year; use year=all for history."},"externalContext":{"eia":null,"title30":{"snapshot":{"chapterCount":6,"featuredSectionCount":100,"latestAmendedOn":"2026-08-14","latestIssueDate":"2026-08-14","partCount":206,"sectionCount":5954,"upToDateAsOf":"2026-08-19"},"regulations":[{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 77.502","heading":"Electric equipment; examination, testing, and maintenance.","id":"77.502","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-F/section-77.502","part":"77","partHeading":"PART 77—MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"F","subpartHeading":"Subpart F—Electrical Equipment—General","text":"Electric equipment shall be frequently examined, tested, and properly maintained by a qualified person to assure safe operating conditions. When a potentially dangerous condition is found on electric equipment, such equipment shall be removed from service until such condition is corrected. A record of such examinations shall be kept.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 77.205","heading":"Travelways at surface installations.","id":"77.205","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-C/section-77.205","part":"77","partHeading":"PART 77—MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"C","subpartHeading":"Subpart C—Surface Installations","text":"(a) Safe means of access shall be provided and maintained to all working places.\n\n(b) Travelways and platforms or other means of access to areas where persons are required to travel or work, shall be kept clear of all extraneous material and other stumbling or slipping hazards.\n\n(c) Inclined travelways shall be constructed of nonskid material or equipped with cleats.\n\n(d) Regularly used travelways shall be sanded, salted, or cleared of snow and ice as soon as practicable.\n\n(e) Crossovers, elevated walkways, elevated ramps, and stairways shall be of substantial construction, provided with handrails, and maintained in good condition. Where necessary toeboards shall be provided.\n\n(f) Crossovers shall be provided where it is necessary to cross conveyors.\n\n(g) Moving conveyors shall be crossed only at designated crossover points.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.1100-3","heading":"Condition and examination of firefighting equipment.","id":"75.1100-3","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-L/section-75.1100-3","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"L","subpartHeading":"Subpart L—Fire Protection","text":"All firefighting equipment shall be maintained in a usable and operative condition. Chemical extinguishers shall be examined every 6 months and the date of the examination shall be written on a permanent tag attached to the extinguisher.\n\n[35 FR 17890, Nov. 20, 1970, as amended at 60 FR 33723, June 29, 1995]","occurrenceCount":2},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.503","heading":"Permissible electric face equipment; maintenance.","id":"75.503","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-F/section-75.503","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"F","subpartHeading":"Subpart F—Electrical Equipment—General","text":"[Statutory Provisions]\n\nThe operator of each coal mine shall maintain in permissible condition all electric face equipment required by §§ 75.500, 75.501, 75.504 to be permissible which is taken into or used inby the last open crosscut of any such mine.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.360","heading":"Preshift examination at fixed intervals.","id":"75.360","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.360","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a)(1) Except as provided in paragraph (a)(2) of this section, a certified person designated by the operator must make a preshift examination within 3 hours preceding the beginning of any 8-hour interval during which any person is scheduled to work or travel underground. No person other than certified examiners may enter or remain in any underground area unless a preshift examination has been completed for the established 8-hour interval. The operator must establish 8-hour intervals of time subject to the required preshift examinations.\n\n(2) Preshift examinations of areas where pumpers are scheduled to work or travel shall not be required prior to the pumper entering the areas if the pumper is a certified person and the pumper conducts an examination for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (b)(11) of this section, tests for methane and oxygen deficiency, and determines if the air is moving in its proper direction in the area where the pumper works or travels. The examination of the area must be completed before the pumper performs any other work. A record of all hazardous conditions and violations of the mandatory health or safety standards found by the pumper shall be made and retained in accordance with § 75.363 of this part.\n\n(b) The person conducting the preshift examination shall examine for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (b)(11) of this section, test for methane and oxygen deficiency, and determine if the air is moving in its proper direction at the following locations:\n\n(1) Roadways, travelways and track haulageways where persons are scheduled, prior to the beginning of the preshift examination, to work or travel during the oncoming shift.\n\n(2) Belt conveyors that will be used to transport persons during the oncoming shift and the entries in which these belt conveyors are located.\n\n(3) Working sections and areas where mechanized mining equipment is being installed or removed, if anyone is scheduled to work on the section or in the area during the oncoming shift. The scope of the examination shall include the working places, approaches to worked-out areas and ventilation controls on these sections and in these areas, and the examination shall include tests of the roof, face and rib conditions on these sections and in these areas.\n\n(4) Approaches to worked-out areas along intake air courses and at the entries used to carry air into worked-out areas if the intake air passing the approaches is used to ventilate working sections where anyone is scheduled to work during the oncoming shift. The examination of the approaches to the worked-out areas shall be made in the intake air course immediately inby and outby each entry used to carry air into the worked-out area. An examination of the entries used to carry air into the worked-out areas shall be conducted at a point immediately inby the intersection of each entry with the intake air course.\n\n(5) Seals along intake air courses where intake air passes by a seal to ventilate working sections where anyone is scheduled to work during the oncoming shift.\n\n(6)(i) Entries and rooms developed after November 15, 1992, and developed more than 2 crosscuts off an intake air course without permanent ventilation controls where intake air passes through or by these entries or rooms to reach a working section where anyone is scheduled to work during the oncoming shift; and,\n\n(ii) Entries and rooms developed after November 15, 1992, and driven more than 20 feet off an intake air course without a crosscut and without permanent ventilation controls where intake air passes through or by these entries or rooms to reach a working section where anyone is scheduled to work during the oncoming shift.\n\n(7) Areas where trolley wires or trolley feeder wires are to be or will remain energized during the oncoming shift.\n\n(8) High spots along intake air courses where methane is likely to accumulate, if equipment will be operated in the area during the shift.\n\n(9) Underground electrical installations referred to in § 75.340(a), except those pumps listed in § 75.340 (b)(2) through (b)(6), and areas where compressors subject to § 75.344 are installed if the electrical installation or compressor is or will be energized during the shift.\n\n(10) Other areas where work or travel during the oncoming shift is scheduled prior to the beginning of the preshift examination.\n\n(11) Preshift examinations shall include examinations to identify violations of the standards listed below:\n\n(i) §§ 75.202(a) and 75.220(a)(1)—roof control;\n\n(ii) §§ 75.333(h) and 75.370(a)(1)—ventilation, methane;\n\n(iii) §§ 75.400 and 75.403—accumulations of combustible materials and application of rock dust;\n\n(iv) § 75.1403—other safeguards, limited to maintenance of travelways along belt conveyors, off track haulage roadways, and track haulage, track switches, and other components for haulage;\n\n(v) § 75.1722(a)—guarding moving machine parts; and\n\n(vi) § 75.1731(a)—maintenance of belt conveyor components.\n\n(c) The person conducting the preshift examination shall determine the volume of air entering each of the following areas if anyone is scheduled to work in the areas during the oncoming shift:\n\n(1) In the last open crosscut of each set of entries or rooms on each working section and areas where mechanized mining equipment is being installed or removed. The last open crosscut is the crosscut in the line of pillars containing the permanent stoppings that separate the intake air courses and the return air courses.\n\n(2) On each longwall or shortwall in the intake entry or entries at the intake end of the longwall or shortwall face immediately outby the face and the velocity of air at each end of the face at the locations specified in the approved ventilation plan.\n\n(3) At the intake end of any pillar line—\n\n(i) If a single split of air is used, in the intake entry furthest from the return air course, immediately outby the first open crosscut outby the line of pillars being mined; or\n\n(ii) If a split system is used, in the intake entries of each split immediately inby the split point.\n\n(d) The person conducting the preshift examination shall check the refuge alternative for damage, the integrity of the tamper-evident seal and the mechanisms required to deploy the refuge alternative, and the ready availability of compressed oxygen and air.\n\n(e) The district manager may require the operator to examine other areas of the mine or examine for other hazards and violations of other mandatory health or safety standards found during the preshift examination.\n\n(f) Certification. At each working place examined, the person doing the preshift examination shall certify by initials, date, and the time, that the examination was made. In areas required to be examined outby a working section, the certified person shall certify by initials, date, and the time at enough locations to show that the entire area has been examined.\n\n(g) Recordkeeping. A record of the results of each preshift examination, including a record of hazardous conditions and violations of the nine mandatory health or safety standards and their locations found by the examiner during each examination, and of the results and locations of air and methane measurements, shall be made on the surface before any persons, other than certified persons conducting examinations required by this subpart, enter any underground area of the mine. The results of methane tests shall be recorded as the percentage of methane measured by the examiner. The record shall be made by the certified person who made the examination or by a person designated by the operator. If the record is made by someone other than the examiner, the examiner shall verify the record by initials and date by or at the end of the shift for which the examination was made. A record shall also be made by a certified person of the action taken to correct hazardous conditions and violations of mandatory health or safety standards found during the preshift examination. All preshift and corrective action records shall be countersigned by the mine foreman or equivalent mine official by the end of the mine foreman's or equivalent mine official's next regularly scheduled working shift. The records required by this section shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.\n\n(h) Retention period. Records shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.\n\n[61 FR 9829, Mar. 11, 1996, as amended at 61 FR 55527, Oct. 25, 1996; 62 FR 35085, June 30, 1997; 64 FR 45170, Aug. 19, 1999; 73 FR 80697, Dec. 31, 2008; 77 FR 20714, Apr. 6, 2012]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.362","heading":"On-shift examination.","id":"75.362","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.362","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a)(1) At least once during each shift, or more often if necessary for safety, a certified person designated by the operator shall conduct an on-shift examination of each section where anyone is assigned to work during the shift and any area where mechanized mining equipment is being installed or removed during the shift. The certified person shall check for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (a)(3) of this section, test for methane and oxygen deficiency, and determine if the air is moving in its proper direction.\n\n(2) A person designated by the operator shall conduct an examination and record the results and the corrective actions taken to assure compliance with the respirable dust control parameters specified in the approved mine ventilation plan. In those instances when a shift change is accomplished without an interruption in production on a section, the examination shall be made anytime within 1 hour after the shift change. In those instances when there is an interruption in production during the shift change, the examination shall be made before production begins on a section. Deficiencies in dust controls shall be corrected before production begins or resumes. The examination shall include: Air quantities and velocities; water pressures and flow rates; excessive leakage in the water delivery system; water spray numbers and orientations; section ventilation and control device placement; roof bolting machine dust collector vacuum levels; scrubber air flow rate; work practices required by the ventilation plan; and any other dust suppression measures. Measurements of the air velocity and quantity, water pressure and flow rates are not required if continuous monitoring of these controls is used and indicates that the dust controls are functioning properly.\n\n(3) On-shift examinations shall include examinations to identify violations of the standards listed below:\n\n(i) §§ 75.202(a) and 75.220(a)(1)—roof control;\n\n(ii) §§ 75.333(h) and 75.370(a)(1)—ventilation, methane;\n\n(iii) §§ 75.400 and 75.403—accumulations of combustible materials and application of rock dust;\n\n(iv) § 75.1403—other safeguards, limited to maintenance of travelways along belt conveyors, off track haulage roadways, and track haulage, track switches, and other components for haulage;\n\n(v) § 75.1722(a)—guarding moving machine parts; and\n\n(vi) § 75.1731(a)—maintenance of belt conveyor components.\n\n(b) During each shift that coal is produced, a certified person shall examine for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (a)(3) of this section along each belt conveyor haulageway where a belt conveyor is operated. This examination may be conducted at the same time as the preshift examination of belt conveyors and belt conveyor haulageways, if the examination is conducted within 3 hours before the oncoming shift.\n\n(c) Persons conducting the on-shift examination shall determine at the following locations:\n\n(1) The volume of air in the last open crosscut of each set of entries or rooms on each section and areas where mechanized mining equipment is being installed or removed. The last open crosscut is the crosscut in the line of pillars containing the permanent stoppings that separate the intake air courses and the return air courses.\n\n(2) The volume of air on a longwall or shortwall, including areas where longwall or shortwall equipment is being installed or removed, in the intake entry or entries at the intake end of the longwall or shortwall.\n\n(3) The velocity of air at each end of the longwall or shortwall face at the locations specified in the approved ventilation plan.\n\n(4) The volume of air at the intake end of any pillar line—\n\n(i) Where a single split of air is used in the intake entry furthest from the return air course immediately outby the first open crosscut outby the line of pillars being mined; or\n\n(ii) Where a split system is used in the intake entries of each split immediately inby the split point.\n\n(d) (1) A qualified person shall make tests for methane—\n\n(i) At the start of each shift at each working place before electrically operated equipment is energized; and\n\n(ii) Immediately before equipment is energized, taken into, or operated in a working place; and\n\n(iii) At 20-minute intervals, or more often if required in the approved ventilation plan at specific locations, during the operation of equipment in the working place.\n\n(2) Except as provided for in paragraph (d)(3) of this section, these methane tests shall be made at the face from under permanent roof support, using extendable probes or other acceptable means. When longwall or shortwall mining systems are used, these methane tests shall be made at the shearer, the plow, or the cutting head. When mining has been stopped for more than 20 minutes, methane tests shall be conducted prior to the start up of equipment.\n\n(3) As an alternative method of compliance with paragraph (d)(2) of this section during roof bolting, methane tests may be made by sweeping an area not less than 16 feet inby the last area of permanently supported roof, using a probe or other acceptable means. This method of testing is conditioned on meeting the following requirements:\n\n(i) The roof bolting machine must be equipped with an integral automated temporary roof support (ATRS) system that meets the requirements of 30 CFR 75.209.\n\n(ii) The roof bolting machine must have a permanently mounted, MSHA-approved methane monitor which meets the maintenance and calibration requirements of 30 CFR 75.342(a)(4), the warning signal requirements of 30 CFR 75.342(b), and the automatic de-energization requirements of 30 CFR 75.342(c).\n\n(iii) The methane monitor sensor must be mounted near the inby end and within 18 inches of the longitudinal center of the ATRS support, and positioned at least 12 inches from the roof when the ATRS is fully deployed.\n\n(iv) Manual methane tests must be made at intervals not exceeding 20 minutes. The test may be made either from under permanent roof support or from the roof bolter's work position protected by the deployed ATRS.\n\n(v) Once a methane test is made at the face, all subsequent methane tests in the same area of unsupported roof must also be made at the face, from under permanent roof support, using extendable probes or other acceptable means at intervals not exceeding 20 minutes.\n\n(vi) The district manager may require that the ventilation plan include the minimum air quantity and the position and placement of ventilation controls to be maintained during roof bolting.\n\n(e) If auxiliary fans and tubing are used, they shall be inspected frequently.\n\n(f) During each shift that coal is produced and at intervals not exceeding 4 hours, tests for methane shall be made by a certified person or by an atmospheric monitoring system (AMS) in each return split of air from each working section between the last working place, or longwall or shortwall face, ventilated by that split of air and the junction of the return air split with another air split, seal, or worked-out area. If auxiliary fans and tubing are used, the tests shall be made at a location outby the auxiliary fan discharge.\n\n(g) Certification. (1) The person conducting the on-shift examination in belt haulage entries shall certify by initials, date, and time that the examination was made. The certified person shall certify by initials, date, and the time at enough locations to show that the entire area has been examined.\n\n(2) The certified person directing the on-shift examination to assure compliance with the respirable dust control parameters specified in the approved mine ventilation plan shall:\n\n(i) Certify by initials, date, and time on a board maintained at the section load-out or similar location showing that the examination was made prior to resuming production; and\n\n(ii) Verify, by initials and date, the record of the results of the examination required under (a)(2) of this section to assure compliance with the respirable dust control parameters specified in the mine ventilation plan. The verification shall be made no later than the end of the shift for which the examination was made.\n\n(3) The mine foreman or equivalent mine official shall countersign each examination record required under (a)(2) of this section after it is verified by the certified person under (g)(2)(ii) of this section, and no later than the end of the mine foreman's or equivalent mine official's next regularly scheduled working shift. The record shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.\n\n(4) Records shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.\n\n[61 FR 9829, Mar. 11, 1996; 61 FR 26442, May 28, 1996, as amended at 68 FR 40138, July 7, 2003; 77 FR 20715, Apr. 6, 2012; 79 FR 24987, May 1, 2014]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.1731","heading":"Maintenance of belt conveyors and belt conveyor entries.","id":"75.1731","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-R/section-75.1731","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"R","subpartHeading":"Subpart R—Miscellaneous","text":"(a) Damaged rollers, or other damaged belt conveyor components, which pose a fire hazard must be immediately repaired or replaced. All other damaged rollers, or other damaged belt conveyor components, must be repaired or replaced.\n\n(b) Conveyor belts must be properly aligned to prevent the moving belt from rubbing against the structure or components.\n\n(c) Materials shall not be allowed in the belt conveyor entry where the material may contribute to a frictional heating hazard.\n\n(d) Splicing of any approved conveyor belt must maintain flame-resistant properties of the belt.\n\n[73 FR 80616, Dec. 31, 2008]","occurrenceCount":2},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.400","heading":"Accumulation of combustible materials.","id":"75.400","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-E/section-75.400","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"E","subpartHeading":"Subpart E—Combustible Materials and Rock Dusting","text":"Coal dust, including float coal dust deposited on rock-dusted surfaces, loose coal, and other combustible materials, shall be cleaned up and not be permitted to accumulate in active workings, or on diesel-powered and electric equipment therein.\n\n[61 FR 55527, Oct. 25, 1996]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.517","heading":"Power wires and cables; insulation and protection.","id":"75.517","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-F/section-75.517","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"F","subpartHeading":"Subpart F—Electrical Equipment—General","text":"[Statutory Provisions]\n\nPower wires and cables, except trolley wires, trolley feeder wires, and bare signal wires, shall be insulated adequately and fully protected.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.601-1","heading":"Short circuit protection; ratings and settings of circuit breakers.","id":"75.601-1","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-G/section-75.601-1","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"G","subpartHeading":"Subpart G—Trailing Cables","text":"Circuit breakers providing short circuit protection for trailing cables shall be set so as not to exceed the maximum allowable instantaneous settings specified in this section; however, higher settings may be permitted by an authorized representative of the Secretary when he has determined that special applications are justified:\n\nConductor size AWG or MGM Maximum allowable circuit breaker instantaneous setting (amperes) 14 50 12 75 10 150 8 200 6 300 4 500 3 600 2 800 1 1,000 1/0 1,250 2/0 1,500 3/0 2,000 4/0 2,500 250 2,500 300 2,500 350 2,500 400 2,500 450 2,500 500 2,500","occurrenceCount":1}],"fullCorpus":"/data/title30-sections.json"}}},"meta":{"representation":"json","mineId":"4404946","dataSource":"postgres","snapshotId":"2026-10-13T11:19:05.459773+00:00","completedAt":"2026-10-13T11:26:59.401Z","sourceCount":20,"totalRows":17906804}}