# Relationship history for MSHA mine 4300633

Current hierarchy: **Dana M  Gravel; Dean A  Gravel → Gravel Construction Co Inc → Cedar Rapids Crusher**

- Valid-time bounds: inclusive, date granularity
- Null end: open-ended in the upstream history row; not independent proof of present control
- Transaction-time observation: 2026-10-13T11:19:05.459773+00:00

## Valid-time edges

- **operator_operates_mine:** Gravel Construction Co Inc → Cedar Rapids Crusher; 2005-07-13 to current/open; source msha-controller-operator-history
- **controller_controls_mine:** Dana M  Gravel  et al → Cedar Rapids Crusher; 2005-07-13 to current/open; source msha-controller-operator-history
- **controller_controls_operator:** Dana M  Gravel  et al → Gravel Construction Co Inc; 2005-07-13 to current/open; source msha-controller-operator-history
- **controller_controls_operator:** Dean A  Gravel  et al → Gravel Construction Co Inc; 2005-07-13 to current/open; source msha-controller-operator-history
