# Relationship history for MSHA mine 4104852

Current hierarchy: **GCC SAB de CV → NM ENERGY LLC → Corner Ranch**

- Valid-time bounds: inclusive, date granularity
- Null end: open-ended in the upstream history row; not independent proof of present control
- Transaction-time observation: 2026-10-13T11:19:05.459773+00:00

## Valid-time edges

- **controller_controls_mine:** Stacey M Shelly" Simpson et al" → Corner Ranch; 2009-10-01 to current/open; source msha-controller-operator-history
- **operator_operates_mine:** Simpson Crushed Stone, LLC → Corner Ranch; 2011-02-01 to 2025-06-08; source msha-controller-operator-history
- **controller_controls_operator:** Stacey M Shelly" Simpson et al" → Simpson Crushed Stone, LLC; 2011-02-01 to 2025-06-08; source msha-controller-operator-history
- **controller_controls_operator:** Kenneth R Rusty"  Simpson et al" → Simpson Crushed Stone, LLC; 2011-02-01 to 2025-06-08; source msha-controller-operator-history
- **controller_controls_mine:** GCC SAB de CV → Corner Ranch; 2024-09-01 to current/open; source msha-controller-operator-history
- **operator_operates_mine:** NM ENERGY LLC → Corner Ranch; 2025-06-09 to current/open; source msha-controller-operator-history
- **controller_controls_operator:** GCC SAB de CV → NM ENERGY LLC; 2025-06-09 to current/open; source msha-controller-operator-history
