# Relationship history for MSHA mine 4202176

Current hierarchy: **Larry  Rose → Larry Rose Construction → ROSE GRAVEL PIT**

- Valid-time bounds: inclusive, date granularity
- Null end: open-ended in the upstream history row; not independent proof of present control
- Transaction-time observation: 2026-10-13T11:19:05.459773+00:00

## Valid-time edges

- **operator_operates_mine:** Larry Rose Construction → ROSE GRAVEL PIT; 1997-05-01 to current/open; source msha-controller-operator-history
- **controller_controls_mine:** Larry  Rose → ROSE GRAVEL PIT; 1997-05-01 to current/open; source msha-controller-operator-history
- **controller_controls_operator:** Larry  Rose → Larry Rose Construction; 1997-05-01 to current/open; source msha-controller-operator-history
