# Relationship history for MSHA mine 4201225

Current hierarchy: **Schocker Robert E → Schocker Construction Company → Schocker Sand And Gravel Pit**

- Valid-time bounds: inclusive, date granularity
- Null end: open-ended in the upstream history row; not independent proof of present control
- Transaction-time observation: 2026-10-17T05:35:58.500035+00:00

## Valid-time edges

- **operator_operates_mine:** Schocker Construction Company → Schocker Sand And Gravel Pit; 1950-01-01 to current/open; source msha-controller-operator-history
- **controller_controls_mine:** Schocker Robert E → Schocker Sand And Gravel Pit; 1950-01-01 to current/open; source msha-controller-operator-history
- **controller_controls_operator:** Schocker Robert E → Schocker Construction Company; 1950-01-01 to current/open; source msha-controller-operator-history
