{"data":{"schemaVersion":"realm.mine-profile.v1","generatedAt":"2026-10-13T11:26:59.401Z","identity":{"mine_id":"4002966","name":"Mine #1","status":"Abandoned","status_date":"2002-08-29","mine_type":"Underground","coal_metal":"C","commodity":"Coal (Bituminous)","state":"TN","county":"Morgan","nearest_town":"Coalfield","operator_id":"P24121","operator_name":"Dalco Coal Of Tennessee Llc","controller_id":"C15809","controller_name":"Chester  Franklin","district":"C07","office":"Barbourville KY Field Office","employees":0,"latitude":36.036667,"longitude":-84.38},"coverage":{"contributingSources":11,"registeredSources":20,"sourceRows":133},"relationships":{"schemaVersion":"realm.temporal-relationships.v1","temporalSemantics":{"validTime":{"granularity":"date","bounds":"inclusive","nullStart":"start date not published in the upstream history row","nullEnd":"open-ended in the upstream history row; not independent proof of present control"},"transactionTime":{"observedAt":"2026-10-13T11:19:05.459773+00:00","meaning":"time the checksum-addressed MDRS artifacts were observed by the PostgreSQL ingestion"},"derivation":{"controllerControlsOperator":"intersection of controller and operator valid-time intervals evidenced through this mine","currentIdentity":"current controller and operator are asserted only by the MDRS Mines snapshot"}},"current":{"mine":{"type":"mine","id":"4002966","name":"Mine #1"},"operator":{"type":"operator","id":"P24121","name":"Dalco Coal Of Tennessee Llc"},"controller":{"type":"controller","id":"C15809","name":"Chester  Franklin"},"source":{"datasetId":"msha-mines","observedAt":"2026-10-13T11:19:05.459773+00:00"}},"edges":[{"type":"controller_controls_mine","subject":{"type":"controller","id":"C06624","name":"Donald C  Seiber et al"},"object":{"type":"mine","id":"4002966","name":"Mine #1"},"validFrom":"1978-08-28","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4002966|C06624|1978-08-28|"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"P03283","name":"Tri-Dean Mining Inc"},"object":{"type":"mine","id":"4002966","name":"Mine #1"},"validFrom":"1987-12-01","validTo":"1991-04-28","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4002966|P03283|1987-12-01|1991-04-28"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C06624","name":"Donald C  Seiber et al"},"object":{"type":"operator","id":"P03283","name":"Tri-Dean Mining Inc"},"validFrom":"1987-12-01","validTo":"1991-04-28","current":false,"derived":true,"evidenceMineId":"4002966","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4002966|P03283|1987-12-01|C06624|1978-08-28|72340"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"P21431","name":"Tri-Dean Mining Inc"},"object":{"type":"mine","id":"4002966","name":"Mine #1"},"validFrom":"1991-04-29","validTo":"1992-02-13","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4002966|P21431|1991-04-29|1992-02-13"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"C14380","name":"Harvey E  Ward et al"},"object":{"type":"mine","id":"4002966","name":"Mine #1"},"validFrom":"1991-04-29","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4002966|C14380|1991-04-29|"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C14380","name":"Harvey E  Ward et al"},"object":{"type":"operator","id":"P21431","name":"Tri-Dean Mining Inc"},"validFrom":"1991-04-29","validTo":"1992-02-13","current":false,"derived":true,"evidenceMineId":"4002966","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4002966|P21431|1991-04-29|C14380|1991-04-29|92655"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"P21885","name":"West Prg 1 Inc"},"object":{"type":"mine","id":"4002966","name":"Mine #1"},"validFrom":"1992-02-14","validTo":"1998-03-11","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4002966|P21885|1992-02-14|1998-03-11"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"C15120","name":"Onyx International Inc & Coalfield Consultants Inc"},"object":{"type":"mine","id":"4002966","name":"Mine #1"},"validFrom":"1992-02-14","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4002966|C15120|1992-02-14|"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C15120","name":"Onyx International Inc & Coalfield Consultants Inc"},"object":{"type":"operator","id":"P21885","name":"West Prg 1 Inc"},"validFrom":"1992-02-14","validTo":"1998-03-11","current":false,"derived":true,"evidenceMineId":"4002966","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4002966|P21885|1992-02-14|C15120|1992-02-14|94811"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"P23982","name":"East Ward Llc"},"object":{"type":"mine","id":"4002966","name":"Mine #1"},"validFrom":"1998-03-12","validTo":"1999-01-19","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4002966|P23982|1998-03-12|1999-01-19"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"C15731","name":"Sterling J  Gregory et al"},"object":{"type":"mine","id":"4002966","name":"Mine #1"},"validFrom":"1998-03-12","validTo":"1999-01-19","current":false,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4002966|C15731|1998-03-12|1999-01-19"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C15731","name":"Sterling J  Gregory et al"},"object":{"type":"operator","id":"P23982","name":"East Ward Llc"},"validFrom":"1998-03-12","validTo":"1999-01-19","current":false,"derived":true,"evidenceMineId":"4002966","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4002966|P23982|1998-03-12|C15731|1998-03-12|96633"}},{"type":"operator_operates_mine","subject":{"type":"operator","id":"P24121","name":"Dalco Coal Of Tennessee Llc"},"object":{"type":"mine","id":"4002966","name":"Mine #1"},"validFrom":"1999-01-20","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4002966|P24121|1999-01-20|"}},{"type":"controller_controls_mine","subject":{"type":"controller","id":"C15809","name":"Chester  Franklin"},"object":{"type":"mine","id":"4002966","name":"Mine #1"},"validFrom":"1999-01-20","validTo":null,"current":true,"derived":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4002966|C15809|1999-01-20|"}},{"type":"controller_controls_operator","subject":{"type":"controller","id":"C15809","name":"Chester  Franklin"},"object":{"type":"operator","id":"P24121","name":"Dalco Coal Of Tennessee Llc"},"validFrom":"1999-01-20","validTo":null,"current":true,"derived":true,"evidenceMineId":"4002966","intervalAnomaly":false,"source":{"datasetId":"msha-controller-operator-history","observedAt":"2026-10-13T11:19:05.459773+00:00","recordKey":"4002966|P24121|1999-01-20|C15809|1999-01-20|96808"}}],"coverage":{"historyRecords":5,"edgeCount":15,"intervalAnomalies":0,"sourceDatasetId":"msha-controller-operator-history"}},"sources":[{"id":"msha-addresses","name":"Addresses of Record","domains":["identity","logistics"],"products":["entity resolution","address history","facility geocoding"],"rowCount":1,"firstDate":"2002-08-29","lastDate":"2002-08-29","metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-assessed-violations","name":"Assessed Violations","domains":["compliance","legal"],"products":["penalty lifecycle","paid and outstanding amounts","assessment aging"],"rowCount":18,"firstDate":"2000-01-03","lastDate":"2000-04-20","metrics":{"ss":14,"delinquent":18,"recentRows":0,"paidPenalty":1770,"proposedPenalty":1770,"currentAssessment":1770},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"1089359","VIOLATION_NO":"7451431","ISSUE_DT":"04/20/2000","CFR_STANDARD_CD":"77.1109(c)(1)","SIG_SUB_IND":"N","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"55.00","CURRENT_ASSESSMENT_AMT":"55.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2000-04-20"},{"SOURCE_ROW_NUMBER":"1089358","VIOLATION_NO":"7451425","ISSUE_DT":"04/20/2000","CFR_STANDARD_CD":"77.1605(d)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"90.00","CURRENT_ASSESSMENT_AMT":"90.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2000-04-20"},{"SOURCE_ROW_NUMBER":"1089357","VIOLATION_NO":"7451424","ISSUE_DT":"04/20/2000","CFR_STANDARD_CD":"75.370(a)(1)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"131.00","CURRENT_ASSESSMENT_AMT":"131.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2000-04-20"},{"SOURCE_ROW_NUMBER":"1089356","VIOLATION_NO":"7451423","ISSUE_DT":"04/20/2000","CFR_STANDARD_CD":"75.362(a)(1)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"131.00","CURRENT_ASSESSMENT_AMT":"131.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2000-04-20"},{"SOURCE_ROW_NUMBER":"1089038","VIOLATION_NO":"7467064","ISSUE_DT":"02/22/2000","CFR_STANDARD_CD":"75.601-1","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"104.00","CURRENT_ASSESSMENT_AMT":"104.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2000-02-22"},{"SOURCE_ROW_NUMBER":"1089037","VIOLATION_NO":"7467063","ISSUE_DT":"02/22/2000","CFR_STANDARD_CD":"75.600-1","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"104.00","CURRENT_ASSESSMENT_AMT":"104.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2000-02-22"},{"SOURCE_ROW_NUMBER":"1089036","VIOLATION_NO":"7467062","ISSUE_DT":"02/22/2000","CFR_STANDARD_CD":"75.605","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"104.00","CURRENT_ASSESSMENT_AMT":"104.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2000-02-22"},{"SOURCE_ROW_NUMBER":"1089035","VIOLATION_NO":"7467061","ISSUE_DT":"02/22/2000","CFR_STANDARD_CD":"75.601-1","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"104.00","CURRENT_ASSESSMENT_AMT":"104.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2000-02-22"},{"SOURCE_ROW_NUMBER":"1089034","VIOLATION_NO":"7465800","ISSUE_DT":"02/22/2000","CFR_STANDARD_CD":"75.601-1","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"104.00","CURRENT_ASSESSMENT_AMT":"104.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2000-02-22"},{"SOURCE_ROW_NUMBER":"1089033","VIOLATION_NO":"7465799","ISSUE_DT":"02/22/2000","CFR_STANDARD_CD":"75.701","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"104.00","CURRENT_ASSESSMENT_AMT":"104.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2000-02-22"},{"SOURCE_ROW_NUMBER":"1089032","VIOLATION_NO":"7465754","ISSUE_DT":"02/22/2000","CFR_STANDARD_CD":"75.802(b)(2)","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"140.00","CURRENT_ASSESSMENT_AMT":"140.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2000-02-22"},{"SOURCE_ROW_NUMBER":"1088972","VIOLATION_NO":"7465595","ISSUE_DT":"02/14/2000","CFR_STANDARD_CD":"75.523","SIG_SUB_IND":"Y","CITATION_TYPE_CD":"Citation","PROPOSED_PENALTY_AMT":"104.00","CURRENT_ASSESSMENT_AMT":"104.00","ASSESS_CASE_STATUS_CD":"Closed","sourceDate":"2000-02-14"}]},{"id":"msha-coal-dust-samples","name":"Coal Dust Samples","domains":["health","safety"],"products":["respirable dust trends","CPDM coverage","void patterns","occupation exposure"],"rowCount":38,"firstDate":"2000-01-03","lastDate":"2000-05-12","metrics":{"recentRows":0,"cpdmSamples":0,"voidSamples":5,"validSamples":33,"maxConcentration":7.762,"concentrationTotal":36.793},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"388999","CASS_NUM":"50510215","SMP_TAKEN_DT":"5/12/2000","CONC":".346","SMP_TYPE_CD_DESC":"INVALID SAMPLE TYPE","SMP_USE_CD_DESC":"VOID SAMPLE","VOID_CD_DESC":"INVALID SAMPLE TYPE","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-05-12"},{"SOURCE_ROW_NUMBER":"51292","CASS_NUM":"50510025","SMP_TAKEN_DT":"5/11/2000","CONC":".053","SMP_TYPE_CD_DESC":"DESIGNATED AREA","SMP_USE_CD_DESC":"VOID SAMPLE","VOID_CD_DESC":"EXCESS SAMPLE","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-05-11"},{"SOURCE_ROW_NUMBER":"53086","CASS_NUM":"50510074","SMP_TAKEN_DT":"5/10/2000","CONC":"3.871","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"VOID SAMPLE","VOID_CD_DESC":"CONTAMINATED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-05-10"},{"SOURCE_ROW_NUMBER":"435512","CASS_NUM":"50510036","SMP_TAKEN_DT":"5/9/2000","CONC":".201","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-05-09"},{"SOURCE_ROW_NUMBER":"979027","CASS_NUM":"50510263","SMP_TAKEN_DT":"5/8/2000","CONC":".615","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT YET USED IN DETERMINATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-05-08"},{"SOURCE_ROW_NUMBER":"795271","CASS_NUM":"57207147","SMP_TAKEN_DT":"5/2/2000","CONC":".575","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-05-02"},{"SOURCE_ROW_NUMBER":"768427","CASS_NUM":"57207141","SMP_TAKEN_DT":"5/2/2000","CONC":".179","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"SCOOP CAR OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-05-02"},{"SOURCE_ROW_NUMBER":"736849","CASS_NUM":"57207153","SMP_TAKEN_DT":"5/2/2000","CONC":"1.087","SMP_TYPE_CD_DESC":"DESIGNATED AREA","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"OCCUPATION CODE NOT FOUND","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-05-02"},{"SOURCE_ROW_NUMBER":"184066","CASS_NUM":"57207145","SMP_TAKEN_DT":"5/2/2000","CONC":".36","SMP_TYPE_CD_DESC":"DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"CONTINUOUS MINER OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-05-02"},{"SOURCE_ROW_NUMBER":"42108","CASS_NUM":"57207118","SMP_TAKEN_DT":"5/2/2000","CONC":".551","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-05-02"},{"SOURCE_ROW_NUMBER":"1543767","CASS_NUM":"57207453","SMP_TAKEN_DT":"4/20/2000","CONC":"1.11","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"SCOOP CAR OPERATOR","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-04-20"},{"SOURCE_ROW_NUMBER":"1533371","CASS_NUM":"57207462","SMP_TAKEN_DT":"4/20/2000","CONC":"1.759","SMP_TYPE_CD_DESC":"NON DESIGNATED OCCUPATION","SMP_USE_CD_DESC":"NOT USED ON INSPECTOR SAMPLES; NOT FOUND ON OPERATOR SAMPLE","VOID_CD_DESC":"SAMPLE NOT VOIDED","OCC_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","DEVICE_TYPE_CD":"CMDPSU","sourceDate":"2000-04-20"}]},{"id":"msha-controller-operator-history","name":"Controller and Operator History","domains":["identity","compliance"],"products":["historical ownership attribution","operator transitions","valid-time joins"],"rowCount":5,"firstDate":"1987-12-01","lastDate":"1999-01-20","metrics":{"recentRows":0,"currentOperatorTenures":1,"completedOperatorTenures":4},"periods":{},"recentRecords":[]},{"id":"msha-inspections","name":"Inspections","domains":["safety","compliance"],"products":["inspection mix","on-site hours","event context","citation rate denominator"],"rowCount":22,"firstDate":"2000-01-03","lastDate":"2002-08-29","metrics":{"inspectors":26,"recentRows":0,"onSiteHours":228.5,"inspectionHours":396,"inspectionSamples":0},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"503876","EVENT_NO":"4228599","INSPECTION_BEGIN_DT":"08/29/2002","INSPECTION_END_DT":"08/29/2002","ACTIVITY_CODE":"AAA","ACTIVITY":"Regular Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"4","SUM_TOTAL_ON_SITE_HOURS":"2","sourceDate":"2002-08-29"},{"SOURCE_ROW_NUMBER":"863966","EVENT_NO":"4228584","INSPECTION_BEGIN_DT":"04/22/2002","INSPECTION_END_DT":"06/20/2002","ACTIVITY_CODE":"AAA","ACTIVITY":"Regular Inspection","NBR_INSPECTOR":"2","SUM_TOTAL_INSP_HOURS":"20","SUM_TOTAL_ON_SITE_HOURS":"10","sourceDate":"2002-04-22"},{"SOURCE_ROW_NUMBER":"273721","EVENT_NO":"4228644","INSPECTION_BEGIN_DT":"03/21/2002","INSPECTION_END_DT":"03/21/2002","ACTIVITY_CODE":"AAA","ACTIVITY":"Regular Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"7","SUM_TOTAL_ON_SITE_HOURS":"2","sourceDate":"2002-03-21"},{"SOURCE_ROW_NUMBER":"596501","EVENT_NO":"4228549","INSPECTION_BEGIN_DT":"10/25/2001","INSPECTION_END_DT":"10/25/2001","ACTIVITY_CODE":"AAA","ACTIVITY":"Regular Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"5","SUM_TOTAL_ON_SITE_HOURS":"3","sourceDate":"2001-10-25"},{"SOURCE_ROW_NUMBER":"904069","EVENT_NO":"4211847","INSPECTION_BEGIN_DT":"08/28/2001","INSPECTION_END_DT":"08/30/2001","ACTIVITY_CODE":"AAA","ACTIVITY":"Regular Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"5","SUM_TOTAL_ON_SITE_HOURS":"1","sourceDate":"2001-08-28"},{"SOURCE_ROW_NUMBER":"196409","EVENT_NO":"4228609","INSPECTION_BEGIN_DT":"04/06/2001","INSPECTION_END_DT":"06/13/2001","ACTIVITY_CODE":"AAA","ACTIVITY":"Regular Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"8","SUM_TOTAL_ON_SITE_HOURS":"3.5","sourceDate":"2001-04-06"},{"SOURCE_ROW_NUMBER":"404401","EVENT_NO":"4228501","INSPECTION_BEGIN_DT":"02/14/2001","INSPECTION_END_DT":"03/27/2001","ACTIVITY_CODE":"AAA","ACTIVITY":"Regular Inspection","NBR_INSPECTOR":"3","SUM_TOTAL_INSP_HOURS":"15","SUM_TOTAL_ON_SITE_HOURS":"5","sourceDate":"2001-02-14"},{"SOURCE_ROW_NUMBER":"510429","EVENT_NO":"4211187","INSPECTION_BEGIN_DT":"10/02/2000","INSPECTION_END_DT":"12/20/2000","ACTIVITY_CODE":"AAA","ACTIVITY":"Regular Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"13","SUM_TOTAL_ON_SITE_HOURS":"5","sourceDate":"2000-10-02"},{"SOURCE_ROW_NUMBER":"852406","EVENT_NO":"4211806","INSPECTION_BEGIN_DT":"09/18/2000","INSPECTION_END_DT":"09/28/2000","ACTIVITY_CODE":"AAA","ACTIVITY":"Regular Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"7","SUM_TOTAL_ON_SITE_HOURS":"1","sourceDate":"2000-09-18"},{"SOURCE_ROW_NUMBER":"1108174","EVENT_NO":"4211180","INSPECTION_BEGIN_DT":"05/21/2000","INSPECTION_END_DT":"06/26/2000","ACTIVITY_CODE":"AAA","ACTIVITY":"Regular Inspection","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"28","SUM_TOTAL_ON_SITE_HOURS":"18","sourceDate":"2000-05-21"},{"SOURCE_ROW_NUMBER":"632959","EVENT_NO":"4211685","INSPECTION_BEGIN_DT":"05/01/2000","INSPECTION_END_DT":"05/04/2000","ACTIVITY_CODE":"BAB","ACTIVITY":"RESP DUST TECH INSP - U. G. MINES","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"18","SUM_TOTAL_ON_SITE_HOURS":"10","sourceDate":"2000-05-01"},{"SOURCE_ROW_NUMBER":"870165","EVENT_NO":"4211682","INSPECTION_BEGIN_DT":"04/25/2000","INSPECTION_END_DT":"04/26/2000","ACTIVITY_CODE":"CAA","ACTIVITY":"SPOT INSPECTION","NBR_INSPECTOR":"1","SUM_TOTAL_INSP_HOURS":"3","SUM_TOTAL_ON_SITE_HOURS":".5","sourceDate":"2000-04-25"}]},{"id":"msha-mine-production-quarterly","name":"Mine Employment and Production — Quarterly","domains":["production","safety","compliance"],"products":["production trend","employee hours","rate denominators","seasonality"],"rowCount":19,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2002-Q3":{"hours":0,"employees":0,"production":0},"2002-Q2":{"hours":0,"employees":0,"production":0},"2001-Q4":{"hours":0,"employees":0,"production":0},"2001-Q3":{"hours":0,"employees":0,"production":0},"2001-Q2":{"hours":0,"employees":0,"production":0},"2001-Q1":{"hours":0,"employees":0,"production":0},"2000-Q4":{"hours":0,"employees":0,"production":0},"2000-Q3":{"hours":0,"employees":0,"production":0},"2000-Q2":{"hours":4713,"employees":9,"production":7471},"2000-Q1":{"hours":7155,"employees":13,"production":3989}},"recentRecords":[]},{"id":"msha-mine-production-yearly","name":"Mine Employment and Production — Yearly","domains":["production","safety","compliance"],"products":["annual trend","backfill","quarterly reconciliation"],"rowCount":2,"firstDate":null,"lastDate":null,"metrics":{},"periods":{"2000":{"hours":11868,"employees":11,"production":11460}},"recentRecords":[]},{"id":"msha-mines","name":"Mines","domains":["identity","production","logistics"],"products":["mine identity","status","commodity","location","operator and controller"],"rowCount":1,"firstDate":null,"lastDate":null,"metrics":{},"periods":{},"recentRecords":[]},{"id":"msha-noise-samples","name":"Noise Samples","domains":["health","safety","equipment"],"products":["hearing exposure","machine and manufacturer patterns","occupation coverage"],"rowCount":5,"firstDate":"2000-01-19","lastDate":"2000-04-20","metrics":{"recentRows":0,"doseOver100":1,"actDoseTotal":285,"pelDoseTotal":163},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"181267","EVENT_NO":"4211674","SURVEY_DATE":"04/20/2000","OCCUPATION_CD_DESC":"LABORER/BLACKSMITH","MACHINE_CD":"40","MANUFACTURER_CD":"119","ACT_DOSE_85":"2","PEL_DOSE_90":"1","SURVEY_TYPE":"I","sourceDate":"2000-04-20"},{"SOURCE_ROW_NUMBER":"181266","EVENT_NO":"4211646","SURVEY_DATE":"01/19/2000","OCCUPATION_CD_DESC":"ROOF BOLTER (SINGLE HEAD)","MACHINE_CD":"30","MANUFACTURER_CD":"058","ACT_DOSE_85":"85","PEL_DOSE_90":"39","SURVEY_TYPE":"I","sourceDate":"2000-01-19"},{"SOURCE_ROW_NUMBER":"181265","EVENT_NO":"4211646","SURVEY_DATE":"01/19/2000","OCCUPATION_CD_DESC":"CONTINUOUS MINER OPERATOR","MACHINE_CD":"06","MANUFACTURER_CD":"114","ACT_DOSE_85":"129","PEL_DOSE_90":"96","SURVEY_TYPE":"I","sourceDate":"2000-01-19"},{"SOURCE_ROW_NUMBER":"181264","EVENT_NO":"4211646","SURVEY_DATE":"01/19/2000","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","MACHINE_CD":"37","MANUFACTURER_CD":"058","ACT_DOSE_85":"50","PEL_DOSE_90":"21","SURVEY_TYPE":"I","sourceDate":"2000-01-19"},{"SOURCE_ROW_NUMBER":"181263","EVENT_NO":"4211646","SURVEY_DATE":"01/19/2000","OCCUPATION_CD_DESC":"SHUTTLE CAR OPERATOR (STANDARD SIDE)","MACHINE_CD":"37","MANUFACTURER_CD":"058","ACT_DOSE_85":"19","PEL_DOSE_90":"6","SURVEY_TYPE":"I","sourceDate":"2000-01-19"}]},{"id":"msha-quartz-samples","name":"Quartz Samples — Coal","domains":["health","safety"],"products":["quartz exposure trends","occupation context","applicable-rule linkage"],"rowCount":4,"firstDate":"2000-02-08","lastDate":"2000-05-02","metrics":{"recentRows":0,"voidSamples":0,"maxQuartzPct":8.5,"validSamples":4,"quartzPctTotal":28.6},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"7561","CASSETTE_NO":"57207153","SAMPLE_DT":"05/02/2000","QUARTZ_PCT":"07.4","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2000-05-02"},{"SOURCE_ROW_NUMBER":"97629","CASSETTE_NO":"57261285","SAMPLE_DT":"04/20/2000","QUARTZ_PCT":"06.7","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2000-04-20"},{"SOURCE_ROW_NUMBER":"145172","CASSETTE_NO":"57260958","SAMPLE_DT":"02/08/2000","QUARTZ_PCT":"06.0","OCC_CODE_DESC":"CONTINUOUS MINER OPERATOR","SAMPLE_TYPE_DESC":"DESIGNATED OCCUPATION","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2000-02-08"},{"SOURCE_ROW_NUMBER":"139094","CASSETTE_NO":"57261239","SAMPLE_DT":"02/08/2000","QUARTZ_PCT":"08.5","OCC_CODE_DESC":"OCCUPATION CODE NOT FOUND","SAMPLE_TYPE_DESC":"DESIGNATED AREA","VOID_CD_DESC":"SAMPLE NOT VOIDED","sourceDate":"2000-02-08"}]},{"id":"msha-violations","name":"Violations","domains":["compliance","safety","legal"],"products":["citation and order record","condition text","Title 30 linkage","abatement patterns"],"rowCount":18,"firstDate":"2000-01-03","lastDate":"2000-04-20","metrics":{"ss":14,"amountDue":1770,"contested":0,"amountPaid":1770,"recentRows":0,"section104d":0,"unterminated":0,"proposedPenalty":1770},"periods":{},"recentRecords":[{"SOURCE_ROW_NUMBER":"2068397","VIOLATION_NO":"7451431","VIOLATION_ISSUE_DT":"04/20/2000","SIG_SUB":"N","PART_SECTION":"77.1109(c)(1)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Unlikely","INJ_ILLNESS":"NoLostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"04/25/2000","PROPOSED_PENALTY":"55","AMOUNT_DUE":"55","AMOUNT_PAID":"55","CONTESTED_IND":"N","sourceDate":"2000-04-20"},{"SOURCE_ROW_NUMBER":"2068396","VIOLATION_NO":"7451425","VIOLATION_ISSUE_DT":"04/20/2000","SIG_SUB":"Y","PART_SECTION":"77.1605(d)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"04/25/2000","PROPOSED_PENALTY":"90","AMOUNT_DUE":"90","AMOUNT_PAID":"90","CONTESTED_IND":"N","sourceDate":"2000-04-20"},{"SOURCE_ROW_NUMBER":"2068395","VIOLATION_NO":"7451424","VIOLATION_ISSUE_DT":"04/20/2000","SIG_SUB":"Y","PART_SECTION":"75.370(a)(1)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"5","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"04/20/2000","PROPOSED_PENALTY":"131","AMOUNT_DUE":"131","AMOUNT_PAID":"131","CONTESTED_IND":"N","sourceDate":"2000-04-20"},{"SOURCE_ROW_NUMBER":"2068394","VIOLATION_NO":"7451423","VIOLATION_ISSUE_DT":"04/20/2000","SIG_SUB":"Y","PART_SECTION":"75.362(a)(1)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"5","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"04/20/2000","PROPOSED_PENALTY":"131","AMOUNT_DUE":"131","AMOUNT_PAID":"131","CONTESTED_IND":"N","sourceDate":"2000-04-20"},{"SOURCE_ROW_NUMBER":"2068393","VIOLATION_NO":"7467064","VIOLATION_ISSUE_DT":"02/22/2000","SIG_SUB":"Y","PART_SECTION":"75.601-1","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"02/22/2000","PROPOSED_PENALTY":"104","AMOUNT_DUE":"104","AMOUNT_PAID":"104","CONTESTED_IND":"N","sourceDate":"2000-02-22"},{"SOURCE_ROW_NUMBER":"2068392","VIOLATION_NO":"7467063","VIOLATION_ISSUE_DT":"02/22/2000","SIG_SUB":"Y","PART_SECTION":"75.600-1","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"02/22/2000","PROPOSED_PENALTY":"104","AMOUNT_DUE":"104","AMOUNT_PAID":"104","CONTESTED_IND":"N","sourceDate":"2000-02-22"},{"SOURCE_ROW_NUMBER":"2068391","VIOLATION_NO":"7467062","VIOLATION_ISSUE_DT":"02/22/2000","SIG_SUB":"Y","PART_SECTION":"75.605","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"02/28/2000","PROPOSED_PENALTY":"104","AMOUNT_DUE":"104","AMOUNT_PAID":"104","CONTESTED_IND":"N","sourceDate":"2000-02-22"},{"SOURCE_ROW_NUMBER":"2068390","VIOLATION_NO":"7467061","VIOLATION_ISSUE_DT":"02/22/2000","SIG_SUB":"Y","PART_SECTION":"75.601-1","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"02/28/2000","PROPOSED_PENALTY":"104","AMOUNT_DUE":"104","AMOUNT_PAID":"104","CONTESTED_IND":"N","sourceDate":"2000-02-22"},{"SOURCE_ROW_NUMBER":"2068389","VIOLATION_NO":"7465800","VIOLATION_ISSUE_DT":"02/22/2000","SIG_SUB":"Y","PART_SECTION":"75.601-1","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"02/22/2000","PROPOSED_PENALTY":"104","AMOUNT_DUE":"104","AMOUNT_PAID":"104","CONTESTED_IND":"N","sourceDate":"2000-02-22"},{"SOURCE_ROW_NUMBER":"2068388","VIOLATION_NO":"7465799","VIOLATION_ISSUE_DT":"02/22/2000","SIG_SUB":"Y","PART_SECTION":"75.701","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"02/28/2000","PROPOSED_PENALTY":"104","AMOUNT_DUE":"104","AMOUNT_PAID":"104","CONTESTED_IND":"N","sourceDate":"2000-02-22"},{"SOURCE_ROW_NUMBER":"2068387","VIOLATION_NO":"7465754","VIOLATION_ISSUE_DT":"02/22/2000","SIG_SUB":"Y","PART_SECTION":"75.802(b)(2)","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"Permanent","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"02/28/2000","PROPOSED_PENALTY":"140","AMOUNT_DUE":"140","AMOUNT_PAID":"140","CONTESTED_IND":"N","sourceDate":"2000-02-22"},{"SOURCE_ROW_NUMBER":"2068386","VIOLATION_NO":"7465595","VIOLATION_ISSUE_DT":"02/14/2000","SIG_SUB":"Y","PART_SECTION":"75.523","CIT_ORD_SAFE":"Citation","LIKELIHOOD":"Reasonably","INJ_ILLNESS":"LostDays","NO_AFFECTED":"1","NEGLIGENCE":"ModNegligence","TERMINATION_DT":"02/28/2000","PROPOSED_PENALTY":"104","AMOUNT_DUE":"104","AMOUNT_PAID":"104","CONTESTED_IND":"N","sourceDate":"2000-02-14"}]}],"safety":{"href":"/api/v1/mines/4002966/safety","description":"Full-period safety series, top CFR sections and paginated activity. Requires PostgreSQL."},"silica":{"href":"/api/v1/mines/4002966/silica","description":"Dedicated silica records, measurements, sample status and trends. Defaults to the snapshot year; use year=all for history."},"externalContext":{"eia":null,"title30":{"snapshot":{"chapterCount":6,"featuredSectionCount":100,"latestAmendedOn":"2026-08-14","latestIssueDate":"2026-08-14","partCount":206,"sectionCount":5954,"upToDateAsOf":"2026-08-19"},"regulations":[{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 77.1109","heading":"Quantity and location of firefighting equipment.","id":"77.1109","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-L/section-77.1109","part":"77","partHeading":"PART 77—MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"L","subpartHeading":"Subpart L—Fire Protection","text":"Preparation plants, dryer plants, tipples, drawoff tunnels, shops, and other surface installations shall be equipped with the following firefighting equipment.\n\n(a) Each structure presenting a fire hazard shall be provided with portable fire extinguishers commensurate with the potential fire hazard at the structure in accordance with the recommendations of the National Fire Protection Association.\n\n(b) Preparation plants shall be equipped with waterlines, with outlet valves on each floor, and with sufficient fire hose to project a water stream to any point in the plant. However, where freezing conditions exist or water is not available, a 125-pound multipurpose dry powder extinguisher may be substituted for the purposes of this paragraph (b) for each 2,500 square feet of floor space in a wooden or other flammable structure, or for each 5,000 square feet of floor space in a metal, concrete-block, or other type of non-flammable construction.\n\n(c)(1) Mobile equipment, including trucks, front-end loaders, bulldozers, portable welding units, and augers, shall be equipped with at least one portable fire extinguisher.\n\n(2) Power shovels, draglines, and other large equipment shall be equipped with at least one portable fire extinguisher; however, additional fire extinguishers may be required by an authorized representative of the Secretary.\n\n(3) Auxiliary equipment such as portable drills, sweepers, and scrapers, when operated more than 600 feet from equipment required to have portable fire extinguishers, shall be equipped with at least one fire extinguisher.\n\n(d) Fire extinguishers shall be provided at permanent electrical installations commensurate with the potential fire hazard at such installation in accordance with the recommendations of the National Fire Protection Association.\n\n(e) Two portable fire extinguishers, or the equivalent, shall be provided at each of the following combustible liquid storage installations:\n\n(1) Near each above ground or unburied combustible liquid storage station; and,\n\n(2) Near the transfer pump of each buried combustible liquid storage tank.\n\n(f) Vehicles transporting explosives and blasting agents shall be equipped with fire protection as recommended in Code 495, section 20, National Fire Protection Association Handbook, 12th Edition, 1962.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 77.1605","heading":"Loading and haulage equipment; installations.","id":"77.1605","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-77/subpart-Q/section-77.1605","part":"77","partHeading":"PART 77—MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"Q","subpartHeading":"Subpart Q—Loading and Haulage","text":"(a) Cab windows shall be of safety glass or equivalent, in good condition and shall be kept clean.\n\n(b) Mobile equipment shall be equipped with adequate brakes, and all trucks and front-end loaders shall also be equipped with parking brakes.\n\n(c) Positive-action type brakes shall be provided on aerial tramways.\n\n(d) Mobile equipment shall be provided with audible warning devices. Lights shall be provided on both ends when required.\n\n(e) Guard nets or other suitable protection shall be provided where tramways pass over roadways, walkways, or buildings.\n\n(f) Guards shall be installed to prevent swaying buckets from hitting towers.\n\n(g) Aerial tramway cable connections shall be designed to offer minimum obstruction to the passage of wheels.\n\n(h) Rocker-bottom or bottom-dump cars shall be equipped with positive locking devices, or other suitable devices.\n\n(i) Ramps and dumps shall be of solid construction, of ample width, have ample clearance and headroom, and be kept reasonably free of spillage.\n\n(j) Chute-loading installations shall be designed so that the men pulling chutes are not required to be in a hazardous position during loading operations.\n\n(k) Berms or guards shall be provided on the outer bank of elevated roadways.\n\n(l) Berms, bumper blocks, safety hooks, or similar means shall be provided to prevent overtravel and overturning at dumping locations.\n\n(m) Roadbeds, rails, joints, switches, frogs, and other elements on railroads shall be designed, installed, and maintained in a safe manner consistent with the speed and type of haulage.\n\n(n) Where practicable, a minimum of 30 inches continuous clearance from the farthest projection of moving railroad equipment shall be provided on at least one side of the tracks; all places where it is not possible to provide 30-inch clearance shall be marked conspicuously.\n\n(o) Track guardrails, lead rails, and frogs shall be protected or blocked so as to prevent a person's foot from becoming wedged.\n\n(p) Positive-acting stop-blocks, derail devices, track skates, or other adequate means shall be installed wherever necessary to protect persons from runaway or moving railroad equipment.\n\n(q) Switch throws shall be installed so as to provide adequate clearance for switchmen.\n\n(r) Where necessary, bumper blocks or the equivalent shall be provided at all track dead ends.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.370","heading":"Mine ventilation plan; submission and approval.","id":"75.370","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.370","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a)(1) The operator shall develop and follow a ventilation plan approved by the district manager. The plan shall be designed to control methane and respirable dust and shall be suitable to the conditions and mining system at the mine. The ventilation plan shall consist of two parts, the plan content as prescribed in § 75.371 and the ventilation map with information as prescribed in § 75.372. Only that portion of the map which contains information required under § 75.371 will be subject to approval by the district manager.\n\n(2) The proposed ventilation plan and any revision to the plan shall be submitted in writing to the district manager. When revisions to a ventilation plan are proposed, only the revised pages, maps, or sketches of the plan need to be submitted. When required in writing by the district manager, the operator shall submit a fully revised plan by consolidating the plan and all revisions in an orderly manner and by deleting all outdated material.\n\n(3) (i) The mine operator shall notify the representative of miners at least 5 days prior to submission of a mine ventilation plan and any revision to a mine ventilation plan. If requested, the mine operator shall provide a copy to the representative of miners at the time of notification. In the event of a situation requiring immediate action on a plan revision, notification of the revision shall be given, and if requested, a copy of the revision shall be provided, to the representative of miners by the operator at the time of submittal;\n\n(ii) A copy of the proposed ventilation plan, and a copy of any proposed revision, submitted for approval shall be made available for inspection by the representative of miners; and\n\n(iii) A copy of the proposed ventilation plan, and a copy of any proposed revision, submitted for approval shall be posted on the mine bulletin board at the time of submittal. The proposed plan or proposed revision shall remain posted until it is approved, withdrawn or denied.\n\n(b) Following receipt of the proposed plan or proposed revision, the representative of miners may submit timely comments to the district manager, in writing, for consideration during the review process. A copy of these comments shall also be provided to the operator by the district manager upon request.\n\n(c) (1) The district manager will notify the operator in writing of the approval or denial of approval of a proposed ventilation plan or proposed revision. A copy of this notification will be sent to the representative of miners by the district manager.\n\n(2) If the district manager denies approval of a proposed plan or revision, the deficiencies of the plan or revision shall be specified in writing and the operator will be provided an opportunity to discuss the deficiencies with the district manager.\n\n(d) No proposed ventilation plan shall be implemented before it is approved by the district manager. Any intentional change to the ventilation system that alters the main air current or any split of the main air current in a manner that could materially affect the safety and health of the miners, or any change to the information required in § 75.371 shall be submitted to and approved by the district manager before implementation.\n\n(e) Before implementing an approved ventilation plan or a revision to a ventilation plan, persons affected by the revision shall be instructed by the operator in its provisions.\n\n(f) The approved ventilation plan and any revisions shall be—\n\n(1) Provided upon request to the representative of miners by the operator following notification of approval;\n\n(2) Made available for inspection by the representative of miners; and\n\n(3) Posted on the mine bulletin board within 1 working day following notification of approval. The approved plan and revisions shall remain posted on the bulletin board for the period that they are in effect.\n\n(g) The ventilation plan for each mine shall be reviewed every 6 months by an authorized representative of the Secretary to assure that it is suitable to current conditions in the mine.","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.362","heading":"On-shift examination.","id":"75.362","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-D/section-75.362","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"D","subpartHeading":"Subpart D—Ventilation","text":"(a)(1) At least once during each shift, or more often if necessary for safety, a certified person designated by the operator shall conduct an on-shift examination of each section where anyone is assigned to work during the shift and any area where mechanized mining equipment is being installed or removed during the shift. The certified person shall check for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (a)(3) of this section, test for methane and oxygen deficiency, and determine if the air is moving in its proper direction.\n\n(2) A person designated by the operator shall conduct an examination and record the results and the corrective actions taken to assure compliance with the respirable dust control parameters specified in the approved mine ventilation plan. In those instances when a shift change is accomplished without an interruption in production on a section, the examination shall be made anytime within 1 hour after the shift change. In those instances when there is an interruption in production during the shift change, the examination shall be made before production begins on a section. Deficiencies in dust controls shall be corrected before production begins or resumes. The examination shall include: Air quantities and velocities; water pressures and flow rates; excessive leakage in the water delivery system; water spray numbers and orientations; section ventilation and control device placement; roof bolting machine dust collector vacuum levels; scrubber air flow rate; work practices required by the ventilation plan; and any other dust suppression measures. Measurements of the air velocity and quantity, water pressure and flow rates are not required if continuous monitoring of these controls is used and indicates that the dust controls are functioning properly.\n\n(3) On-shift examinations shall include examinations to identify violations of the standards listed below:\n\n(i) §§ 75.202(a) and 75.220(a)(1)—roof control;\n\n(ii) §§ 75.333(h) and 75.370(a)(1)—ventilation, methane;\n\n(iii) §§ 75.400 and 75.403—accumulations of combustible materials and application of rock dust;\n\n(iv) § 75.1403—other safeguards, limited to maintenance of travelways along belt conveyors, off track haulage roadways, and track haulage, track switches, and other components for haulage;\n\n(v) § 75.1722(a)—guarding moving machine parts; and\n\n(vi) § 75.1731(a)—maintenance of belt conveyor components.\n\n(b) During each shift that coal is produced, a certified person shall examine for hazardous conditions and violations of the mandatory health or safety standards referenced in paragraph (a)(3) of this section along each belt conveyor haulageway where a belt conveyor is operated. This examination may be conducted at the same time as the preshift examination of belt conveyors and belt conveyor haulageways, if the examination is conducted within 3 hours before the oncoming shift.\n\n(c) Persons conducting the on-shift examination shall determine at the following locations:\n\n(1) The volume of air in the last open crosscut of each set of entries or rooms on each section and areas where mechanized mining equipment is being installed or removed. The last open crosscut is the crosscut in the line of pillars containing the permanent stoppings that separate the intake air courses and the return air courses.\n\n(2) The volume of air on a longwall or shortwall, including areas where longwall or shortwall equipment is being installed or removed, in the intake entry or entries at the intake end of the longwall or shortwall.\n\n(3) The velocity of air at each end of the longwall or shortwall face at the locations specified in the approved ventilation plan.\n\n(4) The volume of air at the intake end of any pillar line—\n\n(i) Where a single split of air is used in the intake entry furthest from the return air course immediately outby the first open crosscut outby the line of pillars being mined; or\n\n(ii) Where a split system is used in the intake entries of each split immediately inby the split point.\n\n(d) (1) A qualified person shall make tests for methane—\n\n(i) At the start of each shift at each working place before electrically operated equipment is energized; and\n\n(ii) Immediately before equipment is energized, taken into, or operated in a working place; and\n\n(iii) At 20-minute intervals, or more often if required in the approved ventilation plan at specific locations, during the operation of equipment in the working place.\n\n(2) Except as provided for in paragraph (d)(3) of this section, these methane tests shall be made at the face from under permanent roof support, using extendable probes or other acceptable means. When longwall or shortwall mining systems are used, these methane tests shall be made at the shearer, the plow, or the cutting head. When mining has been stopped for more than 20 minutes, methane tests shall be conducted prior to the start up of equipment.\n\n(3) As an alternative method of compliance with paragraph (d)(2) of this section during roof bolting, methane tests may be made by sweeping an area not less than 16 feet inby the last area of permanently supported roof, using a probe or other acceptable means. This method of testing is conditioned on meeting the following requirements:\n\n(i) The roof bolting machine must be equipped with an integral automated temporary roof support (ATRS) system that meets the requirements of 30 CFR 75.209.\n\n(ii) The roof bolting machine must have a permanently mounted, MSHA-approved methane monitor which meets the maintenance and calibration requirements of 30 CFR 75.342(a)(4), the warning signal requirements of 30 CFR 75.342(b), and the automatic de-energization requirements of 30 CFR 75.342(c).\n\n(iii) The methane monitor sensor must be mounted near the inby end and within 18 inches of the longitudinal center of the ATRS support, and positioned at least 12 inches from the roof when the ATRS is fully deployed.\n\n(iv) Manual methane tests must be made at intervals not exceeding 20 minutes. The test may be made either from under permanent roof support or from the roof bolter's work position protected by the deployed ATRS.\n\n(v) Once a methane test is made at the face, all subsequent methane tests in the same area of unsupported roof must also be made at the face, from under permanent roof support, using extendable probes or other acceptable means at intervals not exceeding 20 minutes.\n\n(vi) The district manager may require that the ventilation plan include the minimum air quantity and the position and placement of ventilation controls to be maintained during roof bolting.\n\n(e) If auxiliary fans and tubing are used, they shall be inspected frequently.\n\n(f) During each shift that coal is produced and at intervals not exceeding 4 hours, tests for methane shall be made by a certified person or by an atmospheric monitoring system (AMS) in each return split of air from each working section between the last working place, or longwall or shortwall face, ventilated by that split of air and the junction of the return air split with another air split, seal, or worked-out area. If auxiliary fans and tubing are used, the tests shall be made at a location outby the auxiliary fan discharge.\n\n(g) Certification. (1) The person conducting the on-shift examination in belt haulage entries shall certify by initials, date, and time that the examination was made. The certified person shall certify by initials, date, and the time at enough locations to show that the entire area has been examined.\n\n(2) The certified person directing the on-shift examination to assure compliance with the respirable dust control parameters specified in the approved mine ventilation plan shall:\n\n(i) Certify by initials, date, and time on a board maintained at the section load-out or similar location showing that the examination was made prior to resuming production; and\n\n(ii) Verify, by initials and date, the record of the results of the examination required under (a)(2) of this section to assure compliance with the respirable dust control parameters specified in the mine ventilation plan. The verification shall be made no later than the end of the shift for which the examination was made.\n\n(3) The mine foreman or equivalent mine official shall countersign each examination record required under (a)(2) of this section after it is verified by the certified person under (g)(2)(ii) of this section, and no later than the end of the mine foreman's or equivalent mine official's next regularly scheduled working shift. The record shall be made in a secure book that is not susceptible to alteration or electronically in a computer system so as to be secure and not susceptible to alteration.\n\n(4) Records shall be retained at a surface location at the mine for at least 1 year and shall be made available for inspection by authorized representatives of the Secretary and the representative of miners.\n\n[61 FR 9829, Mar. 11, 1996; 61 FR 26442, May 28, 1996, as amended at 68 FR 40138, July 7, 2003; 77 FR 20715, Apr. 6, 2012; 79 FR 24987, May 1, 2014]","occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.601-1","heading":"Short circuit protection; ratings and settings of circuit breakers.","id":"75.601-1","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-G/section-75.601-1","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"G","subpartHeading":"Subpart G—Trailing Cables","text":"Circuit breakers providing short circuit protection for trailing cables shall be set so as not to exceed the maximum allowable instantaneous settings specified in this section; however, higher settings may be permitted by an authorized representative of the Secretary when he has determined that special applications are justified:\n\nConductor size AWG or MGM Maximum allowable circuit breaker instantaneous setting (amperes) 14 50 12 75 10 150 8 200 6 300 4 500 3 600 2 800 1 1,000 1/0 1,250 2/0 1,500 3/0 2,000 4/0 2,500 250 2,500 300 2,500 350 2,500 400 2,500 450 2,500 500 2,500","occurrenceCount":3},{"chapter":"I","heading":"Approved cables; flame resistance.","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-G/section-75.600-1","part":"75","subchapter":"O","subpart":"G","id":"75.600-1","citation":"30 CFR 75.600-1","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subpartHeading":"","text":null,"occurrenceCount":1},{"chapter":"I","heading":"Clamping of trailing cables to equipment.","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-G/section-75.605","part":"75","subchapter":"O","subpart":"G","id":"75.605","citation":"30 CFR 75.605","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subpartHeading":"","text":null,"occurrenceCount":1},{"chapter":"I","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","citation":"30 CFR 75.701","heading":"Grounding metallic frames, casings, and other enclosures of electric equipment.","id":"75.701","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-H/section-75.701","part":"75","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subchapter":"O","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","subpart":"H","subpartHeading":"Subpart H—Grounding","text":"[Statutory Provisions]\n\nMetallic frames, casings, and other enclosures of electric equipment that can become “alive” through failure of insulation or by contact with energized parts shall be grounded by methods approved by an authorized representative of the Secretary.","occurrenceCount":1},{"chapter":"I","heading":"Protection of high-voltage circuits extending underground.","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-I/section-75.802","part":"75","subchapter":"O","subpart":"I","id":"75.802","citation":"30 CFR 75.802","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subpartHeading":"","text":null,"occurrenceCount":1},{"chapter":"I","heading":"Electric face equipment; deenergization.","officialUrl":"https://www.ecfr.gov/current/title-30/chapter-I/subchapter-O/part-75/subpart-F/section-75.523","part":"75","subchapter":"O","subpart":"F","id":"75.523","citation":"30 CFR 75.523","chapterHeading":"CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","subchapterHeading":"SUBCHAPTER O—COAL MINE SAFETY AND HEALTH","partHeading":"PART 75—MANDATORY SAFETY STANDARDS—UNDERGROUND COAL MINES","subpartHeading":"","text":null,"occurrenceCount":1}],"fullCorpus":"/data/title30-sections.json"}}},"meta":{"representation":"json","mineId":"4002966","dataSource":"postgres","snapshotId":"2026-10-13T11:19:05.459773+00:00","completedAt":"2026-10-13T11:26:59.401Z","sourceCount":20,"totalRows":17906804}}